This announcement constitutes a solicitation notice for a fixed price construction contract. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for FY21 Military Construction Army Project Number 76897 to construct an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project scope includes building an aircraft hangar, maintenance shops, administrative space, parts storage, hazardous materials storage, petroleum storage, ground support equipment storage, covered storage, hangar access apron, aircraft washing apron, fire pump building, foundations, cybersecurity measures, building information systems, fire protection and alarm systems, intrusion detection, and utility monitoring. Supporting facilities such as site development, utilities, fire suppression, lighting, paving, parking, drainage, landscaping and signage are also included. Proposals will be evaluated on experience, past performance, organization and management plan, small business participation plan, and price. The contract award will be a fixed price construction contract determined through best value tradeoff procedures. The North American Industry Classification Code is 236220 and the small business size standard is $39.5M average annual revenue.

View the file

Other files

File Type Posted
sf30-21r4-am-0010.pdf PDF
sf30-21r4-am-0009.pdf PDF
Drawings-am-0009.pdf PDF
Drawings-am-0008.pdf PDF
sf30-21r4-am-0008.pdf PDF
sf30-21r4-am-0007.pdf PDF
Drawings-am-0007.pdf PDF
Drawings am-0006.pdf PDF
Drawings-am-0005.pdf PDF
sf30-21r4-am-0005.pdf PDF
sf30-21r4-am-0004.pdf PDF
Specifications-am-0003.pdf PDF
sf30-21r4-am-0003.pdf PDF
Drawings-am-0003.pdf PDF
sf30-21r4-am-0002.pdf PDF
Drawings-am-0002.pdf PDF
sf30-21r4-am-0001.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 1.pdf PDF
FILE 9 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 2.pdf PDF
FILE 6 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 1 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 2 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 7 OF 15 03 Struct Design Complete Rev 01-12-2021.pdf PDF
FILE 5 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 11 OF 15 05 Mech Design Complete REV 01-12-2021.pdf PDF
FILE 15 OF 15 09 Telecomm Design Complete REV 01-12-2021.pdf PDF
FILE 12 OF 15 06 Plumb Design Complete REV 01-12-2021.pdf PDF
FILE 3 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 8 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
FILE 4 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 13 OF 15 07 Fire Protection DESIGN COMPLETE REV 01-12-2021.pdf PDF
FILE 10 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
21r4-RFP solicitation.pdf PDF
FILE 14 OF 15 08 Elec Design Complete REV 01-21-2021 (reduced).pdf PDF
FILE 0 OF 15 Title Sheets G Design Complete Rev 01-12-2021.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 3.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0006 15 Mar 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A21R0004 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

ODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE Page 2 of 3

1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.

Revised pages replace like-numbered pages. The revision mark “(Am-0006)” is shown on each revised page.

A. REVISED SECTIONS. The following sections are revised and changes are in bold and/or strikethrough.

Section 01 35 26, para 3.1.3

Section 01 90 00, para 1.2.4

Section 08 34 16.10, para 2.2.3

Section 21 13 25, para 3.18

Section 26 20 00, para 2.7

Section 33 71 02, para 3.6.9

Section 00 10 00, Proposal Schedule, Note 7

Section 00 22 16, para 3.4.2, 3.4.4, 4.0, and 9.1.2

B. ADDITIONS TO SECTIONS: The following sections are added to a section:

Section 01 33 29, HPSB Checklist Attachment

Section 01 90 00, Vehicle Registration Attachment, Mandatory Use of Cloth Face Coverings Attachment

Section 00 60 00, Requests for Information, #159 to 219

C. NEW PARAGRAPHS. The following pargraphs are added to the sections.

Section 01 90 00, para 1.22, and 1.23

D. REVISED AMENDMENTS (PAGE 1): The following blocks are revised:

Am-0001, SF-30, block 9a

Am-0002, SF-30, block 9a

Am-0003, SF-30, block 9a

Am-0004, SF-30, block 9a

Am-0005, SF-30, block 9a

E. NEW SECTIONS: The following sections are added to the solicitation.

N/A

F. DELETED SECTIONS: The following sections are deleted in the solicitation.

2. CHANGES TO DRAWINGS

A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:

SHEET ID SHEET NO. MARK REVISION DATE

G-002 Vol 1 of 3 4 03/11/21

G-003 Vol 1 of 3 4 03/11/21

CS506 Vol 1 of 3 4 03/11/21

Am-0006

SHEET ID SHEET NO. MARK REVISION DATE

M-610 Vol 2 of 3 4 03/11/21

M-612 Vol 2 of 3 4 03/11/21

P-507 Vol 2 of 3 4 03/11/21

EG001 Vol 3 of 3 4 03/11/21

EP001 Vol 3 of 3 4 03/11/21

B. NEW DRAWINGS (ISSUED). The following new drawings are issued herewith:

3. Requests for Information (RFIs) is extended to March 18, 2021 at 2:00 p.m., Hawaii Standard Time.

4. The proposal due date has changed. See Am-0006, SF 1442, Block 13.

(Am-0006)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airf ield, Oahu, Haw aii

DAYNA N MATSUMURA (808) 835-4379

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Jan-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________1095 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Mar 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 230 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128A21R0004 120

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0001 12 Feb 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A21R0004 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0002 22 Feb 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A21R0004 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

ODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0003 26 Feb 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A21R0004 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

ODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0004 02 Mar 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A21R0004 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

ODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0005 08 Mar 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A21R0004 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

ODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

Section 00 10 00 – Page 2

NOTES TO PROPOSAL SCHEDULE:

1. This procurement is UNRESTRICTED.

2. Failure to provide an offer on all CLINs listed in the Proposal Schedule may cause the Offeror to be ineligible for award.

3. The basis of award will be in accordance with Section 00 22 16, Proposal Submission Requirements and

Evaluation Factors.

4. See Section 00 21 16, FAR Provision 52.217-5 Evaluation of Options 52.217-3, Evaluation Exclusive of

Options. By submission of a price under the Option, the Offer agrees that the Government may exercise the

OPTION at any time within 120 calendar days following the date of the award of the basic contract.

5. Offerors must have and/or maintain an active registration with the System for Award Management (SAM) website. The Government will only award a contract to an offeror actively registered in the SAM database. To register in SAM, go to http://www.sam.gov.

6. Effective September 15, 2019, the only long-term contractor credential available for access is the RAPID Gate

Credential. Enrollment information can be found at https://eform.rapidgate.com/

7. Small Business Subcontracting Plan (applies if the Offeror is other than a small business concern):

If the Offeror is other than a small business concern, the Offeror shall submit a subcontracting plan with the proposal, in accordance with FAR 52.219-9. See Section 00 22 16, Appendix A for a sample. During proposal evaluation the Contracting Officer will request an electronic format of the offeror’s subcontracting plan, of what was submitted with the proposal. see Section 00 22 16, Paragraph 9.1.10 for requirements associated with the

Subcontracting Plan.

8. Each Offeror must submit the following documents electronically in PDF format. Failure to submit all required documents electronically in PDF format may result in the Bidder being considered non-responsive. Please refer to

Section 00 73 00, Appendix A – Electronic Bid Submissions, for further instructions.

a. SF 1442 (pages 1 and 2) including acknowledging all amendments

b. Proposal Schedule

c. Section 00 45 00, Representations and Certifications

d. Section 00 45 00, Representations and Certifications, Appendix A – SF LLL Disclosure of Lobbying

Activities

e. Volumes 1 and 2 in response to Section 00 22 16

9. The magnitude of this construction project is $50,000,000 - $100,000,000.

10. Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet.

Please refer to Section 00 73 00, Appendix B – Bidder Questions and Comments, for further instructions.

11. Due to social distancing requirements, a site visit will not be held. Photos of the project site are located at

Section 00 73 00, Appendix C, Project Site Photos.

http://www.sam.gov/ https://eform.rapidgate.com/

Section 00 22 16 – Page 3

(Am-0006) the Technical Proposal must be submitted as separate files. Ensure that each file is clearly marked to indicate its contents; and the identity of the Offeror.

3.1.2 Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

3.1.3 No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal

(Volume 2), or vice versa. An Offeror shall include all information in its proposal and shall not attempt to incorporate information by reference. The Government will not review information listed on website links.

3.1.5 Deviations, Exception and Assumptions

Deviations and exceptions to the terms and conditions of the solicitation are not allowed. Should the

Offeror include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the Offeror shall be deemed “unacceptable” and ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of its proposal. If the Offeror must make any assumptions prior to submitting its proposal, the Offeror shall list and describe in detail the assumptions on the first page of each Tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the Request for Proposal (RFP). The Offeror shall clearly describe on the

Proposal Cover Sheet submitted with the Price Proposal any assumption to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.

3.2 DISCUSSIONS

The Government does not intend to enter into discussions with Offerors prior to making an award. An Offeror is encouraged to present its best technical proposal and price in its initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to conduct discussions. If this occurs, a competitive range will be determined and Offerors in the competitive range will be notified. The competitive range may be limited for purposes of efficiency in accordance with

(IAW) FAR Part 15.306(c)(2). Upon conclusion of discussions, the Contracting Officer will request final proposal revisions and may, upon receipt of final proposal revisions, proceed to award a contract without further discussions or notice.

3.3 GENERAL INSTRUCTIONS

3.3.1 Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages shall be numbered.

3.3.2 Proposal materials shall be in PDF file format using Adobe Acrobat software, and shall be in searchable text. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of

Contents. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use alternative paper sizes (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10 pitch, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.

Section 00 22 16 – Page 4

3.3.3 Provide read-only PDF file format in searchable text using Adobe Acrobat software containing the technical volume as well as a read-only PDF format using Adobe Acrobat software containing the price volume.

3.3.4 “Confidential” contracts cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. An Offeror that includes information in its proposal that it does not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark such information in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive

Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

3.3.5 For submissions with page limitations: Where authorized, alternative page sizes (11" x 14" or 11" x 17") will count as one page. Tables of contents, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

3.3.6 All proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision. The Offeror shall provide a revised copy of the entire proposal in read-only .pdf file format in searchable text.

3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1)

3.4.1 Technical Proposal. Submit the Technical Proposal in read-only PDF format. Sections of the proposal shall be bookmarked (linked to the index) in logical order.

Offerors shall submit the price proposal via DoD SAFE (refer to Section 00 73 00, Appendix A). The

PDF file for the price proposal shall be titled, “W9128A21R0004_COMPANY NAME_TECHNICAL

PROPOSAL”.

3.4.2 Size Restrictions and Page Limits. The following are established for each factor:

Factor 1 – Experience – 2 single sided pages per contract to include Attachment A (not to exceed 10 single sided pages total)

Factor 2 – Past Performance – No page limitation

Factor 3 – Organization and Management Plan – A total of seven (7) single-sided pages. Of the seven (7) pages, one (1) single-sided no larger than 11”x17” shall be for the Organizational Chart in accordance with paragraph 7.1.b.

Factor 4 – Small Business Participation Plan – No page limitation

Factor 5 – Price – No page limitation

For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11” x 14” or 11” x 17”) will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

Proposal material shall be submitted in PDF format. Do not use a font size smaller than 10 pitch, an unusual font style such as script, or condensed print for any submission. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches.

Section 00 22 16 – Page 6

4.0 PROPOSAL CONTENT AND RELATED EVALUATION FACTORS

VOLUME 1 – TECHNICAL PROPOSAL

Factor / Subfactor LOCATION DESCRIPTION RELATIVE IMPORTANCE

N/A Vol 1 Tab A Proposal Cover Sheet Not Rated

FACTOR 1 Vol 1 Tab B Experience Most Important Technical Factor

(Equally important to Factor 2)

FACTOR 2 Vol 1 Tab C Past Performance Most Important Technical Factor

(Equally important to Factor 1)

FACTOR 3 Vol 1 Tab D Organization and

Management Plan

3rd Most Important Technical Factor

(Less important than either Factor 1 or Factor 2)

FACTOR 4 Vol 1 Tab E Small Business Participation

Plan

4th Most Important Technical Factor

(Less important than Technical

Factors 1, 2, or 3)

VOLUME 2 – PRICE PROPOSAL

Factor / Subfactor /

Element

LOCATION DESCRIPTION RELATIVE IMPORTANCE

N/A Vol 2, Tab 1 Proposal Cover Sheet Not Rated

N/A Vol 2 Tab 2 Signed Letter Responding to

RFP, SF1442 and

Acknowledgement of

Amendments

Not Rated

FACTOR 5 Vol 2 Tab 3 SECTION 00 10 00, PROPOSAL SCHEDULE

(PRICE)

Significantly less important than

Approximately equal to Factors 1, 2, 3 and 4 combined

N/A Vol 2 Tab 4 Bonding Capability Go / No Go

N/A Vol 2 Tab 5 Representations & Certifications Not Rated

N/A Vol 2 Tab 6 JV Agreement (if applicable) Not Rated

Section 00 22 16 – Page 12

Project staff that have on-site decision making authority on behalf of the Contractor.

See paragraph 10.2.2.d for the evaluation rating system for Factor 3, Organization and Management Plan.

8.0 VOLUME 1 – TAB E, FACTOR 4: SMALL BUSINESS PARTICIPATION PLAN

8.1 Submission Requirements

All Offerors shall identify the extent to which Small Businesses (SBs); Veteran-Owned Small Businesses

(VOSBs); Service-Disabled Veteran-Owned Small Businesses (SDVOSBs); HUBZone Small Businesses

(HUBZone); Small Disadvantaged Businesses (SDBs); and Woman-Owned Small Businesses (WOSBs) would be utilized in the performance of this proposed contract (including all options). For small businesses, as defined by the North American Industry Classification System (NAICS) Code applicable to this solicitation, the Offeror shall identify their own participation as a SB, VOSB, SDVOSB, HUBZone SB, SDB, or WOSB, and it will be considered in evaluating the proposed small business participation plan. Offerors shall submit

Attachment C - Small Business Participation Plan. See paragraph 3.4.2 for page limitation.

Offerors must propose goals for Small Business Participation. Small business participation goals are to be an estimated percentage of total contract dollars (including all options). Provide an overall goal to be accomplished through collective small business participation from any type of small business, to include all small business programs, and propose individual goals for each small business program. The work to be performed directly by a small business prime Offeror will be included in the Offeror’s Small Business

Participation goal.

8.2 Evaluation Criteria and Rating System

All Offerors (both large and small businesses) will be evaluated on the level of small business commitment that they demonstrate for the proposed acquisition. The small business participation Minimum Quantitative

Requirement (MQR) is based on the total contract value (including all options) for this solicitation is as follows:

Category

Percentage of Total

Contract Value

Small Business 36%

Veteran Owned Small Business 3%

Service Disabled Veteran Owned Small Business 5%

HUBZone 2%

Small Disadvantaged Business 26% 6%

Women Owned Small Business 5%

All Offerors (both large and small businesses) will be evaluated on the level of small business commitment that they demonstrate for the proposed acquisition.

A small business Offeror also receives credit for their small business participation as a Prime Contractor and can apply their dollar value when calculating percentages in all the applicable small business categories.

Small Business Participation Plans (from large and small businesses) will be evaluated on the basis of:

a. The extent to which Small Business (SB) firms, as defined in FAR Part 19, are specifically identified in the proposal;

b. The extent of commitment to Small Business firms (for example, enforceable commitments will be given additional consideration over non-enforceable commitments);

c. The complexity and variety of the work small business firms are to perform;

Section 00 22 16 – Page 14

(Am-0006)

9.1.1 Price Proposal. Submit the Price Proposal in read-only PDF format. The only documents that can be scanned are the items identified in paragraphs 9.1.2 and 9.1.3.

a. Offerors shall submit the price proposal via DoD SAFE (refer to Section 00 73 00, Appendix A).

The PDF file for the price proposal shall be titled, “W9128A21R0004_COMPANY NAME_PRICE

PROPOSAL”.

9.1.2 Size Restrictions and Page Limits. The following are established for each factor:

Factor 5 – Section 00 10 00 Proposal Schedule: No page limit

Proposal material shall be submitted in PDF format. Do not use a font size smaller than 10 pitch, an unusual font style such as script, or condensed print for any submission. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches.

9.1.3 Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents, as indicated in the following chart below.

TAB CONTENTS OF THE PRICE PROPOSAL – Volume 2

1 Coversheet

2 The SF1442 and Acknowledgement of Amendments

3 Section 00 10 00, Proposal Schedule

4 Bonding Capability

Copy of Representations and Certifications completed electronically via the System for

Award Management (SAM.gov).

6 JV Agreement or Articles of Organization for LLC, if applicable.

7 Subcontracting Plan, only if requested as described in paragraph 9.1.10

HUBZONE CONTRACTORS. This RFP includes Contract Clause 52.219-4 regarding a 10% evaluation preference for HUBZone small business concerns. HUBZone small business concerns electing to waive their evaluation preference shall submit a copy of clause 52.219-4 indicating such. HUBZONE small business concerns not waiving the evaluation preference shall submit a copy of their SBA certification letter under this tab.

Supplemental Price Breakdown. If deemed necessary to evaluate elements of the price proposal, the

Government will request a breakdown of elements of the price in a sealed envelope marked “Price

Breakdown Information”, in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three (3) working days after proposal submission due date. This information may be required for the initial proposal, and if requested, for any revised proposals. This information is not an opportunity for an Offeror to revise its non-price or price proposal.

9.1.4 Volume 2, TAB 1: Proposal Cover Sheet. The proposal cover sheet is required by FAR 52.215-1(2)(c)(i)-

9v) and must be submitted by all Offerors. This provision, titled “Instruction to Offerors – Competitive

Acquisition” and the format for the proposal coversheet as indicated below:

Section 00 22 16 – Page 16

(Am-0006)

If the Offeror is a large business concern, the Offeror shall submit a subcontracting plan in accordance with FAR 52.219-9 (See Section 00 22 16, Appendix A Attachment D for a sample) NO LATER THAN five (5) calendar days after a notification request from the Contracting Officer or the Contract Specialist.

The Offeror may e-mail its small business subcontracting plan to Dayna Matsumura

(dayna.n.matsumura@usace.army.mil) and Kent Tamai (kent.a.tamai@usace.army.mil).

The plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB) (to include historically black colleges and universities/minority institutions (HBCU/MI)), woman-owned small business (WOSB), HUBZone business, veteran-owned small business (VOSB) and service-disabled veteran-owned small business

(SDVOSB), along with the proposed percentages of their participation, to demonstrate a plan to meet the subcontracting goals that will apply to these contracts. The Offeror shall provide specific information on proposed subcontracted effort for this project.

Subcontracting Plan Assessment:

The Small Business Subcontracting Plan Format at Attachment D shall be utilized. The Government will assess the offeror’s Subcontracting Plan in accordance with the DoD checklist for reviewing subcontracting plan contained in Attachment E. Offerors are encouraged to review the DoD checklist to ascertain the criteria by which the subcontracting plan will be assessed. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. In accordance with DFARS 215.304 (c), when the Participation Plan is evaluated the extent that small businesses and

HBCUs are specifically identified in proposals, the small businesses and HBCUs considered in the evaluation shall be listed in any subcontracting plan submitted.

As part of the subcontracting plan assessment, the Government will review information submitted or contained within Volume 1, Tab E, Small Business Participation Plan, to review the Offeror’s past performance in establishing realistic yet challenging goals, and in achieving them.

Only the selected Offeror’s plan will be assessed and approved prior to award of the contract.

9.2 Factor 5 – Price, Proposal Evaluation Criteria

The Offeror’s proposed price will not be rated or scored, but will be evaluated to determine if it is fair and reasonable, using one or more of the price analysis techniques found at FAR 15.404-1(b). The Government may request supplemental price breakdown information to assist the Government in performing the price evaluation.

The Contracting Officer will evaluate the price proposals for unbalanced pricing. An Offeror may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.

10.0 EVALUATION PROCEDURES

10.1 Source Selection Evaluation Board (SSEB)

The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference, except as expressly allowed by this solicitation.

10.2 Evaluation

a. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor, except that performance risk ratings are assigned to past performance (see below).

mailto:dayna.n.matsumura@usace.army.mil mailto:kent.a.tamai@usace.army.mil

RFI # Question Response

08 34 16.10.

Per paragraph 2.2.3, the hangar door frames are to be hot dipped galvanized. Hot dipped galvanized door frames will warp, can the use of another galvanizing or powder coating system be acceptable?

Paragraph 2.2.13 and 2.3.1.1 indicate prime painting for the door frame.

Paragraph 2.5.1 indicates prime and finish paint for the door frame. Please verify non exposed door frame behind the finish metal panels is prime paint only.

See Am-0006, revised section 08 34 16.10, para 2.2.3.

Non-exposed door framing / frame behind the finish metal panels are not excluded.

01 33 29 Paragraph 1.5.a.

Per Spec Section 01 33 29 Paragraph 1.5.a, the completed HPSB Checklist was to be included at the end of the spec section. However, the checklist was not included. Please provide the HPSB Checklist so that the contractor can understand the full scope of the sustainability certification process.

See Am-0006, revised section 01 33 29

In multiple places, the RFP states, "Do not use a font size smaller than 10 pitch, an unusual font style such as script, or condensed print for any submission."

Does the government mean that we should not use a font size smaller than 10 point?

See Am-0006, Section 00 22 16, para 3.3.2, 3.4.2, and 9.1.2

32 13 14.13.

Currently class F fly ash is being received from outside of the Continental United

States. Confirm acceptable to obtain this material from outside United States.

Comply with clause 52.225-13, Restrictions on Foreign Purchases (Jun

2008), 52.225-11, Buy American - Construction Materials Under Trade

Agreements (Oct 2019), and specifications.

33 71 02, EP-503.

Spec Section 33 71 02 states to not mix different kinds of conduit in any one duct bank. Sheet EP503 Detail A1 indicates a 1-1/2" Compressed air conduit in a joint trench with Electrical and Data PVC. Please confirm Detail A1 on EP503 is acceptable to mix different kinds of conduit at these locations only.

See Am-0006, revised section 33 71 02, para 3.6.9

26 20 00.

Spec Section 26 20 00 2.7 "volume greater than 100 cubic inches, UL 50, hot-dip, zinc coated, if sheet steel" Please confirm that Hot Dipped is required or if a standard NEMA 1 painted Junction box can be provided at indoor locations.

See Am-0006, revised section 26 20 00, para 2.7

Section 00 60 00, Requests for Information - Page 1

26 20 00, EP-001.

Sheet EP 001 Note 42 states "IMAGING SERVICE CAN BE PROVIDED &

PERFORMED BY SUB-CONTRACTING WITH WILLIAMS ELECTRIC OR

OTHER SIMILAR COMPANY WITH ADVANCED METERING EXPERTISE."

Spec Section 26 20 00 3.5.6 c. "Meters are integrated into the EEDRS by

Williams Electric Company under the currently ongoing USACE Huntsville Center

Advance Metering System Project, contract W9212DY-15-D-0008 to 0017."

Please confirm whether the hiring of Williams Electric Company will be by the

Contractor or Government provided as the Specs state.

See Am-0006, revised sheet EP-001

26 24 13.

Please confirm the Electrical tests listed under Spec Section 26-24-13 3.5.1.3b can be provided at the Factory and not required to be done on site by the 3rd

Party Tester.

3rd Party Tester on site is required.

26 24 13.

States to "trip circuit breakers by operation of each protective device" Please confirm this can be achieved through primary injection testing listed in Spec

Section 26 24 13 3.5.13 b.

This is in the follow up verification, the spec states to "trip circuit breakers by operation of each protective device". Primary injection testing is not required at this step.

EP-001.

Sheet EP 001 Note 41 states that all exposed conduit in hangar shall be GRC.

Please confirm GRC is required for all systems including Fire Alarm, Tel/Data, Security, Mass Notification, PA.

Confirmed. Adhere to EP-001, Note 41.

T-611.

Sheet T611 indicates a new 12 Strand Fiber between the new Hangar and existing Bldg. 1322. Provide details of Bldg. 1322 for connection point location and confirm that all conduits are existing including inside the building.

Conduits are existing within Bldg. 1322. See TS-102, keynote 1.

T-605.

Sheet T605 Sheet Note 38 indicates and 8"x8" box that is fed from a 4" Conduit.

Per code, please confirm this should be a 28"x28" box.

See Am-0005, revised drawing T-602.

EG-001.

Sheet EG001 Sheet Note 16 states to bond the perimeter counterpoise system to every column. Sheet Note 23 on that same page states to bond the counterpoise to not less than 1/2 of the columns. Please confirm that only 1/2 of the columns are required to be bonded to the counterpoise.

See Am-0006, revised sheet EG-001.

Section 00 60 00, Requests for Information - Page 2

EP-602.

Sheet EP602 Sheet Note 3 states that the single line indicates a single track hangar door and if a three track hangar door is used that additional electrical equipment will be required. Please confirm if the hangar door is to be single or three track so the contractor can include the correct cost for the electrical equipment.

See Am-0005, revised drawing AP-602.

08 34 16.10, 09 90 00.

Specs 08 34 16.10 and 09 90 00 are contradictory for the painting on the hangar doors; please coordinate these spec sections.

See Am-0003, revised section 08 34 16.10, para 2.2.6 and 2.2.7.

22 00 00, 23 64 26, 33 61 13.13.

Section 22 00 00 p2.2 Under Ground Pre-Insulated Pipe (Hot Water) specifies a carrier pipe of Type K copper tube, insulation to be closed cell polyurethane foam, and jacket pipe to be either PVC or HDPE.

Section 23 64 26 p2.3 Under Ground Pre-Insulated Pipe (Chilled Water) specifies a carrier pipe of Grade B seamless Type S Black Steel, insulation to be closed cell polyurethane foam, and jacket pipe to be HDPE.

Section 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution is for both Hot Water and Chilled Water and specifies polyisocyanurate insulation and a carrier pipe of either PVC, PE or RTRP. Is this section applicable or should it be deleted?

See Am-0005, revised section 33 61 13.13

EL501.

Light fixture schedule does not provide light fixture manufacturer or Cat # specification, please advise if designer will be providing information or if will be responsibility of contractor to propose fixture selection.

Specifying Manufacturers' names is prohibited in Government contracts, price accordingly per drawings and specs.

EL601.

Detail A4 on EL601 does not provide light fixture manufacturer or Cat # specification for obstruction light, please advise if designer will be providing information or if…