T1716010 KEEN Stability Letter - signed with Load Charts_106379386.pdf

PDF 3 MB Posted

Attached to
New Crane Barge
Solicitation number
W912BU22B0018
Issued by

About this file

This document provides details on a solicitation for a new crane barge for the U.S. Army Corps of Engineers. The solicitation requests bids for the fabrication and delivery of one new crane barge to replace an existing barge operated by the Detroit District at the Sault Ste Marie Area office. The new barge must be built and classed by the American Bureau of Shipping to standards for a Maltese Cross A-1 Steel Barge intended for Great Lakes service, with an intact stability satisfying specified regulations. Dimensions of the hull are specified as 150 feet length, 50 feet beam, 10 feet depth at sides, and 5 feet design waterline with 4 inches of camber. The contractor will be required to fabricate and deliver the completed barge. Delivery and acceptance of the barge will take place at the St. Mary's Falls Canal in Sault Sainte Marie, Michigan, with liquidated damages associated with the procurement. Bids are due by August 29th at 10:00am EDT and must be submitted by email, with bid guarantee, payment and performance bonding required.

View the file

Other files

File Type Posted
Audited Abstract W912BU22B0018 New Crane Barge (Harvey Replacement).pdf PDF
W912BU22B0018 Amendment 3.pdf PDF
W912BU22B0018 Amendment 1 SF30.pdf PDF
Amendment 2 TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22 (Redlined for Amendment).pdf PDF
W912BU22B0018 Amendment 2.pdf PDF
Amendment 2 Q and A.pdf PDF
866-B155-02_Rev 2_DAMAGE STABILITY ANALYSIS_10-12-21.pdf PDF
866-B710-01_REV 1_AC LOAD ANALYSIS_07-05-21.pdf PDF
Amendment 1 - Q and A.pdf PDF
866-B677-02_Rev 0_FIXED CO2 SYSTEM CALCULATIONS_02-11-22.pdf PDF
611-D460-02 Communications Mark.pdf PDF
866-B405-02 _Rev 0_CATHODIC PROTECTION CALCULATION _04-15-2021.pdf PDF
866-B155-01_Rev 2_INTACT STABILITY ANALYSIS_10-12-21.pdf PDF
866-B725-01_Rev 1_AC VOLTAGE DROP CALCULATIONS_07-01-21.pdf PDF
866-B522-02_Rev 4_SPUD HANDLING SYSTEM ARRANGEMENT_07-08-22.pdf PDF
866-B330-07_Rev 1_BOOM REST DESIGN CALCULATIONS_02-28-22.pdf PDF
866-B685-01_REV 3_HEATING AND VENTILATION SYSTEM CALCULATIONS_04-26-22.pdf PDF
866-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE.pdf PDF
W912BU22B0018 Amendment 1.pdf PDF
866-B601-01 PIPE MARKING GUIDE.pdf PDF
866-B105-01_Rev 0_HULL LINES AND OFFSETS.pdf PDF
866-B330-04_Rev 2_CRANE TRACKING AREA.pdf PDF
866-B552_01_Rev 3_SPUD WELL STRUCTURAL ARRANGEMENT.pdf PDF
866-B309-01 Rev 6 TRANSVERSE STRUCTURE.pdf PDF
866-B410-02_Rev 2_TOW KNEES RUB RAILS AND FENDERS.pdf PDF
866-B670-01_Rev 3_FILLS VENTS AND SOUNDS.pdf PDF
TAI 1240_866-B130-01_Rev 2_TANK CAPACITY PLAN REPORT_06-02-22.pdf PDF
866-B667-01_REV 1_SANITARY AND BLACK WATER SYSTEM.pdf PDF
866-B730-01_Rev 1_LIGHTING PLAN.pdf PDF
866-B307-01 Rev 6 DECK AND BOTTOM PLATING.pdf PDF
866-B307-02_Rev 3_SHELL PLATING.pdf PDF
866-B730-02_Rev 1_RECEPTACLE PLAN.pdf PDF
866-B330-06_Rev 1_BOOM REST.pdf PDF
866-B436-01_Rev 1_INSULATION AND SHEATHING.pdf PDF
866-B720-01_REV 3_AC and DC ONE-LINE.pdf PDF
866-B215-01_Rev 3_GENERAL ARRANGEMENT.pdf PDF
866-B325-01_Rev 2_SEA CHEST DETAILS.pdf PDF
866-B685-02_Rev 4_HEATING AND VENTILATION SYSTEM DRAWING.pdf PDF
866-B635-01_Rev 2_LUBE OIL STORAGE ARRANGEMENT.pdf PDF
866-B405-01_REV 2_CATHODIC PROTECTION.pdf PDF
866-B130-02_Rev 3_TANK ARRANGEMENT.pdf PDF
866-B420-01_Rev 2_DECK FITTINGS ARRANGEMENT.pdf PDF
866-B650-01_Rev 1_ENGINE EXHAUST SYSTEM.pdf PDF
TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22.pdf PDF
866-B330-02_Rev 2_MACHINERY AND WINCH FOUNDATION.pdf PDF
866-B550-01_Rev 2_SPUD STRUCTURAL ARRANGEMENT_02-04-22.pdf PDF
TAI 1240_866-B115-01_Rev 4_WEIGHT ESTIMATE_06-08-22.pdf PDF
866-B330-03_Rev 1_MACHINERY AND WINCH FOUNDATIONS CALCULATIONS pdf.pdf PDF
866-B690-01_Rev 1_COMPRESSED AIR SYSTEM.pdf PDF
866-B730-03_Rev 0_SHORE POWER ARRANGEMENT.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS Plaza, 1 6855 Northchase Drive | Houston, TX 77060 USA TEL: 1 -281 -877-6000 | FAX: 1 -281 -877-6001 | Email: ABS-WorldHQ@eagle.org | www.eagle.org

Stability Letter 29 March 2018

Master, �KEEN� ON: 1279883 Conrad Industries, Hull C-1166 102.53� (LOA) x 42.65� x 8�-6� Deck Crane Barge [I]

You are responsible for maintaining this barge in a satisfactory stability condition at all times and for following the instructions and precautions listed below. All log entries required by 46 CFR 97.35 shall be made prior to getting underway for each voyage.

An inclining experiment witnessed by ABS Americas on behalf of the U.S. Coast Guard was conducted on the �KEEN�, U.S. ON 1279883 at Conrad Industries, in Amelia, Louisiana on 20 November 2017. On the basis of this inclining experiment, stability calculations have been performed.

Results indicate that the stability of the �KEEN�, as presently outfitted and equipped, is satisfactory for operation on River Service only, provided that the following restrictions are observed.

OPERATING RESTRICTIONS

1. ROUTE: Operations are limited to rivers, lakes, bays, sounds and great lakes summer service only. Since the barge�s route is based upon other considerations in addition to stability, you are cautioned that the route may be further limited to that specified on the Certificate of Inspection.

2. DRAFT AND TRIM: A minimum freeboard of 4 feet 2-3/4 inches measured from the main deck amidships must be maintained. This corresponds to a maximum molded draft of 4 feet 3- 3/4 inches (4 feet 4-1/8 inches extreme). Trim and heel should be minimized.

3. DECK CARGO: Deck cargo shall not exceed 22.25 LT at 11.13�above baseline.

4. TANKS:

a. No more than one centerline or P/S pair of the tanks may be partially filled at one time.

b. Any cross connections between port and starboard tank pairs shall be kept closed at all times when underway.

5. HULL OPENINGS: Any openings that could allow water to enter into the hull or superstructure should be kept closed during lifting or when rough weather or river conditions exist or are anticipated.

6. LIFTING OPERATIONS:

a. Lifting is permitted only on River Service.

b. The wind speed shall not exceed 40 mph during lifting operations

c. The capacities shown on the attached Crane Load Charts, bearing ABS Americas approval stamp dated 29 March 2018, shall not be exceeded. Legible copies of these charts must be maintained in the crane operator�s control stations in clear sight of the

Electronically published by ABS Houston.

Reference T1716010, dated 29-MAR-2018.

http://www.eagle.org

�KEEN�

Conrad Industies., Hull C-1166

ON 1279883

29 March 2018

Page: 2 of 3 operator. Any further manufacturer restrictions regarding wind, dynamic loading, machine list, machine trim and heel pin angle shall be followed.

d. Only one crane shall be operated during lifting operations.

e. Prior to lifting, operator shall ensure that the crane is in accordance with the following Ready-To-Lift conditions:

a. Maintenance Crane Lifting Operations � Ready-To-Lift Condition

1) With the Maintenance Crane positioned on centerline, facing aft with 0° boom elevation, the �READY-TO-LIFT� condition of the barge shall be:

i) Vessel List: Not to exceed 0.20° to Port or Starboard

ii) Vessel Trim: Not to exceed 0.20° Forward or Aft

iii) Draft: Not to exceed 4�-6� @ Fwd Node Draft Marks (9�-6� Fwd FR 0)

2) The operators shall make adjustments to the Wicket Crane position to place the barge in the �Ready-To-Lift� condition, making allowances for the tank loads, deck loads, other loads and environmental factors.

b. Wicket Lifting Operations (Port Side Only) � Ready-To-Lift Condition

1) Maintenance Crane Ready-To-Lift Position: fully retracted, 0° boom angle elevation, facing forward, ~35° off centerline to starboard.

2) Wicket Lifter Crane Ready-To-Lift Position: �stowed� with boom facing aft over the deck, ~25° off centerline to port, lowered to the deck with the jib tucked under/fully retracted.

3) The barge �READY-TO-LIFT� condition shall be:

i)Vessel List: Not Less Than 0.25° to Starboard.

ii) Vessel Trim: Not to exceed 0.50° Forward or Aft

iii) Draft: Not to exceed 4�-9� @ Fwd Node Draft Marks (9�-6� Fwd FR 0)

4) The operators shall make adjustments to the Maintenance Crane position to place the barge in the �Ready-To-Lift� condition, making allowances for the tank loads, deck loads, other loads and environmental factors.

c. Wicket 360° Lifting Operations � Ready-To-lift Condition

1) Maintenance Crane Ready-To-Lift Position: fully retracted, 0° boom angle elevation, facing forward on centerline.

2) Wicket Lifter Crane Ready-To-Lift Position: �stowed� with boom facing aft over the deck, ~25° off centerline to port, lowered to the deck with the jib tucked under/fully retracted.

3) The barge �READY-TO-LIFT� condition shall be:

i) Vessel List: Not to exceed 0.30° to Port or Starboard.

Electronically published by ABS Houston.

�KEEN�

Conrad Industies., Hull C-1166

ON 1279883

29 March 2018

Page: 3 of 3

ii) Vessel Trim: Not to exceed 0.10° Forward or Aft

iii) Draft: Not to exceed 4�-5� @ Fwd Node Draft Marks (9�-6� Fwd FR 0)

4) Derated 360° Swing Load Chart shall be used.

7. WEIGHT CHANGES: This stability letter has been issued based upon the following lightship characteristics:

Weight: 567.04 Long Tons VCG: 12.30 Feet above baseline LCG: 41.31 Feet Aft of Frame 0 TCG: 0.97 Feet Stbd. Of Centerline

We note that the barge is not fitted with permanent ballast, and the lightship includes the cranes and booms in their stowed positions. Spuds are excluded from lightship.

Any alternations resulting in a change in these parameters will invalidate this stability letter.

No fixed ballast or other such weights shall be added, removed and/or relocated without the authorization and supervision of the cognizant OCMI or ABS.

8. BILGES: The barge's bilges and voids shall be kept pumped to minimum contents at all times consistent with pollution prevention requirements.

9. LIST: You should make every effort to determine the cause of any list of the barge before taking corrective action.

10. FREEING PORTS: Deck freeing ports shall be maintained operable and completely unobstructed at all times.

11. WATERTIGHT BULKHEADS: No watertight bulkheads shall be removed or altered without the authorization and supervision of the cognizant Officer in Charge, Marine Inspection (OCMI).

This stability letter shall be maintained in a suitable location on board the barge at all times.

Very truly yours, Roy H. Bleiberg Vice President of Engineering ABS Americas

By: _______________________________ William (Bill) Leyrer Managing Principal Engineer ABS Americas � Houston SED

Attachment: Crane Load Charts, bearing ABS Americas approval stamp dated 29 March 2018

Electronically published by ABS Houston.

A P P E N D IX A

Electronically published by ABS Houston.

A P P E N

D I X

P P E N

D I X

A

File details come from the government source that posted it. Updated .