This is a solicitation for a design-build construction project to build an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project includes construction of a hangar, maintenance shops, administrative space, parts and tool storage, hazardous materials storage, POL storage, GSE storage, covered storage, hangar access apron, aircraft washing apron and associated pavement, fire pump building, special foundations, cybersecurity measures, building information systems, fire protection and alarm systems, IDS installation, and utility monitoring control systems connection. Supporting facilities include site development, utilities, fire suppression systems, water storage tank, lighting, paving, parking, walks, curbs, gutters, storm drainage, landscaping, and signage. Air conditioning will be provided by self-contained systems. Measures will be provided in accordance with DoD Minimum Antiterrorism for Buildings standards. Interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity measures and sustainability/energy measures will be incorporated. Facilities will be designed for a minimum 40-year life. The procurement will be evaluated on experience, past performance, organization and management plan, small business participation plan, and price using best value tradeoff procedures.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0005 08 Mar 2021
6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE
CEPOH – CONTRACTING DIVISION HAWAII
USACE, HONOLULU DISTRICT See Item 6
BLDG 252 (CECT-POH)
FT SHAFTER, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
W9128A20R0017 X
9B. DATED (SEE ITEM 11)
X 29-Jan-2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
ODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii
See Continuation Page
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W9128A21R0004
Am-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE Page 2 of 3
1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.
Revised pages replace like-numbered pages. The revision mark “(Am-0005)” is shown on each revised page.
A. REVISED SECTIONS. The following are sections were revised and changes are in bold and / or strikethrough.
Section 01 91 00.15 10, Paragraph 1.2
Section 07 42 13, Paragraph 2.3.1
Section 08 41 13, Paragraph 3.4.5
Section 08 51 13, Paragraph 1.10.5
Section 09 62 38, Paragraph 3.2
Section 09 65 00, Paragraph 3.3
Section 09 67 23.15, Paragrph 3.5
Section 09 97 13.27, Paragraph 3.2
Section 32 11 23.23, Paragraph 1.3.2
Section 32 13 14.13, Paragraphs 2.1.1, 2.1.5, Part 3
B. ADDITIONS TO SECTION: The following sections were added to a section:
Section 00 60 00, Requests for Information, #82 to 158
C. NEW PARAGRAPHS. The following pargraphs are added to the sections.
N/A
D. REPLACED SECTION: The following sections are to be replaced in its entirety:
Section 08 81 00, Page 1-11
Section 41 22 13.13, Page 1-28
Section 41 22 13.14, Page 1-18
E. NEW SECTIONS: The following sections are added to the solicitation.
N/A
F. DELETED SECTIONS: The following sections are deleted in the solicitation.
Section 33 61 13.13, Page 1-14
2. CHANGES TO DRAWINGS
A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:
SHEET ID SHEET NO. MARK REVISION DATE
G-002 Vol 1 of 3 3 03/04/21
G-003 Vol 1 of 3 3 03/04/21
CS505 Vol 1 of 3 3 03/04/21
Am-0005
SHEET ID SHEET NO. MARK REVISION DATE
S-412 Vol 1 of 3 3 03/04/21
A-001 Vol 2 of 3 3 03/04/21
A-155 Vol 2 of 3 3 03/04/21
A-201 Vol 2 of 3 3 03/04/21
A-424 Vol 2 of 3 3 03/04/21
A-602 Vol 2 of 3 3 03/04/21
A-603 Vol 2 of 3 3 03/04/21
A-712 Vol 2 of 3 3 03/04/21
A-714 Vol 2 of 3 3 03/04/21
A-733 Vol 2 of 3 3 03/04/21
A-741 Vol 2 of 3 3 03/04/21
AF601 Vol 2 of 3 3 03/04/21
EP001 Vol 3 of 3 3 03/04/21
EP102 Vol 3 of 3 3 03/04/21
EP503 Vol 3 of 3 3 03/04/21
EP507 Vol 3 of 3 3 03/04/21
EP602 Vol 3 of 3 3 03/04/21
EP609 Vol 3 of 3 3 03/04/21
T-602 Vol 3 of 3 3 03/04/21
B. NEW DRAWINGS (ISSUED). The following new drawings are issued herewith:
N/A
3. Requests for Information (RFIs) is extended to March 12, 2021 at 2:00 p.m., Hawaii Standard Time.
4. The proposal due date remains unchanged. See Am-0004, SF 1442, Block 13.
RFI # Question Response
09 97 13.27.
Paragraph 2.3 indicates all painting of exposed hangar steel is to be accomplished in the field and if any primer is installed at the shop it is to be removed and finish painted in the field. Paragraph 3.2 indicates "Shop coating" of steel. Please clarify and coordinate.
Shop coating or field coating is acceptable.
See Am-0005, revised section 09 97 13.27, para 2.3 and 3.2.
07 42 13.
Please verify that the structural steel (Rafters, purlins, angles and other structural support members) have been specified to be installed within alignment tolerances as specified in section 07 42 13 paragraph 3.1. If not please coordinate or delete the requirement in this section.
Please verify that all support framing for the metal panel systems specified in section 05 40 00 are shown on the drawings. If not then the metal panel will be required to span between the steel framing indicated on the drawings and cold formed metal systems will not be required.
Structural steel members shall be in accordance with sections 05 12 00 and 07 42 13.
As sections 05 12 00 and 07 42 13 refeence different standards, the more stringent requirement shall apply.
Support for metal wall panels are indicated on the drawings. Cold formed metal systems are required as indicated on the specifications.
01 35 26; 3.1.3.
01 35 26, paragraph 3.1.3, state "Contract documents identify materials such as PCB, lead paint, and friable an non-friable asbestos and other OSHA regulated chemicals." Please clarify where this is located in the documents.
Currently, there is no known hazardous materials located at the site.
Section 01 35 26, para 3.1.3 provides a generic statement intended to address any unforeseen materials that may be encountered during construction.
01 45 35; 1.5.10.
01 45 35 paragraph 1.5.10 discuss 3rd party QC testing requirements for mastic and intumescent coatings. Contract documents do not show any fireproofing requirements. Please confirm this is not required.
Confirmed. There is no fire proofing required for this project; therefore, section 01 45 35, para 1.5.10 would not apply.
41 22 313; 41 22 13.14.
Bridge Crane specifications 41 22 13.13 and 41 22 13.14 do not reference any AISC requirements only AWS requirements. Please clarify if AISC requirements per 05 12 00 applies also to the bridge crane manufacturer and installer.
See Am-0005, revised section 41 22 13.13 paragraph 1.3.
AISC is a requirement indicated in 41 22 13.14 paragraph 1.3.
32 31 13. 53, CS505.
Specification 32 31 13. 53 indicates standard hinges for gate hardware. However, detail E9/CS505 illustrates a custom welded hinge. Please confirm standard hinges are required per specification.
See Am-0005, revised drawing CS505.
Section 00 60 00, Requests for Information - Page 1 (Am-0005)
32 13 14.13, paragraph 2.1.1, CG102.
Please confirm that Spec 32 13 14.13, paragraph 2.1.1 "smoothness requirements do not apply over crowns, drainage structures, or similar penetration" would be applicable for swale areas in PCC pavement to be installed per CG102.
See Am-0005, revised section 32 13 14.13, para 2.2.1.
32 13 14.13 paragraph 2.3.
Based on the amendment no 2 response regarding the airfield pavement, it seems the locally produced aggregates may not be able to meet the spec section 32 13 14.13 paragraph 2.3 requirement. Can USACE or subject matter expert provide a source list of qualified quarries within or outside of the United States?
No. Contractors are responsible to procure aggregates to meet specifications.
Note: Several airfield pavements at Hickam Air Force Base were constructed using aggregates that met the requirements of section 32 13 14.13.
Sheet A-424.
• Sheet A-424 Note 15 indicates a built-in issue counter w/ drawers connected to a built-in issue counter w/ shelves in the Aircraft Parts Supply Office Counter (#101).
• The note provides the finish (PL-2, SS-2), which is Plastic Laminate Cabinets with a ½" solid surface top.
• The note also references Detail C6/A-751. This detail shows the countertop to be 16 GA. Stainless Steel on ¾" plywood.
• The built-in issue counter w/ shelves also calls for a 16 GA. Stainless Steel on ¾" plywood top.
Please confirm that the built-in issue counter w/ drawers is to be 16 GA. Stainless Steel on ¾" plywood to match the rest of the countertop.
See Am-0005, revised sheet A-424, note #15.
A-552, A-563.
Please provide the spec for the pre-finished aluminum wall panel system shown on Details E8/A-563 and A6/A-553.
See Am-0003, added specification 07 42 13.13.
01 57 19.
Please confirm the Government accepts "Generator Status" of all hazardous materials to be disposed of that is generated from pre-existing conditions and performance of the work...and the Government will sign applicable hazardous waste disposal manifests
Confirmed.
Section 00 60 00, Requests for Information - Page 2
01 57 19.
While FAR 52.236-7 – Permits and Responsibilities indicates Contractor is responsible for all permitting required for the project, will the Government identify permits (in addition to digging permits) required to perform work specific to WAAF
Price accordingly per specifications, drawings, and amendments.
32 13 14.13 Section 1.4.3.3.
Specification requires onstie Quality Control Laboratory.
Due to the small size of Oahu, specimens are never more than a 45 minute travel from a certified offsite laboratory.
Request the use of an off site laboratory for all quality control testing provided it meets all other specification requirements. Requiring onsite certified laboratory will add unnecessary cost.
Price accordingly per specifications.
32 13 14.13 Section 2.3.2.1.
Specification calls for "coarse aggregate that has been washed sufficient to remove dust and other coatings."
Local aggregates have proven test results complying with C33 cleanliness as well as this specifications moderate ASR and deleterious classification requirements without the need for washing.
Request acceptance of "clean" in lieu of "washed" coarse aggregate.
Price accordingly per specifications.
32 13 14.13 Section 2.13.1.
Specification requires a mixture with "a minimum total cementitious materials content of 517 pounds per cubic yard."
Request clarification that Supplementary Cementitious Material weight is to be included in the "total cementitious material" weight.
Confirmed that total cementitious materials contents weight includes supplementary cementitious material weight.
Section 00 60 00, Requests for Information - Page 3
32 13 14.13 Section 3.2.2.
Specication states "After underyling material has been prepared for conrete placement, equipment is not permitted thereon with the exception of the paver." It goes on to state "Rework and repair the surface before concrete is placed."
Request access for concrete placer and concrete trucks on prepared underlying material in front of and adjacent to the paver. Contractor will rework and repair any damaged underlying material before concrete is placed.
Price accordingly per specifications.
A-712.
Note D4 on A-712 show a 6" insulated metal wall panel on the sliding hangar doors. There are no details that show how these panels (not provided by door manufacturers) will be fastened to the door. Please provide applicable attachment details.
See Am-0005, revised sheets A-712 and A-714.
32 13 14.13.
Para. 1.4.1 g states, "Slipform paving equipment manufacturer's representative: A representative of the slipform paving equipment manufacturer is required to be on-site to inspect and make corrections to the paving equipment to ensure proper operations.
Given all slipform manufacturer are located on the main land this burden will increase time and cost to the Gov't. In lieu of the requirement, will USACE allow option for a manufacturer certified operator/mechanic to perform these tests to satisfy this specification requirement?
Price accordingly per specifications.
32 13 14.13.
Para. 2.1.5 states... "fill the core holes with an approved non-shrink concrete..."
Request filling of concrete core holes with approved concrete mix as an alternative to non-shrink concrete.
See Am-0005, revised section 32 13 14.13.
Section 00 60 00, Requests for Information - Page 4
32 13 14.13.
Para. 2.11.7.1 states, "Provide burlap conforming to AASHTO M 182, class 3 or 4."
Requesting use of class 1 burlap, stacked within multiple layers to achieve the desired weight requirements of class 3 or class 4 and desired textured finish as determined by the test section.
Price accordingly per specifications.
32 13 14.13.
Para. 3.4.2 states, operate non-agitating equipment only on smooth roads and for haul time less than 15 minutes."
Request increase in haul time of non-agitating equipment up to 45 minutes, so long as placement requirements specified in section 3.4 are met.
Price accordingly per specifications.
32 13 14.13.
Para. 2.13.2.1, states "Perform at least three different water-cementitous material ratios, which produce a range of strength encompassing that required on the project."
Confirm acceptable to use W/C ratio outside of the allowable maximum 0.45 to obtain the necessary data to support range in strengths encompassing that required on the project.
Confirmed W/C ratio outside of the allowable maximum 0.45 is allowed to obtain data to support range in strengths per specification.
32 13 14.13.
Para 3.12.2 Table 6 indicates uniformity testing is required every 4-months during paving. Please eliminate the need for uniformity testing after the initial test is accepted, pending CQC testing results remain in compliance with the specifications.
Price accordingly per specifications.
Section 00 60 00, Requests for Information - Page 5
32 13 14.13.
Para. 2.3.2.4, table 5 (Limits of Deleterious Materials in Coarse Aggregate for Airfield Pavements) contains requirements for "Severe" and "Moderate" weather.
Hawaii is unique among the United States in that it has warm weather conditions year round. Ambient air temperatures for this project average 70s-80s Fahrenheit so there is no risk of exposure to freeze thawing cycles or the use of deicing chemicals. Hawaii has a milder climate than coastal southern California, which is classified as "negligible weather" per Fig.1 from Page 7 of ASTM C33 "Location of Weathering Regions".
Please consider changing Table 5 Deleterious Requirements from Moderate to Negligible.
Price accordingly per specifications.
32 13 14.13.
Is it the intent of the Army Corps of Engineers to submit all specification section 32 13 14.13 - Concrete Paving for Airfields and Other Heavy Duty Pavements submittals through the Transportation System Center in Omaha, NE Army Corps of Engineering District Office?
TSC will review the mix designs and selective submittals.
32 13 14.13.
Will the USACE require the Contactor and its Subcontractors to participate in a 2 day long airfield paving work shop as part of this contract.
Yes. Contractor and subcontractors will be required to attend a 2 or 3-day airfield paving workshop.
See Am-0005, revised section 32 13.14.
32 13 14.13.
Please consider waiving the requirement to test Aggregate Deleterious & ASR tests every 30-days of concrete production as required by table 6 in para. 3.12.2 so long as the aggregate source remains unchanged. It takes 5 weeks to complete the ASR Testing ASTM C1260 and C1567. Freeze thaw testing requires 300 cycles of freezing and thawing at 30 cycles per week for a total testing duration of 10 weeks. These durations do not include the time to ship samples and report development. Due to the fact that Hawaii doesn't have a history of ASR issues and the climate is not prone to freeze thaw conditions, please consider waiving this unnecessary requirement that adds significant time and cost to the Government.
Price accordingly per specifications.
Section 00 60 00, Requests for Information - Page 6
32 13 14.13 Section 3.12.2.
Table 6 - Plant - Scales, Weighing Accuracy requires the NRMCA QC 3 to be completed monthly during concrete production. Currently the NRMCA QC section 3 is completed every two years due to the certificate being valid for two years from the date issuance. Please confirm the valid certificate through the duration of the paving is all that is required.
Price accordingly per specifications. Perform NRMCA QC 3 calibration monthly.
32 11 23.23 Section 1.3.2.
The specification states "Use an asphalt paving machine to place drainage layer material. Alternate methods may be used if it can be demonstrated in the test section that these methods obtain the specified results."
Please clarify which results are required to be met to prove that an alternate method could be used.
See Am-0005, revised section 32 13 23.23, para 1.3.2
32 13 14.13.
For this project, who is responsible for approving variance requests for Section 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements
Variance request will be evaluated by Transportation System Center, Omaha District.
32 11 23.23.
For the drainage layer, please confirm the Government will require rapid draining material (RDM) not OGM stabilized Material.
Refer to Section 32 11 23.23, paragraph 1.3.
The specification allows either RDM or OGM for drainage layer.
S-311, S-503, A-541, A-543.
Structural drawings illustrate typical isolation joint (S-311, C6/S-503) at slab on grade where terminating at stem walls. However, architectural drawings illustrate waterstop detail (ie A3/A-541, A3,C8/A-543). Please advise which detail to follow.
Both the Isolation Joint and the Waterstop details are required as indicated on the drawings
A-601, A-602.
On the Door Schedule door 117 Type Mark mentions "I". On Sheet A-602 Door Type I is not shown. Please advise
See Am-0003, revised sheet A-601.
I-106.
Sheet I-106 Equipment Schedule still shows (18) L3 Lockers. We could only find
(10) 3 tier lockers in the new Addendum. Please advise
See Am-0002 and Am-0003, revised drawings A-102, A-103, I-101 and I-106, and revised Section 10 51 13.
Section 00 60 00, Requests for Information - Page 7
I-106.
Suppliers are having a hard time finding L3 30"x30"x30" 3 Tier lockers. Could the government provide a designer, manufacturer, specs on who or where suppliers can purchase these? The largest locker that suppliers can provide that meet the specs are 24" W x 24" D x 24"H / Overall height is 72". Please advise.
Price accordingly per specifications.
09 90 00.
Will the Government allow a NACE Certified Coating Inspector inspect all work until certification can be made by SSPC?
Price accordingly per specifications.
A-741, S-232.
Detail A1 on sheet A741 indicates vertical steel angles @ 4'-0" O/C for attachment of Hat channel for the draft curtain on grids 3,5,7,9,& 10. This detail directs the contactor to refer to the structural drawings for more information. Elevations of truss on grids 5 & 9 on sheet S232 do not indicate angles. Please provide information and please verify that a drywall substrate on top of the hat channel is not required.
See Am-0005, revised sheet A-741.
A-152, A-153, A-154, A-155, A-156, A-181, A-552.
These drawings refer to a fall protection system but there does not appear to be a technical specification for these. Please provide.
See section 01 35 26, para 3.4.3 for roofline performance requirements.
A-603.
Glazing Types are not shown for the H1, hangar door, windows. Also in the table, Glazing Type GT-2 is shown for the glazing required for window types W1, W2 and W3; in the detailed views on Sheet A-603 for Type W1, W2, and W3 the views call for GT-1. Please advise.
See Am-0003, revised drawing A-603
32 13 14.13.
Refer to RFI response 6 and 13; if requirement remains to have batching plant located 15 minutes haul time away from placing site (paragraph 2.11.1.1), this will add considerable cost to the project to create an on-site batch plant. Please reconsider waiving this requirement.
See Section 32 13 14.13, Paragraph 3.4 for 45 minutes non-agitating dump truck delivery and 90 minutes agitating truck mixer delivery.
Price accordingly per specifications.
Section 00 60 00, Requests for Information - Page 8
07 21 13.
Thermal moisture protection specs include 072113 Board and block Insulation, 072116 Mineral Fiber Blanket Insulation and 072210 Spray Applied Polyurethane Insulation (SAPI). We have found on the drawings Mineral Fiber Insulation and Spray applied insulation. Please clarify where the Board and block insulation is used as it does not appear to be depicted on the architectural drawings.
See Am-0005, revised sheet A-001
A-501.
Reference detail A6/A-501 and A1/A-501. These details show concrete infills with the note "see struct". These do not appear to be shown on the structural drawings.
Please advise if these concrete infills are needed and coordinate the drawings.
Concrete infills are required as indicated in the drawings.
See A1/S-506 for typical detail.
A-401, A-544.
Details above CMU wall on the Hangar show steel members, metal siding, Gyp sheathing Fluid applied air barrier, EPS and EIFS. Please clarify if no framing is required for the wall assembly, and that the intent is for the gyp sheathing to apply directly to the metal siding (except where framing is shown such as A3/A-544).
Price accordingly per specifications.
23 35 43, EP503.
Spec Section 26-35-43 2.2 states that the 400hz Aircraft power cable assembly, states cable length must be 90ft. Sheet C7/EP503 states the cable length to be 75'. Please confirm the length shall be 75LF.
See Am-0005, revised sheet EP503.
26 20 00.
Spec Section 26-20-00 2.17 provides requirement for Transformers feeding non-linear loads. Please confirm which transformers on the project feed non-linear loads.
All transformers feed non-linear loads.
TS-102.
Sheet TS102 provides a partial view of the existing telecom infrastructure for new a new 12 Strand Fiber from the new Hangar to Building 1322. The ductbank seems to be cutoff, please provide a drawing or if not available then the footage of the existing ductbank between the new hangar and Building 1322
See Am-0002, revised drawing TS-102.
See drawing T-611 for distances of existing duct banks.
Section 00 60 00, Requests for Information - Page 9
093010, 096238, 096500, 096800, AF-602.
Reference specs 09 30 10 Ceramic Tile, 09 62 39 Static Control Flooring, 09 65 00 Resilient Flooring, and 09 68 00 Carpeting. There do not appear to be any manufacturers listed in the plans or specs for these finishes. The finish schedule refers to AF-602, which just provides a description of the materials but no manufacturer. Please provide desired manufacturer.
Salient characteristics are provided in the specifications, and colored photos provided on the drawings to show color and texture.
Price accordingly.
01 91 00.15 10.
Total Building Commissioning specification calls for "band slabs-on-grade" which is a structural element. Structural system for building erection is typically not part of Building envelope Commissioning. Please advise what is the intent of band slabs-on-grade in the building envelope commissioning.
See Am-0005, revised section 01 91 00.15 10
41 22 13.13, A-120, A-121, A-122, A-131, A-135, A-136.
Dwg Nos. A-120, A-121, A-122, A-131, A-135 & A-136 illustrate the bridge crane to be a SINGLE GIRDER Underhung type.
[1.3.2.2] specifies the crane designed and constructed to CMAA 74 ... which is a SINGLE GIRDER bridge crane.
? Confirm the two (2) 10 ton cranes in the Maintenance Hangar should be SINGLE GIRDER Underhung type designed and constructed in accordance with
CMAA 74?
? Also, confirm, since these are multi-runway underhung bridge cranes, they should also be designed and constructed in accordance with ANSI MH27.1?
? Also, confirm, since these are underhung multi-runway bridge cranes designed as Single Girder cranes per CMAA 74, that walkways/footwalks are not required?
1. See Am-0005, revised section 41 22 13.13, para 1.3.2.2.
2. See Am-0005, revised section 41 22 13.13, para 1.3.2.2 and 2.2.2.
3.Walkways/footwalks are not required.
Section 00 60 00, Requests for Information - Page 10
41 22 13.13.
[1.3.2.2] specifies the cranes will operate in an indoor non-hazardous environment. As such the following sections should be removed;
? [2.4.1] remove the following ".....Class I, Division 2 hazardous locations. Provide equipment suitable for Group D."
? [2.4.9.2] remove this section in its entirety. Rail clamps are for outdoor cranes.
These are indoor cranes per 1.3.2.2.
? [2.4.12.5] remove this section in its entirety, a wind indicator is not required for an indoor crane.
? [2.4.4.1 b.] remove this section in its entirety, motor heaters are for outdoor cranes.
? [2.4.6.1] remove the following sentence "Provide thermostatically-controlled heaters...." Heaters are for outdoor cranes.
? [2.4.6.1] control enclosures should be designed as NEMA type 4/12 for indoor environment.
The (2) 10 ton cranes are located in the hangar by which is a hazardous area.
See Am-0005, revised section 41 22 13.13, para 1.3.2.2.
See Am-0005, revised section 41 22 13.13, para 2.4.9.2 See Am-0005, revised section 41 22 13.13, para 2.4.12.5 See Am-0005, revised section 41 22 13.13, para 2.4.4.1.b See Am-0005, revised section 41 22 13.13, para 2.4.6.1
41 22 13.13.
[2.2.7] Confirm runway rails should be designed and constructed per ANSI MH27.1 for multi-runway underhung bridge cranes?
See Am-0005, revised section 41 22 13.13, para 1.3.2.2 and 2.2.2
41 22 13.13.
[2.4.5.1 a. & b.] 1.) Confirm brakes should be electric-mechanical brakes per CMAA 74 and not hydraulic brakes? Hydraulic brakes typically for outdoor high-capacity cranes.
2.) Also, confirm since the brakes will be electric-mechanical, then [2.4.12.6] oil pump should be deleted?
1) See Am-0005, revised section 41 22 13.13, para 2.4.5.1
2) See Am-0005, revised section 41 22 13.13, para 2.4.12.6
41 22 13.13.
[2.2.4] 1.) These are underhung cranes and therefore they have underhung end trucks, and should be designed in accordance with ANSI MH27.1 and CMAA #74?
2.) Rigid box sections and jacking pads are for top-riding bridge cranes and should be removed from this paragraph?
See Am-0005 revised section 41 22 13.13, para 1.3.2.2 and 2.2.4
Section 00 60 00, Requests for Information - Page 11
41 22 13.13.
[2.4.11.5] and [2.4.11.6] Both sections should be removed in their entirety, they are for outdoor bridge cranes. The pendant system should be simply designed per [2.4.11.4] as written.
See Am-0005, revised section 41 22 13.13, para 2.4.11.4 and 2.4.11.6
AG-102, A-103.
Enlarged signage floor plan on Plan Sheet AG102 shows fire extinguisher signs (FES-1) in Room Nos. 105 & 106. Please clarify if there are fire extinguishers located in these rooms. These are not shown or called out on enlarged floor plan on Plan sheet A-103.
See Am-0003, revised sheet AG-102.
AG-102, A-103.
Enlarged signage floor plan on Plan Sheet AG102 shows a fire extinguisher sign (FES-1) in Corridor 2 Room No. 157B between gridlines C & E. There is no fire extinguisher shown or called out on enlarged floor plan on Plan Sheet A-103.
Please clarify if a fire extinguisher or cabinet will be provided.
See Am-0003, revised drawing AG-102.
10 44 16.
Specification Section 104416 - Fire Extinguishers and Cabinets. Please confirm if all fire extinguishers are to be provided by the government.
Price accordingly per specifications.
15 06 02, A-151.
A-151 refers to a roof mounted boardwalk system, which is described in specification 15 06 02. However, there are no details in the drawings for this boardwalk system; please provide.
See Am-0005, revised sheet A-733.
A-151, A-531.
Are canopies and roofing systems required at all personnel doors? Currently the roof plans do not indicate this but the details on sheet A531 indicates that they are required. Please clarify.
Canopies are shown on roof plan sheet A-151 to A-156.
00 10 00.
Form 1442 #13B states that an offer guarantee is not required. However, given that the project value is in the $50M-100M range, and the proposed cost is now of approximately equal importance as the sum of the technical components, it is in the government's best interest to have bidding contractors provide an offer guarantee. Please advise if this requirement will be changed.
A bid guarantee is not required.
Section 00 60 00, Requests for Information - Page 12
I-101, I-106.
I-101 notes that items shown in half-tone or dashed lines are not included in the furniture package, and that the furniture package is NIC. However, lockers L3, L4, and L5 are shown in full-tone, solid lines, which would indicate that they ARE included in the furniture package, meaning they are NIC. However, I-106 lists L3, L4, and L5 as being CFCI. Please clarify if these lockers are intended to be CFCI or part of the furniture package, which would be NIC.
See Am-0002 and Am-0003, revised drawings A-102, A-103, I-101 and I-106, and revised Section 10 51 13.
A-502.
Details C7 & C8/A502 - GSE column details show Steel columns wrapped with EIFS system. Is the air barrier required in this application for an open structure?
Please advise.
See sheets AB101 and AB103 for extend of air barrier.
09 90 00, 09 97 13.16, 09 97 13.27.
Refer to 1.4.2 SSPC QP 1 Certification on page 7, Section 09 90 00. SSPC QP1 certification is required for painting scope of work as well as SECTION 09 97
13.16 INTERIOR COATING OF WATER TANK and SECTION 09 97 13.27
COATING OF STEEL STRUCTURES. Can be waived the SSPC QP-1 certification requirement for this project and/or will the Government allow a NACE Certified Coating Inspector inspect all work instead?
Price accordingly per specifications
08 11 16, 08 41 16, 08 51 13.
All opening along with the glazing in the Hanger doors to meet ASTM E 1996/1886 Large missile impact. The glass shown on schedule table on section 08 81 00 doesn't meet ASTM E 1996/1886. The 060 PVB inner layer can meet small missile impact but not Large missile impact. Please clarify.
See Am-0005, revised section 08 81 00, para 3.5
08 11 16, 08 41 16, 08 51 13.
Which missile impact test is required to meet requirement as they state in all the spec.? ASTM E 1996/1886 Missile A or D in table 2. D-Missile is going to require a 090 SGP inner layer or a 1.00 PVB inner layer to meet large missile impact.
Refer to IBC 2015 section 1609.1.2.
See Am-0005, revised section 08 81 00, para 3.5, and revised sheet A-603.
41 22 13.13, Page 8 (of 41 22 13.13) section 1.3.2.2 calls for indoor, nonhazardous location. It conflicts with Section 2.4.1 which calls for Class 1, Div 2, Gr. D hazardous location. Please clarify.
See Am-0005, section 41 22 13.13, para 1.3.2.2.
The (2) ton cranes are located in the hangar which is a hazardous area.
Section 00 60 00, Requests for Information - Page 13
Part 1
41 22 13.13.
Please see below questions:
1. Section 1.5.2: States "hook assembly and nuclear safety". Please delete nuclear safety.
2. Section 2.2.2 calls for bridge girders constructed of WF beams, I-Beams or plate girder. Drawing S-231 shows patented track runway beams. Could the girders be patented track too?
Please confirm the type of girders required.
3. Section 2.2.3 calls for box section for end ties. Underhung cranes will not have box section for end ties. It will be C-channel.
4. Section 2.2.4 calls for rotating axle type end trucks. This applies to top running cranes. Underhung cranes will have fixed axle end trucks.
5. Section 2.2.6 calls for hydraulic or spring bumpers. Commercial products come with rubber bumpers. Are rubber bumpers acceptable?
6. Section 2.3.2.2 calls for enclosed gears. In an underhung system, crane and trolley wheels are driven by open pinion/gears. Commercial products will not have gear covers.
7. Section 2.3.4 calls for double flanged wheels for cranes and trollies. Underhung system will have single flanged wheels. Also, the wheel bearings may not be double row spherical roller type.
8.Section 2.4.1 requires "Explosion proof Class 1, Div 2, Gr. D hazardous location. Conflicts with section 1.3.2.2 that requires "indoor non-hazardous environment. Please confirm location specification.
9. Section 2.4.4.3 requires TEFC motors. Commercial products will have TENV motors. Is TENV motor acceptable?
41 22 13.13.
Please see below questions:
1. See Am-005, revised section 41 22 13.13, para 1.5.2.
2. See Am-005, revised section 41 22 13.13, para 2.2.2.
3. See Am-005, revised section 41 22 13.13, para 2.2.3.
4. See Am-005, revised section 41 22 13.13, para 2.2.4.
5. Price accordingly per Specifications.
6. Price accordingly per Specifications.
7. Price accordingly per Specifications.
8. See Am-005, revised section 41 22 13.13, para 1.3.2.2.
9. Usage of TENV motor is acceptable.
See Am-005, revised section 41 22 13.13, para 2.4.4.3.
Section 00 60 00, Requests for Information - Page 14
Part 2
10. Section 2.4.4.6 requires micro-motors. With VFD control system you can run at a slow speed. Why do you need micro-motor? Please delete micro-motor.
11. Section 2.4.5.1requires hydraulic brakes operated from cab. There is no cab and no hydraulic brakes. Please delete section 2.4.5.1
12. Section 2.4.6.2.f requires speed control to be VFD control type as specified in section 2.4.2.2. Please delete 2.4.6.2.(a-c).
13. Section 2.4.7.4 requires motorized trolley for pendant. Are you sure you need a motorized pendant? It will push the price up. If required, does it need to be in explosion proof hazardous requires transfer of control from pendant to cab. There is no cab, please delete this section. location?
14. Section 2.4.7.5 requires transfer of control from pendant to cab. There is no cab, please delete this section.
15. Section 2.4.8.1 requires Mainline disconnect in NEMA 7D enclosure. Please confirm NEMA 7 or NEMA 3/12.
16. Section 2.4.8.2 requires an isolation transfer. If required, does it need to be in explosion proof hazardous location?
17. Section 2.4.9.1 requires bridge and trolley limit switches. Per sections 2.3.1.1 & 2.3.1.2 bridge and trolley limit switches are optional. Please confirm.
18. Section 2.4.11.2 requires runway conductors to be rigid bars with tandem collectors. You cannot have a rigid bar/collector system in a Class 1, Div 2, Gr. D hazardous location. Please delete section 2.4.1 that calls for hazardous location.
See Am-0005, revised section 41 22 13.13, and the following paragraphs:
10. Section 2.4.4.6
11. Section 2.4.5.1
12. Section 2.4.6.2.(a-c)
13. Section 2.4.7.4
14. Section 2.4.7.5
15. Section 2.4.8.1
16. Section 2.4.8.2
17. Section 2.4.9.1 Concur, limit switches are optional.
18. Section 2.4.11.2 Hangar bay is a hazardous location.
Section 00 60 00, Requests for Information - Page 15
In SECTION 09 67 23.15 – 3.5 EXAMINATION – Subsection - d. CHECK FOR MOISTURE – It states the Following:
Concrete must be dry before application of this floor coating material. Concrete moisture testing must occur. Calcium chloride testing or in-situ relative humidity testing is recommended. Readings must be below 3 pounds per 1,000 square feet (1.5 kg per 150 m2) over a 24-hour period on the calcium chloride test or below 75% relative internal concrete humidity. Test methods ASTM F1869 or ASTM F2170, respectively or follow instructions from the supplies of these tests. NOTE:
Although testing is critical, it is not a guarantee against future problems. This is especially true if there is no vapor barrier or the vapor barrier is not functioning properly and/or you suspect you may have concrete contamination from oils, chemical spills or excessive salts.
A. If the pounds per square feet exceed 3 pounds as stated above or 3.5 pounds as identified in Table Ic. Is the contractor to install a Moisture Vapor Barrier before the Thin Film System ( SECTION 09 67 23.15 - 2.3 THIN FILM FLOORING
SYSTEM)
B. If a Moisture Vapor Barrier is required. What is the thickness or pounds per square feet does it need to exceed, if the Moisture test reveals above 3 or 3.5 pounds per 1,000 sf?
See Am-0005, revised section 09 62 38, para 3.2 See Am-0005, revised section 09 65 00, para 3.3 See Am-0005, revised section 09 67 23.15, para 3.5
S-105, S-106.
Structural Sheet S-106 indicates a Braced Frame Footing (BFF-2) for the columns on G/13 & F/13. On Sheet S-105, there appears to be a similar condition at G/1 & F/1, however there is no indication of a braced frame footing or column footing.
Please advise.
See Am-0002, revised Sheets S-105 and S-322.
Section 00 60 00, Requests for Information - Page 16
Section 00 2216 Para. 8.0.
Section 00 22 16, Paragraph 8.0, Volume 1 – Tab E, Factor 4: Small Business Participation Plan currently requires Offerors to submit their Small Business (SB) Participation Plan on the same day and time as the rest of the Volume 1 – Technical Proposal and Volume 2 – Price Proposal. Throughout the State of Hawaii, it is standard for subcontractors to hold their pricing, during the bidding process, to the last second in order to discourage price shopping. As a result, in order to be competitive and provide the Government with the best value, Offerors are forced to consolidate and review subcontractor scope of work bids, then finalize their pricing within minutes of submitting their proposals. As the subcontractor selection affects both the proposed pricing and the SB Participation Plan, this significantly affects an Offeror's ability to finalize both its Volume 1 and Volume 2 submittals until subcontractor selection and then final pricing is determined.
Taking into consideration this standard subcontractor practice, we would like to request that the Government allow Offerors to submit their Tab E, Factor 4: Small Business Participation Plan separate from Volume 1 – Technical Proposal and at least one (1) business day after the current 2pm HST, March 19th, 2021 submittal due date/time for Volumes 1 and 2, or by or before 2pm HST, March 22nd, 2021 by also DoD SAFE submittal or perhaps email as will be allowed for the SB Subcontracting Plan. This will allow Offerors to focus on providing the best value to the Government, while also allowing Offerors to provide an accurate and detailed breakdown of their Small Business Participation Plan, including verification of business size status.
Denied
00 10 00, 00 73 00.
SF1442 13A states "Sealed offers in original and 1 copies to perform the work required are due at at the place specified in item 8...". Per 00 73 00, Electronic Proposal Submission is required via SAFE online submission. Please confirm only Electronic Submission is required.
Electronic submission is required by DoD SAFE.
32 31 13.53.
Verify Security Fence system does not require lightning protection system connection.
See section 32 31 13.53, para 3.7
Section 00 60 00, Requests for Information - Page 17
00 10 00.
Bid bonds are commonly required on projects which also involve performance and payment bonds. A bid bond guarantees the owner will receive compensation if the selected bidder fails to execute the contract or provide the required performance and payment bonds. In addition, a bid bond ensures a third party (the surety) verifies the bidder possesses the required funds, expertise, and capacity to successfully complete the project. Given this project's size and scope, will the owner consider requiring each bidder to submit the federal government's Standard Form 24 (bid bond) with its bid?
A bid bond is not required.
CS-509.
A1/CS-509 shows details for the bike racks. There is a note that states "install bike racks per manufacturer recommendations". Is there a desired manufacturer for the bike racks? There does not appear to be a technical specification provided for the bike racks.
Confirmed. There is no preference for a manufacturer.
A-712.
Keynote D3 on A-712 states '2" thick insulated translucent wall panel system, typical at hangar door; window type ___'. Please provide window type and specification for the translucent wall panel system.
See Am-0005, revised sheet A-712.
00 10 00, AF-601.
CLIN 0004/Option 3 states to paint all interior exposed ceilings that are scheduled as ETS. In the finish schedule on AF-601, there are several rooms with "ETS" listed for the ceiling material, but also has a paint listed for the finish code. Note 13 on AF-601 lists several rooms and states "paint exposed ceiling...in lieu of leaving ceiling unpainted". Please confirm the base bid is to leave all rooms with "ETS" as ceiling material with no paint finish, and price Option 3 as painting these same areas with the paint listed in the finish code.
Confirmed, base bid is to leave all rooms with "ETS" as ceiling material with no paint finish, and price Option 3 as painting these same areas with the paint listed in the finish code.
Section 00 60 00, Requests for Information - Page 18
00 10 00, 09 97 13.27, AF-601.
On AF-601, Room 100 Aircraft Maintenance Bay has a ceiling material "ETS" with finish code "P-2". Is the intent for the steel structure to be painted P-2 for the base bid? Room 100 is not specifically called out in Note 13 on AF-601, though it appears to be applicable to Option 3 based on the description in 00 10 00. Please advise if the intent is for the base bid to paint the Aircraft Maintenance Bay steel structure P-2, and Option 3 is to perform the 3-coat epoxy paint per 09 97 13.27.
Confirmed, Option 3 does not apply to Room 100.
Section 00 60 00, Requests for Information - Page 19
FY21 PN76897 AIRCRAFT MAINTENANCE HANGAR PN76897
SECTION 01 91 00.15 10
TOTAL BUILDING COMMISSIONING
05/19
PART 1 GENERAL
1.1 SUMMARY
Commission the building systems listed herein. Employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The Commissioning Firm must employ a Lead Commissioning Specialist that coordinates all aspects of the commissioning process. Conform to the commissioning procedures outlined in this specification.
1.2 SYSTEMS TO BE COMMISSIONED
Commission the following systems:
Heating, Ventilating, Air Conditioning, and Refrigeration Systems (HVAC) Building Automation System
Lighting Systems to include Interior and exterior lighting, daylighting, and shading controls including automatic controls and occupancy sensors Power Distribution Systems Service Water Heating Systems Plumbing Systems Water Pumping and Mixing Systems Non-Potable Process Water Systems Hazardous Fluid Containment Systems Irrigation Systems Water Harvesting/Reclaim Systems Compressed Air and Vacuum Systems Energy and Water Utility Metering Systems and Sub-Meters Building Envelope: include moisture, thermal integrity, and air tightness for the entire building envelope including systems such as walls, fenestration, roofing, roof openings, floors, band slabs-on-grade.
Indoor Air Quality (IAQ) systems and associated controls Storm Water Management Systems Valve Control for Industrial Waste Water Systems
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 180 (2012) Standard Practice for Inspection and Maintenance of Commercial Building
SECTION 01 91 00.15 10 Page 3 (Am-0005) j3ec9kts Cross-Out
Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel. Fabricate metal wall panel side laps with factory-installed captive gaskets or separator strips that provide a tight seal and prevent metal-to-metal contact, in a manner that will seal weather-tight and minimize noise from movements within panel assembly.
2.2.1 Sheet Metal Accessories
Fabricate flashing and trim to comply with recommendations in SMACNA 1793 that apply to the design, dimensions, metal, and other characteristics of item indicated:
a. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.
b. End Seams: fabricate nonmoving end seams with flat-lock seams. Form seams and seal with epoxy seam sealer. Rivet joints for additional strength.
c. Sealed Joints: form non-expansion but movable joints in metal to accommodate elastomeric sealant to comply with SMACNA 1793.
d. Fabricate cleats and attachment devices of size and metal thickness recommended by SMACNA 1793 or by metal wall panel manufacturer for application, but not less than thickness of metal being secured.
2.3 PANEL MATERIALS
2.3.1 Steel Sheet
Roll-form steel wall panels to the specified profile, with 22 gauge and depth as indicated. Material must be plumb and true, and within the tolerances listed:
a. Galvanized Steel Sheet conforming to ASTM A653/A653M and AISI SG03-3.
b. Individual panels must be continuous length to cover the entire length of any unbroken wall area with no joints or seams and formed without warping, waviness, or ripples that are not part of the panel profile and free of damage to the finish coating system.
c. Provide panels with thermal expansion and contraction consistent with the type of system specified.
1. Profile and coverage to be a minimum height and width from manufacturer's standard for the indicated wall area.
2. Profile to be a 1-1/2 inch high rib at 7.2 inches o.c., 38-7/8 inch overall width with 36 inch coverage and exposed fasteners.
3. Smooth, flat Surface Texture.
2.3.2 Factory Color Finish
Comply with NAAMM AMP 500 for recommendations for applying and designating finishes. Noticeable variations in same piece are not acceptable.
SECTION 07 42 13 Page 13 (Am-0005) j3ec9kts Cross-Out j3ec9kts Cross-Out characteristics as follows:
a. For single-acting offset pivot, butt hung, or continuous geared hinge entrances in the closed and locked position, test the specimen in accordance with ANSI/BHMA A156.10, and ASTM E283 at a pressure differential of 1.57 psf for pairs of doors; ensure that maximum infiltration for a pair of 7 foot by 8 foot entrance doors and frame is
1.2 cfm/square foot.
b. Ensure the maximum allowable infiltration for a completed storefront system does not exceed 0.06 cfm/square foot when tested in accordance with ASTM E1424 at a differential static pressure of 6.24 psf.
3.4.2 Wind Loads
Provide a completed storefront system capable of withstanding wind pressure loads, normal to the wall plane indicated, as follows:
a. Exterior Walls
(1) Positive Pressure: Refer to Structural Drawings.
(2) Negative Pressure: Refer to Structural Drawings.
3.4.3 Deflection
Submit certified test reports showing that the maximum allowable deflection in a member when tested in accordance with ASTM E330/E330M with allowable stress is L/175 or 3/4 inches maximum.
3.4.4 Condensation Resistance and Thermal Transmittance
Submit certified test reports showing compliance with specified performance characteristics as follows:
a. U-Value Requirements:
(1) Perform test in accordance with the AAMA 1503 procedure and on the configuration specified therein.
(2) Thermal Transmittance ("U" Value) maximum 0.65 (6250) BTU/hr/sf/deg F at 15 mph exterior wind.
3.4.5 Water Infiltration
Submit certified test reports showing that the system has been installed is designed to provide no uncontrolled water when tested in accordance with ASTM E1105 at a static pressure of 8 psf.
3.5 ADJUSTING AND CLEANING
3.5.1 Protection
Protect the installed product's finish surfaces from damage during construction. Protect the aluminum storefront system from damage from grinding and polishing compounds, plaster, lime, acid, cement, or other harmful contaminants.
SECTION 08 41 13 Page 13 (Am-0005)
1.10.2 Wind Borne Debris
Provide impact resistant exterior window assemblies meeting the Windborne-Debris-Impact Resistant Performance requirements of ASTM E1996 and ASTM E1886 as follows:
(1) Pass missile-impact tests when tested according to ASTM E1886 and meeting performance requirements according to ASTM E1996 for missiles A and D in Table 2.
1.10.3 Air Infiltration
Air infiltration must not exceed the amount established by AAMA/WDMA/CSA 101/I.S.2/A440 for each window type.
1.10.4 Water Penetration
Water penetration must not exceed the amount established by AAMA/WDMA/CSA 101/I.S.2/A440 for each window type.
1.10.5 Sound Attenuation
The window unit must have a minimum STC of 41 with the window glazed with two pieces of 1/4 inch thick laminated glass when tested in accordance with AAMA/WDMA/CSA 101/I.S.2/A440 acoustical performance.
When tested in accordance with AAMA/WDMA/CSA 101/I.S.2/A440 or the following below, provide a minimum Sound Transmission Class (STC) of 35 in accordance with ASTM E90 and as determined by ASTM E413 or Outside-Indoor Transmission Class (OITC) of 25 in accordance with ASTM E1332 and as determined by ASTM E413 with the window glazed with 1/2 inch air space between two pieces…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .