About this file

This document contains calculations for the fixed CO2 fire suppression system for a new crane barge procurement opportunity. The opportunity is an Invitation for Bid issued by the USACE Marine Design Center on behalf of the Detroit District for the procurement of one new 150-foot by 50-foot by 10-foot deep steel crane barge with a 5-foot design waterline and 4-inch camber. The barge must be built to ABS Maltese Cross A-1 classification and meet applicable stability requirements. Delivery of the completed barge is required to the St. Mary's Falls Canal in Sault Sainte Marie, Michigan, with liquidated damages associated with the procurement and bonding requirements included. Bids for the crane barge are due by August 29th at 10:00am EDT via email to the address provided. The attached calculations determine the necessary CO2 volumes and weights required to protect the machinery room, generator room, engine room, and boiler room based on their dimensions and in accordance with cited regulations.

View the file

Other files for this federal contract opportunity

Other files attached to New Crane Barge, newest first.
File Type Posted
Audited Abstract W912BU22B0018 New Crane Barge (Harvey Replacement).pdf PDF
Amendment 2 Q and A.pdf PDF
Amendment 2 TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22 (Redlined for Amendment).pdf PDF
Amendment 1 - Q and A.pdf PDF
866-B155-02_Rev 2_DAMAGE STABILITY ANALYSIS_10-12-21.pdf PDF
866-B710-01_REV 1_AC LOAD ANALYSIS_07-05-21.pdf PDF
866-B725-01_Rev 1_AC VOLTAGE DROP CALCULATIONS_07-01-21.pdf PDF
866-B405-02 _Rev 0_CATHODIC PROTECTION CALCULATION _04-15-2021.pdf PDF
TAI 1240_866-B115-01_Rev 4_WEIGHT ESTIMATE_06-08-22.pdf PDF
866-B215-01_Rev 3_GENERAL ARRANGEMENT.pdf PDF
866-B330-02_Rev 2_MACHINERY AND WINCH FOUNDATION.pdf PDF
866-B311-01 Rev 6 LONGITUDINAL STRUCTURE.pdf PDF
866-B307-01 Rev 6 DECK AND BOTTOM PLATING.pdf PDF
866-B330-06_Rev 1_BOOM REST.pdf PDF
866-B315-01_Rev 3_DECKHOUSE STRUCTURE.pdf PDF
866-B307-02_Rev 3_SHELL PLATING.pdf PDF
866-B325-01_Rev 2_SEA CHEST DETAILS.pdf PDF
866-B436-01_Rev 1_INSULATION AND SHEATHING.pdf PDF
866-B410-01 Rev 5 SKEG STRUCTURE.pdf PDF
866-B550-01_Rev 2_SPUD STRUCTURAL ARRANGEMENT_02-04-22.pdf PDF
TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22.pdf PDF
866-B650-01_Rev 1_ENGINE EXHAUST SYSTEM.pdf PDF
866-B665-01_Rev 1_POTABLE WATER SYSTEM.pdf PDF
866-B720-01_REV 3_AC and DC ONE-LINE.pdf PDF
866-B730-02_Rev 1_RECEPTACLE PLAN.pdf PDF
866-B730-03_Rev 0_SHORE POWER ARRANGEMENT.pdf PDF
W912BU22B0018.pdf PDF
866-B170-01_Rev 1_DRY DOCKING PLAN.pdf PDF
866-B105-01_Rev 0_HULL LINES AND OFFSETS.pdf PDF
866-B309-01 Rev 6 TRANSVERSE STRUCTURE.pdf PDF
866-B307-03 Rev 5 RAKE STRUCTURE.pdf PDF
866-B330-03_Rev 1_MACHINERY AND WINCH FOUNDATIONS CALCULATIONS pdf.pdf PDF
866-B552_01_Rev 3_SPUD WELL STRUCTURAL ARRANGEMENT.pdf PDF
866-B685-02_Rev 4_HEATING AND VENTILATION SYSTEM DRAWING.pdf PDF
866-B677-01_Rev 2_FIXED FIRE EXTINGUISHING SYSTEM.pdf PDF
866-B640-01_Rev 2_ENGINE COOLING SYSTEM.pdf PDF
866-B630-01_Rev 2_FUEL OIL SYSTEM ARRANGEMENT.pdf PDF
866-B635-01_Rev 2_LUBE OIL STORAGE ARRANGEMENT.pdf PDF
866-B637-01_Rev 2_WASTE OIL SYSTEM.pdf PDF
866-B690-01_Rev 1_COMPRESSED AIR SYSTEM.pdf PDF
866-B660-03_Rev 2_DECK WASHDOWN SYSTEM.pdf PDF
TAI 1240_866-B130-01_Rev 2_TANK CAPACITY PLAN REPORT_06-02-22.pdf PDF
866-B130-02_Rev 3_TANK ARRANGEMENT.pdf PDF
866-B410-02_Rev 2_TOW KNEES RUB RAILS AND FENDERS.pdf PDF
866-B420-01_Rev 2_DECK FITTINGS ARRANGEMENT.pdf PDF
866-B427-01_Rev 2_LADDER ARRANGEMENT.pdf PDF
866-B470-01_Rev 2_TRANSDUCER WELL DETAILS.pdf PDF
866-B405-01_REV 2_CATHODIC PROTECTION.pdf PDF
866-B670-01_Rev 3_FILLS VENTS AND SOUNDS.pdf PDF
866-B660-02_Rev 2_BILGE AND BALLAST SYSTEM.pdf PDF
Show all 50

New Crane Barge has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAI ENGINEERS, LLC

Fixed CO2 System Calculations

REPORT # 866-B677-02

(MDC 3265 CRANE BARGE)

TAI PROJECT NO. 1240

Rev. 0

02/11/22

This drawing, design, concept, and specification are the intellectual property of

TECHNOLOGY ASSOCIATES, INC.

THE GOVERNMENT'S RIGHTS TO USE, MODIFY REPRODUCE, RELEASE, PERFORM, DISPLAY, OR DISCLOSE THESE

TECHNICAL DATA ARE RESTRICTED ACCORDING TO DFARS 252.227-7017 (12) AND DFARS 252.227-7017 (13). NO

RIGHTS TO REPRODUCE FROM THIS DESIGN HAVE BEEN GRANTED. ANY REPRODUCTION OF TECHNICAL DATA OR

PORTIONS THEREOF MUST ALSO REPRODUCE ALL MARKINGS ON THIS DOCUMENT INCLUDING THIS LEGEND.

THESE LIMITED GOVERNMENT PURPOSE RIGHTS ARE VALID TILL DECEMBER, 31, 2035.

TAI Engineers, LLC TAI 1240

Machinery Room Volume

Machinery Room Volume = ft3

Required CO2 Volume = ft3 (Ref.#1, 4-7-3/3.3.2(i))

CO2 Specific Volume = ft3/lb

Required Weight of CO2 = lb (Ref.#1, 4-7-3/3.3.3)

Required Weight of CO2 = lb (USCG)

Generator Room

Engine Room Volume = ft3

Air Receiver Volume = gal at 100 psi

= ft3

Total Air Volume in the Room = ft3

Required CO2 Volume = ft3 (Ref.#1, 4-7-3/3.3.2(i))

CO2 Specific Volume = ft3/lb

Required Weight of CO2 = lb (Ref.#1, 4-7-3/3.3.2(i))

Required Weight of CO2 = lb (USCG)

Boiler Room

Boiler Room Volume = ft3

Required CO2 Volume = ft3 (Ref.#1, 4-7-3/3.3.2(i))

CO2 Specific Volume = ft3/lb

3840.00

1080.00

4966.52

3840.00

1126.52

221.5

248.3

4320.0

1728.0

9.0

192.6

216.0

1986.6

9.0

Project Title:

TAI 1240 CRANE BARGE

Subject:

FIXED CO2 SYSTEM CALCULATIONS

Proj. no:

TAI 1240

Date:

02-04-22

9.0

1536.0

TAI Engineers, LLC TAI 1240

Project Title:

TAI 1240 CRANE BARGE

Subject:

FIXED CO2 SYSTEM CALCULATIONS

Proj. no:

TAI 1240

Date:

02-04-22

Required Weight of CO2 = lb (Ref.#1, 4-7-3/3.3.2(i))

Required Weight of CO2 = lb (USCG)192.0

171.2

Ref:

1. MVR_Part_4_July20.pdf

File details come from the government source that posted it. Updated .