This announcement is a solicitation notice for the construction project FY21 Military Construction Army (MCA) Project Number (PN) 76897 Aircraft Maintenance Hangar at Wheeler Army Airfield, Oahu, Hawaii. The project scope includes constructing a modified standard design rotary wing aircraft maintenance hangar, associated maintenance shops, administrative space, parts and tool storage, hazardous materials storage, petroleum, oil and lubricants storage, ground support equipment storage, hangar access apron, aircraft washing apron, utility connections, fire suppression systems, lighting, and site development. The project magnitude is $50-100 million. The procurement will be evaluated based on experience, past performance, organization and management plan, small business participation plan, and price. Proposals will be evaluated using best value tradeoff procedures to select the offer representing the best value to the government. The NAICS code is 236220 and small business size standard is $39.5 million. The award will be a fixed price construction contract.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0008 29 Mar 2021
6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE
CEPOH – CONTRACTING DIVISION HAWAII
USACE, HONOLULU DISTRICT See Item 6
BLDG 252 (CECT-POH)
FT SHAFTER, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
W9128A21R0004 X
9B. DATED (SEE ITEM 11)
X 29-Jan-2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
ODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii
See Continuation Page
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W9128A21R0004
Am-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE Page 2 of 3
1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.
Revised pages replace like-numbered pages. The revision mark “(Am-0008)” is shown on each revised page.
A. REVISED SECTIONS. The following are sections were revised and changes are in bold and strikethrough.
Table of Contents Section 05 40 00, para 1.1, and 1.4 Section 09 97 13.16, pages 1 and 3, para 1.4.5.5, and 1.9 Section 10 28 13, para 2.3.9
Section 31 00 00, para 3.10.1.4.1
Section 32 13 14.13, para 2.11.1.1
Section 32 31 13.53, para 2.8. and 2.9
Section 33 40 00, para 1.2, 3.4.1.1, 3.4.1.2, 3.4.1.3, 3.4.1.4, 3.4.1.5, 3.4.1.6, and 3.9.1.2
Section 00 60 00, Requests for Information #252 and 303
B. ADDITIONS TO SECTION: The following sections were added to a section:
Section 00 60 00, Request for Information #331 to 378
C. NEW PARAGRAPHS. The following pargraphs are added to the sections.
N/A
D. REPLACED SECTION: The following sections are to be replaced in its entirety:
Section 09 97 13.27, Pages 1-22
E. NEW SECTIONS: The following sections are added to the solicitation.
N/A
F. DELETED SECTIONS: The following sections are deleted in the solicitation.
N/A
2. CHANGES TO DRAWINGS
A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:
SHEET ID SHEET NO. MARK REVISION DATE
G-002 Vol 1 of 3 6 03/25/21
G-003 Vol 1 of 3 6 03/25/21
CS504 Vol 1 of 3 6 03/25/21
S-181 Vol 1 of 3 6 03/25/21
S-602 Vol 1 of 3 6 03/25/21
S-603 Vol 1 of 3 6 03/25/21
Am-0008
SHEET ID SHEET NO. MARK REVISION DATE
M-501 Vol 2 of 3 6 03/25/21
EL101 Vol 3 of 3 6 03/25/21
EL102 Vol 3 of 3 6 03/25/21
EL107 Vol 3 of 3 6 03/25/21
EP602 Vol 3 of 3 6 03/25/21
EP607 Vol 3 of 3 6 03/25/21
B. NEW DRAWINGS (ISSUED). The following new drawings are issued herewith:
N/A
3. The proposal due date remains unchanged. See Am-0007, SF 1442, Block 13.
RFI # Question Issued Response
41 22 13.14, paragraph 2.4.2.
This section requires VFD controls as well as two speed magnetic controls.
It should be either VFD or two speed magnetic controls, you cannot have both.
Please delete two speed magnetic control.
See Am-0005, revised section 41 22 13.14 paragraph 2.4.2
EG101.
In reference to RFI #153 response, Elec-sheets does not reflect fence grounding.
Please advise.
See Am-0007, response to RFI #255.
Section 00 60 00, Requests for Information - Page 1 (Am-0008)
T-611.
Sheet T611 General Note 1 states to coordinate with NEC and Contractor Officer and that the Contractor is responsible for costs associated with AT&T. This is contrary to other projects where the Government contracted directly with AT&T. Please confirm that the costs for AT&T shall be by the Government and not the contractor. If it is to be provided by the Contractor, please provide an allowance amount to include in the base bid.
Confirmed. Contractor is responsible for costs associated with AT&T, estimated at $50,000.
221 Please note that the new bid date coincides with the same day / time for another See Am-0006, revised SF1442, block 13.
07 27 45.
Note on AB101 calls for reference to specification section 07 27 45. This specification section is not included in Volume 1 of the project specification. Please provide 07 27 45.
See Am-0007, revised note on sheet AB101
A-544 A3, C8, E6.
A-544 Detail A3, C8, E6 shows metal stud framing attached over the 1-1/2" metal siding again no metal stud framing is shown supporting the metal siding. Is it the intent to attach the 3-1/2" metal stud framing directly to the exterior of the metal siding using the siding as the only support for the studs and EIFS system?
Please verify that metal siding will support this assembly as shown.
Contractor is responsible for design of cold-formed metal framing as indicated on section 05 40 00 and metal wall panels (metal siding) as indicated on section 07 42 13. Exterior cold-formed metal framing shall comply with section 05 40 00 paragraph1.6.1, 1.6.2, and Am-0008 section 05 40 00 paragraph 1.4. Interior non-load bearingcold-formed metal framing shall comply with Am-0007 section 05 40 00 paragraph1.4.
Exterior cold-formed metal framing requirements shall be determined by the Contractor's Designer of Record as indicated on section 05 40 00 paragraph 1.6.1, 1.6.2, and Am-008 section 05 40 00 paragraph 1.4.
05 40 00.
Does the requirement of the 05 40 00 specification for shop drawings and engineering only apply to metal framing that is clearly indicated in the drawings?
Contractor is responsible for cold-formed metal framing as indicated in section 05 40 00.
Exterior cold-formed metal framing shall comply with section 05 40 00 para 1.6.1, and 1.6.2, and Am-0008 revised section 05 40 00, para 1.4.
Interior non-load bearing cold-formed metal framing and comply with Am-0007, section 05 40 00, para 1.4.
05 40 00.
Please clarify that if no metal studs are shown on the drawings or details that additional framing will not be required to meet design criteria.
Contractor is responsible for cold-formed metal framing as indicated in section 05 40 00.
Exterior cold-formed metal framing shall comply with section 05 40 00 para 1.6.1, and 1.6.2, and Am-0008 revised section 05 40 00, para 1.4.
Interior non-load bearing cold-formed metal framing and comply with Am-0007, section 05 40 00, para 1.4.
AF601.
AF601 Interior finish schedule remark # 14 lists the walls of all the comm rooms and comm room storage room to be painted except for comm room 143.
Please advice if comm room 143 walls should be painted per option 4.
No Room 143 is not included as part of option 4.
Section 00 60 00, Requests for Information - Page 1
EL502 C4/EL502.
Detail calls for special Wire Guard over Fixture TYPEs B and C. TYPE B fixture is not a surface ceiling mount fixture; it is a pendant mounted fixture. Is the additional wire guard still required for the TYPE B fixture?
If required, please provide new detail or new fixture description.
Wire guard required only for arms and weapons vault, rooms 116, 155, and C155B.
EL502.
Detail C4. Confirm that the wire guard cage is not required for the Type B/BE suspended fixture.
See Am-0008, response to RFI #337
09 97 13.27.
Am-0005, RFI #82 response indicated that shop or field coating is acceptable for coating of steel structures. The RFI response references revised section 09 97
13.27 paragraphs 2.3 and 3.2. However, only paragraph 3.2 was updated to reflect option of shop or field coating. Portion of RFI #82 with regards to paragraph 2.3 was not addressed in the response. Paragraph 2.3 still indicates that all shop applied primer must be removed to final field surface preparation and coating system application. Should the steel be coated with primer, intermediate, and top coats in the shop, would the coatings need to be removed once arriving in the field per paragraph 2.3? Or is the intent that if steel is shop coated, it would not need to be removed and re-prepped, primed, and coated in the field? Please clarify.
See Am-0008, revised section 09 97 13.27, para 2.3
09 97 13.27.
Am-0005 issued revised section 09 97 13.27 paragraph 3.2 indicating that steel can be shop or field coated. Please define location or parameters of 'field' coating application.
Field application should meet SSPC QP1.
Field painting is coating something once it is installed onsite.
09 97 13.16.
Specification section 09 97 13.16 appears to be intended for the coating of a steel water tank. The coatings indicated in paragraph 2.3.1 are not typically intended for use on concrete substrates. Please advise specification for coating of concrete water tank.
See Am-0008, revised section 09 97 13.16 The coating system and application is for the concrete water tank and concrete foam containment tank.
09 97 13.16.
Specification section 09 97 13.16 appears to be only intended for the Fire Water Storage Tank. Please confirm that the below grade Foam Tank does not require any coatings per 09 97 13.16.
See Am-0007, revised section 09 97 13.16 to include foam containment tank.
Section 00 60 00, Requests for Information - Page 2
09 97 13.16, 09 97 13.27.
"Section 09 97 13.16, 09 97 13.27, 1.4.5.5, Require the painting contractor to hold BOTH SSPC QP 1 and SSPC QS 1.
BOTH QP 1 and QS 1 require painter's proficiency in management, quality control and compliance in the areas of safety, health and the environment. Therefore making it redundant. In order to provide the most competitive pricing, please advise if the QS 1 certification can be waived and/or will Government allow NACE Certified Coating Inspector inspect all work in sections 09 97 13.16 & 09 97.13.27 in lieu of QS 1 certification?
See Am-0008, revised sections 09 97 13.16 and 09 97 13.27.
EL102.
Sheet EL102/room 115. Light Fixture Type B fixture designation and symbol does not match. Please clarify light fixtures in room.
See Am-0008, revised sheet EL102.
EL101.
Sheet EL101/grid lines 1/A. Exterior fixture type not called out. Please identify.
See Am-0008, revised sheet EL101.
EL107.
Sheet EL107/ detail A8 Recycled Storage. Light fixture type not called out. Please identify.
See Am-0008, revised sheet EL107
EL107.
Sheet EL107/ detail A1 Bike Rack. Light Fixture type K as to how this fixture is mounted. Please provide mounting detail.
See Am-0007, response to RFI #239
09 97 13.27.
If both QP1 and QS1 certifications are required per 09 97 13.27, this will vastly limit the amount of Subcontractors able to comply with the specification and bid the project. In order to provide the highest quality and most cost effective solution, please advise if Contractor may select, at their discretion, between the following options:
1. Coat the steel per 09 97 12.27 (including any requirement amendments per RFIs)
OR
2. Hot Dip Galvanize the steel. If hot dip galvanizing is allowed, please advise of minimum requirements.
See Am-0008, revised section 09 97 13.27 Deleted requirement for SSPC QS1.
25 05 11.04.
Spec 25 05 11.04: Cybersecurity for Facility-Related Control Systems - Please confirm whether Wireless Access in 3.1.2 by Contractors will be authorized by the Government.
Specification 25 05 11.04, Para 3.1.2 does not allow for wireless facility devices.
Note, however, all 25 05 11 specifications include language stating: "Temporary contractor-installed IP networks may be used during construction" provided the IP networks meet specified requirements. See, for example, Section 25 05 11.04, Paragraph 1.9.2 (Temporary IP Networks under 1.9 "CYBERSECURITY DURING
CONSTRUCTION").
Section 00 60 00, Requests for Information - Page 3
41 22 13.13.
Spec 41 22 13.13: Bridge Cranes –
Please confirm if the EMI Suppression requirements in 2.5 only apply to the Bridge Crane systems or other electrical system wiring within the Repair Hangars.
The EMI Suppression requirements in section 41 22 13.13, para 2.5 only apply to the Bridge Crane System.
09 90 00.
Refer to RFI Question #117 (Amendment 5). We Humbly ask the Temporary use of an NACE Certified Coating Inspector. This is the highest requirement in the coating industry, including QP1. There is a limited amount of companies in Hawaii with QP1 status. By allowing the Temporary use of an NACE Certified Coating Inspector, many more companies could be allowed to bid on this work. This will open the field.
Part of the requirement in obtaining QP1 is paperwork and documentation and passing the field audit. A project needs to be started or ongoing. The results will be given the day of audit. By allowing the Temporary use of a NACE Certified person now in this RFI, a field audit can be made in advance and be on site when work begins.
Comply with section 09 97 13.27, para 1.4.6.4 for QP1.
Comply with section 09 97 13.27, para 1.4.6.3 for certified inspector.
EY101-105.
Speaker types are not defined on the plans, just diamonds
a. There are 5 different speaker types listed in the specs, but each type is not defined on the drawings
i. Please define which speaker is desired in which location
See Am-0007, revised sheet EY-001.
See Am-0006, response to RFI #179
08 81 00.
Please note that the composition of glass types GT-1 and GT-2 are the same.
Specifications indicate different values for each glass type in SHGC (.29 & .40), VLT (47% & 22%) and RVL-Ext (19% & 12%). It is suggested that the VLT value shall be the actual result of the glass composition due to the multi layers of light screening materials. Please confirm that we are to meet the SHGC and RVL-Ext values and advise on glazing types.
See Am-0005, revised section 08 81 00 See Am-0007, revised sheet A-603
15 06 02.
Per section 15 06 02, in Part 2, the specification calls for a galvanized system.
Requesting substitution for fiber reinforced plastic system that meets and/or exceeds specification requirements. This sections also calls for a polypropylene base. Requesting substitution for alternate plastic bases that exceed specification requirements and warranties.
Comply with specifications.
Section 00 60 00, Requests for Information - Page 4
15 06 02.
Section 15 06 02 calls for a non-penetrating roof system that is also mentioned in
2.3.1 as a designed system that does not penetrate roofing membrane. Subsection 1.3a, 1.3c and 2.2.3 call for an engineered system for seismic and high wind applications that will be mechanically fastened. Engineering requirements require positive attachment to meet code for engineered systems for any rooftop application.
Please advise.
Per the manufacturer, the pre-fabricated raised walkway and platform are portable and a non-penetrating style.
See section 15 06 02, para 2.3.1.b for custom design system to fit piping, conduits, equipment, or walkways to be installed and actual conditions of service and loading See sheets A-155, S-001, and S-006 for seismic and high wind engineering requirements.
If during the engineering process it is determined the walkway and platform systems do need positive attachment to the roof or roof structure, options are listed in section 15 06 02, para 2.3.2.j or 2.3.4.c.
15 06 02.
Per section 15 06 02, subsection 1.3 and 2.2 call for substructure and structural components of the access system to be galvanized steel. Subsection 2.3.3 calls for stainless steel framing. Please advise.
See Am-0007, revised section 15 06 02, para 2.3.3.
S161, S361.
S161 & A1&A5/S361GSE Storage.
A1/S361 shows the TOF for TB1 and F 5x7 = 1'4" below FFE, but A5/S361 shows the TOF for TB2 is 1' 11" below FFE by the scale measure. Please clarify
Existing drawings will not be scaled for dimensions.
See S-161 Foundation Note 2 for top of footing elevation.
See Am-0007, revised sheet S-001.
EL102.
Sheet EL102/room 115. Light Fixture Type B fixture designation and symbol does not match. Please clarify light fixtures in room.
See Am-0008, response to RFI #344
EL101.
Sheet EL101/grid lines 1/A. Exterior fixture type not called out. Please identify.
See Am-0008, response to RFI #345
EL107.
Sheet EL107/ detail A8 Recycled Storage. Light fixture type not called out. Please identify.
See Am-0008, response to RFI #346
EL107.
Sheet EL107/ detail A1 Bike Rack. Light Fixture type K as to how this fixture is mounted. Please provide mounting detail.
See Am-0007, response to RFI #239
33 16 13.16, S-381.
Please confirm if the 250,000 gallon Concrete Fire Protection Water Storage Tank, which is to be designed by the tank manufacturer, can be designed as a cast-in-place concrete tank meeting the requirements of ACI-350 which is the governing code for water retaining concrete structures. Tanks of this size constructed previously on Island for BWS have been designed in accordance with ACI-350.
Comply with specifications.
Section 00 60 00, Requests for Information - Page 5
S-181, S-381, ES-101.
Please confirm if the 250,000 gallon Concrete Fire Protection Water Storage Tank, which is to be designed by the tank manufacturer, can be a circular concrete tank.
The water depth would remain the same as the rectangular tank allowing for similar operations. A circular tank would be of benefit to the owner as it would eliminate deadzones that can be observed in corners of a rectangular tank. In addition circular water storage tanks are standard on Island for BWS.
The tank must be constructed per the specifications and drawings.
The design was approved by DPW Historical pursuant to Federal law.
A-155 and A-733.
Amendment 05 provided the detail for Roof Walkway and platform detail on drawing A-155 and A-733. However, we cannot find the requirement of the material including the finish. Please provide the specification.
See section 15 06 02.
See Am-0008, response to RFI #356
S-001, DC-2
Drawing S-001, DC-2, provides a 25 psf Dead Load and 20 psf Live Load.
Specification Section 33 16 13.16, 1.2.a, gives a 60 psf roof live load. Please confirmthe dead and live loads required for the water storage tank.
25 psf Dead Load and 20 psf Live Load are not applicable for the Water Storage Tank.
The roof live load shall be 60 psf per Section 33 16 13.16, para 1.2 Dead load requirement shall be determined by the Contractor's designer of record.
S-001, DC-5 33 16 13.16, 1.2.b Drawing S-001, DC-5, and Specification Section 33 16 13.16, 1.2.b, give a net allowable soil bearing capacity of 3000 psf. However, we were unable to locate geotechnical data on the anticipated settlement beneath the water storage tank.
Please confirm if an assumed angular distortion of ¼" in 25' and maximum total uniform settlement of 1" is acceptable for use on this project.
The estimated angular distortion is about 0.5 inches in 40 feet and a maximum uniform settlement of about 1 inch.
E-101 Hazardous Area Location Plan E-101 maps out where the Hazardous Areas are located and general note 1 gives very detailed clarification for that, please confirmthat the plan is correct. Per your answers in Amendment 5 for RFIs 147 and 148, you classified the bridge and gantry cranes as being with the hazardous areas, but aren't they outside of the hazardous areas per general note 1 on E-101? Please clarify.
There are two (10) ton cranes located in the Hangar Bay Rm 100.
There is one (2) ton crane located in the Power Plant Power Train Shop Rm 108.
All cranes are in the Hazardous Location Plan as shown in sheet E-101.
Comply with hazardous requirements as set forth by the boundaries on sheet E-101, Note 1.
EG001 - EG601
EG-sheets: Grounding/Lightning Protection only shown on Aircraft Maintenance Hangar Bldg.
Please confirm other bldgs/structures will not require Grounding/Lightning Protection systems besides code minimum.
See Am-0007, response to RFI #304
Section 00 60 00, Requests for Information - Page 6
09 97 13.27 Sect 09 97 13.27, 3.2 allows for surfaces to be coated in a shop, while 2.3 states that coatings applied in a shop must be removed in the filed. While the removal of a holding primer in the field is prudent, the requirements of 2.3, in relation to 3.2 remain unclear. Are the requirements of 2.3, in particular the complete removal of shop applied coatings, applicable should the contractor perform surface preparation and apply the complete coating system in the shop?
See Am-0007, response to RFI #304
32 13 14.13 Paragraph 2.11.1.1 states "Locate the batching and mixing plant off Government premises no more than 15 minutes haul time from the placing site". There are currently no batch plants on island within 15 minutes haul time, and there is limited area within 15 minutes haul time to set a mobile batch plant. Please advise if this can be changed to allow a PCC batch plant on site.
See Am-0008, revised section 32 13 14.13, para 2.11.1.1.
M501 31 00 00 C7/M501 and Spec 31 00 00, Para 3.10.1.4.1.a & b Detail C7/M501 calls out only CLSM backfill of CHW & HW trench for the vehicular traffic area. Para 3.101.4.1 of Spec 31 00 00 calls out CLSM, select borrow (subbase) or non-expansive granular fill for the pavement area.
a. Please clarify can we utilize other than CLSM to backfill CHW & HW trench per Para 3.10.1.4.1.
b. Para 3.10.1.4.1 calls out "non expansive granular material". This non-expansive granular material is a 2" minus SELECT GRANULAR MATERIAL defined in Para
1.2.9 or can be a 3" minus non expansive granular satisfactory material? Please clarify.
a. See Am-0008 revised sheet M501
b. See Am-0007, response to RFI #285.
31 00 00 Spec 31 00 00, Para 1.2.9, Para 3.10.1.4, & Para 3.12 Para 1.2.9 states "provide select granular materials UNDER FLOOR SLABS, CONCRETE LANDING AND CONCRETE PADS where indicated on plans."
a. Please clarify only 2" minus select granular (Para 1.2.9) can be utilized to embank to the subgrade of floor slabs, conc landing & pads or 3" minus satisfactory material per Para 3.12 can be utilized?
b. Please clarify only 2" minus select granular fill can be utilized for plumbing trench backfill under the bldg. SOG, or trench backfill per Para 3.10.1.4.1 (CLSM, select borrow or non-expansive granular), or per Para 3.10.1.4 (satisfactory material).
(a) See Am-0007, response to RFI #285 response.
3" minus satisfactory material is allowed per spec.
(b) Trench backfill requirements is in section 31 00 00 which applies to plumbing / mechanical piping located outside the building line.
See International Plumbing Code for plumbing trenching / piping under the building.
Section 00 60 00, Requests for Information - Page 7
32 13 14.13 Based on the responses to RFIs #6, #13, #10, and #14, all ready-mix suppliers on island have declined to bid this project. At this point in time, the only contractor able to provide the specified PCC mix is a bidding General Contractor who has been contracted to perform adjacent airfield paving work at Wheeler. This creates a conflict of interest and sole-sourcing of the PCC mix from a bidding General Contractor.
Please kindly reconsider revisiting the responses to the RFIs referenced above to allow other General Contractors to bid this project.
No waivers will be allowed.
32 31 15.53 Paragraph 2.9 calls out for a Electro-Magnetic lock, but no rating is given for it or any details for how it is to be installed. Please provide rating and drawing details.
See Am-0008, revised section 32 31 15.53, para 2.9
32 31 13.53 The low amperage low voltage ratings for the Gate Operator are indicative of a residential gate operator, however the additional features of emergency release being capable of being locked, the Class IV type rating for restricted access control.
Do you want a heavier duty more secure gate operator or a low security gate operator is sufficient for this application? Please confirm.
See Am-0008, revised section 32 31 13.53, para 2.8
EY601, EY002 32 31 13.53
Please confirm whether any safety detection is required for the sliding gate, such as infrared beams on front and back side of gates or safety edges, etc. If so, please provide spec and detail drawings.
See Am-0008, revised sheet CS504.
See Am-0008, revised section 32 31 13.53, para 2.9
CS504
Detail A1 for the Sliding Gate concrete grade beam for sliding gate track to set in.
Is 4" thick concrete sufficient for the heavy track that will pass over it? Should it be 12" thick where traffic passes over it and 6" thick where traffic does not pass over it? Please confirm.
See Am-0008, revised sheet CS504.
In Amendment 7, a load center LC-1 was added to the single-line diagram, but it is of a different voltage than the panel that feeds it. The load center is 120/240V single phase, but is being fed from a 208/120V three-phase distribution panel.
See Am-0008, revised sheet EP602
Section 00 60 00, Requests for Information - Page 8
FY21 PN76897 AIRCRAFT MAINTENANCE HANGAR PN76897
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 00 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 90 00 MISCELLANEOUS PROVISIONS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 22 10 SPRAYED APPLIED POLYURETHANE INSULATION (SAPI)
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) AND
DIRECT-APPLIED EXTERIOR FINISH SYSTEM (DEFS)
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 13 METAL WALL PANELS (METAL SIDING)
PROJECT TABLE OF CONTENTS Page 1
07 42 13.13 FORMED METAL WALL PANELS (8" AND 12" INTERLOCKING)
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 90 00 SEISMIC WATERPROOF EXPANSION JOINT
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCE DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM (OPTION 5)
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 97 13.16 INTERIOR COATING OF CONCRETE WATER TANK AND FOAM
CONTAINMENT TANK
09 97 13.27 COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS AND MONITOR MOUNTS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET AND SHOWER COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHER WALL BRACKETS AND CABINETS
10 51 13 METAL LOCKERS
10 81 13.01 35 BIRD CONTROL DEVICES
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 36 00 STAINLESS STEEL COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
PROJECT TABLE OF CONTENTS Page 2
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
13 34 23.13 PREFABRICATED USED PRODUCT RECLAMATION/POL STORAGE
BUILDING
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 15 -
15 06 02 NON-PENETRATING ROOFTOP WALKWAY AND ACCESS SUPPORTS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (HVAC)
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (FIRE)
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (FOAM)
25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 3
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 31 16.13 CHEMICAL TERMITE CONTROL
31 31 16.19 TERMITE CONTROL BARRIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT (OPTION 2)
32 11 20 SUBBASES AND SEPARATION LAYER
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 ASPHALT PAVING FOR AIRFIELDS AND HEAVY TRAFFIC AREAS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 14.13 CONCRETE PAVING FOR AIRFIELD PAVEMENT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 31 25 WOOD COMPOSITE FENCES AND GATES
32 92 19 SEEDING (OPTION 2)
32 92 26 SPRIGGING (OPTION 2)
32 93 00 EXTERIOR PLANTS (OPTION 2)
DIVISION 33 - UTILITIES
33 01 50.31 LEAK DETECTION FOR FUELING SYSTEMS
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 13.16 WIRE-WOUND RECTANGULAR PRESTRESSED-CONCRETE WATER TANK
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.13 BRIDGE CRANES
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
PROJECT TABLE OF CONTENTS Page 4
46 25 14 COALESCING OR VERTICAL TUBE OIL-WATER SEPARATORS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
SECTION 05 40 00
COLD-FORMED METAL FRAMING
05/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016; Errata 7-9 2017) Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14)
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI S100 (2012) North American Specification for the Design of Cold-Formed Steel Structural Members
AISI S110 (2007; Suppl 1; Reaffirmed 2012) Standard for Seismic Design of Cold-Formed Steel Structural Systems - Special Bolted Moment Frames
AISI S200 (2007) North American Standard for Cold-Formed Steel Framing - General Provision
AISI S201 (2007) North American Standard for Cold-Formed Steel Framing - Product Data
AISI S202 (2011) Code of Standard Practice for Cold-formed Steel Structural Framing
AISI S211 (2007) North American Standard for Cold-Formed Steel Framing - Wall Stud Design
AISI S212 (2007) North American Standard for Cold-Formed Steel Framing - Header Design
AISI S213 (2007; Suppl 1 2009) North American Standard for Cold-Formed Steel Framing - Lateral Design
AISI S214 (2012) North American Standard for Cold-Formed Steel Framing – Truss Design
SECTION 05 40 00 Page 2
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-10 (2010; Errata 2011; Supp 1 2013) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1003/A1003M (2015) Standard Specification for Steel Sheet, Carbon, Metallic- and Nonmetallic-Coated for Cold-Formed Framing Members
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A370 (2017a) Standard Test Methods and Definitions for Mechanical Testing of Steel Products
ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM C1007 (2011a) Standard Specification for Installation of Load Bearing (Transverse and Axial) Steel Studs and Related Accessories
ASTM C1513 (2018) Standard Specification for Steel Tapping Screws for Cold-Formed Steel Framing Connections
ASTM C955 (2017) Standard Specification for Cold-Formed Steel Structural Framing Members
ASTM E119 (2018) Standard Test Methods for Fire Tests of Building Construction and Materials
SECTION 05 40 00 Page 3
1.3 DELIVERY, STORAGE, AND HANDLING
Steel framing and related accessories shall be stored and handled in accordance with the AISI S202, "Code of Standard Practice for Cold-Formed Steel Structural Framing".
1.4 LOAD-BEARING AND EXTERIOR COLD-FORMED METAL FRAMING
Exterior cold-formed metal framing shall include elements that support wind pressures per ASCE 7-10. Include top and bottom tracks, bracing, fastenings, and other accessories necessary for complete installation.
Framing members shall have the structural properties as required. Where physical structural properties are not indicated, they shall be as necessary to withstand all imposed loads. Design framing in accordance with AISI S100. Interior non-load-bearing metal framing, furring, and ceiling suspension systems are specified in Section 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD. Metal suspension systems for acoustical ceilings are specified in Section 09 51 00 ACOUSTICAL CEILINGS.
Submit mill certificates or test reports from independent testing agency, qualified in accordance with ASTM E329, showing that the steel sheet used in the manufacture of each cold-formed component complies with the minimum yield strengths and uncoated steel thickness specified. Test reports shall be based on the results of three coupon tests in accordance with ASTM A370.
1.5 MAXIMUM DEFLECTION
Deflections of structural members shall not exceed the more restrictive of the limitations of ICC IBC and UFC 3-301-01.
1.6 QUALITY ASSURANCE
a. Engineering Responsibility: Preparation of Shop Drawings, design calculations, and other structural data by a registered professional engineer.
b. Testing Agency Qualifications: An independent testing agency, acceptable to authorities having jurisdiction, qualified according to ASTM E329 for testing indicated.
c. Product Tests: Mill certificates or data from a qualified independent testing agency indicating steel sheet complies with requirements, including base-metal thickness, yield strength, tensile strength, total elongation, chemical requirements, and metallic-coating thickness.
d. Welding Qualifications: Qualify procedures and personnel according to the following:
(1) AWS D1.1/D1.1M, "Structural Welding Code - Steel".
(2) AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel".
e. Fire-Test-Response Characteristics: Where indicated, provide cold-formed metal framing identical to that of assemblies tested for fire resistance per ASTM E119 by, and displaying a classification label from, a testing and inspecting agency acceptable to authorities having jurisdiction.
f. AISI Specifications and Standards: Comply with:
SECTION 05 40 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 97 13.16
INTERIOR COATING OF CONCRETE WATER TANK AND FOAM CONTAINMENT TANK
05/11
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Contract Errors, Omissions, and Other Discrepancies
1.4.2 Corrective Action (CA)
1.4.2.1 Corrective Action Procedures
1.4.2.2 Implement Corrective Action
1.4.3 Coating Work Plan
1.4.4 Design Data
1.4.4.1 Environmental Control System
1.4.5 Qualifications
1.4.5.1 Qualifications of Certified Industrial Hygienist (CIH)
1.4.5.2 Qualifications of Certified Protective Coatings Specialist
(PCS)
1.4.5.3 Qualifications of QC Specialist Coating Inspector
1.4.5.4 Qualifications of Testing Laboratory for Coatings
1.4.5.5 Qualifications of Coating Contractors
1.4.5.6 Roof Joint Sealant Materials
1.4.5.7 Roof Joint Sealant Compatibility
1.4.6 Protective Coating Specialist (PCS)
1.4.7 Pre-Application Meeting
1.5 PRODUCT DATA
1.5.1 Roof Joint Sealant Instructions
1.5.2 Coating System Instructions
1.6 DELIVERY AND STORAGE
1.7 COATING HAZARDS
1.8 WORK SEQUENCE
1.9 JOB SITE REFERENCES
PART 2 PRODUCTS
2.1 RECYCLED CONTENT
2.2 ROOF JOINT SEALANT
2.3 COATING SYSTEM
2.3.1 MIL-DTL-24441 Epoxy System for Non-potable Water Tanks
2.3.1.1 Epoxy Primer Coat
2.3.1.2 Epoxy Intermediate Coat
2.3.1.3 Epoxy Topcoat
PART 3 EXECUTION
3.1 COATING AND ABRASIVE SAMPLE COLLECTION AND TESTING
3.2 SLUDGE REMOVAL AND TANK CLEANING
SECTION 09 97 13.16 Page 1
SECTION 09 97 13.16
INTERIOR COATING OF CONCRETE WATER TANK AND FOAM CONTAINMENT TANK
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D3276 (2015; E 2016) Standard Guide for Painting Inspectors (Metal Substrates)
ASTM D3925 (2002; R 2015) Sampling Liquid Paints and Related Pigmented Coatings
ASTM D4285 (1983; R 2012) Indicating Oil or Water in Compressed Air
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 9001 (2008; Corr 1 2009) Quality Management Systems- Requirements
NACE INTERNATIONAL (NACE)
NACE SP0188 (1999; R 2006) Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Guide 12 (1998; E 2004) Guide for Illumination of Industrial Painting Projects
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC PA 2 (2015; E 2018) Procedure for Determining Conformance to Dry Coating Thickness Requirements
SSPC QP 1 (2012; E 2012) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
SSPC QS 1 (2015) Standard Procedure for Evaluating a Contractor's Advanced Quality Management System
SSPC SP 1 (2015) Solvent Cleaning
SECTION 09 97 13.16 Page 3 (Am-0008) j3ec9kts Cross-Out
1.4.5.3 Qualifications of QC Specialist Coating Inspector
Submit documentation that each coating inspector is employed, and qualified to SSPC PCI Level II, by the selected coating inspection company.
1.4.5.4 Qualifications of Testing Laboratory for Coatings
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified.
1.4.5.5 Qualifications of Coating Contractors
All Contractors and Subcontractors that perform surface preparation or coating application shall be certified to either ISO 9001 or SSPC QP 1 and SSPC QS 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application. The painting Contractors and painting Subcontractors must remain so certified for the duration of the project. If a Contractor's or Subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in Contractor certification status.
1.4.5.6 Roof Joint Sealant Materials
Provide manufacturer's certification of conformance to contract requirements.
1.4.5.7 Roof Joint Sealant Compatibility
Provide manufacturer's certification that the selected joint sealant is compatible with the epoxy primer and is suitable for application directly to prepared surfaces.
1.4.6 Protective Coating Specialist (PCS)
The PCS shall be considered a QC Specialist and shall report to the QC Manager, as specified in Section 01 45 04 CONTRACTOR QUALITY CONTROL. The PCS shall approve all submittals prior to submission to the QC Manager for approval or submission to the government for approval.
1.4.7 Pre-Application Meeting
After approval of submittals but prior to the initiation of coating work, Contractor representatives, including at a minimum, project superintendent and QC manager, paint foreman, coating inspector, and PCS shall have a pre-application coating preparatory meeting. This meeting shall be in addition to the pre-construction conference. Specific items addressed shall include: corrective action requirements and procedures, coating work plan, safety plan, coordination with other Sections, inspection standards, inspection requirements and tools, test procedures, environmental control system, safety plan, and test logs. Notify Contracting Officer at least ten days prior to meeting.
SECTION 09 97 13.16 Page 8 (Am-0008) j3ec9kts Cross-Out
1.5 PRODUCT DATA
1.5.1 Roof Joint Sealant Instructions
Submit manufacturer's printed instructions including detailed mixing and application procedures, minimum and maximum application temperatures, and curing procedures. Include Safety Data Sheets (SDS) for materials to be used at the job site in accordance with 29 CFR 1926.59.
1.5.2 Coating System Instructions
Submit manufacturer's printed instructions including detailed mixing and application procedures, number and types of coats required, minimum and maximum application temperatures, and curing procedures. Include Safety Data Sheets (SDS) for materials to be used at the job site in accordance with 29 CFR 1926.59.
1.6 DELIVERY AND STORAGE
Ship, store, and handle materials in accordance with SSPC PA 1, and as modified in this Section. Maintain temperature in storage spaces between 40 and 75 degrees F, and air temperature more than 5 degrees F above the dew-point at all times. Inspect materials for damage and return non-compliant materials to manufacturer. Remove materials with expired shelf life from government property immediately and notify the Contracting Officer. Expired materials may be returned to manufacturer, tested, and if compliant, issued a shelf life extension.
If materials are approaching shelf life expiration and an extension is desired, samples may be sent to the manufacturer, along with complete records of storage conditions, with a request for shelf life extension. If the manufacturer finds the samples and storage data suitable for shelf life extension, the manufacturer may issue an extension, referencing the product evaluation and the review of storage records. Products may not be extended longer than allowed in the product specification.
1.7 COATING HAZARDS
Ensure that employees are trained in all aspects of the safety plan.
Specified coatings may have potential health hazards if ingested or improperly handled. The coating manufacturer's written safety precautions shall be followed throughout mixing, application, and curing of the coatings. During tank cleaning, cleanup, surface preparation, and paint application phases, ensure that employees are protected from toxic and hazardous chemical agents which exceed concentrations in 29 CFR 1910.1000.
Comply with respiratory protection requirements in 29 CFR 1910.134. The CIH shall approve work procedures and personal protective equipment.
1.8 WORK SEQUENCE
Coat tank interior following leak testing.
1.9 JOB SITE REFERENCES
Make available to the Contracting Officer at least one copy each of
ASTM D3276, ASTM D3925, ASTM D4285, NACE SP0188, SSPC SP COM, SSPC SP 1,
SSPC SP 13/NACE No. 6, SSPC PA 1, SSPC PA 2, SSPC Guide 12, SSPC QP 1, SSPC QS 1, and an SSPC Certified Contractor Evaluation Form at the job site.
SECTION 09 97 13.16 Page 9 (Am-0008)
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 97 13.27
COATING OF STEEL STRUCTURES
10/16
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Contract Errors, Omissions, and Other Discrepancies
1.4.2 Corrective Action (CA)
1.4.2.1 Corrective Action Procedures
1.4.2.2 Implement Corrective Action
1.4.3 Coating Work Plan
1.4.4 Design Data
1.4.4.1 Containment System
1.4.5 Test Reports
1.4.5.1 Joint Sealant Qualification Test Reports
1.4.5.2 Coatings Qualification Test Reports
1.4.6 Qualifications
1.4.6.1 Qualifications of Certified Industrial Hygienist (CIH)
1.4.6.2 Qualifications of Certified Protective Coatings Specialist
(PCS)
1.4.6.3 Qualifications of QC Specialist Coating Inspector
1.4.6.4 Qualifications of Coating Contractors
1.4.6.5 Joint Sealant Materials
1.4.6.6 Coating Materials
1.4.6.7 Coating System Component Compatibility
1.4.7 Protective Coating Specialist (PCS)
1.4.8 Pre-Application Meeting
1.5 PRODUCT DATA
1.5.1 Joint Sealant Instructions
1.5.2 Coating System Instructions
1.6 DELIVERY AND STORAGE
1.7 COATING HAZARDS
1.8 JOB SITE REFERENCES
PART 2 PRODUCTS
2.1 RECYCLED CONTENT
2.2 JOINT SEALANT
2.3 COATING SYSTEM
2.3.1 Zinc-Rich Epoxy Primer Coat
2.3.2 Epoxy Intermediate Coat
2.3.3 Polyurethane Topcoat
2.4 COATING SAMPLE COLLECTION AND SHIPPING KIT
2.5 TEST KITS
2.5.1 Test Kit for Measuring Chloride, Sulfate and Nitrate Ions on
Steel and Coated Surfaces
SECTION 09 97 13.27 Page 1
2.5.2 Test Kit for Identifying Amine Blush on Epoxy Surfaces
PART 3 EXECUTION
3.1 COATING SAMPLE COLLECTION AND TESTING
3.1.1 Coating Sample Collection
3.1.2 Coating Sample Test Reports
3.2 SURFACES TO BE COATED
3.3 LIGHTING
3.4 ENVIRONMENTAL CONDITIONS
3.4.1 Containment
3.4.2 Automated Monitoring Requirements
3.5 SURFACE PREPARATION
3.5.1 Abrasive Blasting Equipment
3.5.2 Pre-Preparation Testing for Surface Contamination
3.5.2.1 Pre-Preparation Testing for Soluble Salts Contamination
3.5.3 Abrasive Blasting
3.5.4 Disposal of Used Abrasive
3.5.5 Pre-Application Testing For Surface Contamination
3.5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .