Amendment 1 - Q and A.pdf

PDF 108 KB Posted

Attached to
New Crane Barge Federal contract opportunity
Solicitation number
W912BU22B0018
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document contains an amendment with questions and answers regarding Solicitation #W912BU-22-B-0018 for the construction of a new crane barge. The solicitation requires the fabrication and delivery of a 150-foot by 50-foot crane barge with a molded depth of 10 feet and design waterline of 5 feet to meet ABS classification standards. Clause C550 defines the requirements for optional sets of spuds, while Clauses C552 and C554 define the base requirements for four spudwell installations and spud handling equipment. Per the answers provided, these base spudwell and handling items are not optional, and the contractor has flexibility to propose pump configurations to meet the waste oil system requirements defined by Clause C637 during engineering.

View the file

Other files for this federal contract opportunity

Other files attached to New Crane Barge, newest first.
File Type Posted
W912BU22B0018 Amendment 2.pdf PDF
Amendment 2 TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22 (Redlined for Amendment).pdf PDF
866-B155-01_Rev 2_INTACT STABILITY ANALYSIS_10-12-21.pdf PDF
866-B522-02_Rev 4_SPUD HANDLING SYSTEM ARRANGEMENT_07-08-22.pdf PDF
866-B677-02_Rev 0_FIXED CO2 SYSTEM CALCULATIONS_02-11-22.pdf PDF
611-D460-02 Communications Mark.pdf PDF
866-B155-02_Rev 2_DAMAGE STABILITY ANALYSIS_10-12-21.pdf PDF
866-B710-01_REV 1_AC LOAD ANALYSIS_07-05-21.pdf PDF
TAI 1240_866-B130-01_Rev 2_TANK CAPACITY PLAN REPORT_06-02-22.pdf PDF
866-B130-02_Rev 3_TANK ARRANGEMENT.pdf PDF
866-B410-02_Rev 2_TOW KNEES RUB RAILS AND FENDERS.pdf PDF
866-B420-01_Rev 2_DECK FITTINGS ARRANGEMENT.pdf PDF
866-B427-01_Rev 2_LADDER ARRANGEMENT.pdf PDF
866-B470-01_Rev 2_TRANSDUCER WELL DETAILS.pdf PDF
866-B405-01_REV 2_CATHODIC PROTECTION.pdf PDF
866-B670-01_Rev 3_FILLS VENTS AND SOUNDS.pdf PDF
866-B660-02_Rev 2_BILGE AND BALLAST SYSTEM.pdf PDF
W912BU22B0018.pdf PDF
866-B170-01_Rev 1_DRY DOCKING PLAN.pdf PDF
866-B105-01_Rev 0_HULL LINES AND OFFSETS.pdf PDF
866-B309-01 Rev 6 TRANSVERSE STRUCTURE.pdf PDF
866-B307-03 Rev 5 RAKE STRUCTURE.pdf PDF
866-B330-03_Rev 1_MACHINERY AND WINCH FOUNDATIONS CALCULATIONS pdf.pdf PDF
866-B552_01_Rev 3_SPUD WELL STRUCTURAL ARRANGEMENT.pdf PDF
866-B685-02_Rev 4_HEATING AND VENTILATION SYSTEM DRAWING.pdf PDF
866-B677-01_Rev 2_FIXED FIRE EXTINGUISHING SYSTEM.pdf PDF
866-B640-01_Rev 2_ENGINE COOLING SYSTEM.pdf PDF
866-B630-01_Rev 2_FUEL OIL SYSTEM ARRANGEMENT.pdf PDF
866-B635-01_Rev 2_LUBE OIL STORAGE ARRANGEMENT.pdf PDF
866-B637-01_Rev 2_WASTE OIL SYSTEM.pdf PDF
866-B690-01_Rev 1_COMPRESSED AIR SYSTEM.pdf PDF
866-B660-03_Rev 2_DECK WASHDOWN SYSTEM.pdf PDF
TAI 1240_866-B115-01_Rev 4_WEIGHT ESTIMATE_06-08-22.pdf PDF
866-B215-01_Rev 3_GENERAL ARRANGEMENT.pdf PDF
866-B330-02_Rev 2_MACHINERY AND WINCH FOUNDATION.pdf PDF
866-B311-01 Rev 6 LONGITUDINAL STRUCTURE.pdf PDF
866-B307-01 Rev 6 DECK AND BOTTOM PLATING.pdf PDF
866-B330-06_Rev 1_BOOM REST.pdf PDF
866-B315-01_Rev 3_DECKHOUSE STRUCTURE.pdf PDF
866-B307-02_Rev 3_SHELL PLATING.pdf PDF
866-B325-01_Rev 2_SEA CHEST DETAILS.pdf PDF
866-B436-01_Rev 1_INSULATION AND SHEATHING.pdf PDF
866-B410-01 Rev 5 SKEG STRUCTURE.pdf PDF
866-B550-01_Rev 2_SPUD STRUCTURAL ARRANGEMENT_02-04-22.pdf PDF
TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22.pdf PDF
866-B650-01_Rev 1_ENGINE EXHAUST SYSTEM.pdf PDF
866-B665-01_Rev 1_POTABLE WATER SYSTEM.pdf PDF
866-B720-01_REV 3_AC and DC ONE-LINE.pdf PDF
866-B730-02_Rev 1_RECEPTACLE PLAN.pdf PDF
866-B730-03_Rev 0_SHORE POWER ARRANGEMENT.pdf PDF
Show all 50

New Crane Barge has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #W912BU-22-B-0018 for Amendment #1

Questions and answers:

Question #1 For CLIN 0001AE and CLIN 0001AF – Clause C550 Spuds – the clause details out options for one set of spuds (two spuds are a set). Does the contractor assume that the associated equipment with the items that operate the spuds should also be included in the option pricing? This equipment would include the spud well, the spud winches, sheaves, winch VFD, and foundations.

Answer to #1:

Clause C550 in the solicitation defines the work required to fabricate and install two, separate, sets of spuds for the barge. Should the Government choose to exercise one or both options (CLIN 0001AE and/or CLIN 0001AF), then the contractor shall provide the spuds in accordance with the requirements of Clause C550.

Clause C552 Spudwell Installations and Clause C554 Spud Handling System define the work to be performed as part of the base contract, and these items are not options. The spudwells (four) and the spud handling equipment (four) are required by the Government regardless of whether option CLIN 0001AE and/or option CLIN 0001AF are exercised by the Government.

Question #2 Contract drawing 866-B637-01 does not clearly define a pump or pump(s) for the waste oil system. Please define if a pump or pump(s) are required as part of the waste oil system?

Answer to #2:

Clause C637 requires the contractor to prepare a system drawing during the Engineering Phase of the contract that reflects the equipment selected by the contractor for installation on the barge. Drawing #866-B637-01 defines that individual pumps are required with each generator set. The contractor may supply pumps with each generator as shown on the contract drawing or supply a pump or pumps for the complete system based on his system drawing developed during the Engineering Phase.