This solicitation announcement is for a fixed price construction contract to build an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project includes constructing a modified standard design rotary wing aircraft hangar, associated maintenance shops and administrative space, hazardous materials and POL storage facilities, a GSE storage building, hangar access and washing aprons, an airfield fire pump building, foundations, cybersecurity, building information systems, fire protection and alarm systems, and utility connection work. Supporting facilities incorporate site development, utilities, fire suppression including a water tank, lighting, paving, parking, drainage, landscaping and signage. Self-contained air conditioning, DoD antiterrorism standards, accessibility, cybersecurity, sustainability measures, and 40-year facility design life are required. The performance period will be determined. The estimated value is $50-100 million. The solicitation is open and unrestricted, with proposals due on April 13, 2021. The best value award will be determined by experience, past performance, organization and management plan, small business participation plan, and price factors.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0009 31 Mar 2021
6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE
CEPOH – CONTRACTING DIVISION HAWAII
USACE, HONOLULU DISTRICT See Item 6
BLDG 252 (CECT-POH)
FT SHAFTER, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
W9128A21R0004 X
9B. DATED (SEE ITEM 11)
X 29-Jan-2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
ODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii
See Continuation Page
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
W9128A21R0004
Am-0009
1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.
Revised pages replace like-numbered pages. The revision mark “(Am-0009)” is shown on each revised page.
A. REVISED SECTIONS. The following are sections were revised and changes are in bold and strikethrough.
Section 28 31 76, Paragraph 2.19.1
B. ADDITIONS TO SECTION: The following sections were added to a section:
Section 00 60 00, Requests for Information #379 to 380
C. NEW PARAGRAPHS. The following pargraphs are added to the sections.
N/A
D. REPLACED SECTION: The following sections are to be replaced in its entirety:
Section 00 60 00, Requests for Information #369 and 372
E. NEW SECTIONS: The following sections are added to the solicitation.
N/A
F. DELETED SECTIONS: The following sections are deleted in the solicitation.
N/A
2. CHANGES TO DRAWINGS
A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:
SHEET ID SHEET NO. MARK REVISION DATE
G-002 Vol 1 of 3 7 03/30/21
G-004 Vol 1 of 3 7 03/30/21
B. NEW DRAWINGS (ISSUED). The following new drawings are issued herewith:
N/A
3. The proposal due date has changed. See Am-0009, SF 1442, Block 13.
(Am-0009)
FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii
DAYNA N MATSUMURA (808) 835-4379
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jan-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 7 calendar days and complete it within ________ 1095 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 0 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 13 Apr 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 230 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W9128A21R0004 122
RFI # Question Issued Response
09 97 13.27 Sect 09 97 13.27, 3.2 allows for surfaces to be coated in a shop, while 2.3 states that coatings applied in a shop must be removed in the filed. While the removal of a holding primer in the field is prudent, the requirements of 2.3, in relation to 3.2 remain unclear. Are the requirements of 2.3, in particular the complete removal of shop applied coatings, applicable should the contractor perform surface preparation and apply the complete coating system in the shop?
See Am-0008, response to RFI #339
31 00 00 Spec 31 00 00, Para 1.2.9, Para 3.10.1.4, & Para 3.12 Para 1.2.9 states "provide select granular materials UNDER FLOOR SLABS, CONCRETE LANDING AND CONCRETE PADS where indicated on plans."
a. Please clarify only 2" minus select granular (Para 1.2.9) can be utilized to embank to the subgrade of floor slabs, conc landing & pads or 3" minus satisfactory material per Para 3.12 can be utilized?
b. Please clarify only 2" minus select granular fill can be utilized for plumbing trench backfill under the bldg. SOG, or trench backfill per Para 3.10.1.4.1 (CLSM, select borrow or non-expansive granular), or per Para 3.10.1.4 (satisfactory material).
(a) See Am-0007, response to RFI #285 response
(b) 3" minus satisfactory material is allowed per spec.
Trench backfill requirements is in section 31 00 00 which applies to plumbing / mechanical piping located outside the building line.
See International Plumbing Code for plumbing trenching / piping under the building.
Section 00 60 00, Requests for Information - Page 1 (Am-0009)
J3CT9DNM
Rectangle
RFI # Question Issued Response
28 531 76 page 27 Section 2.19 Section 28 531 76 page 27 Section 2.19 INTERFACE TO THE BASE WIDE MASS NOTIFICATION NETWORK states "A WAVES 10 transceiver shall be provided."
Please confirm that the WAVES 10 transceiver will work with the current base mass notification receiver and network.
Please provide make, model and location of the base wide mass notification receiver.
If it is not compatible with current base mass notification receiver and network, please define the operational level and test procedure that would satisfy the terms of the contract regarding the WAVES 10 transceiver.
See Am-0009, revised section 28 31 76, para 2.19.1
We noticed a discrepancy in the extents of Bid Option 1.
Sheet G004 shows 2 rows of parking stalls in the base bid, and 2 in the bid option.
However, it states to refer to the Civil drawings. CS106 shows 1 row of parking stalls as base bid and 3 in the bid option.
Please confirm since G004 refers to Civil drawings, that CS106 should be followed and only 1 row of parking stalls is to be included in the base bid, with 3 rows of parking stalls in Bid Option 1.
See Am-0009, revised sheet G-004.
Drawing sheet CS106 is correct.
Section 00 60 00, Requests for Information - Page 1
FY21 PN76897 AIRCRAFT MAINTENANCE HANGAR PN76897
equipped with mounting holes and other openings as needed for a complete installation. Fabrication marks and holes shall be ground and finished to provide a smooth and neat appearance for each plate. Each plate shall be primed and painted.
c. Speakers shall utilize screw terminals for termination of all field wiring.
2.17.2 Visual Notification Appliances
Visual notification appliances shall conform to the applicable requirements of UL 1971 and conform to the Architectural Barriers Act (ABA). Colored lens, such as amber, shall comply with UL 1638. The manufacturer shall have the color lens tested to the full UL 1971 polar plotting criteria, voltage drop, and temperature rise as stated in 1971. Fire Alarm/Mass Notification Appliances shall have clear high intensity optic lens, xenon flash tubes, and output white light and be marked "ALERT" in red letters.
The light pattern shall be disbursed so that it is visible above and below the strobe and from a 90 degree angle on both sides of the strobe. Strobe flash rate shall be 1 flash per second and a minimum of 15 candela (actual output after derating for tinted lens) based on the UL 1971 test. Strobe shall be surface mounted. Provide synchronized operation of all strobes in the building. Devices shall use screw terminals for all field wiring.
2.18 ENVIRONMENTAL ENCLOSURES OR GUARDS
Environmental enclosures shall be provided to permit Fire Alarm or Mass Notification components to be used in areas that exceed the environmental limits of the listing. The enclosure shall be listed for the device or appliance as either a manufactured part number or as a listed compatible accessory for the UL category that the component is currently listed.
Guards required to deter mechanical damage shall be either a listed manufactured part or a listed accessory for the category of the initiating device or notification appliance.
2.19 INTERFACE TO THE BASE WIDE MASS NOTIFICATION NETWORK
2.19.1 Radio
The radio transceiver shall be bi-direction and meet all the requirements of paragraph, RADIO TRANSMITTER AND INTERFACE PANELS as specified in this transceiver utilized in the Mass Notification System shall be compatible with the base wide receiving station as well as being capable of the following:
a. Communication with the Central Control/Monitoring System to provide supervision of communication link and status changes are reported by automatic and manual poll/reply/acknowledge routines.
b. All monitored points/status changes are transmitted immediately and at programmed intervals until acknowledged by the Central Control/Monitoring System.
c. Each transceiver shall transmits a unique identity code as part of all messages; the code is set by the user at the transceiver.
SECTION 28 31 76 Page 27 (Am-0009)
Specification Section. A WAVES 10 transceiver shall be provided. The existing base wide receiving station uses a WAVES 7 system. The j3ec9kts Cross-Out
2.19.1.1 Radio Frequency Communications
Use of radio frequency-type communications systems shall comply with National Telecommunications and Information Administration (NTIA) requirements.
2.19.1.2 Licensed Radio Frequency Systems
An approved DD Form 1494 for the system is required prior to operation.
2.19.2 Secure Radio System
2.19.2.1 Communications Network
The communications network provides two-way signals between central control units and autonomous control units (in individual building systems), and should include redundant (primary and backup) communication links. The system shall incorporate technology to prevent easy interruption of the radio traffic for MNS Alerting.
2.19.2.2 Radio Frequency Communications
Use of radio frequency-type communications systems shall comply with National Telecommunications and Information Administration (NTIA) requirements. The systems shall be designed to minimize the potential for interference, jamming, eavesdropping, and spoofing.
2.19.2.3 Licensed Radio Frequency Systems
An approved DD Form 1494 for the system is required prior to operation.
2.20 AUTOMATIC FIRE TRANSMITTERS
2.20.1 Radio Transmitter and Interface Panels
Transmitters shall be compatible with proprietary supervising station receiving equipment. Each radio alarm transmitter shall be the manufacturer's recognized commercial product, completely assembled, wired, factory tested, and delivered ready for installation and operation.
Transmitters shall be provided in accordance with applicable portions of NFPA 72, Federal Communications Commission (FCC) 47 CFR 90 and Federal Communications Commission (FCC) 47 CFR 15. Transmitter electronics module shall be contained within the physical housing as an integral, removable assembly. The proprietary supervising station receiving equipment is Monaco and the transceiver shall be fully compatible with this equipment. At the contractors option, and if UL or FM listed, the transmitter may be housed in the same panel as the fire alarm control panel. The transmitter shall be Narrowband radio, with FCC certification for narrowband operation and meets the requirements of the NTIA (National Telecommunications and Information Administration) Manual of Regulations and Procedures for Federal Frequency Management.
2.20.1.1 Operation
Operate each transmitter from 120-volt ac power. In the event of 120-volt ac power loss, the transmitter shall automatically switch to battery operation. Switchover shall be accomplished with no interruption of protective service, and shall automatically transmit a trouble message.
Upon restoration of ac power, transfer back to normal ac power supply shall
SECTION 28 31 76 Page 28 also be automatic.
2.20.1.2 Battery Power
Transmitter standby battery capacity shall provide sufficient power to operate the transmitter in a normal standby status for a minimum of 72 hours and be capable of transmitting alarms during that period.
2.20.1.3 Transmitter Housing
Use NEMA Type 1 for housing. The housing shall contain a lock that is keyed identical to radio alarm transmitter housings on the base. Radio alarm transmitter housing shall be factory painted with a suitable priming coat and not less than two coats of a hard, durable weatherproof enamel.
2.20.1.4 Antenna
Antenna shall be omnidirectional, coaxial, halfwave dipole antennas for radio alarm transmitters with a driving point impedance to match transmitter output. The antenna and antenna mounts shall be corrosion resistant and designed to withstand wind velocities of 100 mph. Do not mount antennas to any portion of the building roofing system. Protect the antenna from physical damage.
2.20.2 Signals to Be Transmitted to the Base Receiving Station
The signals which are to be sent to the base receiving station shall be as indicated on the drawings.
2.21 WIRING
Provide wiring materials under this section as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM with the additions and modifications specified herein. NFPA 70 accepted fire alarm cables that do not require the use of raceways except as modified herein are permitted.
2.21.1 Alarm Wiring
The SLC wiring shall be solid copper cable in accordance with the manufacturers requirements. Copper signaling line circuits and initiating device circuit field wiring shall be No. 14 AWG size twisted and shielded solid conductors at a minimum. Visual notification appliance circuit conductors, that contain audible alarm appliances, shall be solid copper No. 14 AWG size conductors at a minimum. Speaker circuits shall be copper No. 16 AWG size twisted and shielded conductors at a minimum. Wire size shall be sufficient to prevent voltage drop problems. Circuits operating at 24 VDC shall not operate at less than the UL listed voltages for the sensors and/or appliances. Power wiring, operating at 120 VAC minimum, shall be a minimum No. 12 AWG solid copper having similar insulation.
Acceptable power-limited cables are FPL, FPLR or FPLP as appropriate with red colored covering. Nonpower-limited cables shall comply with NFPA 70.
SECTION 28 31 76 Page 29
PART 3 EXECUTION
3.1 INSTALLATION OF FIRE ALARM INITIATING DEVICES AND NOTIFICATION
APPLIANCES
3.1.1 FMCP
Locate the FMCP where indicated on the drawings. Surface mount the enclosure with the top of the cabinet 6 feet above the finished floor or center the cabinet at 5 feet, whichever is lower. Conductor terminations shall be labeled and a drawing containing conductors, their labels, their circuits, and their interconnection shall be permanently mounted in the
FMCP.
3.1.2 Manual Stations:
Locate manual stations as required by NFPA 72 and as indicated on the drawings. Mount stations so that their operating handles are 4 feet above the finished floor measured to top of the device. Mount stations so they are located no farther than 5 feet from the exit door they serve, measured horizontally.
3.1.3 Notification Appliance Devices
Locate notification appliance devices as required by NFPA 72 and where indicated. Mount assemblies on walls as required by NFPA 72 and to meet the intelligibility requirements. Ceiling mounted speakers shall conform to NFPA 72.
3.1.4 Smoke Sensors
Locate sensors as required by NFPA 72 and their listings on a 4 inch mounting box. Locate smoke sensors on the ceiling. Smoke sensors are permitted to be on the wall no lower than 12 inches from the ceiling with no minimum distance from the ceiling. Install smoke sensors no closer than 5 feet from air handling supply outlets.
3.1.5 Annunciator
Locate the annunciator as shown on the drawings. Surface mount the panel, with the top of the panel 6 feet above the finished floor or center the panel at 5 feet, whichever is lower.
3.1.6 Water Flow Detectors and Tamper Switches
Connect to water flow detectors and tamper switches.
3.1.7 Local Operating Console (LOC)
Locate the LOC as required by NFPA 72 and as indicated. Mount the console so that the top message button is no higher than 44 inches above the floor.
3.2 SYSTEM FIELD WIRING
3.2.1 Wiring within Cabinets, Enclosures, and Boxes
Provide wiring installed in a neat and workmanlike manner and installed parallel with or at right angles to the sides and back of any box, enclosure, or cabinet. Conductors that are terminated, spliced, or
SECTION 28 31 76 Page 30 otherwise interrupted in any enclosure, cabinet, mounting, or junction box shall be connected to screw-type terminal blocks. Mark each terminal in accordance with the wiring diagrams of the system. The use of wire nuts or similar devices is prohibited. Conform wiring to NFPA 70.
Indicate the following in the wiring diagrams.
a. Point-to-point wiring diagrams showing the points of connection and terminals used for electrical field connections in the system, including interconnections between the equipment or systems that are supervised or controlled by the system. Diagrams shall show connections from field devices to the FACP and remote fire alarm control units, initiating circuits, switches, relays and terminals.
b. Complete riser diagrams indicating the wiring sequence of devices and their connections to the control equipment. Include a color code schedule for the wiring. Include floor plans showing the locations of devices and equipment.
3.2.2 Terminal Cabinets
Provide a terminal cabinet at the base of any circuit riser, on each floor at each riser, and where indicated on the drawings. Terminal size shall be appropriate for the size of the wiring to be connected. Conductor terminations shall be labeled and a drawing containing conductors, their labels, their circuits, and their interconnection shall be permanently mounted in the terminal cabinet. Minimum size is 8 inches by 8 inches.
Only screw-type terminals are permitted.
3.2.3 Alarm Wiring
Voltages shall not be mixed in any junction box, housing, or device, except those containing power supplies and control relays. Provide all wiring in electrical metallic conduit. Conceal conduit in finished areas of new construction and wherever practicable in existing construction. The use of flexible conduit not exceeding a 6 foot length shall be permitted in initiating device or notification appliance circuits. Run conduit or tubing (rigid, IMC, EMT, FMC, etc. as permitted by NFPA 72 and NFPA 70) concealed. Use of cables in conduit is not permitted.
3.2.4 Conductor Terminations
Labeling of conductors at terminal blocks in terminal cabinets, FMCP, and remote FMCP and the LOC shall be provided at each conductor connection.
Each conductor or cable shall have a shrink-wrap label to provide a unique and specific designation. Each terminal cabinet, FMCP, and remote FMCP shall contain a laminated drawing that indicates each conductor, its label, circuit, and terminal. The laminated drawing shall be neat, using 12 point lettering minimum size, and mounted within each cabinet, panel, or unit so that it does not interfere with the wiring or terminals. Maintain existing color code scheme where connecting to existing equipment.
3.3 CONNECTION OF NEW SYSTEM
The following new system connections shall be made during the last phase of construction, at the beginning of the preliminary tests. New system connections shall include:
a. Connection of new system transmitter to existing base fire reporting
SECTION 28 31 76 Page 31 system.
Once these connections are made, system shall be left energized and new audio/visual devices deactivated. Report immediately to the Contracting Officer, coordination and field problems resulting from the connection of the above components.
3.4 FIRESTOPPING
Provide firestopping for holes at conduit penetrations through floor slabs, fire rated walls, partitions with fire rated doors, corridor walls, and vertical service shafts in accordance with Section 07 84 00 FIRESTOPPING.
3.5 PAINTING
Paint exposed electrical, fire alarm conduit, and surface metal raceway to match adjacent finishes in exposed areas. Paint junction boxes red in unfinished areas and conduits and surface metal raceways shall be painted with a 1-inch wide red band every 10 feet in unfinished areas.. Painting shall comply with Section 09 90 00 PAINTS AND COATINGS.
3.6 FIELD QUALITY CONTROL
3.6.1 Testing Procedures
Submit detailed test procedures, prepared and signed by a Registered Professional Engineer or a NICET Level 4 Fire Alarm Technician, and signed by representative of the installing company, for the fire detection and alarm system 60 days prior to performing system tests. Detailed test procedures shall list all components of the installed system such as initiating devices and circuits, notification appliances and circuits, signaling line devices and circuits, control devices/equipment, batteries, transmitting and receiving equipment, power sources/supply, annunciators, special hazard equipment, emergency communication equipment, interface equipment, Guard's Tour equipment, and transient (surge) suppressors. Test procedures shall include sequence of testing, time estimate for each test, and sample test data forms. The test data forms shall be in a check-off format (pass/fail with space to add applicable test data; similar to the forma in NFPA 72) and shall be used for the preliminary testing and the acceptance testing. The test data forms shall record the test results and shall:
a. Identify the NFPA Class of all Initiating Device Circuits (IDC), Notification Appliance Circuits (NAC), Voice Notification System Circuits (NAC Audio), and Signaling Line Circuits (SLC).
b. Identify each test required by NFPA 72 Test Methods and required test herein to be performed on each component, and describe how this test shall be performed.
c. Identify each component and circuit as to type, location within the facility, and unique identity within the installed system. Provide necessary floor plan sheets showing each component location, test location, and alphanumeric identity.
d. Identify all test equipment and personnel required to perform each test (including equipment necessary for testing smoke detectors using real smoke).
SECTION 28 31 76 Page 32
e. Provide space to identify the date and time of each test. Provide space to identify the names and signatures of the individuals conducting and witnessing each test.
3.6.2 Tests Stages
3.6.2.1 Preliminary Testing
Conduct preliminary tests to ensure that devices and circuits are functioning properly. Tests shall meet the requirements of paragraph entitled "Minimum System Tests." After preliminary testing is complete, provide a letter certifying that the installation is complete and fully operable. The letter shall state that each initiating and indicating device was tested in place and functioned properly. The letter shall also state that panel functions were tested and operated properly. The letter shall include the names and titles of the witnesses to the preliminary tests. The Contractor and an authorized representative from each supplier of equipment shall be in attendance at the preliminary testing to make necessary adjustments.
3.6.2.2 Request for Formal Inspection and Tests
When tests have been completed and corrections made, submit a signed, dated certificate with a request for formal inspection and tests to the USACE Fire Protection Engineer.
3.6.2.3 Final Testing
Notify the Contracting Officer in writing when the system is ready for final acceptance testing. Submit request for test at least 15 calendar days prior to the test date. The tests shall be performed in accordance with the approved test procedures in the presence of the Contracting Officer. Furnish instruments and personnel required for the tests. A final acceptance test will not be scheduled until the following are provided at the job site:
a. The systems manufacturer's technical representative
b. Marked-up red line drawings of the system as actually installed
c. Megger test results
d. Loop resistance test results
e. Complete program printout including input/output addresses
The final tests will be witnessed by the USACE Fire Protection Engineer.
At this time, any and all required tests shall be repeated at their discretion.
3.6.2.4 System Acceptance
Following acceptance of the system, as-built drawings and O&M manuals shall be delivered to the Contracting Officer for review and acceptance. Submit six sets of detailed as-built drawings. The drawings shall show the system as installed, including deviations from both the project drawings and the approved shop drawings. These drawings shall be submitted within two weeks after the final acceptance test of the system. At least one set of as-built (marked-up) drawings shall be provided at the time of, or prior to
SECTION 28 31 76 Page 33 the final acceptance test.
a. Furnish one set of full size paper as-built drawings and schematics.
The drawings shall be prepared on uniform sized mylar sheets not less than 30 by 42 inches with 8 by 4 inch title block similar to contract drawings. Furnish one set of CD or DVD discs containing software back-up and CAD based drawings in latest version of AutoCAD and DXF format of as-built drawings and schematics.
b. Include complete wiring diagrams showing connections between devices and equipment, both factory and field wired.
c. Include a riser diagram and drawings showing the as-built location of devices and equipment.
3.6.3 Minimum System Tests
Test the system in accordance with the procedures outlined in NFPA 72, ISO 7240-16, IEC 60268-16. The required tests are as follows:
a. Megger Tests: After wiring has been installed, and prior to making any connections to panels or devices, wiring shall be megger tested for insulation resistance, grounds, and/or shorts. Conductors with 300 volt rated insulation shall be tested at a minimum of 250 VDC.
Conductors with 600 volt rated insulation shall be tested at a minimum of 500 VDC. The tests shall be witnessed by the Contracting Officer and test results recorded for use at the final acceptance test.
b. Loop Resistance Tests: Measure and record the resistance of each circuit with each pair of conductors in the circuit short-circuited at the farthest point from the circuit origin. The tests shall be witnessed by the Contracting Officer and test results recorded for use at the final acceptance test.
c. Verify the absence of unwanted voltages between circuit conductors and ground. The tests shall be accomplished at the preliminary test with results available at the final system test.
d. Verify that the control unit is in the normal condition as detailed in the manufacturer's O&M manual.
e. Test each initiating device and notification appliance and circuit for proper operation and response at the control unit. Smoke sensors shall be tested in accordance with manufacturer's recommended calibrated test method. Use of magnets is prohibited. Testing of duct smoke detectors shall comply with the requirements of NFPA 72 except that, for item 12(e) (Supervision) in Table 14.4.2.2, disconnect at least 20 percent of devices. If there is a failure at these devices, then supervision shall be tested at each device.
f. Test the system for specified functions in accordance with the contract drawings and specifications and the manufacturer's O&M manual.
g. Test both primary power and secondary power. Verify, by test, the secondary power system is capable of operating the system for the time period and in the manner specified.
h. Determine that the system is operable under trouble conditions as specified.
SECTION 28 31 76 Page 34
i. Visually inspect wiring.
j. Test the battery charger and batteries.
k. Verify that software control and data files have been entered or programmed into the FACP. Hard copy records of the software shall be provided to the Contracting Officer.
l. Verify that red-line drawings are accurate.
m. Measure the current in circuits to ensure there is the calculated spare capacity for the circuits.
n. Measure voltage readings for circuits to ensure that voltage drop is not excessive.
o. Disconnect the verification feature for smoke sensors during tests to minimize the amount of smoke needed to activate the sensor. Testing of smoke sensors shall be conducted using real smoke or the use of canned smoke which is permitted.
p. Measure the voltage drop at the most remote appliance (based on wire length) on each notification appliance circuit.
3.6.3.1 Intelligibility Tests
Intelligibility testing of the System shall be accomplished in accordance with NFPA 72 for Voice Evacuation Systems, IEC 60268-16, and ASA S3.2.
Following are the specific requirements for intelligibility tests:
a. Intelligibility Requirements: Verify intelligibility by measurement after installation.
b. Ensure that a CIS value greater than the required minimum value is provided in each area where building occupants typically could be found. The minimum required value for CIS is .8.
c. Areas of the building provided with hard wall and ceiling surfaces (such as metal or concrete) that are found to cause excessive sound reflections may be permitted to have a CIS score less than the minimum required value if approved by the DOD installation, and if building occupants in these areas can determine that a voice signal is being broadcast and they must walk no more than 33 feet to find a location with at least the minimum required CIS value within the same area.
d. Areas of the building where occupants are not expected to be normally present are permitted to have a CIS score less than the minimum required value if personnel can determine that a voice signal is being broadcast and they must walk no more than 50 feet to a location with at least the minimum required CIS value within the same area.
e. Take measurements near the head level applicable for most personnel in the space under normal conditions (e.g., standing, sitting, sleeping, as appropriate).
f. The distance the occupant must walk to the location meeting the minimum required CIS value shall be measured on the floor or other walking surface as follows:
SECTION 28 31 76 Page 35
(1) Along the centerline of the natural path of travel, starting from any point subject to occupancy with less than the minimum required CIS value.
(2) Curving around any corners or obstructions, with a 12 inches clearance there from.
(3) Terminating directly below the location where the minimum required CIS value has been obtained.
Use commercially available test instrumentation to measure intelligibility as specified by ISO 7240-19 and ISO 7240-16 as applicable. Use the mean value of at least three readings to compute the intelligibility score at each test location.
3.7 INSTRUCTION OF GOVERNMENT EMPLOYEES
3.7.1 Instructor
Include in the project the services of an instructor, who has received specific training from the manufacturer for the training of other persons regarding the inspection, testing, and maintenance of the system provided.
The instructor shall train the Government employees designated by the Contracting Officer, in the care, adjustment, maintenance, and operation of the fire alarm system. Each instructor shall be thoroughly familiar with all parts of this installation. The instructor shall be trained in operating theory as well as in practical O&M work. Submit the instructors information and qualifications including the training history.
3.7.2 Required Instruction Time
Provide 8 hours of instruction after final acceptance of the system. The instruction shall be given during regular working hours on such dates and times as are selected by the Contracting Officer. The instruction may be divided into two or more periods at the discretion of the Contracting Officer. The training shall allow for rescheduling for unforeseen maintenance and/or fire department responses.
3.7.2.1 Technical Training
Equipment manufacturer or a factory representative shall provide 1 day of on site. Training shall allow for classroom instruction as well as individual hands on programming, troubleshooting and diagnostics exercises.
Training shall occur within 6 months of system acceptance.
3.8 Technical Data and Computer Software
Provide, in manual format, lesson plans, operating instructions, maintenance procedures, and training data for the training courses. The operations training shall familiarize designated government personnel with proper operation of the installed system. The maintenance training course shall provide the designated government personnel adequate knowledge required to diagnose, repair, maintain, and expand functions inherent to the system.
3.9 OPERATION AND MAINTENANCE (O&M) INSTRUCTIONS
Submit 6 copies of the Operation and Maintenance Instructions, indexed and
SECTION 28 31 76 Page 36 in booklet form. The Operation and Maintenance Instructions shall be a single volume or in separate volumes, and may be submitted as a Technical Data Package. Manuals shall be approved prior to training. The Interior Fire Alarm And Mass Notification System Operation and Maintenance Instructions shall include:
a. "Manufacturer Data Package 5" as specified in Section 01 78 23
OPERATION AND MAINTENANCE DATA.
b. Operating manual outlining step-by-step procedures required for system startup, operation, and shutdown. The manual shall include the manufacturer's name, model number, service manual, parts list, and complete description of equipment and their basic operating features.
c. Maintenance manual listing routine maintenance procedures, possible breakdowns and repairs, and troubleshooting guide. The manuals shall include conduit layout, equipment layout and simplified wiring, and control diagrams of the system as installed.
d. The manuals shall include complete procedures for system revision and expansion, detailing both equipment and software requirements.
e. Software delivered for this project shall be provided, on each type of CD/DVD media utilized.
f. Printouts of configuration settings for all devices.
g. Routine maintenance checklist. The routine maintenance checklist shall be arranged in a columnar format. The first column shall list all installed devices, the second column shall state the maintenance activity or state no maintenance required, the third column shall state the frequency of the maintenance activity, and the fourth column for additional comments or reference. All data (devices, testing frequencies, etc.) shall comply with UFC 3-601-02.
3.10 EXTRA MATERIALS
3.10.1 Repair Service/Replacement Parts
Repair services and replacement parts for the system shall be available for a period of 10 years after the date of final acceptance of this work by the Contracting Officer. During guarantee period, the service technician shall be on-site within 24 hours after notification. All repairs shall be completed within 24 hours of arrival on-site.
3.10.2 Interchangeable Parts
Spare parts furnished shall be directly interchangeable with the corresponding components of the installed system. Spare parts shall be suitably packaged and identified by nameplate, tagging, or stamping. Spare parts shall be delivered to the Contracting Officer at the time of the final acceptance testing.
3.10.3 Spare Parts
Furnish the following spare parts and accessories:
a. Four fuses for each fused circuit
SECTION 28 31 76 Page 37
b. Two of each type of notification appliance in the system (e.g. speaker, FA strobe, MNS strobe, etc.)
c. Two of each type of initiating device included in the system (e.g.
smoke detector, thermal detector, manual station, etc.)
3.10.4 Special Tools
Software, connecting cables and proprietary equipment, necessary for the maintenance, testing, and reprogramming of the equipment shall be furnished to the Contracting Officer.
-- End of Section --
SECTION 28 31 76 Page 38
| Am-0009 |
| SF1442 |