About this file

This announcement constitutes a solicitation for a design-build construction project. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for FY21 Military Construction Army Project Number 76897 to construct an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project magnitude is estimated between $50-100 million. Offerors must submit proposals by March 12, 2021 at 2:00 PM Hawaii time addressing experience, past performance, organization and management plan, and small business participation plan. Price will also be evaluated with all non-price factors significantly more important. The project scope includes construction of a hangar, maintenance shops, administrative space, storage buildings, aprons, utilities, and site work. Sustainability measures and antiterrorism standards will be incorporated. The contract will be a fixed-price design-build award with a anticipated 1095-day performance period.

View the file

Other files

File Type Posted
sf30-21r4-am-0010.pdf PDF
sf30-21r4-am-0009.pdf PDF
Drawings-am-0009.pdf PDF
Drawings-am-0008.pdf PDF
sf30-21r4-am-0008.pdf PDF
sf30-21r4-am-0007.pdf PDF
Drawings-am-0007.pdf PDF
Drawings am-0006.pdf PDF
sf30-21r4-am-0006.pdf PDF
Drawings-am-0005.pdf PDF
sf30-21r4-am-0005.pdf PDF
sf30-21r4-am-0004.pdf PDF
Specifications-am-0003.pdf PDF
sf30-21r4-am-0003.pdf PDF
Drawings-am-0003.pdf PDF
sf30-21r4-am-0002.pdf PDF
Drawings-am-0002.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 1.pdf PDF
FILE 9 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 2.pdf PDF
FILE 6 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 1 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 2 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 7 OF 15 03 Struct Design Complete Rev 01-12-2021.pdf PDF
FILE 5 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 11 OF 15 05 Mech Design Complete REV 01-12-2021.pdf PDF
FILE 15 OF 15 09 Telecomm Design Complete REV 01-12-2021.pdf PDF
FILE 12 OF 15 06 Plumb Design Complete REV 01-12-2021.pdf PDF
FILE 3 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 8 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
FILE 4 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 13 OF 15 07 Fire Protection DESIGN COMPLETE REV 01-12-2021.pdf PDF
FILE 10 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
21r4-RFP solicitation.pdf PDF
FILE 14 OF 15 08 Elec Design Complete REV 01-21-2021 (reduced).pdf PDF
FILE 0 OF 15 Title Sheets G Design Complete Rev 01-12-2021.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 3.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0001 12 Feb 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A20R0017 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W9128A21R0004

Am-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE Page 2 of 2

1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.

Revised pages replace like-numbered pages. The revision mark “(Am-0001)” is shown on each revised page.

A. REVISED SECTIONS. The following are sections were revised and changes are in bold and strikeout.

Section 00 22 16, Paragraphs 2.0, and 4.0

2. Requests for Information are due on 25 February 2021 at 10:00 a.m., Hawaii Standard Time (HST).

3. The proposal due due date has changed. See SF 1442, Block 13.

Section 00 22 16 – Page 2

(Am-0001)

1.0 OVERVIEW

1.1 This is a “Best Value” solicitation for the construction project entitled, “FY21 Military Construction Army

(MCA) Project Number (PN) 76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii.”

The Government will evaluate the proposals in accordance with the criteria described herein and award a fixed-price construction contract to the responsible Offeror whose proposal conforms to all the terms and conditions of the solicitation and is determined to represent the overall best value to the Government.

General Description of Work: See Section 00 21 16, Provision S-36.2 Magnitude of the Proposed Project, (a)

Physical Characteristics.

1.2 Cost of Preparing Proposals

The Government will not reimburse any Offeror for any costs incurred in the preparation and submittal of its proposal in response to this solicitation.

1.3 Inquiries

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet.

Please refer to Section 00 73 00, Appendix B – Offeror Questions and Comments for further instructions.

Before submitting a Request for Information, Offerors are requested to review the plans, specifications, the solicitation, and any amendments for answers to questions and/or comments prior to the submission of an RFI.

1.4 Place and Time Submittal of Proposals

Proposals shall be submitted electronically through the DoD Secure Access File Exchange (SAFE). Please refer to section 00 73 00, Appendix A – Electronic Proposal Submissions, for further instructions.

Proposals received by the Government after the date and time set for receipt of proposals will be handled in accordance with the requirements of Provision “52.215-1, Instructions to Offerors ⎯ Competitive Acquisition

(Jan 2004),” subparagraph (c), found in Section 00 21 16.

2.0 BASIS OF AWARD

The Contracting Officer intends to award a fixed-price construction contract to the responsible Offeror whose proposal conforms to the solicitation, is fair and reasonable, and offers the best overall value to the

Government, considering all non-price factors described herein, and price, as determined by the Source

Selection Authority. All technical evaluation factors, when combined, are considered significantly more important than the approximately equal to price factor. The Government reserves the right to accept other than the lowest priced Offeror or to reject all Offerors. The Government will not award a contract to an

Offeror whose proposal contains a deficiency, as described in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

If awarded the contract, the Offeror shall construct the project in accordance with the plans and specifications.

An Offeror’s proposal that receives an “Unacceptable” rating on any of the NON-PRICE factors is not awardable in accordance with paragraph 10.2.2.

3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS

3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and

Section 00 22 16 – Page 6

4.0 PROPOSAL CONTENT AND RELATED EVALUATION FACTORS

VOLUME 1 – TECHNICAL PROPOSAL

Factor / Subfactor LOCATION DESCRIPTION RELATIVE IMPORTANCE

N/A Vol 1 Tab A Proposal Cover Sheet Not Rated

FACTOR 1 Vol 1 Tab B Experience Most Important Technical Factor

(Equally important to Factor 2)

FACTOR 2 Vol 1 Tab C Past Performance Most Important Technical Factor

(Equally important to Factor 1)

FACTOR 3 Vol 1 Tab D Organization and

Management Plan

3rd Most Important Technical Factor

(Less important than either Factor 1 or Factor 2)

FACTOR 4 Vol 1 Tab E Small Business Participation

Plan

4th Most Important Technical Factor

(Less important than Technical

Factors 1, 2, or 3)

VOLUME 2 – PRICE PROPOSAL

Factor / Subfactor /

Element

LOCATION DESCRIPTION RELATIVE IMPORTANCE

N/A Vol 2, Tab 1 Proposal Cover Sheet Not Rated

N/A Vol 2 Tab 2 Signed Letter Responding to

RFP, SF1442 and

Acknowledgement of

Amendments

Not Rated

FACTOR 5 Vol 2 Tab 3 SECTION 00 10 00, PROPOSAL SCHEDULE

(PRICE)

Significantly less important than

Approximately equal to

Factors 1, 2, 3 and 4 combined

N/A Vol 2 Tab 4 Bonding Capability Go / No Go

N/A Vol 2 Tab 5 Representations & Certifications Not Rated

N/A Vol 2 Tab 6 JV Agreement (if applicable) Not Rated

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airf ield, Oahu, Haw aii

DAYNA N MATSUMURA (808) 835-4379

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Jan-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________1095 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Mar 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 230 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128A21R0004 110

SF30-Am-0001
Section 00 22 16, para 2.0
Section 00 22 16, para 4.0
SF1442

File details come from the government source that posted it. Updated .