This document contains a federal contract opportunity for the procurement of a new crane barge. The U.S. Army Corps of Engineers Marine Design Center is seeking bids for the fabrication and delivery of one crane barge to replace an existing vessel operating out of the Sault Ste Marie Area office for the Detroit District. The new barge must be built and classed to ABS standards for Maltese Cross A-1 Steel Barge and Great Lakes Service. Dimensions include a length of 150 feet, beam of 50 feet, depth of 10 feet, and design waterline of 5 feet. The contractor will be responsible for fabrication and delivery to the St. Mary's Falls Canal in Sault Sainte Marie, Michigan. Liquidated damages and bonding requirements apply to this procurement. Bids are due by August 29th at 10:00am EDT and are to be emailed to the specified Army Corps contact.

View the file

Other files

File Type Posted
Audited Abstract W912BU22B0018 New Crane Barge (Harvey Replacement).pdf PDF
W912BU22B0018 Amendment 3.pdf PDF
W912BU22B0018 Amendment 1 SF30.pdf PDF
Amendment 2 TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22 (Redlined for Amendment).pdf PDF
W912BU22B0018 Amendment 2.pdf PDF
Amendment 2 Q and A.pdf PDF
866-B155-02_Rev 2_DAMAGE STABILITY ANALYSIS_10-12-21.pdf PDF
866-B710-01_REV 1_AC LOAD ANALYSIS_07-05-21.pdf PDF
Amendment 1 - Q and A.pdf PDF
866-B677-02_Rev 0_FIXED CO2 SYSTEM CALCULATIONS_02-11-22.pdf PDF
611-D460-02 Communications Mark.pdf PDF
866-B155-01_Rev 2_INTACT STABILITY ANALYSIS_10-12-21.pdf PDF
866-B725-01_Rev 1_AC VOLTAGE DROP CALCULATIONS_07-01-21.pdf PDF
866-B522-02_Rev 4_SPUD HANDLING SYSTEM ARRANGEMENT_07-08-22.pdf PDF
T1716010 KEEN Stability Letter - signed with Load Charts_106379386.pdf PDF
866-B330-07_Rev 1_BOOM REST DESIGN CALCULATIONS_02-28-22.pdf PDF
866-B685-01_REV 3_HEATING AND VENTILATION SYSTEM CALCULATIONS_04-26-22.pdf PDF
866-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE.pdf PDF
W912BU22B0018 Amendment 1.pdf PDF
866-B601-01 PIPE MARKING GUIDE.pdf PDF
866-B105-01_Rev 0_HULL LINES AND OFFSETS.pdf PDF
866-B330-04_Rev 2_CRANE TRACKING AREA.pdf PDF
866-B552_01_Rev 3_SPUD WELL STRUCTURAL ARRANGEMENT.pdf PDF
866-B309-01 Rev 6 TRANSVERSE STRUCTURE.pdf PDF
866-B410-02_Rev 2_TOW KNEES RUB RAILS AND FENDERS.pdf PDF
866-B670-01_Rev 3_FILLS VENTS AND SOUNDS.pdf PDF
TAI 1240_866-B130-01_Rev 2_TANK CAPACITY PLAN REPORT_06-02-22.pdf PDF
866-B667-01_REV 1_SANITARY AND BLACK WATER SYSTEM.pdf PDF
866-B730-01_Rev 1_LIGHTING PLAN.pdf PDF
866-B307-01 Rev 6 DECK AND BOTTOM PLATING.pdf PDF
866-B307-02_Rev 3_SHELL PLATING.pdf PDF
866-B730-02_Rev 1_RECEPTACLE PLAN.pdf PDF
866-B330-06_Rev 1_BOOM REST.pdf PDF
866-B436-01_Rev 1_INSULATION AND SHEATHING.pdf PDF
866-B720-01_REV 3_AC and DC ONE-LINE.pdf PDF
866-B215-01_Rev 3_GENERAL ARRANGEMENT.pdf PDF
866-B325-01_Rev 2_SEA CHEST DETAILS.pdf PDF
866-B685-02_Rev 4_HEATING AND VENTILATION SYSTEM DRAWING.pdf PDF
866-B635-01_Rev 2_LUBE OIL STORAGE ARRANGEMENT.pdf PDF
866-B405-01_REV 2_CATHODIC PROTECTION.pdf PDF
866-B130-02_Rev 3_TANK ARRANGEMENT.pdf PDF
866-B420-01_Rev 2_DECK FITTINGS ARRANGEMENT.pdf PDF
866-B650-01_Rev 1_ENGINE EXHAUST SYSTEM.pdf PDF
TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22.pdf PDF
866-B330-02_Rev 2_MACHINERY AND WINCH FOUNDATION.pdf PDF
866-B550-01_Rev 2_SPUD STRUCTURAL ARRANGEMENT_02-04-22.pdf PDF
TAI 1240_866-B115-01_Rev 4_WEIGHT ESTIMATE_06-08-22.pdf PDF
866-B330-03_Rev 1_MACHINERY AND WINCH FOUNDATIONS CALCULATIONS pdf.pdf PDF
866-B690-01_Rev 1_COMPRESSED AIR SYSTEM.pdf PDF
866-B730-03_Rev 0_SHORE POWER ARRANGEMENT.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proj No.

TAI-1240

Date:

04-08-2021

For Steel and Aluminum boat hulls (or under water structures), the following formula can be used to calculate the total weight (in pounds) of sacrificial anodes required.

1.0

8727.15 Sq. ft.

Wetted Surface Area Calculated from Emperical Formula 6375 Sq. ft.

2.0

Wetted surface area considered for Anode Calculation 8727.15 Sq. ft.

Current Density (From Standards for fully Displacement hulls) 2 mA/sq.ft Anode Material considered Aluminum Energy Content (amp-hours per pound for Aluminum anodes) 1200 A-H/lb Immersion hours per year 8760 hours Number of years of life needed for Anodes 5 years Total number of Immersion hours 43800 hours

TOTAL ANODES WEIGHT (lbs) - Calculated 637.082 lbs

REF: Prep By DG Chk By SP App By -

Immersion Hours

PROJECT TITLE:

CELRE CRANE BARGE HARVEY REPLACEMENT

SUBJECT:

ANODE WEIGHT CALCULATION

Estimated Wetted Surface Area of Boat Hulls:

ANODE WEIGHT CALCULATION FORMULA :

Anode Weight (lbs) = ((wetted surface area) x (current density) x (immersion)) / ((energy content) x (1000mA/Amp))

TECHNICAL INFORMATION

Wetted surface area (Sq. ft.)

1.5-5.0 for painted Steel hull/structure 0.2-3.0 for painted Aluminum hull/structure

Current Density (mA per sq.ft)

0.50 LWL x (Beam + Draft) for light-displacement vessels

ANODE SIZING CALCULATION

Number of hours in water per replacement interval (8766 hours per year)

Actual or Estimated Wetted surface area of metal

368 for Mil-Spec zinc anodes 1200 for Mil-Spec aluminum anodes

Energy Content (amp-hours per pound)

0.75LWL x (Beam + Draft) for medium displacement vessels

1.0 LWL x (Beam + Draft) for full hull displacement vessels

(motor yachts and sail boats)

Wetted Surface Area Estimated from AutoCAD drawing for 5'- 6" Draft

TECHNOLOGY ASSOCIATES INC. TAI 1240

Weight of each Anode (from MIL-SPEC-MIL-A24779) (AHS-20) 16.7 lbs No. of anodes required 38.14862 Nos No. of Anodes can be provided 44 Nos

REF: Prep By DG Chk By SP App By -

Conclusion: 1. Install 44 (Forty Four) Aluminum anodes each having 16.7 lb weight.

TECHNOLOGY ASSOCIATES INC. TAI 1240