Drawings am-0006.pdf
PDF 784 KB Posted
- Solicitation number
- W9128A21R0004
About this file
This is a solicitation notice for a design-bid-build construction project. The project involves constructing an aircraft maintenance hangar and associated facilities at Wheeler Army Airfield in Oahu, Hawaii, with a project magnitude between $50-100 million. Facilities include the hangar, maintenance shops, administrative space, storage buildings, hazardous materials storage, utilities, site development, and sustainability measures. Services required include interior design, accessibility compliance, cybersecurity integration, and building information systems. The procurement will be conducted using best value tradeoff procedures and evaluated based on experience, past performance, management plan, small business participation, and price. The solicitation encourages maximum practicable subcontracting to small businesses.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
G-002
S C
H E
D U
L E
O F
D R
A W
IN
G
S
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
S O
N O
C .B
M .L
K A
T O
K A
B A
Y A
S H
I
J
A N
DESIGN COMPLETE REV 12 JAN 2021
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
GENERAL
STRUCTURAL STRUCTURAL (CONT.)
CIVIL
SHEET NO SHEET NAME REV STATUS
G-001 COVER SHEET
G-002 SCHEDULE OF DRAWINGS - 1 1,2,3,4
G-003 SCHEDULE OF DRAWINGS - 2 1,2,3,4
G-004 OPTIONS - SITE PLAN
SHEET NO SHEET NAME REV STATUS
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL GENERAL NOTES
S-003 SCHEDULE OF SPECIAL INSPECTIONS
S-004 SCHEDULE OF SPECIAL INSPECTIONS
S-005 SCHEDULE OF SPECIAL INSPECTIONS
S-006 COMPONENTS AND CLADDING WIND PRESSURES
S-007 COMPONENTS AND CLADDING WIND PRESSURES
S-008 COMPONENTS AND CLADDING WIND PRESSURES
S-101 OVERALL FOUNDATION PLAN
S-102 FOUNDATION PLAN - A
S-103 FOUNDATION PLAN - B
S-104 FOUNDATION PLAN - C
S-105 FOUNDATION PLAN - D 1
S-106 FOUNDATION PLAN - E
S-111 OVERALL ROOF FRAMING PLAN
S-112 ROOF FRAMING PLAN - A
S-113 ROOF FRAMING PLAN - B
S-114 ROOF FRAMING PLAN - C
S-121 HANGAR DOOR TRACK SUPPORT FRAMING PLAN
S-122 BOTTOM CHORD FRAMING PLAN - D
S-123 BOTTOM CHORD FRAMING PLAN - E
S-124 ROOF FRAMING PLAN - D
S-125 ROOF FRAMING PLAN - E
S-161 GSE STORAGE - FOUNDATION AND ROOF FRAMING PLANS 2
S-171 FIRE PUMP BUILDING - FOUNDATION AND ROOF FRAMING PLANS AND ELEVATION
S-181 WATER STORAGE TANK - FOUNDATION AND ROOF FRAMING PLANS
S-182 FOAM CONTAINMENT TANK - FOUNDATION AND ROOF FRAMING PLANS
S-191 POL, HAZMAT & CHILLER - FOUNDATION PLANS
S-192 TRASH ENCLOSURE FOUNDATION AND ROOF FRAMING PLANS, SECTIONS AND DETAILS
S-193 COVERED BIKE RACK FOUNDATION AND ROOF FRAMING PLANS
S-201 ADMIN BUILDING ELEVATIONS
S-202 ADMIN BUILDING ELEVATIONS
S-203 HANGAR BAY - WALL ELEVATION - GRIDLINE 1 2
S-204 HANGAR BAY - WALL ELEVATION - GRIDLINE E, ZONE D 2
S-205 HANGAR BAY - WALL ELEVATION - GRIDLINE E, ZONE E 2
S-206 HANGAR BAY - WALL ELEVATION - GRIDLINE 13 2
S-207 HANGAR BAY - WALL ELEVATION - GRIDLINE F, ZONE E 2
S-208 HANGAR BAY - WALL ELEVATION - GRIDLINE F, ZONE D 2
S-221 HANGAR BAY - FRAME ELEVATION - GRIDLINE 1
S-222 HANGAR BAY - FRAME ELEVATION - GRIDLINE E, ZONE D
S-223 HANGAR BAY - FRAME ELEVATION - GRIDLINE E, ZONE E
S-224 HANGAR BAY - FRAME ELEVATION - GRIDLINE 13
S-225 HANGAR BAY - FRAME ELEVATION - GRIDLINE K
S-231 HANGAR BAY - TRUSS ELEVATIONS - TYP TRUSS
S-232 HANGAR BAY - TRUSS ELEVATIONS - GRIDLINE 5, 9
S-233 HANGAR BAY - FRAME ELEVATIONS - GRIDLINE F
S-234 HANGAR BAY - FRAME ELEVATIONS - GRIDLINE G
S-235 HANGAR BAY - FRAME ELEVATIONS - GRIDLINE H
S-236 HANGAR BAY - FRAME ELEVATIONS - GRIDLINE J
S-237 HANGAR BAY - FRAME ELEVATIONS - GRIDLINE K
S-238 HANGAR BAY - FRAME ELEVATIONS - BRIDGE CRANE SUPPORTS
S-239 HANGAR BAY - FRAME ELEVATIONS - BRIDGE CRANE SUPPORTS
S-261 GSE STORAGE ELEVATION
S-301 STEEL GEOMETRY TRANSVERSE BUILDING SECTION
S-311 ADMIN BUILDING FOUNDATION SECTIONS
S-313 ADMIN BUILDING ROOF FRAMING SECTIONS
S-314 ADMIN BUILDING ROOF FRAMING SECTIONS 1
S-320 TYPICAL WALL SECTIONS
S-322 HANGAR FOUNDATION SECTIONS 1
S-323 HANGAR FOUNDATION SECTIONS
S-324 HANGAR FOUNDATION SECTIONS
S-325 HANGAR FOUNDATION SECTIONS
S-361 GSE SECTIONS 2
S-371 FIRE PUMP ROOM SECTIONS
S-381 WATER STORAGE TANK AND FOAM CONTAINMENT TANK SECTIONS 1
S-401 ENLARGED PLAN - PILASTER FOOTING
S-402 ENLARGED PLAN - ADMIN VAULTS
S-403 ENLARGED PLAN - ADMIN ENTRANCES
S-404 ENLARGED PLANS - DOOR CANOPY
S-405 ENLARGED PLAN - ADMIN MECHANICAL BLOCKING
S-411 ENLARGED PLAN - HANGAR BAY
S-412 ENLARGED PLAN - FOAM GENERATOR SUPPORT 3
S-501 TYPICAL REINFORCING DETAILS
S-502 TYPICAL FOUNDATION DETAILS
S-503 TYPICAL SLAB ON GRADE DETAILS
S-504 TYPICAL SLAB ON GRADE DETAILS
S-505 TYPICAL CMU WALL DETAILS
S-506 TYPICAL CMU WALL DETAILS
S-507 TYPICAL CMU WALL DETAILS
S-508 TYPICAL STEEL DECK TO CMU WALL DETAILS
S-509 TYPICAL STEEL BEAM TO CMU WALL DETAILS
S-510 TYPICAL STEEL BEAM TO CMU WALL DETAILS
S-511 TYPICAL STEEL DETALS
S-512 TYPICAL STEEL DETALS
S-513 TYPICAL STEEL DETALS
S-515 TYPICAL CONCRETE WALL DETAILS
S-521 TYPICAL GIRT DETAILS
S-541 HANGAR FRAME DETAILS - TOP CHORD GL 1 x E
S-542 HANGAR FRAME DETAILS - TOP CHORD GL 1 x F
S-543 HANGAR FRAME DETAILS - TOP CHORD GL 1 x J
S-544 HANGAR FRAME DETAILS - TOP CHORD GL 1 x K
S-545 HANGAR FRAME DETAILS - BOTTOM CHORD GL 1 x E
S-546 HANGAR FRAME DETAILS - BOTTOM CHORD GL 1 x F
S-547 HANGAR FRAME DETAILS - BOTTOM CHORD GL 1 x J
S-548 HANGAR FRAME DETAILS - BOTTOM CHORD GL 1 x K
S-549 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 1.5 x E.5
S-551 HANGAR TRUSS DETAILS - TOP CHORD GL 2 x E
S-552 HANGAR TRUSS DETAILS - TOP CHORD GL 2 x E.5
S-553 HANGAR TRUSS DETAILS - TOP CHORD GL 2 x F
S-554 HANGAR TRUSS DETAILS - TOP CHORD GL 2 x J
S-555 HANGAR TRUSS DETAILS - TOP CHORD GL 2 x K
S-556 HANGAR TRUSS DETAILS - TOP CHORD GL 5 x J
S-561 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 2 x E
S-562 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 2 x E.5
S-563 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 2 x F
S-564 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 2 x J
S-565 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 2 x K
S-566 HANGAR TRUSS DETAILS - BOTTOM CHORD GL 5 x J
S-571 HANGAR GIRDER TRUSS DETAILS
S-572 STRUCTURAL DOOR TRACK DETAILS
SHEET NO SHEET NAME REV STATUS
BJ001 BORING LOCATION PLAN
BJ002 BORING LOGS - 1
BJ003 BORING LOGS - 2
BJ004 BORING LOGS - 3
BJ005 BORING LOGS - 4
BJ006 BORING LOGS - 5
BJ007 BORING LOGS - 6
BJ008 BORING LOGS - 7
BJ009 BORING LOGS - 8
V-001 EXISTING CONDITIONS
V-002 TOPOGRAPHIC SURVEY NOTES, LEGEND, AND ABBREVIATIONS
C-001 NOTES
C-002 NOTES, LEGEND, AND ABBREVIATIONS
C-003 EROSION CONTROL PLAN
C-004 EROSION CONTROL DETAILS
C-005 EROSION CONTROL NOTES
C-006 HAUL ROUTE
C-007 COSA AND EROSION CONTROL PLAN
C-008 AIRFIELD CONTROL PLAN
C-009 DISPOSAL SITE HAUL ROUTE AND LOCATION AND DISPOSAL SITE NOTES
CD101 SITE AND UTILITY DEMOLITION PLAN
CS100 OVERALL AREA PLAN
CS101 OVERALL SITE PLAN
CS102 SITE PLAN - 1
CS103 SITE PLAN - 2
CS104 SITE PLAN - 3
CS105 SITE PLAN - 4
CS106 SITE PLAN - BID OPTION 1
CS501 SITE DETAILS - 1
CS502 SITE DETAILS - 2
CS503 SITE DETAILS - 3
CS504 SITE DETAILS - 4
CS505 SITE DETAILS - 5 3
CS506 SITE DETAILS - 6 4
CS507 SITE DETAILS - 7
CS508 SITE DETAILS - 8
CS509 SITE DETAILS - 9
CS510 SITE DETAILS - 10
CS511 SITE DETAILS - 11
CS512 SITE DETAILS - 12
CJ101 APRON JOINTING PLAN
CP101 STRIPING AND SIGNAGE PLAN
CP102 APRON STRIPING PLAN
CP501 STRIPING AND SIGNAGE DETAILS - 1
CP502 STRIPING AND SIGNAGE DETAILS - 2
CU101 OVERALL UTILITY PLAN
CU102 UTILITY PLAN - 1
CU103 UTILITY PLAN - 2
CU104 UTILITY PLAN - 3
CU105 UTILITY PLAN - 4
CU106 DRAIN LINE PLAN - 1
CU107 DRAIN LINE PLAN - 2
CU108 DRAIN LINE PLAN - 3
CU201 UTILITY PROFILES - 1
CU202 UTILITY PROFILES - 2
CU203 UTILITY PROFILES - 3
CU204 UTILITY PROFILES - 4
CU205 UTILITY PROFILES - 5
CU206 UTILITY PROFILES - 6
CU207 UTILITY PROFILES - 7
CU208 UTILITY PROFILES - 8
CU209 UTILITY PROFILES - 9
CU210 UTILITY PROFILES - 10
CU211 UTILITY PROFILES - 11
CU501 SEWER DETAILS - 1
CU502 SEWER DETAILS - 2
CU503 SEWER DETAILS - 3
CU504 SEWER DETAILS - 4
CU505 DRAIN DETAILS - 1
CU506 DRAIN DETAILS - 2
CU507 DRAIN DETAILS - 3
CU508 DRAIN DETAILS - 4
CU509 DRAIN DETAILS - 5
CU510 TRENCH AND RESTORATION DETAILS
CU511 WATER DETAILS - 1
CU512 WATER DETAILS - 2
CU513 WATER DETAILS - 3
CU514 WATER DETAILS - 4
CU515 WATER DETAILS - 5
CG101 OVERALL GRADING PLAN
CG102 GRADING PLAN - 1
CG103 GRADING PLAN - 2
CG104 GRADING PLAN - 3
CG105 GRADING PLAN - 4
CG106 GRADING PLAN - 5
CG107 GRADING DETAILS
CG108 GRADING DETAILS - LID GRAVEL SWALE
CG109 APRON GRADING PLAN
CG201 GRADING SECTIONS - 1
CG202 GRADING SECTIONS - 2
CG203 GRADING SECTIONS - 3
CG204 GRADING SECTIONS - 4
CG205 GRADING SECTIONS - 5
CG206 GRADING SECTIONS - 6
CG207 GRADING SECTIONS - 7
LS101 LANDSCAPING PLAN
LS501 LANDSCAPING DETAILS
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/1
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/2
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/4
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/1
/2
SHEET NO SHEET NAME REV STATUS
S-573 STRUCTURAL DOOR TRACK DETAILS
S-581 ORDINARY CONCENTRICALLY BRACED FRAME
S-582 ORDINARY CONCENTRICALLY BRACED FRAME
S-583 ORDINARY CONCENTRICALLY BRACED FRAME
S-601 FOOTING SCHEDULE
S-602 BASE PLATE SCHEDULE
S-603 STEEL BEAM CONNECTION SCHEDULE
S-604 STEEL BRACE CONNECTION SCHEDULE
S-605 METAL DECK SCHEDULE
S-641 TYPICAL CONCRETE BEAM SCHEDULE AND DETAILS
S-642 TYPICAL CONCRETE SUSPENDED SLAB SCHEDULE AND DETAILS 1
S-701 2-TON BRIDGE CRANE - ADMIN WING - PLAN
S-702 2-TON BRIDGE CRANE - ADMIN WING - SECTIONS
S-703 10-TON BRIDGE CRANE - HANGAR BAY - PLAN, ZONE D
S-704 10-TON BRIDGE CRANE - HANGAR BAY - PLAN, ZONE E
S-705 10-TON BRIDGE CRANE - HANGAR BAY - SECTION
S-706 10-TON BRIDGE CRANE - HANGAR BAY - SECTION
S-707 HANGAR BAY DEFLECTIONS
S-711 HANGAR DOOR
S-761 PEMB REACTIONS
SHEET NO SHEET NAME REV
A-001 DRAWING ABBREVIATIONS, LEGEND, GENERAL & TERMITE CONTROL NOTES 3
A-002 ARCHITECTURAL SITE PLAN
A-101 COMPOSITE FLOOR PLAN
A-102 ENLARGED FLOOR PLAN - AREA "A" - ANNOTATIVE 1,2
A-103 ENLARGED FLOOR PLAN - AREA "B" - ANNOTATIVE 1,2
A-104 ENLARGED FLOOR PLAN - AREA "C" - ANNOTATIVE
A-105 ENLARGED FLOOR PLAN - AREA "D" - ANNOTATIVE
A-106 ENLARGED FLOOR PLAN - AREA "E" - ANNOTATIVE
A-110 ENLARGED FLOOR PLAN - PART "A" - DIMENSIONAL 1
A-111 ENLARGED FLOOR PLAN - PART "B" - DIMENSIONAL 1
A-112 ENLARGED FLOOR PLAN - PART "C" - DIMENSIONAL
A-113 ENLARGED FLOOR PLAN - PART "D" - DIMENSIONAL
A-114 ENLARGED FLOOR PLAN - PART "E" - DIMENSIONAL
A-120 COMPOSITE CLERESTORY PLAN
A-121 ENLARGED CLERESTORY PLAN - PART "D"
A-122 ENLARGED CLERESTORY PLAN - PART "E"
A-131 COMPOSITE REFLECTED CEILING PLAN
A-132 ENLARGED RCP - PART "A" 2
A-133 ENLARGED RCP - PART "B" 2
A-134 ENLARGED RCP - PART "C"
A-135 ENLARGED RCP - PART "D"
A-136 ENLARGED RCP - PART "E"
A-151 COMPOSITE ROOF PLAN
A-152 ENLARGED ROOF PLAN - PART "A" 2
A-153 ENLARGED ROOF PLAN - PART "B"
A-154 ENLARGED ROOF PLAN - PART "C"
A-155 ENLARGED ROOF PLAN - PART "D" 3
A-156 ENLARGED ROOF PLAN - PART "E"
A-161 GSE/ASIOE STORAGE - FLOOR PLAN & RCP
A-162 GSE/ASIOE STORAGE - ROOF PLAN
A-171 FIRE PUMP BLDG - FLOOR PLAN, RCP & ROOF PLAN
A-181 WATER STORAGE TANK BLDG - FLOOR PLAN & ROOF PLAN
A-191 POL STORAGE/ HAZARD MAT STORAGE - FLOOR PLAN & EXTERIOR ELEVATIONS
A-192 COVERED BIKE RACK - FLOOR/ ROOF PLANS & EXTERIOR ELEVATIONS
A-193 TRASH ENCLOSURE - PLANS & ELEVATIONS
A-194 TRASH ENCLOSURE - SECTIONS
A-195 CHILLER ENCLOSURE - FLOOR PLAN & DETAILS
A-196 CHILLER ENCLOSURE ELEVATIONS
A-201 EXTERIOR ELEVATIONS - COMPOSITE 3
A-201A EXTERIOR ELEVATIONS - COMPOSITE (OPTION)
A-202 PARTIAL NORTH EXTERIOR ELEVATIONS
A-203 PARTIAL NORTH EXTERIOR ELEVATIONS
A-204 PARTIAL SOUTH EXTERIOR ELEVATIONS 2
A-205 PARTIAL SOUTH EXTERIOR ELEVATIONS
A-206 EAST EXTERIOR ELEVATION
A-207 WEST EXTERIOR ELEVATION
A-208 ENLARGED EXTERIOR ELEVATIONS - SECONDARY & MAIN ENTRANCES 2
A-209 EXTERIOR ELEVATIONS - GSE/ASIOE BUILDING
A-209A EXTERIOR ELEVATIONS - GSE/ASIOE BUILDING (OPTION) 2
A-210 EXTERIOR ELEVATIONS - FIRE PUMP BUILDING
A-210A EXTERIOR ELEVATIONS - FIRE PUMP BUILDING (OPTION)
A-211 EXTERIOR ELEVATIONS -WATER TANK
A-211A EXTERIOR ELEVATIONS - WATER TANK (OPTION)
A-212 EXTERIOR ELEVATIONS - TYPICAL ENLARGED
A-213 EXTERIOR ELEVATIONS - TYPICAL ENLARGED
A-214 EXTERIOR ELEVATIONS - TYPICAL ENLARGED
A-301 TRANSVERSE BUILDING SECTIONS 2
A-302 LONGITUDINAL BUILDING SECTION - THRU HANGAR 2
A-303 LONGITUDINAL BUILDING SECTION - THRU ADMIN
A-304 TRANSVERSE & PARTIAL LONGITUDINAL BUILDING SECTIONS - THRU ADMIN
A-305 LONGITUDINAL BUILDING SECTION - THRU HANGAR
A-306 TRANSVERSE & LONGITUDINAL BUILDING SECTIONS - GSE/ASIOE STORAGE 2
A-307 TRANSVERSE & LONGITUDINAL BUILDING SECTIONS - FIRE PUMP BUILDING
A-308 TRANSVERSE & LONGITUDINAL BUILDING SECTIONS - WATER STORAGE TANK
A-309 US FLAG ELEVATION ON SOUTH HANGAR WALL & DETAIL SECTION / COVERED BIKE RACK - SECTION
A-401 WALL SECTIONS 2
A-402 WALL SECTIONS 2
A-403 WALL SECTIONS 2
A-404 WALL SECTIONS
A-405 WALL SECTIONS
A-406 WALL SECTIONS
A-407 WALL SECTIONS
A-408 WALL SECTIONS
A-409 WALL SECTIONS
A-410 MEN'S AND WOMEN'S ROOM DIMENSIONAL PLAN
A-420 ENLARGED PLANS AND ELEVATIONS - MENS RESTROOM 2
A-421 ENLARGED PLANS AND ELEVATIONS - WOMENS RESTROOM 2
A-422 ENLARGED PLANS AND ELEVATIONS - BREAK AND MOTHER'S ROOM 2
A-423 ENLARGED PLANS, ELEVATIONS AND SECTIONS - SERVICE WINDOWS AND COUNTERS
A-424 ENLARGED PLANS AND ELEVATIONS - COUNTERS 3
A-425 TYPICAL EQUIPMENT MOUNTING DETAILS 2
A-501 PLAN DETAILS 2
A-502 PLAN DETAILS 2
VOLUME 1
VOLUME 2
ARCHITECTURAL
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
G-003
S C
H E
D U
L E
O F
D R
A W
IN
G
S
W H
E E
L E
R A
R M
Y A
IR
F
IE
L D
O
A H
U H
A W
A
II
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S
H A
F T
E R
H
A W
A
II
R E
G
IO
N A
L E
N G
IN
E
E R
IN
G
C E
N T
E R
H O
N O
L U
L U
D
IS
T R
IC
T
H O
N O
L U
L U
H
I
S O
N O
C .B
M .L
K A
T O
K A
B A
Y A
S H
I
J
A N
DESIGN COMPLETE REV 12 JAN 2021
F Y
M
C A
P N
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
ARCHITECTURAL (CONT.) PLUMBING
TELECOMMUNICATIONS
SHEET NO SHEET NAME REV STATUS
F-001 FIRE PROTECTION NOTES, SYMBOLS AND ABBREVIATIONS 1
F-002 FIRE PROTECTION NOTES 1
F-003 BUILDING CODE SUMMARY
F-101 CODE COMPLIANCE SITE PLAN
F-102 AMH OVERALL FLOOR PLAN - LIFE SAFETY
F-103 FIRE PUMP BUILDING - LIFE SAFETY 1
SHEET NO SHEET NAME REV STATUS
E-001 LEGEND AND ABBREVIATIONS
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN - 2
ES401 ENLARGED UTILITY PLAN
ES501 ELECTRICAL DUCT DETAILS
ES502 ELECTRICAL DUCT DETAILS - 2
E-101 ELECTRICAL SITE HAZARD CLASSIFICATION
EG001 GROUNDING GENERAL NOTES AND SUPPLEMENTAL LEGEND
EG101 COMPOSITE GROUNDING PLAN
EG102 COMPOSITE LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
EG502 GROUNDING AND LIGHTNING PROTECTION DETAILS
EG503 GROUNDING AND LIGHTNING PROTECTION DETAILS
EG601 GROUNDING RISER DIAGRAM
EL100 OVERALL LIGHTING PLAN
EL101 LIGHTING PLAN - SECTION A
EL102 LIGHTING PLAN - SECTION B
EL103 LIGHTING PLAN - SECTION C
EL104 LIGHTING PLAN - SECTION D
EL105 LIGHTING PLAN - SECTION E
EL106 LIGHTING PLAN - SUPPORT BUILDINGS
EL107 ENLARGED LIGHTING PLANS - BIKE RACK, PATHWAYS AND RECYCLED STORAGE PATHWAYS
EL501 LIGHTING SCHEDULE
EL502 LIGHTING DETAILS
EL601 LIGHTING CONTROL DIAGRAMS
EP001 POWER KEYED NOTES
EP100 OVERALL POWER PLAN
EP101 POWER PLAN - SECTION A
EP102 POWER PLAN - SECTION B
EP103 POWER PLAN - SECTION C
EP104 POWER PLAN - SECTION D
EP105 POWER PLAN - SECTION E
EP106 POWER PLAN - ROOF
EP107 POWER PLAN - SUPPORT BUILDINGS
EP108 POWER PLAN - STORAGE AND CHILLER PAD
EP401 ENLARGED ELECTRICAL ROOM PLANS
EP402 ENLARGED TELECOM ROOMS
EP501 PAD MOUNTED TRANSFORMER DETAILS
EP502 SERVICE ENTRANCE DETAIL
EP503 400HZ/28VDC DETAILS
EP504 ELECTRICAL DETAILS
EP505 ELECTRICAL DETAILS - SHOP WORKBENCH DETAILS
EP506 ELECTRICAL HH 4'x6' DETAIL
EP507 ELECTRICAL HH 3'x5' DETAIL
EP600 ELECTRICAL ONE-LINE NOTES
EP601 ONE-LINE DIAGRAM PRIMARY SYSTEM
EP602 ONE-LINE DIAGRAM - SECONDARY SYSTEM
EP605 ELECTRICAL PANEL SCHEDULES - 1
EP606 ELECTRICAL PANEL SCHEDULES - 2
EP607 ELECTRICAL PANEL SCHEDULES - 3
EP608 ELECTRICAL PANEL SCHEDULES - 4
EP609 ELECTRICAL PANEL SCHEDULES - 5
EP610 ELECTRICAL PANEL SCHEDULES - 6
EP611 ELECTRICAL PANEL SCHEDULES - 7
EP612 ELECTRICAL PANEL SCHEDULES - 8
EP613 ELECTRICAL PANEL SCHEDULES - 9
EP614 ELECTRICAL PANEL SCHEDULES - 10
EP615 ELECTRICAL PANEL SCHEDULES - 11
EY001 SYSTEMS NOTES AND SUPPLEMENTAL LEGEND
EY002 ELECTRICAL SITE PLAN - VEHICLE ACCESS GATE
EY003 SENSOR LOOP DETAILS
EY004 ELECTRICAL SYSTEMS DETAILS
EY005 SYSTEM HANDHOLE DETAILS
EY101 SYSTEMS PLAN - SECTION A
EY102 SYSTEMS PLAN - SECTION B
EY103 SYSTEMS PLAN - SECTION C
EY104 SYSTEMS PLAN - SECTION D
EY105 SYSTEMS PLAN - SECTION E
EY501 SYSTEMS DETAILS
EY601 SYSTEMS RISERS
EY602 SYSTEMS RISERS
SHEET NO SHEET NAME REV STATUS
T-001 TELECOMMUNICATIONS SYMBOLS, LEGEND AND ABBREVIATIONS
T-002 GENERAL TELECOMMUNICATION NOTES
TS101 TELECOMMUNICATIONS SITE PLAN - 1
TS102 TELECOMMUNICATIONS SITE PLAN - 2
T-101 TELECOM PLAN - SECTION A
T-102 TELECOM PLAN - SECTION B
T-103 TELECOM PLAN - SECTION C
T-104 TELECOM PLAN - SECTION D
T-105 TELECOM PLAN - SECTION E
T-401 ENLARGED TELECOMMUNICATION PLANS-1
T-501 TELECOMMUNICATIONS DETAILS - 1
T-502 TELECOMMUNICATIONS DETAILS - 2
T-503 TELECOMMUNICATIONS DETAILS - 3
T-504 TELECOMMUNICATIONS DETAILS - 4
T-505 TELECOMMUNICATIONS DETAILS - 5
T-506 TELECOMMUNICATIONS DETAILS - 6
T-510 TELECOMMUNICATIONS MAINTENANCE HANDHOLE DUCT FORMATIONS
T-511 TELECOM MAINTENANCE HOLE - 6'-0" x 12'-0"
T-512 TELECOM MAINTENANCE HOLE 6'-0" x 12'-0" - CABLE RACKING & MATERIAL SCHEDULE
T-513 TELECOM MAINTENANCE HOLE 6'-0" x 12'-0" - DETAILS
T-514 TELECOMMUNICATIONS DETAILS - 9
T-515 TELECOMMUNICATIONS DETAILS - 10
T-601 TELECOMMUNICATIONS GROUNDING SCHEMATIC DIAGRAM
T-602 TELECOMMUNICATIONS RISERS - 1
T-603 TELECOMMUNICATIONS RISERS - 2
T-604 TELECOMMUNICATIONS RISERS - 3
T-605 VSAT RISER DIAGRAM
T-611 MANHOLE SCHEMATIC DIAGRAM
T-620 CATV RISER DIAGRAM
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/1
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/2
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/4
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M -0
/1
/2
ELECTRICAL
SHEET NO SHEET NAME REV STATUS
A-521 WALL TYPES
A-522 WALL TYPES
A-523 WALL TYPES 2
A-524 WALL TYPES 2
A-525 WALL HEAD DETAILS
A-526 LADDER DETAILS
A-527 LADDER DETAILS
A-531 CANOPY PLAN DETAILS 2
A-541 EXTERIOR WALL DETAILS 2
A-542 EXTERIOR WALL DETAILS 2
A-543 EXTERIOR WALL DETAILS
A-544 EXTERIOR WALL DETAILS
A-545 EXTERIOR WALL DETAILS
A-546 EXTERIOR WALL DETAILS 2
A-547 EXTERIOR WALL DETAILS
A-551 ROOF DETAILS
A-552 ROOF DETAILS 2
A-553 ROOF DETAILS
A-554 DOWNSPOUT AND SCUPPER DETAILS
A-555 ROOF DETAILS
A-556 ROOF DETAILS
A-561 FLOOR DETAILS
A-601 DOOR SCHEDULE 2
A-602 DOOR TYPES 3
A-603 WINDOW & LOUVER SCHEDULE AND TYPES 2,3
A-701 DOOR DETAILS
A-702 DOOR DETAILS
A-703 GATE DOOR DETAILS
A-711 HANGAR DOOR PLANS
A-712 HANGAR DOOR DETAILS 3
A-713 HANGAR DOOR RCP 2
A-714 HANGAR DOOR ELEVATIONS 3
A-721 WINDOW DETAILS
A-725 LOUVER DETAILS
A-726 LOUVER DETAILS
A-731 MISC. DETAILS
A-732 MISC. DETAILS
A-733 MISC. DETAILS 2,3
A-741 FIRE EXTINGUISHER CABINETS 3
A-751 CABINET DETAILS
A-752 CABINET DETAILS
AB101 AIR BARRIER - FLOOR PLAN
AB301 TRANSVERSE BUILDING SECTIONS - AIR BARRIER
AB501 STANDARD MOISTURE BARRIER DETAILS @ WINDOW OPENINGS
AF601 INTERIOR FINISH SCHEDULE 3
AF602 PRODUCT SAMPLES
AF603 PRODUCT SAMPLES
AG100 SITE SIGNAGE PLAN
AG101 ENLARGED SIGNAGE FLOOR PLAN "A"
AG102 ENLARGED SIGNAGE FLOOR PLAN "B" 2
AG103 ENLARGED SIGNAGE FLOOR PLAN "C" 2
AG104 ENLARGED SIGNAGE FLOOR PLAN "D"
AG105 ENLARGED SIGNAGE FLOOR PLAN "E"
AG501 SIGNAGE TYPES
AG502 SIGNAGE TYPES AND PICTOGRAMS
AG503 SIGNAGE DETAILS
AG504 SIGNAGE DETAILS 2
AG505 SIGNAGE DETAILS 2
AG601 SIGNAGE SCHEDULE I
AG602 SIGNAGE SCHEDULE II 2
I-101 FURNITURE PLAN - PART 'A' 1
I-102 FURNITURE PLAN - PART 'B' 1
I-103 FURNITURE PLAN - PART 'C' 1
I-104 FURNITURE PLAN - PART 'D'
I-105 FURNITURE PLAN - PART 'E'
I-106 FURNITURE AND EQUIPMENT SCHEDULE 1,2
MECHANICAL
FA101 AMH OVERALL FLOOR PLAN - FIRE ALARM/MASS NOTIFICATION 1
FA102 FIRE PUMP BUILDING PLAN AND WATER STORAGE TANK - FIRE ALARM 1
FA103 AMH PARTIAL FLOOR PLAN SECTION A - FIRE ALARM/MASS NOTIFICATION 1
FA104 AMH PARTIAL FLOOR PLAN SECTION B - FIRE ALARM/MASS NOTIFICATION 1
FA105 AMH PARTIAL FLOOR PLAN SECTION C - FIRE ALARM/MASS NOTIFICATION 1
FA106 AMH PARTIAL FLOOR PLAN SECTION D - FIRE ALARM/MASS NOTIFICATION 1
FA107 AMH PARTIAL FLOOR PLAN SECTION E - FIRE ALARM/MASS NOTIFICATION 1
FA108 AMH PARTIAL FLOOR PLAN SECTION D - FIRE ALARM SUPPRESSION 1
FA109 AMH PARTIAL FLOOR PLAN SECTION E - FIRE ALARM SUPPRESSION 1
FA110 AMH PARTIAL FLOOR PLAN SECTION D & E - IIIR FLAME DETECTOR PLAN
FA501 FIRE ALARM/MASS NOTIFICATION DETAILS
FA601 AMH FIRE ALARM/MASS NOTIFICATION SEQUENCE OF OPERATIONS
FA602 AMH FIRE SUPPRESSION CONTROL PANEL MATRIX 1
FA603 FIRE PUMP BUILDING FIRE ALARM SEQUENCE OF OPERATIONS
FA604 FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM 1
FA605 FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM 1
FX101 AMH OVERALL FLOOR PLAN - FIRE SPRINKLER
FX102 FIRE PUMP BUILDING PLAN - FIRE SPRINKLER 1
FX103 AMH PARTIAL FLOOR PLAN SECTION A - FIRE SPRINKLER
FX104 AMH PARTIAL FLOOR PLAN SECTION B - FIRE SPRINKLER
FX105 AMH PARTIAL FLOOR PLAN SECTION C - FIRE SPRINKLER
FX106 AMH PARTIAL FLOOR PLAN SECTION D - FIRE SPRINKLER
FX107 AMH PARTIAL FLOOR PLAN SECTION E - FIRE SPRINKLER
FX108 AMH PARTIAL FLOOR PLAN SECTION D - FIRE SUPPRESSION
FX109 AMH PARTIAL FLOOR PLAN SECTION E - FIRE SUPPRESSION
FX110 FIRE PUMP BUILDING PLAN - PIPING LAYOUT 1
FX111 WATER STORAGE TANK - PIPING PLAN, WATER STORAGE TANK - ISOMETRIC
FX112 FIRE SUPPRESSION ROOM PLAN - PIPING LAYOUT 1
FX301 FIRE PROTECTION SECTIONS
FX501 FIRE PROTECTION DETAILS
FX502 FIRE PROTECTION DETAILS
FX503 FIRE PROTECTION DETAILS
FX601 FIRE PROTECTION SCHEDULE
VOLUME 3
FIRE PROTECTION
SHEET NO SHEET NAME REV STATUS
P-001 PLUMBING ABBREVIATIONS, LEGEND, AND GENERAL NOTES
P-002 PLUMBING OVERALL SITE PLAN
P-101 PLUMBING PLAN - AIRCRAFT MAINTENANCE HANGAR
P-102 PLUMBING SANITARY WASTE/VENT PLAN - AREA "A"
P-103 PLUMBING SANITARY WASTE/VENT PLAN - AREA "B"
P-104 PLUMBING SANITARY WASTE/VENT PLAN - AREA "C"
P-105 PLUMBING SANITARY WASTE/VENT PLAN - AREA "D"
P-106 PLUMBING SANITARY WASTE/VENT PLAN - AREA "E"
P-107 PLUMBING DOMESTIC WATER/COMPRESSED AIR PLAN - AREA "A"
P-108 PLUMBING DOMESTIC WATER/COMPRESSED AIR PLAN - AREA "B"
P-109 PLUMBING DOMESTIC WATER/COMPRESSED AIR PLAN - AREA "C"
P-110 PLUMBING DOMESTIC WATER/COMPRESSED AIR PLAN - AREA "D"
P-111 PLUMBING DOMESTIC WATER/COMPRESSED AIR PLAN - AREA "E"
P-112 PLUMBING ROOF PLAN
P-301 PLUMBING BUILDING SECTION
P-302 PLUMBING BUILDING SECTION
P-303 PLUMBING BUILDING SECTION
P-401 PLUMBING ENLARGED PLANS
P-402 PLUMBING ENLARGED PLANS
P-403 PLUMBING ENLARGED PLANS
P-404 PLUMBING ENLARGED PLANS
P-405 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-504 PLUMBING DETAILS
P-505 COMPRESSED AIR DETAILS
P-506 TRENCH DRAIN DETAILS
P-507 PLUMBING HOT WATER SCHEMATICS
P-508 OIL / WATER SEPERATOR DETAIL
P-601 PLUMBING SCHEDULES
P-901 PARTIAL SANITARY WASTE/VENT ISOMETRIC-VIEW 1
P-902 PARTIAL SANITARY WASTE/VENT ISOMETRIC-VIEW 2
P-903 ENLARGED SANITARY WASTE WATER/VENT ISOMETRIC - RESTROOMS
P-904 DOMESTIC WATER ISOMETRIC - VIEW 1
P-905 DOMESTIC WATER ISOMETRIC-VIEW 2
P-906 ENLARGED DOMESTIC WATER ISOMETRIC - RESTROOMS
P-907 COMPRESSED AIR LOOP ISOMETRIC
P-908 COMPRESSED AIR DROP ISOMETRICS
SHEET NO SHEET NAME REV STATUS
M-001 HVAC ABBREVIATIONS, LEGEND, AND GENERAL NOTES
M-002 MECHANICAL OVERALL SITE PLAN
M-101 MECHANICAL PLAN - AIRCRAFT MAINTENANCE HANGAR
M-102 HVAC FLOOR PLAN - AREA "A"
M-103 HVAC FLOOR PLAN - AREA "B"
M-104 HVAC FLOOR PLAN - AREA "C"
M-105 HVAC FLOOR PLAN - AREA "D"
M-106 HVAC FLOOR PLAN - AREA "E"
M-107 HVAC ROOF PLAN
M-301 HVAC BUILDING SECTION
M-302 HVAC BUILDING SECTION
M-303 HVAC BUILDING SECTION
M-304 HVAC BUILDING SECTION
M-401 HVAC ENLARGED PLANS
M-402 HVAC ENLARGED PLANS
M-403 HVAC ENLARGED PLANS
M-404 HVAC ENLARGED PLANS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-504 HVAC DETAILS
M-505 HVAC DETAILS
M-506 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-604 VAV AHU SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-605 ERV SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-606 MAU SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-607 FCU / ACCU AND DEHUMIDIFIER SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-608 FAN SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-609 CHILLED WATER SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-610 DDC CONTROLS DIAGRAM AND ARCHITECTURE
M-611 DDC POINTS LIST
M-612 DOMESTIC HOT WATER SEQUENCE OF OPERATIONS AND CONTROLS DIAGRAM
M-613 COMPRESSED AIR SEQUENCE OF OPERATIONS AND CONTROL DIAGRAM
M-901 CHILLED WATER ISOMETRIC DIAGRAM
M-902 MINI-SPLIT SYSTEM ISOMETRIC DIAGRAM
1,4
3,4
CHILLERS
UCP
VAVS
UCP
ACCUS
UCP
AHUS
UCP MAIN
CPU
TYP.
FIELD
PANELS
PUMPS
UCP
LAN
CONNECTION
MONITORING &
CONTROL
POINTS
MONITORING &
CONTROL
POINTS
TYP.
FIELD
PANELS
NOTES:
1. SEE FLOOR PLANS FOR SUGGESTED PANEL LOCATIONS.
2. CONTRACTOR SHALL PROVIDE REQUIRED NO. OF FIELD PANELS INCLUDING ALL CONDUIT AND WIRING TO PERFORM FUNCTIONS AND PROVIDE POINTS INDICATED
AND SPECIFIED.
3. CONTRACTOR SHALL PROVIDE POWER TO ALL NEW CONTROL PANELS WHETHER INDICATED OR NOT. ALL POWER REQUIREMENTS AND CONTROL WIRING/CONDUIT REQUIREMENTS SHALL BE COORDINATED WITH THE ELECTRICIAN AND CONTROL WIRING CONTRACTOR.
4. THE DDC SYSTEMS VENDOR SHALL BE COMPLETELY RESPONSIBLE FOR COORDINATING INSTALLATION OF ENERGY MANAGEMENT SYSTEM INCLUDING ALL
HARDWARE, SOFTWARE, SENSORS, CONDUIT, AND WIRING.
FCUS
UCP
WORKSTATION (MECH 104)
BUILDING AUTOMATION SYSTEM (BAS) AND DIRECT DIGITAL CONTROLS (DDC) NOTES:
BUILDING AUTOMATION SYSTEM DIRECT DIGITAL CONTROLS SHALL CONSIST OF NATIVE BACNET, MICROPROCESSOR-BASED PEER-TO- PEER, NETWORKED, DISTRIBUTED DEVICES UTILIZING THE BACNET COMMUNICATION PROTOCOL IN AN OPEN, INTEROPERABLE SYSTEM.
THE BAS ALSO INCLUDES OPERATOR INTERFACE DEVICES, PROGRAMMING AND CONFIGURATION SOFTWARE APPLICATIONS, DDC INPUT/OUTPUT DEVICES, NON-DDC AUTOMATIC TEMPERATURE CONTROLS, ENCLOSURES, AND INTERCONNECTING CONDUIT AND WIRE.
HVAC DDC SYSTEM SHALL BE FULLY BACNET COMPLIANT. NO GATEWAYS, COMMUNICATION BRIDGES, PROTOCOL TRANSLATORS OR ANY OTHER DEVICE THAT TRANSLATES ANY PROPRIETARY OR OTHER COMMUNICATION PRTOCOL TO THE BACNET COMMUNICATION
PROTOCOL SHALL BE PERMITTED AS A PART OF THE BAS INSTALLATION.
THE BACNET OPERATING STACK MUST BE EMBEDDED DIRECTLY IN EVERY DEVICE AT THE BOARD LEVEL, AND IN ALL OPERATOR INTERFACE SOFTWARE PACKAGES. DDC CONTROLLERS THAT ARE NOT BACNET COMPLIANT SHALL NOT BE ACCEPTABLE. ALL BAS CONTROLLERS SHALL BE TESTED, CERTIFIED, CLEARLY STAMPED, AND LISTED BY THE BACNET TESTING LABORATORIES (BTL).
PROGRAM DATABASE, DATA ACQUISITION, AND ALL CONTROL SEQUENCE LOGIC SHALL RESIDE IN EACH DDC DEVICE. THE BUILDING LEVEL COMMUNICATION NETWORK (BLCN) SHALL NOT BE DEPENDENT UPON CONNECTION TO A SERVER OR MASTER CONTROLLER FOR PERFORMANCE OF THE SEQUENCE OF CONTROL. EACH INDIVIDUAL DEVICE SHALL, TO THE GREATEST POSSIBLE EXTENT, PERFORM ITS PROGRAMMED SEQUENCE WITHOUT RELIANCE ON THE BLCN. ALL BAS DDC DEVICES SHALL BE CAPABLE OF UPDATING FIRMWARE USING SOFTWARE VIA INTERNET WITHOUT REPLACING ANY HARDWARE, MICROPROCESSORS, OR CHIPS. THE BAS SHALL BE CAPABLE OF SENDING SYSTEM ALARMS AND EVENT NOTIFICATIONS TO PAGERS AND EMAIL SERVICES. THE DDC SYSTEM MUST USE GRAPHICAL PROGRAMMING ONLY. GRAPHICAL USER INTERFACE (GUI) INCLUDING, BUT NOT LIMITED TO, FRONT-END GUI, SHALL DISPLAY, MONITOR, AND CONTROL BOTH THE EXISTING AND NEW CONTROL POINTS IN QUAD D. EXISTING CONTROL POINTS SHALL INCLUDE ALL CAPABILITIES OF EXISTING HVAC DDC TO INCLUDE GUI, MONITOR, CONTROL, LOGIC ALGORITHMS, AND FEATURES, TO MINIMIZE RE-
TRAINING OF OPERATIONS AND MAINTENANCE PERSONNEL.
THE DDC BAS SHALL BE A COMPLETE SYSTEM FROM A SINGLE MANUFACTURER DESIGNED FOR USE ON INTRANETS AND THE INTERNET.
THE PRIMARY BAS COMPONENTS SHALL INCLUDE, BUT NOT BE LIMITED TO:
- WEB SERVER WITH OPERATING SOFTWARE
- OPERATOR WORKSTATION SOFTWARE
- BUILDING CONTROLLERS
- ADVANCED APPLICATION CONTROLLERS
- APPLICATION SPECIFIC CONTROLLERS
THE OPERATOR WORKSTATION ARE LOCATED IN RM133. INSTALL OPERATOR WORKSTATION WITH THE MANUFACTURER'S LATEST SOFTWARE VERSION FOR ALL USED APPLICATIONS. UPGRADE HARDWARE, MEMORY, AND OPERATING SYSTEMS IF REQUIRED.
ENTERPRISE LEVEL COMMUNICATION NETWORK (ELCN) SHALL CONSIST OF HIGH-SPEED BACNET/IP LOCAL AREA NETWORK (LAN) AN/OR WIDE AREA NETWORK (WAN) TO HOST THE MAIN WORKSTATION, BUILDING CONTROLLERS, BUILDING LEVEL COMMUNICATION NETWORK, AND WEB-ENABLED REMOTE CONNECTIVITY. BLCN SHALL CONSIST OF A BACNET INTERNETWORK TO HOST FIELD LEVEL DDC CONTROLLERS. BUILDING CONTROLLERS SHALL AUTOMATICALLY ROUTE BACNET COMMUNICATIONS TO ALL CONFIGURED AVAILABLE BACNET NETWORKS. THE BUILDING CONTROLLERS SHALL BE FULLY IT-COMPATIBLE DEVICES THAT COMMUNICATE DIRECTLY ON A TCP/IP LAN. THE BAS MANUFACTURER MUST NATIVELY SUPPORT THE FOLLOWING BACNET DATA LINKS AS DEFINED IN THE ANSI/ASHRAE
STANDARD 135-2008 BACNET:
- POINT-TO-POINT
- MASTER SLAVE/TOKEN PASSING
- ETHERNET (ISO 8802-3)
- BACNET IP
FIELD SENSORS AND CONTROL DEVICES SHALL CONNECT TO PEER-TO-PEER, FULLY PROGRAMMABLE AS REQUIRED TO ACHIEVE THE POINT MONITORING AND CONTROL. ALL DEVICES ARE TO BE MONITORED BY THE OPERATOR WORKSTATION SOFTWARE. EACH MECHANICAL SYSTEM AND/OR MAJOR PIECE OF MECHANICAL EQUIPMENT SHALL HAVE ONE (1) DEDICATED DDC CONTROLLER WITH SUFFICIENT I/O CAPACITY SUCH THAT IT SHALL BE CONNECTED TO ALL FIELD DEVICES AND SENSORS ASSOCIATED WITH THAT SYSTEM AND/OR PIECE OF EQUIPMENT. DISTRIBUTED CONTROL OF ONE (1) SINGLE PIECE OF MAJOR MECHANICAL EQUIPMENT CAN BE PERFORMED BY MULTIPLE CONTROLLERS IF CONTROLLER CAPACITY IS AS 80% OR LESS. ALL BAS CONTROLLERS, SENSOR, AND
DEVICES SHALL BE UL LISTED.
THE DDC CONTRACTOR IS RESPONSIBLE TO MAINTAIN ADEQUATE SIGNAL STRENGTH TO EACH COMPONENT WITHIN THE DDC NETWORK.
THE DDC CONTRACTOR SHALL DETERMINE IF SIGNAL BOOSTERS ARE NEEDED AND PROVIDE NECESSARY COMPONENTS AS PART OF
THE DDC SYSTEM.
CHILLED WATER DISTRIBUTION NOTES:
THE CHILLED WATER DISTRIBUTION SYSTEM CONSISTS OF VARIABLE FLOW CHILLED WATER PUMPS LOCATED IN RM 104 BEING CONTROLLED TO MAINTAIN A MINIMUM PRESSURE AS MEASURED BY DIFFERENTIAL PRESSURE SENSORS AT THE MOST HYDRAULICALLY REMOTE HVAC UNITS FCU-102 AND AHU-128. CONTRACTOR SHALL INSTALL A DIFFERENTIAL PRESSURE SENSOR AT THE CHILLED WATER CONTROL VALVE FOR AHU-128 AND FCU-102. CONTRACTOR SHALL INCLUDE THE SENSORS IN COMMISSIONING ACTIVITIES TO ENSURE THAT THE VARIABLE FLOW CHILLED WATER PUMPS OPERATE AS DESCRIBED IN THE SEQUENCE OF OPERATIONS BELOW.
CONTRACTOR SHALL INCLUDE THE MODULATING BYPASS CONTROL VALVE (CWS-BYP) IN TESTING AND BALANCING (TAB) AND COMMISSIONING ACTIVITIES TO ENSURE THAT THE VALVE OPERATES AS DESCRIBED IN THE SEQUENCE OF OPERATIONS BELOW.
VARIABLE FLOW CHILLED WATER PUMPS SEQUENCE OF OPERATIONS
THE CHILLED WATER PUMPS SHALL OPERATE AS PRIMARY VARIABLE FLOW PUMPS AND SHALL OPERATE INDEPENDENTLY OF THE CHILLERS. THE MODULATING BYPASS VALVE (CWS-BYP) SHALL MODULATE TO ENSURE THERE IS ADEQUATE FLOW THROUGH THE CHILLERS AT ALL LOADING CONDITIONS AS MEASURED BY THE FLOW METER. THE CHILLED WATER PUMPS VFD'S SHALL ALSO NOT
DECREASE FLOW TO LESS THAN THE MANUFACTURER'S RECOMMENDED MINIMUM.
A BUFFER TANK SHALL BE PROVIDED TO ENSURE ADEQUETE SYSTEM VOLUME AT ALL LOADING CONDITIONS.
CHILLED WATER PUMPS SHALL VARY THE PUMP FLOW THROUGH ITS VFD TO MAINTAIN A MINIMUM DIFFERENTIAL PRESSURE OF 10 PSI (ADJUSTABLE) AS MEASURED BY THE DIFFERENTIAL PRESSURE SENSORS. CHILLED WATER PUMPS SHALL VARY THE PUMP FLOW THOUGH IT'S VFD TO MAINTAIN A MINIMUM DIFFERENTIAL PRESSURE OF 10 PSI (ADJUSTABLE) AS MEASURED BY A DIFFERENTIAL PRESSURE SENSOR AT FCU-102 AND AHU-128. THE DDC SYSTEM SHALL ENSURE THAT 10 PSI (ADJUSTABLE) IS AVAILABLE AT FCU-102 AND AHU-128. AS THE LOAD CONTINUES TO DECREASE TO A MINIMUM, FLOW WILL ALSO CONTINUE TO DECREASE DUE TO CLOSING OF TWO- WAY VALVES IN THE SYSTEM. AT THE LOW END FLOW, THE MODULATING BYPASS CONTROL VALVE SHALL OPEN TO ENSURE MINIMUM FLOWS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS IS MAINTAINED THROUGH THE SINGLE CHILLER AT ALL TIMES. THE MODULATING BYPASS VALVE CWS-BYP SHALL REMAIN CLOSED IF THE MINIMUM FLOW RATE IN THE SYSTEM IS ABOVE THE
RECOMMENDED MINIMUM FLOWS.
AS THE LOAD INCREASED, FLOW REQUIRMENTS WILL ALSO INCREASE AS THE TWO WAY VALVES IN THE SYSTEM OPEN.
DDC CONTROLS DIAGRAMDDC CONTROLS ARCHITECTURE
CONTROL NOTES:
1. WHEELER ARMY AIR FIELD BASE DEPARTMENT OF PUBLIC WORKS (DPW) WILL BE INSTALLING A BASE WIDE DDC SYSTEM (TRIDIUM NIAGARA). THE SERVER FOR THIS BASE WIDE SYSTEM WILL BE INSTALLED IN SCHOFIELD BARRACKS BUILDING 2625. THE DDC SYSTEM FOR THIS PROJECT, FY21 MCA PN76897 AIRCRAFT MAINTENANCE HANGAR, SHALL CONNECT TO THE BASE WIDE DDC SYSTEM. THE CONTROL CONTRACTOR FOR THIS PROJECT SHALL PROVIDE AND INSTALL ALL NECESSARY HARDWARE, INCLUDING JACE BOXES, TO CONNECT TO THE BASE WIDE SYSTEM. TO TIE INTO THE BASE WIDE SYSTEM, THE PROJECT'S CONTROL CONTRACTOR SHALL OBTAIN THE LICENSES AND RUN A COMMUNICATION LINE FROM THE JACE BOXES TO THE COMM. ROOM TO CONNECT TO THE LAN. THE CONTROL CONTRACTOR FOR THIS PROJECT SHALL CONTRACT WITH DPW'S CONTRACTOR, WHO IS RESPONSIBLE FOR THE BASE WIDE DDC SYSTEM, TO INCORPORATE THIS PROJECT'S DDC SYSTEM INTO THE BASE WIDE DDC SYTEM. DPW'S BASE WIDE DDC CONTRACTOR IS JCI.
2. IT SHALL BE THIS PROJECT'S CONTROL CONTRACTOR/SUPPLIER TO OBTAIN THE NECESSARY CYBER SECURITY APPROVALS BEFORE CONNECTION INTO THE BASE WIDE DDC SYSTEM. THE BASE WIDE DDC SYSTEM WILL MEET ALL CYBERSECURITY REQUIREMENTS AND HAVE AN ATO (AUTHORITY TO OPERATE). ADDITIONS FROM
THIS PROJECT TO THE BASED WIDE DDC SYSTEM SHALL MEET CYBERSECURITY REQUIREMENTS.
3. FOAM CONTAINMENT TANK SYSTEM LEVEL MONITORING:
A. COORDINATE WITH ALL CONTRACTORS TO PROVIDE A COMPLETE SYSTEM AS STATED IN UFC 4-211-01, PARA. 6-2.2.3 CONTAINMENT MONITORING SYSTEM.
B. SEE SHEET M-506 FOR ADDITIONAL MONITORING SYSTEM REQUIRMENTS.
4. DDC WORK STATION SHALL BE LOCATED IN MECHANIAL ROOM 104.
FIRE PUMP BUILDING
AIRCRAFT MAINTENANCE HANGAR
LEVEL MONITORING
CONTROL PANEL
MONITORING
POINTS
FOAM
CONTAINMENT
TANK
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
M-610
D D
C C
O N
TR
O
LS
D
IA
G
R
AM
A N
D A
R C
H
IT
EC
TU
R E
H O
N O
LU
LU
D
IS
TR
IC
T
FT
. S H
AF
TE
R , H
AW
AI
I 9
R
EG
IO
N
AL
E
N G
IN
EE
R
IN
G C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
H O
N O
LU
LU
, H I
TN TS KAKM
J
AN
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
DESIGN COMPLETE REV 12 JAN 2021
W H
EE
LE
R A
R M
Y
AI
R
FI
EL
D
, O
AH
U , H
AW
AI
I
FY
M
C A
PN
AI
R
C R
AF
T
M
AI
N
TE
N
AN
C E
H
AN
G
AR
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
-0
3/
/2
DOMESETIC HOT WATER - SEQUENCE OF OPERATIONS
CONTRACTOR SHALL PROVIDE DDC HARDWARE TO PERFORM THIS SEQUENCE OF OPERATION AND TO PROVIDE TO INPUTS, OUTPUTS, AND ALARMS AS SPECIFIED AND SHOWN. IN THE EVENT OF CONFLICTS BETWEEN THIS SEQUENCE AND SCHEMATICS THE SEQUENCE SHALL GOVERN. FEATURES SHOWN IN ONE PLACE AND OMITTED IN OTHERS DO NOT COUNT AS CONFLICTS; PROVIDE THE SUM OF ALL FEATURES INDICATED. UNLESS OTHERWISE SPECIFIED OR INDICATED, ALL MODULATING CONTROL SHALL BE PROPORTIONAL-INTEGRAL-DIFFERENTIAL (PID).
A. HAND-OFF-AUTO SWITCHES:
(1) DOMESTIC HOT WATER PUMP HAND-OFF-AUTO SWITCH: EACH DOMESTIC HOT WATER PUMP STARTER SHALL
HAVE AN INTEGRAL H-O-A SWITCH:
(A) HAND: WITH THE H-O-A SWITCH IN THE "HAND" POSITION, THE PUMP SHALL START AND RUN CONTINUOUSLY, SUBJECT TO SAFETIES.
(B) OFF: WITH THE H-O-A SWITCH IN THE "OFF" POSITION, THE PUMP SHALL STOP.
(C) AUTO: WITH THE H-O-A SWITCH IN THE "AUTO" POSITION, THE PUMP SHALL RUN AS DIRECTED BY THE DDC
HARDWARE, SUBJECT TO SAFETIES.
B.PROOFS AND SAFETIES:
(1) THE DDC HARDWARE SHALL MONITOR ALL PROOFS AND SAFETIES. IN THE EVENT PROOFS INDICATE PUMP
FAILURE OR LOSS OF FLOW, SYSTEM SHALL ALARM AND START SECONDARY UNITS.
(2) PROOFS:
(A) DOMESTIC HOT WATER PUMP STATUS.
(B) DOMESTIC HOT WATER FLOW STATUS.
(3) SAFETIES: NONE OTHER THAN THOSE INTERNAL TO EQUIPMENT.
(4) DDC HARDWARE RESET OF ALL PROOFS SHALL BE VIA A LOCAL BINARY PUSH BUTTON (RST-BUT) INPUT TO THE DDC HARDWARE, OR VIA A REMOTE NETWORK COMMAND TO THE DDC HARDWARE (WHERE THE CONTRACTOR PROVIDES BOTH RESET FUNCTIONS AND THE OPERATOR CAN USE EITHER ONE TO PERFORM THE RESET). RESET
OF SAFETIES SHALL BE VIA LOCAL PUSH BUTTON ONLY.
C. SYSTEM ENABLE AND LOOP ENABLE: THE SYSTEM SHALL BE ENABLED MANUALLY BY THE OPERATOR FROM THE CENTRAL WORKSTATION OR WHEN THE CHILLER ACC-1 IS IN OPERATION. ON RECEIVING THE ENABLE SIGNAL, THE DDC SYSTEM SHALL SEND THE DOMESTIC HOT WATER PUMP AN ENABLE SIGNAL. THE SYSTEM SHALL OPEN THE ASSOCIATED DOMESTIC HOT WATER ISOLATION VALVE. WHEN THE SYSTEM IS ENABLED, ALL SUBORDINATE LOOPS
SHALL BE ENABLED.
D. PUMP ENABLE/DISABLE:
(1) ALL PUMPS SHALL BE INTERLOCKED WITH THE CHILLER ACC-1: THE SYSTEM SHALL SEND THE PUMP A START/STOP SIGNAL SIMULTANEOUSLY WITH SENDING THE CHILLER ENABLING SIGNAL. WHEN THE SYSTEM COMMANDS THE CHILLER TO BE DISABLED, THE SYSTEM SHALL WAIT UNTIL THE CHILLER RESPONDS THAT IT HAS
OBEYED BEFORE STOPPING THE PUMP.
(2) PUMP HWP-1 AND HWP-2 IS SERVES THE DESUPERHEATER DSH-1 WHICH IS INTERLOCKED WITH CHILLER ACC-1
AND MUST BE ENABLED WHEN SCHEDULED.
(3) IF PUMP HWP-1 OR HWP-2 FAILS TO START, THE DCC SYSTEM SHALL ALARM.
F. PUMP CONTROL LOOP (DOMESTIC HOT WATER SYSTEM)
(1) THE DOMESTIC HOT WATER PUMPS SHALL BE CONSTANT SPEED. HOT WATER SHALL BE FLOWING CONSTANTLY
BETWEEN THE DESUPER HEATER DSH-1 AND THE PRE-HEAT TANK.
(2) THE PUMP SHALL BE CONTROLLED BY THE TEMPERATURE SETPOINT OF 110 DEG F IN THE PRE-HEAT TANK. THE DOMESTIC HOT WATER PUMP SHALL BE OPERATING WHEN THE PRE-HEAT TANK TEMPERATURE IS AT 110 DEG F OR
BELOW.
(3) PRIMARY/STANDBY SWITCHING: EACH PUMP SHALL BE SIZED FOR THE FULL CAPACITY REQUIRED FOR THE ASSOCIATED SYSTEM. ONLY ONE PUMP SHALL OPERATE AT ANY GIVEN TIME. PRIMARY AND STANDBY PUMP SHALL BE ROTATED EVERY SEVEN DAYS TO ALLOW APPROXIMATELY EQUAL RUNTIME AND SUBSEQUENT WEAR ON EACH PUMP. AT SYSTEM START HWP-1 SHALL BE ACTIVATED AND HWP-2 SHALL BE THE STANDBY, AND SO ON. AFTER SEVEN DAYS OF SYSTEM OPERATION, HWP-2 SHALL BE ACTIVATED AND HWP-1 SHALL BE THE STANDBY.
DOMESTIC HOT WATER - SEQUENCE OF OPERATION
T1
STORAGE/
PREHEAT
200 GAL.
TO DDC
CONTROL
PANEL
TS
BTU
METER
HWR
FM
TS
HWS
HWR
TO DDC
CONTROL
PANEL
D C
W
TO DSH-1
SEE M-609 FOR
CONTINUATION
HWR
SEE P-507 FOR
CONTINUATION
HWP-1
HWP-2
DCW
SEE P-507 FOR
CONTINUATION
DHW
SEE P-507 FOR
CONTINUATION
HWST-1
DOMESTIC HOT WATER PIPING AND CONTROL SCHEMATIC
HWS
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
M-612
D O
M
ES
TI
C
H O
T W
AT
ER
S
EQ
U
EN
C E
O F
O
PE
R
AT
IO
N
S
AN
D C
O N
TR
O
LS
D
IA
G
R
AM
H O
N O
LU
LU
D
IS
TR
IC
T
FT
. S H
AF
TE
R , H
AW
AI
I 9
R
EG
IO
N
AL
E
N G
IN
EE
R
IN
G C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
H O
N O
LU
LU
, H I
TN TS KAKM
J
AN
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
DESIGN COMPLETE REV 12 JAN 2021
W H
EE
LE
R A
R M
Y
AI
R
FI
EL
D
, O
AH
U , H
AW
AI
I
FY
M
C A
PN
AI
R
C R
AF
T
M
AI
N
TE
N
AN
C E
H
AN
G
AR
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
-0
3/
/2
°F0
-10
°C
30 100
HWST
EHWH
EHWH
T1 T2 T3
STORAGE /
PREHEAT
200 GAL. 200 GAL. 200 GAL.
140°F 140°F
2" DCW
1 1/2"
3" DCW
EST. 278 WFU
105 GPM
1 1/2" 140°F DHWTO DDC
CONTROL
PANEL
TO DDC
CONTROL
PANEL
TO DDC
CONTROL
PANEL
HWR FROM BLDG. SYSTEM @ 110 DEG. F.
HWS TO BLDG. SYSTEM @ 120 DEG. F.
BMV-1 (HIGH/LOW THERMOSTATIC MIXING VALVE
ASSEMBLY BY VALVE MANUFACTURER. SEE DETAIL
A5/P-503.)
CHECK VALVE, TYP.
STRAINER, TYP.
2" HW SUPPLY @ 140 DEG F.
HWRP
DOMESTIC HOT WATER
RETURN INLINE
RECIRCULATION PUMP
HEAT
TRAP
MIN 24"
2" DCW
A
AQUASTAT
2" TEMPERED HW @ 120 DEG. F.
BALL VALVE, TYP. UNLESS
OTHERWISE NOTED
CHECK VALVE
TEST CONNECTION VALVE
TS
BTU
METER
2" HWR
HWP
FM
TS
2" HWR @ 110 DEG F.
TO DDC
CONTROL
PANEL
TO ET-2
1" HWR
1" DCW
2 1/2" HWS
HWR TO
DESUPERHEATER
@ 110 DEG F.
CLAMP ON ULTRASONIC ENERGY FLOWMETER
2" HWS @ 120 DEG F.
T & P RELIEF
VALVE (TYP)
1" HWR
UNION (TYP.)
1" T & P DRAIN (TYP)
1 1/2"
1" HWR
2" HWS
1 1/2" 140°F DHW
2"
HWS FROM
DESUPERHEATER
@ 120 DEG F.
HWP
BALANCING VALVE
CW TO BLDG
SYSTEM
2 1/2" DCW
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
P-507
PL
U
M
BI
N G
H O
T W
AT
ER
S C
H
EM
AT
IC
S
H O
N O
LU
LU
D
IS
TR
IC
T
FT
. S H
AF
TE
R , H
AW
AI
I 9
R
EG
IO
N
AL
E
N G
IN
EE
R
IN
G C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
H O
N O
LU
LU
, H I
TS
, D
N
TS KAKM
J
AN
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
DESIGN COMPLETE REV 12 JAN 2021
W H
EE
LE
R A
R M
Y
AI
R
FI
EL
D
, O
AH
U , H
AW
AI
I
FY
M
C A
PN
AI
R
C R
AF
T
M
AI
N
TE
N
AN
C E
H
AN
G
AR
NTSB4 DOMESTIC HOT WATER SYSTEM SCHEMATIC
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
-0
2/
/2
R
EV
IS
ED
IN
A
C C
O R
D
AN
C E
W
IT
H A
M -0
3/
/2
1. THE LIGHTNING PROTECTION SYSTEM DESIGN IS BASED ON THE ROLLING SPHERE DESIGN, IS APPROXIMATE, AND IS SUBJECT TO DESIGN VERIFICATION AND APPROVAL BY CONTRACTOR. INSURE THAT DURING INSTALLATION ALL POINTS ARE WITHIN 2'-0" OF OUTSIDE BUILDING EDGE, OUTSIDE CORNERS, AND RIDGE ENDS. THE MAXIMUM SPACING OF PERIMETER TERMINALS DOES NOT EXCEED 20'-0" FOR 12" COPPER AIR TERMINALS AND 25'-0" FOR 24" COPPER AIR TERMINALS. SUBMIT INSTALLATION DRAWINGS AND PROVIDE AN UL MASTER LABEL CERTIFIED SYSTEM COORDINATING WITH ACTUAL SUBMITTED MECHANICAL EQUIPMENT, ROOF INFORMATION, AND
ROOFING MANUFACTURER REQUIREMENTS.
2. SYSTEM SHALL BE INSTALLED AS SHOWN TO ENSURE PROPER CODE COMPLIANCE AND SYSTEM CERTIFICATION BY UL. ANY MAJOR
VARIANCE SHALL ENTAIL RESUBMITTAL AND NEW APPROVAL.
3. CONTRACTOR SHALL BOND TO BUILDING STEEL, ELECTRICAL SERVICE, WATER SERVICE, GAS SERVICE, AND OTHER PIPING SYSTEMS AS
REQUIRED BY NFPA 70 AND NFPA 780.
4. CONTRACTOR SHALL VERIFY STRUCTURAL MEMBER LOCATIONS.
5. CONTRACTOR SHALL VERIFY MECHANICAL EQUIPMENT LOCATIONS.
6. COORDINATE INSTALLATION OF LOOP CONDUCTOR WITH INCOMING UTILITIES. BARE COPPER COUNTERPOISE SHALL BE INSTALLED AT A MINIMUM DEPTH OF 30 INCHES, BURIED BETWEEN 3' AND 8' AWAY FROM THE BUILDING, AND HAVE NO BENDS LESS THAN 90 DEGREES.
7. CONTRACTOR SHALL PROVIDE CONDUCTOR FROM ROOF CONDUCTOR TO GROUND ROD, ROUTE CONDUCTOR AROUND GUTTER, PARAPET WALL, AND/OR ROOF EVE AND ALL INCOMING UTILITIES. COORDINATE DOWN CONDUCTORS WITH ALL INCOMING UTILITIES.
8. ALL CONNECTIONS AND EQUIPMENT BONDING SHALL BE IN ACCORDANCE WITH SPECIFICATIONS AND NFPA 780.
9. LOCATE AIR TERMINALS AS INDICATED. INSURE THAT ALL POINTS ARE WITHIN 24" OF OUTSIDE BUILDING EDGE, OUTSIDE CORNERS, AND THAT MAXIMUM SPACING BETWEEN TERMINALS DOES NOT EXCEED 25', AND THAT MINIMUM AIR TERMINAL PROJECTION ABOVE OBJECT
IS 24".
10. BOND EXHAUST HOODS AND PIPES TO LIGHTNING PROTECTION CONDUCTOR.
11. CONTRACTOR SHALL PROVIDE 3/4" X 10'-0" CU CLAD STEEL GROUND RODS AT MINIMUM LOCATIONS SHOWN.
12. MAINTAIN HORIZONTAL OR DOWNWARD COURSING OF MAIN CONDUCTOR AND INSURE THAT ALL BENDS HAVE AT LEAST AN 8" RADIUS
AND DOES NOT EXCEED 90 DEGREES.
13. GROUND BARS TO BE ANCHORED AT INTERVALS NOT TO EXCEED 2'-0".
14. GROUND BARS SHALL BE PRE-DRILLED.
15. AIR TERMINALS SHALL BE BLUNT TIP TYPE.
16. ALL PERIMETER COLUMNS SHALL BE BONDED TO COUNTERPOISE SYSTEM. PERIMETER COLUMN BONDS NOT AT THE LOCATION OF A DOWN CONDUCTOR ARE OMITTED FOR CLARITY. SIZE SHALL BE AS SHOWN ON EG601. LOOP CONDUCTOR SHALL HAVE A GROUND ROD
AT EACH STRUCTURE CORNER AND INTERMEDIATE COLUMN CONNECTION.
17. GROUNDING AND BONDING CONDUCTORS SHOULD NOT BE PLACED IN FERROUS METALLIC CONDUIT. IF IT IS NECESSARY TO PLACE GROUNDING AND BONDING CONDUCTORS IN FERROUS METALLIC CONDUIT THAT EXCEEDS 3 FEET IN LENGTH, THE CONDUCTORS SHALL BE BONDED TO EACH END OF THE CONDUIT USING A GROUNDING BUSHING OR A #6 AWG CONDUCTOR, MINIMUM.
18. SHOP GROUND BARS SHALL BE INTERCONNECTED WITH MINIMUM BARE COPPER CONDUCTOR SIZES AS FOLLOWS:
#1/0 AWG: GROUND BAR TO COUNTERPOISE (GROUND BAR CONNECTION SHALL BE LABELED INDICATING CONNECTION
TO COUNTERPOISE)
#2 AWG: GROUND BAR TO GROUND BAR BARE COPPER CONDUCTOR SHALL BE SURFACE MOUNTED AND ROUTED ALONG WALL AT 2'-0" BETWEEN GROUND BARS. BOND THE CONDUCTOR TO EACH STATION/WORKBENCH AT A LEG. ROUTE VERTICALLY AT GROUND BAR LOCATIONS. ROUTE UNDERFLOOR WHEN CONDUCTOR CROSSES A DOOR OR INTO
ANOTHER ROOM.
PENETRATION OPENINGS THROUGH AIR BARRIERS SHALL COMPLY WITH THE BUILDING AIR BARRIER REQUIREMENTS. CORRECT ALL PENETRATIONS THAT ARE DETERMINED DEFICIENT DURING TESTING. SEE ARCH DRAWINGS FOR AIR BARRIER TESTING BOUNDARIES.
SUPPORT EXPOSED ROOF CABLES AS SHOWN IN APPLICABLE DETAILS AT 36" ON CENTER MAXIMUM.
21. PROVIDE CONDUCTOR FROM ROOF CONDUCTOR TO STEEL COLUMN. ROUTE CONDUCTOR AROUND GUTTER OR ROOF EVE AND PENETRATE WALL OR SOFFIT AND ATTACH TO COLUMN. PENETRATE WALL AT GRADE AND ATTACH TO COLUMN PER DETAIL E1, SHEET
EG501.
22. COORDINATE INSTALLATION OF LOOP CONDUCTOR WITH INCOMING UTILITIES.
23. NOT USED.
GENERAL LIGHTNING PROTECTION AND GROUNDING NOTES:
(APPLICABLE TO ALL EG SHEETS)
19.
20.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
EG001
G R
O U
N D
IN
G
G
EN
ER
AL
N O
TE
S
AN
D
SU
PP
LE
M
EN
TA
L
LE
G
EN
D
FY
M C
A
PN
AI
R C
R
AF
T M
AI
N
TE
N
AN
C
E H
AN
G
AR
H
O N
O
LU
LU
D
IS
TR
IC
T
FT
. S
H
AF
TE
R
, H
AW
AI
I 9
R
EG
IO
N
AL
E
N G
IN
EE
R
IN
G C
EN
TE
R H
O N
O
LU
LU
D
IS
TR
IC
T
H O
N O
LU
LU
, H I
M . L
AM
M . S
TA
N
SB
U
R Y
KAKC
J
AN
DESIGN COMPLETE REV 12 JAN 2021
W H
EE
LE
R A
R M
Y
AI
R
FI
EL
D
, O
AH
U , H
AW
AI
I
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
-0
3/
/2
# KEYED NOTES: (APPLICABLE TO ALL EP SHEETS)
1. MAXIMUM LENGTH FROM THE FROM THE SPLICING JUNCTION BOX TO THE RECEPTACLE SHALL 10’-0”. PROVIDE 2-#10, #10G IN 3/4”C FROM
SPLICING JUNCTION BOX TO RECEPTACLES/DEVICES.
2. WALL MOUNT TRANSFORMERS PER DETAIL E1, SHEET EP504.
3. COORDINATE FLOOR BOX WITH COMMUNICATION DRAWINGS, POWER AND COMM SHALL SHARE THE SAME FLOOR BOX.
4. SINGLE 208V 3 PHASE (NEMA 18-20R) RECEPTACLE. FOLLOW MANUFACTURER INSTALLATION GUIDANCE. INSTALL A JUNCTION BOX IN PLACE
OF A RECEPTACLE IF THAT IS PREFERRED.
5. COORDINATE RECEPTACLE HEIGHT WITH ELEVATED MICROWAVE POSITION SHOWN ON SHEET A-422.
6. SURFACE MOUNT REPEATER RECEPTACLE AT 18’-0” AFF TO BOTTOM. PROVIDE 18”X18” MIN FIRE RATED PLYWOOD BACKBOARD FOR EACH LOCATION. FINISH SHALL BE CLEAR SEALER AND FIRE RATED STAMP SHALL BE CLEARLY VISIBLE ON EACH BACKBOARD. FIX TO PRECAST WALL WITH MIN 1/4" EXPANSION ANCHORS AT ALL FOUR CORNERS OF THE BACKBOARD LOCATE TOP OF BACKBOARD 0’-3” BELOW
RECEPTACLE. UNLESS OTHERWISE NOTED.
7. MOUNT REPEATER RECEPTACLE AT 11’-0” AFF TO BOTTOM.
8. PROVIDE 1 INCH CONDUIT SIZE FOR ENTIRE LENGTH OF CIRCUIT. PROVIDE JUNCTION BOX (WEATHERPROOF GASKETTED, SEE MOUNTING HEIGHTS FOR EACH JUNCTION BOX INDICATED ON SHEETS EY101-105) AND LABEL WITH CIRCUIT AND CAMERA IDENTIFIERS AT ALL CCTV LOCATIONS, AND AT THE CCTV RACK FOR FUTURE IDENTIFICATIONS. SEE SHEET EY602 FOR ADDITIONAL INFORMATION.
9. COORDINATE DEVICE PLACEMENT WITH UTILITY STAND DETAILS IN SHEETS EP503.
10. ALL RECEPTACLES LOCATED IN THIS ROOM SHALL BE MOUNTED AT 34” AFF
11. DDC CONTRACTOR AND ELECTRICAL CONTRACTOR SHALL COORDINATE FINAL LOCATIONS OF DDC CONTROL PANELS AND ASSOCIATED
CIRCUITS TO POWER THE PANELS.
12. CONNECT METER TO NEARBY DDC PANEL TO ALLOW LOCAL AND REMOTE READINGS.
13. CONTRACTOR TO PROVIDE AN ADVANCED METER PER DPW METER STANDARDS AND AS REQUIRED PER ECB 2015-2, UFC 1-200-02 (HIGH PERFORMANCE & SUSTAINABLE BLDGS REQTS), UFC 3-470-01 (12TH JAN 2018 REV) AND UMCS/MCX GUIDELINES FOR ADVANCED METERING.
SEE EP001/NOTE 42 FOR ADDITIONAL INFORMATION. SEE EP401 KEYED NOTES, WHICH DESCRIBES REQUIREMENTS FOR ADVANCED METER AND TELECOM DEVICE/SERVER (PER NETWORK ENTERPRISE CENTER AND DPW TELECOMM STANDARDS) CONNECTIONS.
14. BUILT-IN COUNTERTOP (30"(H) X 24"(W)). SEE DETAIL A8 SHEET A-751. MOUNT OUTLET 4" ABOVE COUNTER.
15. OUTLET TO BE INSTALLED ABOVE WORKBENCH. SEE DETAIL A4 ON SHEET EP505. SEE I-101 FURNITURE PLAN AND COORDINATE OUTLET
LOCATION WITH ACTUAL FURNITURE TO BE INSTALLED.
16. OUTLET TO BE INSTALLED ABOVE WORKBENCH. SEE DETAIL A1 ON SHEET EP505. SEE I-101 FURNITURE PLAN AND COORDINATE OUTLET
LOCATION WITH ACTUAL FURNITURE TO BE INSTALLED.
17. OUTLET TO BE INSTALLED ABOVE WORKBENCH. SEE DETAIL A8 ON SHEET EP505. SEE I-101 FURNITURE PLAN AND COORDINATE OUTLET
LOCATION WITH ACTUAL FURNITURE TO BE INSTALLED.
18. MAIN CIRCUIT BREAKER SHALL BE PROVIDED WITH GROUND FAULT PROTECTION.
19. PROVIDE SWITCHBOARD MAIN CIRCUIT BREAKER OVERCURRENT AND UNDERVOLTAGE PROTECTION.
20. SPECIAL RECEPTACLE 208V, 3PH, 100A THAT MUST BE COMPATIBLE WITH AVIATION MAINTENANCE UNIT (AMU) CABLE ELECTRICAL ASSEMBLY FIGURE D-7 OF TM-55-4920-403-20&P. MOUNT RECEPTACLE 2' 6" AFF. SEE C4/EP504 AND A4/EP504 FOR RECEPTACLE DETAILS.
21. CONTRACTOR TO PROVIDE AN ADVANCED METER PER DPW METER STANDARDS AND AS REQUIRED PER ECB 2015-2, UFC 1-200-02 (HIGH PERFORMANCE & SUSTAINABLE BLDGS REQTS), UFC 3-470-01 (12TH JAN 2018 REV) AND UMCS/MCX GUIDELINES FOR ADVANCED METERING.
23. THE INTERRUPTING RATING OF THE PANELBOARDS AND ELECTRICAL EQUIPMENT SHALL BE INCREASED TO THE NEXT AVAILABLE RATING WHERE THERE IS NOT A RATING THAT IS EQUAL TO THE EQUIPMENTS LISTED SHORT CIRCUIT RATING.
24. PROVIDE GROUNDING CONDUCTORS IN ALL CONDUITS. ALL RACEWAYS SHALL HAVE A SEPARATE EQUIPMENT GROUNDING/BONDING CONDUCTOR. RACEWAY SHALL NOT BE USE AS THE SOLE GROUNDING/BONDING PATH.
25. RACEWAYS CROSSING STRUCTURAL EXPANSION JOINTS OR SEISMIC JOINTS SHALL BE PROVIDED WITH SUITABLE EXPANSION FITTINGS OR OTHER SUITABLE MEANS TO COMPENSATE FOR THE BUILDING EXPANSION AND CONTRACTION AND TO PROVIDE FOR CONTINUITY OF GROUNDING. FOR ISOLATION JOINT LOCATIONS BETWEEN HANGAR MAINTENANCE BAY AND HANGAR ADMINISTRATION WING CMU WALLS, SEE SHEETS S-203 THROUGH S-206 OF STRUCTURAL DRAWINGS.
26. RECEPTACLES THAT HAVE GFCI PROTECTION ARE TO BE WIRED SUCH THAT THE LOSS OF POWER ON ONE RECEPTACLE
DOES NOT AFFECT DOWNSTREAM RECEPTACLES.
27. TELECOM RACK DEDICATED POWER OUTLETS SHALL BE MOUNTED TO RACKS IN LOWER LEFT AS FACING THE REAR OF RACK.
28. EACH PULL ROPE SHALL BE LABELED WITH A UNIQUE IDENTIFIER TAGGED ON EACH END. THE USER END OF THE PULL ROPE
SHALL ALSO INDICATE THE SOURCE LOCATION AND VICE VERSA.
29. PENETRATION OPENINGS THROUGH AIR BARRIERS SHALL COMPLY WITH THE BUILDING AIR BARRIER REQUIREMENTS.
CORRECT ALL PENETRATIONS THAT ARE DETERMINED DEFICIENT DURING TESTING. SEE AB101 FOR AIR BARRIER TESTING
BOUNDARIES. SEE ARCHITECTURE FOR SEALING PENETRATIONS.
30. DO NOT PENETRATE STRUCTURAL COLUMNS, BEAMS, AND TRUSSES. ATTACH DEVICES AND RACEWAY WITH BEAM C- CLAMPS, BRACKETS, CLIPS, UNISTRUT, AND OTHER NON-PENETRATING AND NON-ADHESIVE HARDWARE.
31. COORDINATE POWER RECEPTACLES WITH TELECOMMUNICATIONS OUTLETS. SPACING SHALL BE NO GREATER THAN 12"
CENTER TO CENTER.
GENERAL NOTES:
(APPLICABLE TO ALL EP SHEETS)
1. ALL WIRING SHALL COMPLY WITH NFPA 70-2020, NATIONAL ELECTRICAL CODE.
2. PROVIDE NAMEPLATES ON THE EXTERIOR OF ALL ELECTRICAL PANELS AND ENCLOSURES AS FOLLOWS: DEVICE ID, DEVICE RATING, AND POWER SOURCE. PROVIDE LABEL INDICATING "ARC FLASH HAZARD". PROVIDE ARC FAULT DATA FOR DPW.
DO NOT LABEL ENCLOSURES WITH ARC FAULT DATA.
3. MINIMUM SIZE CONDUIT WILL BE 3/4" FOR ELECTRICAL CIRCUITS.
4. MINIMUM SIZE POWER CONDUCTORS TO BE USED SHALL BE #12 AWG UNLESS OTHERWISE NOTED. RECEPTACLE CIRCUITS
SHALL BE 2-#12,#12G.
5. ALL PRINTERS, FAXES, COPIERS, PLOTTERS, AND SHREDDERS SHALL BE CONNECTED ON THEIR OWN DEDICATED CIRCUIT.
6. POWER SUPPLIES FOR VAV BOXES SHALL FEED A MAXIMUM OF 6 VAV BOXES.
7. NOT USED
8. POWER/COMMUNICATIONS SEPARATION REQUIREMENTS:
- PROVIDE 2" BETWEEN MC CABLE RUNNING IN PARALLEL WITH A COMMUNICATIONS WIREWAY.
- CROSSOVERS BETWEEN MC CABLES AND COMMUNICATIONS WIREWAYS SHALL BE PERPENDICULAR TO EACH OTHER
WITH THE MC CABLE ROUTED BELOW COMMUNICATIONS WIREWAY.
9. MOUNTING HEIGHTS SHALL BE AS SHOWN IN EP001 UNLESS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .