Attachment 19 - Fort Sill MATOC QA Technical.pdf

PDF 883 KB Posted

Attached to
Fort Sill MATOC - Solicitation Federal contract opportunity
Solicitation number
W9124L-23-B-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document contains questions and answers regarding a solicitation for a Fort Sill Multiple Award Task Order Contract (MATOC). The solicitation seeks general construction services including demolition, repair, alteration of buildings, HVAC, civil, structural, mechanical and other work at Fort Sill. Room smoke detectors may be used in lieu of duct detectors for air handling units under 2000 CFM to activate relays, provided the system complies with NFPA and UFC standards. The work involves maintenance, repair of real property and minor construction for the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Sill MATOC - Solicitation, newest first.
File Type Posted
Amendment W9124L23B0001-0006 4-25-2023.pdf PDF
Attachment 2 - Fort Sill MATOC Base Specifications - Rev 2-4-25-2023.pdf PDF
Solicitation W9124L23B0001-0006 MATOC 4-25-2023.pdf PDF
Amendment W9124L23B0001-0005 4-24-2023.pdf PDF
Solicitation W9124L23B0001-0005 MATOC 4-24-2023.pdf PDF
Solicitation W9124L23B0001-0004 MATOC.pdf PDF
Amendment W9124L23B0001-0004 MATOC.pdf PDF
Attachment 18 - Fort Sill MATOC QA Technical.pdf PDF
Solicitation W9124L23B0001-0003 MATOC.pdf PDF
Attachment 16-Ft Sill Air Cooled Chiller Options R07-22-2022.pdf PDF
Attachment 15-Asbestos Inspection Report -1-17-2013.pdf PDF
Attachment 13- Fort Sill MATOC QA Technical.pdf PDF
Amendment W9124L23B0001-0003 MATOC.pdf PDF
Attachment 9- SEED Project Drawings 4702-Revised 0003.pdf PDF
Attachment 10-TOC 21-007 SUBMITTAL REGISTER-Rev1-4-6-2023.pdf PDF
Attachment 17 Ft Sill Mechanical Design Guide R03-14-2023.pdf PDF
Attachment 14- AS BUILTS 4-6-2023.pdf PDF
Attachment 8 - SEED Project SOW - Specifications-Rev1-4-6-2023.pdf PDF
Attachment 2 - Fort Sill MATOC Base Specifications-Rev1-4-6-2023.pdf PDF
Attachment 12 - Fort Sill MATOC QA MICC.pdf PDF
Exhibit G - Fort Sill OK Contractor Weather Report Submittal.pdf PDF
Amendment 2 - W9124L23B0001 0002.pdf PDF
Exhibit H - Fort Sill OK Contractor Material Delay Time Extension Request.pdf PDF
Solicitation - W9124L23B0001 0002.pdf PDF
Amendment 1 - W9124L23B0001 0001.pdf PDF
Solicitation - W9124L23B0001 0001.pdf PDF
Attachment 11 - Site Visit Attendees 3.8.2023_Redacted.pdf PDF
Exhibit F - FS Form 94_PAYMENT ESTIMATE - CONTRACT PERFORMANCE.pdf PDF
Exhibit A -ContractProgressReport.pdf PDF
Attachment 4 - General Decision Number OK20230023 - Heavy - dated 01.06.2023.pdf PDF
Attachment 2 - Fort Sill MATOC Base Specifications.pdf PDF
Attachment 1 - SOW MATOC SILL-Rev3-2-14-2023.pdf PDF
Exhibit E -SWPPP review 2023 check sheet.pdf PDF
Attachment 10 - TOC 21-007 SUBMITTAL REGISTER.pdf PDF
Attachment 5 - General Decision Number OK20230043 - Building - dated 02.10.2023.pdf PDF
Solicitation W9124L23B0001-2-24-2023.pdf PDF
Exhibit B - ContractorsQualityControlDailyReport.pdf PDF
Exhibit C-FS_Form_4025.pdf PDF
Exhibit D -SF1413.pdf PDF
Attachment 9 - Seed Project Drawings 4702.pdf PDF
Attachment 7 - ODOT 2019 -FULL-SPEC-Web-Version.pdf PDF
Attachment 6 - General Decision Number OK20230077 - Residential - dated 01.06.2023.pdf PDF
Attachment 8 - SEED Project SOW Specifications.pdf PDF
Attachment 3 - General Decision Number OK20230014 - Highway - dated 01.06.2023.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICC – Fort Sill Subject: Contractor Questions and Government Answer – Fort Sill MATOC Solicitation Number: W9124L-23-B-0001 Fort Sill MATOC

1. QUESTION: According to Attachment 13, Fort Sill MATOC Q&A Technical, Question #28:

According to Drawing MH-701:

Question - Per the response to Question #28 above, relays can be used to shut down each individual FCU. However, drawings MH 701 depicts a smoke detector for each FCU, to be installed as smoke duct detector. When air flow (CFM) is less than 2000 CFM, a smoke detector /duct detector is not required. The largest FCU at B4702 is 800 CFM. Please provide clarification if smoke/duct detectors are required or if relays can be used. If relays can be used, is it permissible to utilize the smoke detectors in the living quarters of each room to activate the

Attachment 19 - Fort Sill MATOC QA Technical W9124L-23-B-0001 relay? If required, the addition of smoke duct detectors will add massive costs to the project due to the need to install all new signal control wiring to each FCU, along with associated ceiling and wall demo, firestopping, etc. for each wiring run.

ANSWER: Room detectors may be used. System needs to be compliant with NFPA and UFC.

Attachment 19 - Fort Sill MATOC QA Technical W9124L-23-B-0001