About this file

This announcement constitutes a solicitation for a design-bid-build construction project. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for FY21 Military Construction Army Project Number 76897 to construct an aircraft maintenance hangar at Wheeler Army Airfield in Oahu, Hawaii. The project scope includes building an aircraft hangar, maintenance shops, administrative space, storage facilities, airfield infrastructure, utilities, and supporting site development. The procurement will utilize best value procedures and result in a single fixed price construction contract award. The project value is estimated between $50-100 million. The performance period will be determined. Offerors must register with SAM and the closing date for proposals is March 19, 2021 by 2:00pm local time. The solicitation encourages maximum participation of small businesses, with an emphasis on small disadvantaged, women-owned, HUBZone, veteran-owned, and service disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
sf30-21r4-am-0010.pdf PDF
sf30-21r4-am-0009.pdf PDF
Drawings-am-0009.pdf PDF
Drawings-am-0008.pdf PDF
sf30-21r4-am-0008.pdf PDF
sf30-21r4-am-0007.pdf PDF
Drawings-am-0007.pdf PDF
Drawings am-0006.pdf PDF
sf30-21r4-am-0006.pdf PDF
Drawings-am-0005.pdf PDF
sf30-21r4-am-0005.pdf PDF
Specifications-am-0003.pdf PDF
sf30-21r4-am-0003.pdf PDF
Drawings-am-0003.pdf PDF
sf30-21r4-am-0002.pdf PDF
Drawings-am-0002.pdf PDF
sf30-21r4-am-0001.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 1.pdf PDF
FILE 9 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 2.pdf PDF
FILE 6 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 1 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 2 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 7 OF 15 03 Struct Design Complete Rev 01-12-2021.pdf PDF
FILE 5 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 11 OF 15 05 Mech Design Complete REV 01-12-2021.pdf PDF
FILE 15 OF 15 09 Telecomm Design Complete REV 01-12-2021.pdf PDF
FILE 12 OF 15 06 Plumb Design Complete REV 01-12-2021.pdf PDF
FILE 3 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 8 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
FILE 4 OF 15 02 Civil Design Complete Rev 01-12-2021.pdf PDF
FILE 13 OF 15 07 Fire Protection DESIGN COMPLETE REV 01-12-2021.pdf PDF
FILE 10 OF 15 04 Arch Design Complete Rev 01-12-2021.pdf PDF
21r4-RFP solicitation.pdf PDF
FILE 14 OF 15 08 Elec Design Complete REV 01-21-2021 (reduced).pdf PDF
FILE 0 OF 15 Title Sheets G Design Complete Rev 01-12-2021.pdf PDF
DESIGN COMPLETE REV SPECS PN76897 VOL 3.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0004 02 Mar 2021

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A20R0017 X

9B. DATED (SEE ITEM 11)

X 29-Jan-2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

ODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W9128A21R0004

Am-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE Page 2 of 2

1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.

Revised pages replace like-numbered pages. The revision mark “(Am-0004)” is shown on each revised page.

A. REVISED SECTIONS. The following are sections were revised and changes are in bold and strikethrough.

Section 00 60 00, Requests for Information, #36 and 68

B. ADDITIONS TO SECTION: The following sections were added to a section:

N/A

C. NEW PARAGRAPHS. The following pargraphs are added to the sections.

N/A

D. REPLACED SECTION: The following sections are to be replaced in its entirety:

N/A

E. NEW SECTIONS: The following sections are added to the solicitation.

N/A

2. CHANGES TO DRAWINGS

A. REVISED DRAWINGS (ISSUED). The following revised drawings replace like numbered drawings and are issued herewith:

N/A

B. NEW DRAWINGS (ISSUED). The following new drawings are issued herewith:

N/A

3. Requests for information has extended to March 3, 2021 at 10:00 a.m., Hawaii Standard Time.

4. The proposal due date has changed. See Am-0004, SF 1442, Block 13.

(Am-0004)

FY21 MCA PN76897 Aircraft Maintenance Hangar, Wheeler Army Airf ield, Oahu, Haw aii

DAYNA N MATSUMURA (808) 835-4379

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Jan-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________1095 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 Mar 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 230 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128A21R0004 116

W9128A21R0004

RFI # Question Response

10 51 13, A-102, I-101.

Room 154 on Plan A-102 mentions "(24) L6 30" x 30" x 30" Lockers in (3) Tier

Configuration". The lockers it's referring to only shows (5) frames of lockers -please advise. Also, this room shows (10) frames of L3 lockers on Plan I-101.

See Am-0002 and Am-0003, revised sheets A-102, I-102, I-101, and I-106, and revised section 10 51 13.

AG102, AG103, AG601, AG602.

1. Enlarged signage floor plan on Plan Sheet AG102 shows a Sign No. 157F-A in

Airlock 2 Room No. 157F between gridlines C & E, and 7 & 8. This is not shown or included in the sign schedule Plan Sheets AG601 & AG602. Please clarify if this sign will be provided.

2. Enlarged signage floor plan on Plan Sheet AG102 shows a Sign No. CR-1 for

Compressor Room No. 103 between gridlines A & C, and 12 & 13. This is not shown or included in the sign schedule Plan Sheets AG601 & AG602.

Please clarify if this sign will be provided.

3. Enlarged signage floor plan on Plan Sheet AG103 shows a Sign No. C101 for

Cage Room No. C101 between gridlines G & H, and 13 & 14. This is not shown or included in the sign schedule Plan Sheets AG601 & AG602.

Please clarify if this sign will be provided.

4. Sign Details on Plan Sheet AG505 shows Sign Types Q to W. Please provide sign mounting details and elevations for these sign types. Signage schedule on

Plan Sheet AG602 did not specify mounting details and elevations.

Are these made out of standard metal or plastic material? Please clarify.

See Am-0003, revised sheet A-425.

See Am-0003, revised sheet AG102, AG103, AG504, AG505, and

AG602.

Section 00 60 00, Requests for Information - Page 1

(Am-0004)

sf30-21r4-am4
SF1442-21r4-Am-0004
RFI-21r4-Am-0004, RFI #36 and 68