This document describes an invitation for bid for the procurement of a new crane barge. The USACE Marine Design Center is seeking to replace an existing crane barge currently in operation at the Sault Ste Marie Area office for the Detroit District of the USACE. The new crane barge must be built to ABS Maltese Cross A-1 Steel Barge, Great Lakes Service classification. Key requirements include a length of 150 feet, beam of 50 feet, depth of 10 feet, and design waterline of 5 feet. The contractor will be required to fabricate and deliver the barge to the St. Mary's Falls Canal in Sault Sainte Marie, Michigan. Bids are due by August 29th at 10:00am EDT and must be submitted by email. The procurement will include liquidated damages and bid, payment, and performance bonding will be required.

View the file

Other files

File Type Posted
Audited Abstract W912BU22B0018 New Crane Barge (Harvey Replacement).pdf PDF
W912BU22B0018 Amendment 3.pdf PDF
W912BU22B0018 Amendment 1 SF30.pdf PDF
Amendment 2 TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22 (Redlined for Amendment).pdf PDF
W912BU22B0018 Amendment 2.pdf PDF
Amendment 2 Q and A.pdf PDF
866-B155-02_Rev 2_DAMAGE STABILITY ANALYSIS_10-12-21.pdf PDF
866-B710-01_REV 1_AC LOAD ANALYSIS_07-05-21.pdf PDF
Amendment 1 - Q and A.pdf PDF
866-B677-02_Rev 0_FIXED CO2 SYSTEM CALCULATIONS_02-11-22.pdf PDF
611-D460-02 Communications Mark.pdf PDF
866-B405-02 _Rev 0_CATHODIC PROTECTION CALCULATION _04-15-2021.pdf PDF
866-B155-01_Rev 2_INTACT STABILITY ANALYSIS_10-12-21.pdf PDF
866-B725-01_Rev 1_AC VOLTAGE DROP CALCULATIONS_07-01-21.pdf PDF
866-B522-02_Rev 4_SPUD HANDLING SYSTEM ARRANGEMENT_07-08-22.pdf PDF
T1716010 KEEN Stability Letter - signed with Load Charts_106379386.pdf PDF
866-B330-07_Rev 1_BOOM REST DESIGN CALCULATIONS_02-28-22.pdf PDF
866-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE.pdf PDF
W912BU22B0018 Amendment 1.pdf PDF
866-B601-01 PIPE MARKING GUIDE.pdf PDF
866-B105-01_Rev 0_HULL LINES AND OFFSETS.pdf PDF
866-B330-04_Rev 2_CRANE TRACKING AREA.pdf PDF
866-B552_01_Rev 3_SPUD WELL STRUCTURAL ARRANGEMENT.pdf PDF
866-B309-01 Rev 6 TRANSVERSE STRUCTURE.pdf PDF
866-B410-02_Rev 2_TOW KNEES RUB RAILS AND FENDERS.pdf PDF
866-B670-01_Rev 3_FILLS VENTS AND SOUNDS.pdf PDF
TAI 1240_866-B130-01_Rev 2_TANK CAPACITY PLAN REPORT_06-02-22.pdf PDF
866-B667-01_REV 1_SANITARY AND BLACK WATER SYSTEM.pdf PDF
866-B730-01_Rev 1_LIGHTING PLAN.pdf PDF
866-B307-01 Rev 6 DECK AND BOTTOM PLATING.pdf PDF
866-B307-02_Rev 3_SHELL PLATING.pdf PDF
866-B730-02_Rev 1_RECEPTACLE PLAN.pdf PDF
866-B330-06_Rev 1_BOOM REST.pdf PDF
866-B436-01_Rev 1_INSULATION AND SHEATHING.pdf PDF
866-B720-01_REV 3_AC and DC ONE-LINE.pdf PDF
866-B215-01_Rev 3_GENERAL ARRANGEMENT.pdf PDF
866-B325-01_Rev 2_SEA CHEST DETAILS.pdf PDF
866-B685-02_Rev 4_HEATING AND VENTILATION SYSTEM DRAWING.pdf PDF
866-B635-01_Rev 2_LUBE OIL STORAGE ARRANGEMENT.pdf PDF
866-B405-01_REV 2_CATHODIC PROTECTION.pdf PDF
866-B130-02_Rev 3_TANK ARRANGEMENT.pdf PDF
866-B420-01_Rev 2_DECK FITTINGS ARRANGEMENT.pdf PDF
866-B650-01_Rev 1_ENGINE EXHAUST SYSTEM.pdf PDF
TAI 1240_866-B522-02_Rev 3_SPUD HANDLING SYSTEM ARRANGEMENT_05-23-22.pdf PDF
866-B330-02_Rev 2_MACHINERY AND WINCH FOUNDATION.pdf PDF
866-B550-01_Rev 2_SPUD STRUCTURAL ARRANGEMENT_02-04-22.pdf PDF
TAI 1240_866-B115-01_Rev 4_WEIGHT ESTIMATE_06-08-22.pdf PDF
866-B330-03_Rev 1_MACHINERY AND WINCH FOUNDATIONS CALCULATIONS pdf.pdf PDF
866-B690-01_Rev 1_COMPRESSED AIR SYSTEM.pdf PDF
866-B730-03_Rev 0_SHORE POWER ARRANGEMENT.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAI Engineers, LLC TAI 1240

1.0 EXTRACTS FROM GENERAL ARRANGEMENT

Machinery Room Length, MRL 24 ft

Machinery Room Section Area, MRA 186 sq.ft

Main Gensets Power, Pme 99 kW (Ref Appendix #.1)

No. of Gensets (working), nE 2

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Machinery Room 30 Air changes/hr (Ref Appendix #.3)

The quantity of air required for Machinery Room, QA = MRL*MRA*Air changes

= 2229 cfm

2.2 Minimum Supply Fan Capacity based on Combustion Air Requirements and Evacuation of Heat

2.2.1 Combustion air requirement calculation for Diesel Engines

Combustion Air Flow for Genset Engine, qdm = 266.2 cfm (Ref Appendix #.1)

Total Combustion Air Flow (2 Nos Gensets) qC = 532.4 cfm

2.2.2 Air flow for Evacuation of Heat, Q H

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - MACHINERY ROOM Fr# 17 to 21

Date:

04-26-22

QH =

Φdg+Φdg1+Φel+Φep

- 0.4 (qc+qal) cfm ρ x C x DT

Ref: ISO 8861:1998, Chapter 5.3

(See Appendix #2)

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - MACHINERY ROOM Fr# 17 to 21

Date:

04-26-22

Heat emission from 2 No's Main Diesel Engines, Φdg = 1386 BTU/min (Ref Appendix #.1)

Heat from electrical apparatus, Φe = 55.0 BTU/min

Heat from exhaust pipes, Φep = 243.8 BTU/min (Ref Appendix #.1)

Density of air , ρ = 0.0681 lbm /cu.ft (@120 Deg F)

Specific heat of Air , C = 0.2405 BTU/lbm-ºF

Temperature difference, DT = 15 ºF

Outside Temperature, TO = 105 ºF (Ref Appendix #.4)

Machinery Room Temperature, TE = 120 ºF

Combustion Air for Main Diesel Engines, qc = 532.4 cfm

Air flow for alternator cooling qal = 675.6 cfm (Ref Appendix #.2)

Air flow for Evacuation of Heat, QH = 7320.5 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 7852.9 cfm

For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - MACHINERY ROOM Fr# 17 to 21

Date:

04-26-22

3.2 Supply fan capacity calculation

Number of fans required = 1 (Assumed)

Minimum Capacity of Each Supply Fan = 7853 cfm

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (90% of mechanical supply) (Assumed)

Total Air flow for Evacuation of Heat = 7320.5 cfm

Total Exhaust Air Quantity = 6588.5 cfm

(To maintain positive pressure in the room)

4.2 Exhaust fan capacity calculation

Number of fans required = 1 (Assumed)

Minimum Capacity of Each Exhaust Fan = 6588 cfm

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 3.9 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 6.5 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 3.3 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 5.5 sq.ft

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - MACHINERY ROOM Fr# 17 to 21

Date:

04-26-22

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

7.0 SUPPLY AND EXHAUST FAN CAPACITIES

7.1 Supply Fan

Required Supply Ventilation fan : = 7853 CFM

Recommended Supply Ventilation fan : = 8346 CFM

(Hartzell : Size 24 Inch, Model: 44-M-246DA-STAIK3, 0.5" SP, 3 HP) (Ref Appendix #5)

7.2 Exhaust Fan

Required Exhaust Ventilation fan : = 6588 CFM

Recommended Exhaust Ventilation fan : = 7873 CFM

(Hartzell : Size 18 Inch, Model: 44M-186DA-STAIL2, 0.5" SP, 5 HP) (Ref Appendix #5)

Ref:

APPENDIX #1_EM5162 - C4.4 Tier 3 99 EKW Genset Performance Data_3 APPENDIX #2_ISO 8861:1998 SHIPBUILDING — ENGINE-ROOM VENTILATION IN DIESEL-ENGINED SHIPS —DESIGN

REQUIREMENTS AND BASIS OF CALCULATIONS.

APPENDIX #3_SNAME TECHNICAL AND RESEARCH BULLETIN 4-16 (2015 INTERIM).

APPENDIX #4_SOW 3265 Celre Crane Barge Harvey 15 Sep. 2020-2_Redacted

APPENDIX #5_HARTZELL RAPID SHIP MARINE DUTY DUCT AXIAL FAN.

Generator Room Volume, GRv 3898.3 ft3

Gen Set Power, pdg 75.0 (kW) (Ref Appendix #6)

No. of Gen Sets (working), nG 1

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Generator Rm 30 Air changes/hr (Ref Appendix #3)

Quantity of air required for Generator Room, QA = GRv*Air changes

= 1949.2 cfm

2.2 Minimum Supply Fan Capacity based on Combustion Air Requirements and Evacuation of Heat

2.2.1 Combustion air requirement calculation for Diesel Engines

Combustion Air Flow for Genset, qdg = 240.9 cfm (Ref Appendix #6)

Combustion Air Flow for Die. drive Comp. engine, qddga 390.2 cfm (Assumed)

Total Combustion Air Flow QC = 631.1 cfm

2.2.2 Air flow for Evacuation of Heat, Q H

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - GENERATOR ROOM

Date:

04-26-22

QH =

hdg+hdg1+he+hep

- 0.4 (qc)+(qal+qal1) cfm ρ x C x DT

Ref: ISO 8861:1998, Chapter 5.3

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - GENERATOR ROOM

Date:

04-26-22

Heat emission from Genset Engine, hdg = 120 BTU/min (Ref Appendix #6)

Heat emission from Die. Driven air Comp. Engine, hdg1 100 BTU/min (Assumed)

(Engine radiated heat + Cooler Heat)

Heat from electrical apparatus, he = 50.0 BTU/min

Heat from exhaust pipes, hep = 55.2 BTU/min

Density of air , ρ = 0.0722 lbm /cu.ft

Specific heat of Air , C = 0.24 BTU/lbm-ºF

Temperature difference, DT = 15 ºF

Outside Temperature, TO = 105 ºF (Ref Appendix #4)

Emergency Genset Room Temperature, TE = 120 ºF

Combustion Air for Gensets, qc = 631.1 cfm

Air flow for alternator cooling qal = 650 cfm

Air flow for Comp. engine cooling qal1 = 300 cfm (Assumed)

Air flow for Evacuation of Heat, QH = 1948.9 cfm

a) Where full details are available, heat emission can be taken as sum of individual items

b) For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - GENERATOR ROOM

Date:

04-26-22

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 2580 cfm

3.2 Supply fan capacity calculation

Number of fans Required = 1 (Assumed)

Minimum Capacity of Each Supply Fan = 2580 cfm

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (90% of mechanical supply) (Assumed)

Total Supply air = 1949 cfm

Total Exhaust Air Quantity = 1754 cfm

4.2 Exhaust fan capacity calculation

Number of fans Required = 1 (Assumed)

Minimum Capacity of Each Exhaust Fan = 1754 cfm

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 1.29 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 2.15 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - GENERATOR ROOM

Date:

04-26-22

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 0.88 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 1.46 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

7.0 SUPPLY AND EXHAUST FAN CAPACITIES

7.1 Supply Fan

Required Supply Ventilation fan : = 2580 CFM

Recommended Supply Ventilation fan : = 3345 CFM (Ref Appendix #5)

(Hartzell : Size 18 Inch, Model : 44-M-186DA-STAIG3, 0.5"SP, 0.75 HP)

7.2 Exhaust Fan

Required Exhaust Ventilation fan : = 1754 CFM

Recommended Exhaust Ventilation fan : = 1836 CFM (Ref Appendix #10)

(Hartzell : Size 18 Inch, Model : A38-M-183-L---STAIE3, 0.5"SP, 1/3HP)

Ref:

APPENDIX #3_SNAME TECHNICAL AND RESEARCH BULLETIN 4-16 (2015 INTERIM).

APPENDIX #4_SOW 3265 Celre Crane Barge Harvey 15 Sep. 2020-2_Redacted

APPENDIX #5_HARTZELL RAPID SHIP MARINE DUTY DUCT AXIAL FAN.

APPENDIX #6_EM5161 - C4.4 75 EKW Genset Performance Data.

APPENDIX #10_HARTZELL RAPID SHIP MARINE DUTY DUCT AXIAL FAN.

Winch Room Length (fwd), WRL1 6 ft

Winch Room Length (aft), WRL2 12 ft

Winch Room Section Area (fwd), WRA1 355 sq.ft

Winch Room Section Area (aft), WRA2 390.24 sq.ft

Winch Room total volume, WRV(1+2) 6812.8 cu.ft

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Winch Room 10 Air changes/hr (Ref Appendix #3)

The quantity of air required for Winch Room, QA = WRV(1+2)*Air changes

= 1135.5 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 853 BTU/min

Density of air , ρ = 0.0681 lbm /cu.ft (@120 Deg F)

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WINCH ROOM (FWD)

Date:

04-26-22

QH =

he cfm ρ x C x DT

Ref: ISO 8861:1998, Chapter 5.3

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WINCH ROOM (FWD)

Date:

04-26-22

Specific heat of Air , C = 0.2405 BTU/lbm-0F

Temperature difference, DT = 15 OF

Outside Temperature, TO = 105 OF (Ref Appendix #4)

Winch Room Temperature, TE = 120 OF

Air flow for Evacuation of Heat, QH = 3472.3 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 NATURAL SUPPLY AIR CALCULATION

3.1 Total Natural Supply Intake Air Quantity = 3472.3 cfm

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (90% of mechanical supply) (Assumed)

Total Supply air = 3472 cfm

Total Exhaust Air Quantity = 3125 cfm

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WINCH ROOM (FWD)

Date:

04-26-22

4.2 Exhaust fan capacity calculation

Number of fans Required = 1 (Assumed)

Minimum Capacity of Each Exhaust Fan = 3125 cfm

5.0 Natural SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 3.47 sq.ft (limiting velocity of air: 1000 FPM)

Louver cut out size = 5.79 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 1.56 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 2.60 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

7.2 Exhaust Fan

Required Exhaust Ventilation fan : = 3125 CFM

Recommended Exhaust Ventilation fan : = 3345 CFM (Ref Appendix #7)

(Hartzell : Size 18 Inch, Model : 44M-186DA-STAIG3, 0.5"SP, 0.75 HP)

Ref:

APPENDIX #3_SNAME TECHNICAL AND RESEARCH BULLETIN 4-16 (2015 INTERIM).

APPENDIX #4_SOW 3265 Celre Crane Barge Harvey 15 Sep. 2020-2_Redacted

APPENDIX #7_HARTZELL RAPID SHIP MARINE DUTY DUCT AXIAL FAN.

Winch Room Length, WRL 12 ft

Winch Room Section Area, WRA 390.24 sq.ft

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Winch Room 10 Air changes/hr (Ref Appendix #6)

The quantity of air required for Winch Room, QA = WRL*WRA*Air changes

= 780.47 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 853 BTU/min

Density of air , ρ = 0.0681 lbm /cu.ft (@120 Deg F)

Specific heat of Air , C = 0.2405 BTU/lbm-0F

Temperature difference, DT = 15 OF

QH =

he cfm ρ x C x DT

Ref: ISO 8861:1998, Chapter 5.3

(See Appendix #2)

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WINCH ROOM (AFT)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WINCH ROOM (AFT)

Date:

04-26-22

Outside Temperature, TO = 105 OF (Ref Appendix #4)

Winch Room Temperature, TE = 120 OF

Air flow for Evacuation of Heat, QH = 3472.3 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 NATURAL SUPPLY AIR CALCULATION

3.1 Total Natural Supply Intake Air Quantity = 3472.3 cfm

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (90% of mechanical supply) (Assumed)

Total Supply air = 3472 cfm

Total Exhaust Air Quantity = 3125 cfm

4.2 Exhaust fan capacity calculation

Number of fans Required = 1 (Assumed)

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WINCH ROOM (AFT)

Date:

04-26-22

Minimum Capacity of Each Exhaust Fan = 3125 cfm

5.0 Natural SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 3.47 sq.ft (limiting velocity of air: 1000 FPM)

Louver cut out size = 5.79 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 1.56 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 2.60 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

7.2 Exhaust Fan

Required Exhaust Ventilation fan : = 3125 CFM

Recommended Exhaust Ventilation fan : = 3345 CFM (Ref Appendix #7)

(Hartzell : Size 18 Inch, Model : 44M-186DA-STAIG3, 0.5"SP, 0.75 HP)

Ref:

APPENDIX #3_SNAME TECHNICAL AND RESEARCH BULLETIN 4-16 (2015 INTERIM).

APPENDIX #4_SOW 3265 Celre Crane Barge Harvey 15 Sep. 2020-2_Redacted

Boiler Room Length, PRL 24 ft

Boiler Room Section Area, PRA 159.19 sq.ft

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Boiler Room 10 Air changes/hr (Ref Appendix #3)

The quantity of air required for Boiler Room, QA = PRL*PRA*Air changes

= 636.75 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 836 BTU/min

Heat from exhaust pipes, hep = 97.5 BTU/min

Heat from Boilers , hb 300 BTU/min

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - BOILER ROOM

Date:

04-26-22

QH =

(he+hb+hep)

-qb ρ x C x DT

Ref: ISO 8861:1998, Chapter 5.3

(See Appendix #2) cfm

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - BOILER ROOM

Date:

04-26-22

Density of air , ρ = 0.0681 lbm /cu.ft (@120 Deg F)

Specific heat of Air , C = 0.2405 BTU/lbm-0F

Temperature difference, DT = 15 OF

Outside Temperature, TO = 105 OF

Pump Room Temperature, TE = 120 OF (Ref#.2)

Boiler Air Consumption qb = 150 cfm (Assumed)

Air flow for Evacuation of Heat, QH = 4870.9 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 4870.9 cfm

3.2 Supply fan capacity calculation

Number of fans Required = 1 (Assumed)

Minimum Capacity of Each Supply Fan = 4871 cfm

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - BOILER ROOM

Date:

04-26-22

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (90% of mechanical supply) (Assumed)

Total Supply air = 4721 cfm

Total Exhaust Air Quantity = 4249 cfm

4.2 Exhaust fan capacity calculation

Number of fans Required = 1

Minimum Capacity of Each Exhaust Fan = 4249 cfm

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 2.44 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 4.06 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 4.25 sq.ft (limiting velocity of air: 1000 FPM)

Louver cut out size = 7.08 sq.ft

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - BOILER ROOM

Date:

04-26-22

7.0 SUPPLY FAN CAPACITIES

7.1 Supply Fan

Required Supply Ventilation fan : = 4871 CFM

Recommended Supply Ventilation fan : = 5054 CFM (Ref Appendix #7)

(Hartzell : Size 20 Inch, Model : A38-M-206-W---STAIH3, 0.5"SP, 1 HP)

Ref:

APPENDIX #3_SNAME TECHNICAL AND RESEARCH BULLETIN 4-16 (2015 INTERIM).

APPENDIX #4_SOW 3265 Celre Crane Barge Harvey 15 Sep. 2020-2_Redacted

Work Shop/Storage Length (Fr. 10-17), WSL1 42 ft

Work Shop/Storage Length (Fr. 9-10), WSL2 6 ft

Work Shop/Storage Length (Fr. 9-10), WSL3 6 ft

Work Shop /Storage Section Area, WSA1 510.62 sq.ft

Work Shop /Storage Section Area, WSA2 150.48 sq.ft

Work Shop /Storage Section Area, WSA3 150.48 sq.ft

Total Work Shop /Storage Section Volume, WSV(1+2+3) 23252

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Work Shop /Storage 10 Air changes/hr (Ref Appendix #3)

The quantity of air required for Work Shop, QA = WSV(1+2+3)*Air changes

= 3875.3 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 341 BTU/min

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WORK SHOP / STORAGE

Date:

04-26-22

QH =

he cfm ρ x C x DT

Ref: ISO 8861:1998, Chapter 5.3

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WORK SHOP / STORAGE

Date:

04-26-22

Density of air , ρ = 0.0681 lbm /cu.ft (@120 Deg F)

Specific heat of Air , C = 0.2405 BTU/lbm-0F

Temperature difference, DT = 15 OF

Outside Temperature, TO = 105 OF (Ref Appendix #4)

Work Shop Temperature, TE = 120 OF

Air flow for Evacuation of Heat, QH = 1388.9 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 3875.3 cfm

3.2 Supply fan capacity calculation

Number of fans required = 1 (Assumed)

Minimum Capacity of Each Supply Fan = 3875 cfm

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WORK SHOP / STORAGE

Date:

04-26-22

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (90% of mechanical supply) (Assumed)

Total Supply air = 3875 cfm

Total Exhaust Air Quantity = 3488 cfm

4.2 Exhaust fan capacity calculation

Number of fans Required = 1 (Assumed)

Minimum Capacity of Each Exhaust Fan = 3488 cfm

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 3.88 sq.ft (limiting velocity of air: 1000 FPM)

Louver cut out size = 6.46 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 1.74 sq.ft (limiting velocity of air: 2000 FPM)

Louver cut out size = 2.91 sq.ft

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

VENTILATION CALCULATIONS - WORK SHOP / STORAGE

Date:

04-26-22

7.0 SUPPLY FAN CAPACITIES

7.1 Supply Fan

Required Supply Ventilation fan : = 3875 CFM

Recommended Supply Ventilation fan : = 4008 CFM

(Hartzell : Size 18 Inch, Model : 38-M-186W---STAIG3, 0.375"SP, 0.75 HP) (Ref Appendix #8)

Ref:

APPENDIX #3_SNAME TECHNICAL AND RESEARCH BULLETIN 4-16 (2015 INTERIM).

APPENDIX #4_SOW 3265 Celre Crane Barge Harvey 15 Sep. 2020-2_Redacted

APPENDIX #8_HARTZELL RAPID SHIP MARINE DUTY DUCT AXIAL FAN.

LEGEND:

A = Boundary Area ft²

Q s = Head Load, Sensible Btu/hr

Q L = Heat Load, Latent Btu/hr

Q T = Heat Load, Total Btu/hr

Q W = Heat Load, Winter Btu/hr

U = Heat Transfer Coefficient Btu/hr/ft²

T = Space Design Temp. °F

T O = Temp. of Adjacent space/ Outside °F

∆T = Temperature Difference °F

SHF = Sensible Heat Factor

LOAD KEY:

1 = Deck Over

2 = Deck Under

3 = Outboard Bulkhead/ Shell

4 = Forward Bulkhead

5 = Aft Bulkhead

6 = Inboard Bulkhead

7 = Lights

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

MACHINERY ROOM - HVAC CALCULATIONS

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

MACHINERY ROOM - HVAC CALCULATIONS

Date:

04-26-22

8 = Equipments

9 = Personnel

10 = Infiltration

AIR CONDITIONING DESIGN TEMPERATURES

T O = 105 °F

T = 70 °F (Accommodation Spaces)

HEATING DESIGN TEMPERATURES

T O = 0 °F

T = 70 °F (Above Main Deck)

T = 65 °F (Below Main Deck)

Ref:

1. SNAME TECHNICAL RESEARCH BULLETIN NOS. 4-7 AND 4-16.

70 65 °F

Coeff Dir Coeff Dir

Fwd Bhd-Storage 4 0 184.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Port Bhd-Generator Room

3 0 246.0 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Aft Bhd-WR 5 0 184.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd-Boiler Room

3 0 246.0 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Deck Over - Dunnage

1 0 126.0 -70.0 ↓ 0.0 0 0.0 0.0 65.0 1.644 ↑ 13464.4

Deck Over - Weather

1 0 306.0 -70.0 ↓ 0.0 0 0.0 -20.0 85.0 1.644 ↑ 42760.4

Deck Under- Seawater

2 0 432.0 -70.0 ↑ 0.0 0 0.0 28.0 37.0 1.295 ↓ 20699.3

Transmission Sub Total 0 0 0 76924

Lights 7 432.0 3024.0 0 3024.0

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

Sensible Heat Sub Total 3524

Latent Heat Sub Total 600

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

MACHINERY ROOM - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

SPACE SPACE NO. COOLING SEASON: T = °F HEATING SEASON: T =

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

MACHINERY ROOM - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Total Heat (Btu/hr) 4124 76924

Total Heat (kW) 1.2 22.5

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.85

Heat Load Total QW = 76924 BTU/hr

= 22.5 kW

Required Heater Capacity = 22.5 kW

Selected Heater Capacity = 83700 BTU/hr (Ref Appendix #9)

= 24.5 kW

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 108)

Ref:

APPENDIX #9_ STEAM OR HOT WATER UNIT HEATERS_19

Coeff Dir Coeff Dir

Fwd Bhd-Day Rm 4 0 151.5 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Fwd Bhd- Sewage Tk

4 0 61.5 70.0 0.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1536.9

Fwd Bhd- Sewage Tk

4 0 76.9 70.0 0.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1921.1

Fwd Bhd- Sewage Tk

4 0 61.5 70.0 0.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1536.9

Fwd Bhd-6 Crew 4 0 30.8 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Fwd Bhd- Potable water Tk

4 0 61.5 70.0 0.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1536.9

Fwd Bhd- Potable water Tk

4 0 76.9 70.0 0.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1921.1

Fwd Bhd- Potable water Tk

4 0 61.5 70.0 0.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1536.9

Fwd Bhd- Galley/Mess

4 0 151.5 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Port Bhd-Above water line

3 0 31.5 70.0 0.0 ↔ 0.0 0 0.0 -20.0 85.0 0.833 ↔ 2230.4

Port Bhd-Below water line

3 0 30.0 70.0 0.0 ↔ 0.0 0 0.0 28.0 37.0 0.833 ↔ 924.6

Port Bhd-Spud well 3 0 49.0 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Port Bhd-Spud winch

3 0 123.0 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Aft Bhd-Storage 5 0 487.5 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd-Spud winch

3 0 123.0 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Proj. no:

TAI-1240

Subject:

WINCH ROOM FWD - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

U

Q WT O ∆T

Insul key

A T O ∆T U

Q s Q L Q T Adjacent compartment Load key

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

WINCH ROOM FWD - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Stbd Bhd-Spud well 3 0 49.0 70.0 0.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd- Above water line

3 0 31.5 70.0 0.0 ↔ 0.0 0 0.0 -20.0 85.0 0.833 ↔ 2230.4

Stbd Bhd- Below water line

3 0 30.0 70.0 0.0 ↔ 0.0 0 0.0 28.0 37.0 0.833 ↔ 924.6

Deck Over - Dunnage

1 0 42.9 70.0 0.0 ↓ 0.0 0 0.0 0.0 65.0 1.644 ↑ 4584.0

Deck Over - Weather

1 0 655.6 70.0 0.0 ↓ 0.0 0 0.0 -20.0 85.0 1.644 ↑ 91610.8

Deck Over - Dunnage

1 0 42.9 70.0 0.0 ↓ 0.0 0 0.0 0.0 65.0 1.644 ↑ 4584.0

Deck Under- Seawater

2 0 741.4 70.0 0.0 ↑ 0.0 0 0.0 28.0 37.0 1.295 ↓ 35523.0

Transmission Sub Total 0 0 0 152602

Lights 7 741.4 5189.6 0 5189.6

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

Sensible Heat Sub Total 5690

Latent Heat Sub Total 600

Total Heat (Btu/hr) 6290 152602

Total Heat (kW) 1.8 44.7

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.90

Proj. no:

TAI-1240

Subject:

WINCH ROOM FWD - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Heat Load Total QW = 152602 BTU/hr

= 44.7 kW

Required Heater Capacity = 44.7 kW

Selected Heater Capacity = 83700 BTU/hr (Ref Appendix # 9)

= 24.5 kW (2 No's Provided)

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 108)

Ref:

Coeff Dir Coeff Dir

Fwd Bhd- Boiler Rm 4 0 102.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Fwd Bhd-Mach. Rm 4 0 184.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Fwd Bhd-Gen. Rm 4 0 102.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd-Spud well 3 0 123.0 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Aft Bhd-WB Tk(P) 5 0 102.5 -70.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 2561.5

Aft Bhd-WB Tk(C) 5 0 184.5 -70.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 4610.7

Aft Bhd-WB Tk(S) 5 0 102.5 -70.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 2561.5

Port Bhd-Spud well 3 0 123.0 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Deck Over - Cont.

house(P)

1 0 67.5 -70.0 ↓ 0.0 0 0.0 70.0 -5.0 1.644 ↑ -554.9

Deck Over - Weather

1 0 321.0 -70.0 ↓ 0.0 0 0.0 -20.0 85.0 1.644 ↑ 44856.5

Deck Over - Cont.

house(S)

1 112 67.5 -70.0 ↓ 0.0 0 0.0 70.0 -5.0 0.069 ↑ -23.3

Deck Under- Seawater

2 0 456.0 -70.0 ↑ 0.0 0 0.0 28.0 37.0 1.295 ↓ 21849.2

Transmission Sub Total 0 0 0 75861

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

WINCH ROOM AFT - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

WINCH ROOM AFT - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Lights 7 456.0 3192.0 0 3192.0

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

Sensible Heat Sub Total 3692

Latent Heat Sub Total 600

Total Heat (Btu/hr) 4292 75861

Total Heat (kW) 1.3 22.2

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.86

Heat Load Total QW = 75861 BTU/hr

= 22.2 kW

Required Heater Capacity = 22.2 kW

Selected Heater Capacity = 45600 BTU/hr (Ref Appendix # 9)

= 13.4 kW (2 No's Provided)

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 63)

Ref:

Coeff Dir Coeff Dir

Fwd Bhd- Work Shop

4 0 151.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd-Above Water level

3 0 126.0 -70.0 ↔ 0.0 0 0.0 -20.0 85.0 0.833 ↔ 8921.4

Stbd Bhd-Below Water level

3 0 120.0 -70.0 ↔ 0.0 0 0.0 28.0 37.0 0.833 ↔ 3698.5

Aft Bhd-Void 5 0 61.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Aft Bhd-WR 5 0 102.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Port Bhd-MR 3 0 246.0 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Deck Over - Weather

1 0 234.6 -70.0 ↓ 0.0 0 0.0 -20.0 85.0 1.644 ↑ 32783.0

Deck Over - Cont.

House

1 112 30.0 -70.0 ↓ 0.0 0 0.0 70.0 -5.0 0.069 ↑ -10.4

Deck Over - Dunnage

1 0 90.0 -70.0 ↓ 0.0 0 0.0 0.0 65.0 1.644 ↑ 9617.4

Deck Under- Seawater

2 0 354.8 -70.0 ↑ 0.0 0 0.0 28.0 37.0 1.295 ↓ 16997.8

Transmission Sub Total 0 0 0 72008

Lights 7 354.8 2483.3 0 2483.3

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

BOILER ROOM - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

BOILER ROOM - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Sensible Heat Sub Total 2983

Latent Heat Sub Total 600

Total Heat (Btu/hr) 3583 72008

Total Heat (kW) 1.1 21.1

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.83

Heat Load Total QW = 72008 BTU/hr

= 21.1 kW

Required Heater Capacity = 21.1 kW

Selected Heater Capacity = 83700 BTU/hr (Ref Appendix # 9)

= 24.5 kW (1 No's Provided)

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 108)

Ref:

Coeff Dir Coeff Dir

Fwd Bhd-Storage 4 0 151.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Port Bhd-Above Water level

3 0 126.0 -70.0 ↔ 0.0 0 0.0 -20.0 85.0 0.833 ↔ 8921.4

Port Bhd-Below water level

3 0 120.0 -70.0 ↔ 0.0 0 0.0 28.0 37.0 0.833 ↔ 3698.5

Aft Bhd-Void 5 0 61.5 -70.0 ↔ 0.0 0 0.0 35.0 30.0 0.833 ↔ 1536.9

Aft Bhd-WR 5 0 102.5 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd-Mach. Rm 3 0 246.0 -70.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Deck Over - Weather 1 0 234.6 -70.0 ↓ 0.0 0 0.0 -20.0 85.0 1.644 ↑ 32783.0

Deck Over - Cont.

House

1 112 30.0 -70.0 ↓ 0.0 0 0.0 70.0 -5.0 0.069 ↑ -10.4

Deck Over - Dunnage

1 0 90.0 -70.0 ↓ 0.0 0 0.0 0.0 65.0 1.644 ↑ 9617.4

Deck Under- Seawater

2 0 354.8 -70.0 ↑ 0.0 0 0.0 28.0 37.0 1.295 ↓ 16997.8

Transmission Sub Total 0 0 0 73545

Lights 7 354.8 2483.3 0 2483.3 2483.3

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

GENERATOR ROOM - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

GENERATOR ROOM - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Equipment's Genest - 1 No Air Comp. - 2 No's Air Receive. - 2 No's Deck Wash pp - 1 No

8 0 0.0 355

Personnel (2) 9 400 600 1000

Sensible Heat Sub Total 2883

Latent Heat Sub Total 600

Total Heat (Btu/hr) 3483 70706

Total Heat (kW) 1.0 20.7

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.83

Heat Load Total QW = 70706 BTU/hr

= 20.7 kW

Required Heater Capacity = 20.7 kW

Selected Heater Capacity = 83700 BTU/hr (Ref Appendix # 9)

= 24.5 kW (1 No's Provided)

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 108)

Ref:

APPENDIX #10_ STEAM OR HOT WATER UNIT HEATERS_19

Coeff Dir Coeff Dir

Fwd Bhd- Spud well

4 0 49.0 110.0 40.0 ↔ 0.0 0 0.0 40.0 25.0 0.833 ↔ 1020.6

Fwd Bhd- Winch Rm

4 0 102.5 110.0 40.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Fwd Bhd-

FOT(P)

4 0 61.5 110.0 40.0 ↔ 0.0 0 0.0 40.0 25.0 0.833 ↔ 1280.7

Fwd Bhd-

FOT(P)

4 0 92.3 110.0 40.0 ↔ 0.0 0 0.0 40.0 25.0 0.833 ↔ 1921.1

Fwd Bhd-

FOT(S)

4 0 92.3 110.0 40.0 ↔ 0.0 0 0.0 40.0 25.0 0.833 ↔ 1921.1

Fwd Bhd-

FOT(S)

4 0 61.5 110.0 40.0 ↔ 0.0 0 0.0 40.0 25.0 0.833 ↔ 1280.7

Fwd Bhd- Winch Rm

4 0 102.5 110.0 40.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Fwd Bhd- Spud well

4 0 49.0 110.0 40.0 ↔ 0.0 0 0.0 40.0 25.0 0.833 ↔ 1020.6

Port Bhd-Above Water level

3 0 252.0 105.0 35.0 ↔ 0.0 0 0.0 -20.0 85.0 0.833 ↔ 17842.9

Port Bhd-Below Water level

3 0 240.0 105.0 35.0 ↔ 0.0 0 0.0 28.0 37.0 0.833 ↔ 7397.0

Aft Bhd- Boiler Rm

5 0 151.5 130.0 60.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Aft Bhd- Machinery Rm

5 0 184.5 110.0 40.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

STORAGE (C) - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

STORAGE (C) - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Aft Bhd- Generator Rm

5 0 151.5 110.0 40.0 ↔ 0.0 0 0.0 65.0 0.0 0.833 ↔ 0.0

Stbd Bhd-Above Water level

3 0 252.0 105.0 35.0 ↔ 0.0 0 0.0 -20.0 85.0 0.833 ↔ 17842.9

Stbd Bhd-Below Water level

3 0 240.0 105.0 35.0 ↔ 0.0 0 0.0 28.0 37.0 0.833 ↔ 7397.0

Deck Over - Weather

1 0 1414.8 105.0 35.0 ↓ 0.0 0 0.0 -20.0 85.0 1.644 ↑ 197705.0

Deck Over - Dunnage

1 0 868.0 105.0 35.0 ↓ 0.0 0 0.0 0.0 65.0 1.644 ↑ 92754.7

Deck Under- Seawater

2 0 2283.0 105.0 35.0 ↑ 0.0 0 0.0 28.0 37.0 1.295 ↓ 109389.9

Transmission Sub Total 0 0 0 458774

Lights 7 2283.0 15981.0 0 15981.0

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

Sensible Heat Sub Total 16481

Latent Heat Sub Total 600

Total Heat (Btu/hr) 17081 458774

Total Heat (kW) 5.0 134.5

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.96

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

STORAGE (C) - HEATING CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Heat Load Total QW = 458774 BTU/hr

= 134.5 kW

Required Heater Capacity = 134.5 kW

Selected Heater Capacity = 271100 BTU/hr (Ref Appendix # 9)

= 79.5 kW (2 No's Provided)

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 340)

Ref:

APPENDIX #10_ STEAM OR HOT WATER UNIT HEATERS_19

Coeff Dir Coeff Dir

Fwd Bhd-Tank 4 112 65.0 110.0 40.0 0.084 ↔ 218.4 0 218.4 35.0 30.0 0.065 ↔ 126.8

Fwd Bhd-Head 4 112 91.0 110.0 40.0 0.077 ↔ 280.3 0 280.3 60.0 5.0 0.068 ↔ 30.9

Fwd Bhd-Head 4 112 52.0 110.0 40.0 0.077 ↔ 160.2 0 160.2 60.0 5.0 0.068 ↔ 17.7

Port Bhd-Galley 3 112 104.0 70.0 0.0 0.077 ↔ 0.0 0 0.0 65.0 0.0 0.068 ↔ 0.0

Aft Bhd-Pot. Tk 5 112 65.0 110.0 40.0 0.077 ↔ 200.2 0 200.2 35.0 30.0 0.068 ↔ 132.6

Aft Bhd-Winch RM 5 112 26.0 120.0 50.0 0.077 ↔ 100.1 0 100.1 65.0 0.0 0.068 ↔ 0.0

Aft Bhd-Sewage Tk 5 112 65.0 110.0 40.0 0.077 ↔ 200.2 0 200.2 40.0 25.0 0.068 ↔ 110.5

Stbd Bhd-Day Rm 3 112 156.0 70.0 0.0 0.077 ↔ 0.0 0 0.0 65.0 0.0 0.068 ↔ 0.0

Deck Over - Dunnage

1 112 37.8 105.0 35.0 0.085 ↓ 112.4 0 112.4 0.0 65.0 0.063 ↑ 154.8

Deck Over - Weather

1 112 166.5 105.0 35.0 0.085 ↓ 495.4 0 495.4 -20.0 85.0 0.063 ↑ 891.7

Deck Over - Dunnage

1 112 56.7 105.0 35.0 0.085 ↓ 168.7 0 168.7 0.0 65.0 0.063 ↑ 232.2

Deck Under- Seawater

2 8 261.0 100.0 30.0 0.609 ↑ 4768.5 0 4768.5 28.0 37.0 0.281 ↓ 2713.6

Transmission Sub Total 6704 0 6704 4411

Lights 7 261.0 1827.0 0 1827.0

Equipment 8 100.0 0 100.0

Personnel (6) 9 1200 1800 3000

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

6 MEN CREW (Fr-3 to Fr-6) - HVAC CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

6 MEN CREW (Fr-3 to Fr-6) - HVAC CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Sensible Heat Sub Total 9831

Latent Heat Sub Total 1800

Total Heat (Btu/hr) 11631 4411

Total Heat (kW) 3.4 1.3

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.85

Heat Load Total QT = 11631 BTU/hr

Required AC Unit Capacity = 11631 BTU/hr

Total Heating Capacity Provided = 4411 BTU/hr

= 1.3 kW

Provided Heater 12600 (Ref Appendix # 9)

= 3.7 kW

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 18)

Ref:

Coeff Dir Coeff Dir

Fwd Bhd-Water Ballast

4 112 138.67 120.0 50.0 0.077 ↔ 533.9 0 533.9 40.0 25.0 0.068 ↔ 235.7

Port Bhd-6 Crew 3 112 156.00 70.0 0.0 0.077 ↔ 0.0 0 0.0 65.0 0.0 0.068 ↔ 0.0

Aft Bhd-Winch Rm 5 112 138.67 105.0 35.0 0.077 ↔ 373.7 0 373.7 65.0 0.0 0.068 ↔ 0.0

Stbd Bhd-Above Water level

3 112 80.00 70.0 0.0 0.074 ↔ 0.0 0 0.0 -20.0 85.0 0.065 ↔ 442.0

Stbd Bhd-Below Water level

3 112 76.00 70.0 0.0 0.074 ↔ 0.0 0 0.0 28.0 37.0 0.065 ↔ 182.8

Deck Over - Dunnage

1 112 89.79 105.0 35.0 0.085 ↓ 267.1 0 267.1 0.0 65.0 0.065 ↑ 379.4

Deck Over - Solar 1 112 197.55 140.0 70.0 0.085 ↓ 1175.4 0 1175.4 -20.0 85.0 0.065 ↑ 1091.5

Deck Under- Seawater

2 8 287.34 100.0 30.0 0.609 ↑ 5249.7 0 5249.7 28.0 37.0 0.281 ↓ 2987.5

Transmission Sub Total 7600 0 7600 5319

Lights 7 287.3 2011.4 0 2011.4

Equipment 8 200.0 0 200.0

Personnel (8) 9 1600 2400 4000

Sensible Heat Sub Total 11411

Latent Heat Sub Total 2400

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

DAY ROOM (Fr-3 to Fr-6) - HVAC CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

DAY ROOM (Fr-3 to Fr-6) - HVAC CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Total Heat (Btu/hr) 13811 5319

Total Heat (kW) 4.0 1.6

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.83

Heat Load Total QT = 13811 BTU/hr

Required AC Unit Capacity = 13811 BTU/hr

Number of units provided = 1 no

Total Cooling Capacity Provided = 13811 BTU/hr

Total Heating Capacity Provided = 5319 BTU/hr

= 1.6 kW

Provided Heater 12600 (Ref Appendix # 9)

= 3.7 kW

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 18)

Ref:

Coeff Dir Coeff Dir

Fwd Bhd-Tank 4 112 69.3 105.0 35.0 0.084 ↔ 203.8 0 203.8 35.0 30.0 0.065 ↔ 135.2

Fwd Bhd-Head 4 112 69.3 105.0 35.0 0.074 ↔ 179.6 0 179.6 60.0 5.0 0.068 ↔ 23.6

Fwd Bhd-Head 4 112 52.0 105.0 35.0 0.074 ↔ 134.7 0 134.7 60.0 5.0 0.068 ↔ 17.7

Port Bhd-Above Water level

3 112 80.0 105.0 35.0 0.084 ↔ 235.2 0 235.2 -20.0 85.0 0.065 ↔ 442.0

Port Bhd-Below Water level

3 112 76.0 105.0 35.0 0.084 ↔ 223.4 0 223.4 28.0 37.0 0.065 ↔ 182.8

Aft Bhd-Winch Rm 5 112 138.7 105.0 35.0 0.077 ↔ 373.7 0 373.7 65.0 0.0 0.068 ↔ 0.0

Stbd Bhd-6 Crew 3 112 104.0 70.0 0.0 0.077 ↔ 0.0 0 0.0 65.0 0.0 0.068 ↔ 0.0

Deck Over - Weather

1 112 180.0 105.0 35.0 0.084 ↓ 529.2 0 529.2 -20.0 85.0 0.065 ↑ 994.5

Deck Over - Dunnage

1 112 60.0 105.0 35.0 0.084 ↓ 176.4 0 176.4 0.0 65.0 0.065 ↑ 253.5

Deck Under- Seawater

2 8 240.0 100.0 30.0 0.609 ↑ 4384.8 0 4384.8 28.0 37.0 0.281 ↓ 2495.3

Transmission Sub Total 6441 0 6441 4545

Lights 7 240.0 1680.0 0 1680.0

Equipment 8 100.0 0 100.0

Personnel (6) 9 1200 1800 3000

U Q W

U Q s Q L Q T T O ∆T

Adjacent compartment

Load key

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

GALLEY/MESS (Fr-3 to Fr-6) - HVAC CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

GALLEY/MESS (Fr-3 to Fr-6) - HVAC CALCULATIONS (BOTTOM PLAN)

Date:

04-26-22

Sensible Heat Sub Total 9421

Latent Heat Sub Total 1800

Total Heat (Btu/hr) 11221 4545

Total Heat (kW) 3.3 1.3

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.84

Heat Load Total QT = 11221 BTU/hr

Required AC Unit Capacity = 11221 BTU/hr

Number of units provided = 1 no

Total Cooling Capacity Provided = 11221 BTU/hr

Total Heating Capacity Provided = 4545 BTU/hr

= 1.3 kW

Provided Heater 12600 (Ref Appendix # 9)

= 3.7 kW

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 18)

Ref:

70 70 °F

Coeff Dir Coeff Dir

Fwd Bhd-Solar 4 112 34.9 125.0 55.0 0.084 ↔ 161.5 0 161.5 -20.0 90.0 0.065 ↔ 204.4

Stbd Bhd-Weather 3 112 101.6 105.0 35.0 0.074 ↔ 263.2 0 263.2 -20.0 90.0 0.065 ↔ 594.5

Aft Bhd-Tool Box 5 112 24.5 120.0 50.0 0.077 ↔ 94.5 0 94.5 20.0 50.0 0.068 ↔ 83.5

Aft Bhd-Weather 5 112 34.8 105.0 35.0 0.084 ↔ 102.2 0 102.2 -20.0 90.0 0.065 ↔ 203.3

Port Bhd-Weather 3 112 54.0 105.0 35.0 0.084 ↔ 158.8 0 158.8 -20.0 90.0 0.065 ↔ 315.9

Port Bhd-Vent 3 112 21.3 120.0 50.0 0.077 ↔ 81.8 0 81.8 20.0 50.0 0.068 ↔ 72.3

Port Bhd-Vent 3 112 25.5 120.0 50.0 0.077 ↔ 98.2 0 98.2 20.0 50.0 0.068 ↔ 86.7

Port Bhd-Exhaust 3 112 25.5 120.0 50.0 0.077 ↔ 98.2 0 98.2 20.0 50.0 0.068 ↔ 86.7

Deck Over - Solar 1 112 97.5 140.0 70.0 0.085 ↓ 580.1 0 580.1 -20.0 90.0 0.063 ↑ 552.8

Deck Under-Winch Rm

2 8 67.5 70.0 0.0 0.609 ↑ 0.0 0 0.0 65.0 5.0 0.281 ↓ 94.8

Deck Under-Boiler Rm

2 8 30.0 110.0 40.0 0.609 ↑ 730.8 0 730.8 65.0 5.0 0.281 ↓ 42.2

Glass (P) 3 Glass 22.1 ↔ 3531.5 0 3531.5 0.0 70.0 ↔ 0.0

Glass (S) 3 Glass 25.9 ↔ 4141.2 0 4141.2 0.0 70.0 ↔ 0.0

Glass (Aft) 3 Glass 4.7 ↔ 747.0 0 747.0 0.0 70.0 ↔ 0.0

Glass (Fwd) 3 Glass 7.6 ↔ 1208.6 0 1208.6 0.0 70.0 ↔ 0.0

Transmission Sub Total 11998 0 11998 2337

Lights 7 97.5 682.5 0 682.5

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

Insul key

A T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

∆T Adjacent compartment Load key

Proj. no:

TAI-1240

Subject:

CONTROLHOUSE/OFFICE (S) - HVAC CALCULATIONS (DECK PLAN)

Date:

04-26-22

SPACE SPACE NO. COOLING SEASON: T = °F HEATING SEASON: T =

U Q W

U Q s Q L Q T T O

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

CONTROLHOUSE/OFFICE (S) - HVAC CALCULATIONS (DECK PLAN)

Date:

04-26-22

Sensible Heat Sub Total 13180

Latent Heat Sub Total 600

Total Heat (Btu/hr) 13780 2337

Total Heat (kW) 4.0 0.7

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.96

Heat Load Total QT = 13780 BTU/hr

Required AC Unit Capacity = 13780 BTU/hr

Number of units provided = 1 no

Total Cooling Capacity Provided = 13780 BTU/hr

Total Heating Capacity Provided = 2337 BTU/hr

Provided Heater 12600 (Ref Appendix # 9)

= 3.7 kW

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 18)

Ref:

70 70 °F

Coeff Dir Coeff Dir

Fwd Bhd-Solar 4 112 34.9 125.0 55.0 0.084 ↔ 161.5 0 161.5 -20.0 90.0 0.065 ↔ 204.4

Port Bhd-Weather 3 112 82.6 105.0 35.0 0.074 ↔ 213.9 0 213.9 -20.0 90.0 0.065 ↔ 483.1

Aft Bhd-Vent 5 112 21.3 105.0 35.0 0.077 ↔ 57.3 0 57.3 20.0 50.0 0.068 ↔ 72.3

Aft Bhd-Head 5 112 42.5 120.0 50.0 0.077 ↔ 163.6 0 163.6 60.0 10.0 0.068 ↔ 28.9

Stbd Bhd-Weather 3 112 54.4 105.0 35.0 0.074 ↔ 141.0 0 141.0 -20.0 90.0 0.065 ↔ 318.4

Stbd Bhd-Exhaust 3 112 21.3 120.0 50.0 0.077 ↔ 81.8 0 81.8 20.0 50.0 0.068 ↔ 72.3

Stbd Bhd-Exhaust 3 112 25.5 120.0 50.0 0.077 ↔ 98.2 0 98.2 20.0 50.0 0.068 ↔ 86.7

Deck Over - Solar 1 112 82.5 140.0 70.0 0.084 ↓ 485.1 0 485.1 -20.0 90.0 0.065 ↑ 482.6

Deck Under-Winch Rm

2 8 45.0 70.0 0.0 0.609 ↑ 0.0 0 0.0 65.0 5.0 0.281 ↓ 63.2

Deck Under-Gen.

Rm

2 8 30.0 70.0 0.0 0.609 ↑ 0.0 0 0.0 65.0 5.0 0.281 ↓ 42.1

Deck Under-Mech.

Rm

2 8 7.5 70.0 0.0 0.609 ↑ 0.0 0 0.0 65.0 5.0 0.281 ↓ 10.5

Glass (P) 3 Glass 19.4 ↔ 3105.9 0 3105.9 0.0 70.0 ↔ 0.0

Glass (S) 3 Glass 22.1 ↔ 3531.4 0 3531.4 0.0 70.0 ↔ 0.0

Glass (Fwd) 3 Glass 7.6 ↔ 1208.6 0 1208.6 0.0 70.0 ↔ 0.0

Transmission Sub Total 9248 0 9248 1865

Lights 7 82.5 577.4 0 577.4

∆T Adjacent compartment Load key

Insul key

A T O

U Q W

U Q s Q L Q T T O ∆T

Project Title:

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

DECK OPERATOR CONTROLHOUSE (P) - HVAC CALCULATIONS (DECK PLAN)

Date:

04-26-22

TAI 1240 150'x50"x10' CRANE BARGE CELRE

Proj. no:

TAI-1240

Subject:

DECK OPERATOR CONTROLHOUSE (P) - HVAC CALCULATIONS (DECK PLAN)

Date:

04-26-22

Equipment 8 100.0 0 100.0

Personnel (2) 9 400 600 1000

Sensible Heat Sub Total 10326

Latent Heat Sub Total 600

Total Heat (Btu/hr) 10926 1865

Total Heat (kW) 3.2 0.5

Notes: Glass solar Load = 160 Btu/hr/ft²

SHF = 0.95

Heat Load Total QT = 10926 BTU/hr

Required AC Unit Capacity = 10926 BTU/hr

Number of units provided = 1 no

Total Cooling Capacity Provided = 10926 BTU/hr

Total Heating Capacity Provided = 1865 BTU/hr

= 0.5 kW

Provided Heater 12600 (Ref Appendix # 9)

= 3.7 kW

(Make: MODINE Horizontal Delivery, MODEL: HSB/HC 18)

Ref:

APPENDIX #1

MAHA

Rectangle

MAHA

Rectangle

Rectangle

IS 14909:2001

ISO 8861:1998

fn~ x mf~ x m~f

P

In a case where the capacity following formula is used:

Q x rnf$jx m~fa. = of a boiler or a thermal fluid heater is known in kilowatts, the

-,u where

Q m~ f%

P is the maximum continuous rating of the boiler(s), in kilowatts;

is the total steam capacity (maximum continuous rating) of the boiler(s), in kilograms per second;

is the fuel consumption, in kilograms of fuel per kilogram of steam, or in kilograms of fuel per second per kilowatt of thermal capacity;

NOTE –- Where specific data are not available, mf~ = 0,077 kg/kg may be used for the calculation if the steam capacity is known. If the thermal capacity is known, rnf~ = 0,11 kg S-l kW-l may be used.

maf k the air requirement for combustion, in kilograms of air per kilogram of fuel;

NOTE — Where specific data are not available, maf = 15,7 kg/kg may be used for calculation.

p = 1,13 kg/ins (i.e. the density of air, at+ 35 ‘C, 70% RH and 101,3 kPa).

5.3 Airflow for evacuation of heat emission

The sum of the airflow necessary for heat evacuation, qh, shall be calculated, in cubic metres per second, as follows:

where

@@ is the heat emission from main propulsion diesel en9ine(s)j in Rlowatts (see 6.1 );

‘dg is the heat emission from diesel generator engine(s), in kilowatts (see 6.2);

@b is the heat emission from boilers and thermal fluid heaters, in kilowatts (see 6.3);

Op isthe heat emission from steam and condensate pipes, in kilowatts (see 6.4);

Text Box

APPENDIX #2

SNAME Technical and Research Bulletin 4-16 (2015 Interim)

Recommended Practices for Merchant Ship HVAC Design Calculations

Table 2-1: Ventilation & Heating Recommendations for Non-Air Conditioned Spaces

Type Space

Ventilation Heating

Temperature

Rise, Tr (°F)

Max. Air Change, R/C (minutes)

Temperature, Ts (°F)

Air Cond. Equip. and Fan Rooms 15 - 40

Baggage 15 15 60

Battery Room - 4 40

Bonded Stores 15 10 40

Bosn’s Stores - 20 -

Bow Thruster Room 15 6 40

Butcher Shop 10 4 40

Canvas Room - 6 40

Capstan Machinery Room 15 6 -

Cargo Control Room - 10 70

Carpenter Shop 10 6 60

Cleaning Gear Locker - 4 -

CO2 Room 15 6 -

Deck Lockers, Deck Stores 15 - -

Deck Toilet - 6 60

Dry Stores - 15 -

Elec. & Engrs. Workshops 10 6 60

Elev. Mach. Room 15 6 -

Emerg. Gen. Room 15 10 40

Engrs. Stores 20 30 -

F.O. Filling Station - 6 -

Galley and Galley Pantry * 10 1 50

APPENDIX #3

SNAME Technical and Research Bulletin 4-16 (2015 Interim)

Recommended Practices for Merchant Ship HVAC Design Calculations

Table 2-1 Continued

Type Space

Ventilation Heating

Temperature

Rise, Tr (°F)

Max. Air Change, R/C (minutes)

Temperature, Ts (°F)

Garbage Room 10 1 -

Hawser Room - 20 -

Lateral Thruster Comp’t 15 6 -

Laundries – Service ** 10 4 70

Linen Lockers, Daily Service - 15 -

Linen Room – Clean 10 5 60

Linen Room – Soiled 10 4 -

Machine Shop 15 6 60

Oil Skin Lockers - 4 -

Paint Rooms, Deck & Engr’s. 10 4 -

Pantries Service 10 4 -

Passageway, Outside A/C Spaces 10 6 -

Pump Room 15 3 40

Sewage Tank Space 15 6 -

Shaft Alley - 10 -

Stores – Ship’s Dry Daily Galley

& Bulk Food 10 4 50

Stores – Steward’s & Misc. 10 6 -

Stevedores Toilets - 6 60

Toilet & Showers 10 4 70

Winch M.G. 15 6 -

Windlass Machinery Room 15 6 40

* The minimum exhaust air from a Galley shall be equal to the total airflow from all hoods in the Galley.

** The minimum exhaust air from a Laundry space shall be equal to the clothes dryers’ total blower airflow.

Marine Design Center/3265

W912BU-17-D-0001, Tracking Number 0007 o The spuds, spud wells, and spud handling shall be capable of a controlled free-fall operation using the winch drum brakes, without allowing the wire rope to bird nest on the drum.

o The Contractor shall incorporate the crane’s boom rest design into the design of the barge.

Outfitting, Machinery, and Electrical:

o Insulation and soundproofing shall be incorporated as needed in the office/ break

/ and office to maintain a temperature of 70 degrees F and below deck 65 degrees

F when outside temperatures are -20 degrees F. Air conditioning for the office / break/ locker spaces to 70 degrees F when outside temperatures are at 105 degrees F. Boiler system will be used as a backup system for providing heat in these locations.

o Furniture and furnishings as required by 4 crew under typical operation, including desks, computers, network access, bunks and galley furniture. Space and beds shall be available for up to 6 for towing operators over 24 hours.

o Life Saving Equipment as required by ABS and EM 385-1-1.

o Removable handrails shall be provided in accordance EM 385-1-1. The handrails shall have stanchion made from 1-1/2 inch pipe with 5 levels of chain equally spaced. The chain shall be removable from each side of the stanchion.

o A 20 foot work boat and davit shall be provide at the stern of the barge. The davit shall be used for launching and recovering the work boat.

o Overhead hoists and rails in the shop areas for moving supplies and equipment.

o A transducer well shall be installed at near the bow of the vessel for a multi-beam sounder head to assist in strike and shoal removal surveying.

o Spud winches located below the deck and sized to lift the spuds specified above.

The winches shall be sized and rated by the following specifications:

The winch motors shall be rated for 100% torque at zero speed and shall be driven by Variable Frequency Drives. The motors shall have friction brakes that are activated electrically. An electrical actuated drum brake shall also be provided.

The spud winches shall be capable of producing a line pull approximately two times the dry spud weight across a 2-part system on the first drum layer in order to account for removal from the mud or sand. This requirement may require significantly higher motor torque than the motor may be capable of producing, and the winches shall be sized and rated for both conditions.

Shall have near free-fall capabilities (i.e. 200% of rated line speed). The spuds, spud wells, and spud handling shall be capable of a controlled free-fall operation using the winch drum brakes, without allowing the wire rope to bird nest on the drum.

APPENDIX #4

TECH111

Motor (Fan) CFM @ Static Pressure

Size Model 1'' 11⁄2'' 2'' 21⁄2'' 3'' 31⁄2'' 4''

HP RPM CFM BHP CFM BHP CFM BHP CFM BHP CFM BHP CFM BHP CFM BHP

12 _44VM-126DA---STAIG2 3⁄4 3450 1763 0.52 1388 0.61 673 0.72

_44VM-166DA---STAIK2 3 3500 5382 2.49 5142 2.79 4886 3.09 4598 3.38 4245 3.64

_44VM-166DA---STAIF3 1⁄2 1725 1215 0.50

_44VM-186DA---STAIL2 5 3500 7525 3.31 7236 3.63 6918 3.96 6555 4.27 6106 4.51 5420 4.75 4404 4.84

_44VM-186DA---STAIG3 3⁄4 1725 2072 0.58 1098 0.79

_44VM-246DA---STAIK3 3 1760 7483 2.05 6479 2.39 4418 2.61 2979 3.12

_44VM-246DA---STAIG4 3⁄4 1140 2100 0.81

_44VM-286DA---STAIL3 5 1750 12743 4.11 11840 4.60 10739 5.01 9153 5.41

_44VM-286DA---STAIJ4 2 1160 6608 1.53 3384 1.90

_44VM-326DA---STAIN3 10 1765 19741 7.21 18762 8.23 17672 9.07 16429 9.79 14973 10.53 12525 11.10

_44VM-326DA---STAIK4 3 1160 11113 2.70 8367 3.14

_44VM-366DA---STAIP3 20 1765 28278 12.01 27125 13.34 25895 14.56 24660 15.79 23348 16.97 21819 18.01 19989 18.90

_44VM-366DA---STAIL4 5 1160 16511 4.36 14400 5.10 10223 5.48

_44VM-406DA---STAIR3 30 1780 39626 20.89 38501 22.91 37354 24.70 36159 26.30 34871 27.67 33475 28.88 31914 30.03

40 _44VM-406DA---STAIN4 10 1180 24331 7.46 22358 8.35 19817 9.14 15187 9.81 10580 11.11

_44VM-406DA---STAIL5 5 870 15284 3.56 9014 4.15 5588 5.34

_44VM-446DA---STAIS3 40 1775 53213 31.76 51995 34.48 50724 37.51 49385 40.56 47963 43.49 46406 45.48

44 _44VM-446DA---STAIO4 15 1180 33259 11.49 31077 13.26 28420 14.09 25185 15.13 20168 15.93 15100 17.13

_44VM-446DA---STAIM5 71⁄2 870 21627 5.56 17025 6.29 10316 7.14

_44VM-486DA---STAIV3 75 1780 69489 47.81 68187 51.28 66840 54.97 65441 58.93 63978 62.89 62438 66.70 60783 69.58

48 _44VM-486DA---STAIP4 20 1175 43582 16.48 41336 19.06 38725 20.70 35631 21.68

_44VM-486DA---STAIN5 10 870 29391 8.22 25165 9.06 18011 9.87 12289 11.43

_44VM-546DA---STAIS4 40 1180 63267 27.83 60894 31.53 58308 35.12 55367 37.31 52002 38.63 48190 40.49 43715 42.55

54 _44VM-546DA---STAIP5 20 870 43622 13.63 39577 15.26 34414 16.52 25979 17.60 18832 19.59 14553 22.44

_44VM-546DA---STAIN6 10 690 30723 7.69 22555 8.69 13622 10.26