Audited Abstract W912BU22B0018 New Crane Barge (Harvey Replacement).pdf
PDF 514 KB Posted
- Attached to
- New Crane Barge
- Solicitation number
- W912BU22B0018
About this file
This document contains an invitation for bid for the procurement of a new crane barge to replace an existing vessel operated by the U.S. Army Corps of Engineers Detroit District. The IFB specifies requirements for a 150 foot by 50 foot steel barge with a 10 foot depth and 4 inch camber. The barge must be built and classed by the American Bureau of Shipping to standards for Great Lakes service and meet intact stability criteria. The contractor will be responsible for fabricating and delivering the completed barge to the St. Mary's Falls Canal in Sault Sainte Marie, Michigan. Liquidated damages will apply and the bid requires payment, performance, and bid guarantee bonding. Bids are due by August 29th at 10:00am EDT and are to be emailed to the specified Corps of Engineers contact. The IFB provides the specifications and terms for a new crane barge to support operations of the U.S. Army Corps of Engineers Detroit District.
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendments|Bid Bond 3 $3 Mil 3 20% 3 $3 Mil% Item
Number Description Qty Unit Price Extension Price Extension Price Extension
0001AA Planning and Scheduling 1 JOB 100,000.00$ 100,000.00$ 148,690.00$ 148,690.00$ 159,800.00$ 159,800.00$ 0001AB Engineering 1 JOB 386,400.00$ 386,400.00$ 564,106.00$ 564,106.00$ 422,400.00$ 422,400.00$ 0001AC Construction & Testing 1 JOB 9,630,459.11$ 9,630,459.11$ 11,040,785.00$ 11,040,785.00$ 15,654,400.00$ 15,654,400.00$
Base Total 10,116,859.11$ 10,116,859.11$ 11,753,581.00$ 16,236,600.00$ 0001AD Delivery (Option 1) 1 JOB 550,000.00$ 550,000.00$ 218,580.00$ 218,580.00$ 588,400.00$ 588,400.00$ 0001AE TWO SPUDS (Option 2) 1 JOB 154,000.00$ 154,000.00$ 185,405.00$ 185,405.00$ 422,700.00$ 422,700.00$ 0001AF TWO SPUDS (Option 3) 1 JOB 154,000.00$ 154,000.00$ 185,405.00$ 185,405.00$ 422,700.00$ 422,700.00$ 0001AG Timbers for Dunnage (Option 4) 1 JOB 330,000.00$ 330,000.00$ 77,188.00$ 77,188.00$ 181,300.00$ 181,300.00$ 0001AH Furnishings (Option 5) 1 JOB 141,460.00$ 141,460.00$ 105,588.00$ 105,588.00$ 129,300.00$ 129,300.00$
0001 Total CLIN 0001 1 11,446,319.11$ 12,525,747.00$ 17,981,000.00$
Totals Totals Entered from Contractor's Bid Sheet 11,446,319.11$ 12,525,748.00$ 17,981,000.00$ Certified by:
Robert W. Hutcheon, Jr.
Contracting Officer
New Crane Barge - IFB W912BU22B0018 - Date Issued: 07/29/2022 Date Opened 09/08/2022 Southwest Shipyard Sterling Shipyard Conrad Shipyard
| 2022-09-09T13:16:31-0400 | |
| HUTCHEON.ROBERT.W.JR.1391063210 |
File details come from the government source that posted it. Updated .