Attachment 8 - SEED Project SOW Specifications.pdf
PDF 2 MB Posted
- Attached to
- Fort Sill MATOC - Solicitation Federal contract opportunity
- Solicitation number
- W9124L-23-B-0001
About this file
This is a solicitation for a multiple award task order contract to provide maintenance, repair, and construction services at Fort Sill, Oklahoma. Services include demolition, HVAC, civil, structural, mechanical and electrical work. The solicitation is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis. Construction includes repair and alteration of buildings, HVAC systems, civil infrastructure, mechanical systems, painting, roofing and paving. The contract is an indefinite-delivery, indefinite-quantity contract to execute a broad range of construction projects affecting real property at Fort Sill.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
REPAIR HVAC SYSTEM AT BLDG 4702
PROJECT 21-007
SECTION TITLE
01 10 00 SUMMARY OF WORK
03 20 00 CONCRETE REINFORCEMENT
03 30 00 CAST IN PLACE CONCRETE
07 84 00 FIRESTOPPING
07 90 00 JOINT SEALERS
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTING
23 05 93 TESTING, ADJUSTING, AND BALANCING
23 07 00 HVAC INSULATION
23 08 00 COMMISSIONING OF HVAC
23 09 00 HVAC INSTRUMENTATION AND CONTROLS
23 09 10 HEATING, VENTILATING, AND AIR CONDITIONING
23 20 00 HEATING AND COOLING PIPING
23 21 13 STEAM AND CONDENSATE PIPING
23 21 23 HYDRONIC PUMPS
23 30 00 AIR DISTRIBUTION
23 31 00 DUCTS AND DUCT ACCESSORIES
23 52 00 HEATING BOILERS AND ACCESSORIES
23 64 00 PACKAGED WATER CHILLERS
23 73 13 CENTRAL STATION AIR HANDLER
31 20 00 EARTHWORK
31 23 00 EXCAVATION AND FILL
32 31 13 CHAINLINK FENCES AND GATES
32 92 23 SODDING
16A ELECTRICAL SPEC, SECTION 16A
Attachment 8 - SEED SOW & Specification W9124L-23-B-0001
SECTION 01 10 00
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. The work to be performed under this project consists of providing the labor, equipment, and materials to repair building 4702 as described in the contract documents.
B. The work includes incidental related work.
1.2 LOCATION OF WORK
A. Work is located at Building 4702, Fort Sill, Oklahoma.
1.3 PRINCIPAL FEATURES
A. Demolition: Remove the existing HVAC system. Remove the east side wall of the security fence enclosing the existing outside chiller. The chiller is to remain for reuse. Inspect the existing natural gas line for further use. Clean the existing exterior outside air intake duct for reuse. Clean the existing mechanical room air louver for reuse. Clean the masonry chimney for reuse.
Remove geothermal equipment, such as heat pump, pump, and expansion tanks. Remove the existing wall-mounted mechanical room supply fan.
Remove the existing air handler and supply duct. Remove existing chilled water and heating water piping along with the existing hydronic heating and cooling equipment, such as heating boilers, pumps, expansion tanks, air separators, chemical shot feeders, and etc. Remove the existing fan coil units.
Remove the existing exhaust fans along with the exhaust duct. Remove all existing HVAC accessories, such as grilles, diffusers, and insulations.
Furthermore, remove existing motors, motor controls, safety switches, wires, conduits, junction boxes and other associated items. Perform the foregoing tasks in build 4702 in accordance with the project drawings and specifications.
B. New Work: Recalibrate the existing 70 ton outside chiller for reuse and provide 100-gallon buffer tank. Install new 30-ton chiller. Provide a concrete pad and security fence for the new chiller. Install new wall-mounted mechanical room supply air fan. Install new hydronic heating boiler. Install new outside air unit and fresh air duct. Install new fan coil units. Provide hydronic heating and cooling piping along with other hydronic equipment, such as pumps, expansion
Attachment 8 - SEED SOW & Specification tanks, air and dirt separators, and chemical shot feeders. Install new exhaust fans and duct. Provide insulations for ducts and piping, along with other HVAC accessories such as grilles, differs, dampers, and etc. Provide new motors, motor controls, safety switches, fuses, circuit breakers, electrical panel boards, wires, conduits, mounting racks, junction boxes, plastic coated rigid galvanized steel elbows, pull box, power meter, current transformers, ground rods, and other associated items. Perform the foregoing tasks in building 4702 accordance with the project drawings and specifications.
C. Incidentals: The foregoing outline of principal features does not limit the responsibilities of the Contractor to perform all work and furnish all materials required by the drawings and specifications and to perform other work items that may be required or associated with this type of work unless specifically listed below as Government Furnished.
D. Government Furnished Equipment and/or Material: NONE
E. Options: NONE
1.4 CONTRACT DRAWINGS
A. The following drawings form a part of this contract.
Title Drawing No.
TITLE SHEET, LOCATION MAP AND DRAWING INDEX GI-001
GENERAL CIVIL NOTES GC-001
CIVIL SITE PLAN CS-101
CIVIL DETAILS C-501
GENERAL NOTES M-001
HVAC DEMO PLAN – BASEMENT MD-100
HVAC DEMO PLAN – FIRST FLOOR MD-101
HVAC DEMO PLAN – SECOND FLOOR MD-102
HVAC DEMO PLAN – ROOF MD-103
HVAC DEMO DETAILS – MECHANICAL ROOM MD-500
HVAC DEMO DETAILS – FIRST FLOOR MD-501
HVAC DEMO DETAILS – SECOND FLOOR MD-502
HVAC CONSTRUCTION PLAN – BASEMENT MH-100
HVAC CONSTRUCTION PLAN – FIRST FLOOR MH-101
HVAC CONSTRUCTION PLAN – SECOND FLOOR MH-102
HVAC CONSTRUCTION PLAN – ROOF MH-103
HVAC CONSTRUCTION DETAILS – MECHANICAL ROOM MH-500
HVAC CONSTRUCTION DETAILS – FIRST FLOOR MH-501
HVAC CONSTRUCTION DETAILS – SECOND FLOOR MH-502
MECHANICAL / HVAC DETAILS MH-503
MECHANICAL / HVAC DETAILS MH-504
DUCT LAYOUT AND AIR FLOW DIAGRAM MH-600
HYDRONIC CHILLED WATER PIPING DIAGRAM MH-601
Attachment 8 - SEED SOW & Specification
HYDRONIC HEATING WATER PIPING DIAGRAM MH-602
MECHANICAL / HVAC SCHEDULES MH-603
HVAC CONTROLS MH-700
HVAC CONTROLS MH-701
HVAC CONTROLS MH-702
NOTES, LEGEND AND SCHEDULE E1
PLAN E2
NOTES AND PLAN E3
NOTES AND PLAN E4
PLAN E5
NOTES AND PLANS E6
NOTES AND PLAN E7
NOTES AND PLAN E8
SCHEDULES E9
SCHEDULES AND DETAILS E10
NOTES, DIAGRAM AND SCHEDULES E11
B. One electronic set of contract drawings and specifications will be furnished to the Contractor. Upon request one full size hard copy of contract drawings will be provided without charge. Reference publications will not be furnished.
C. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.
D. Record drawings of past work performed on the applicable facility may be on file at the Directorate of Public Works, Engineering Division, building 1950, and are available for review by the offerors during normal business hours. A reasonable number of copies will be provided upon request. The Government assumes no responsibility for any deductions or conclusions made from record drawings. Proposals shall be based upon data obtained through contractor’s field verification of existing conditions at the facility where work is to be performed.
1.5 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
A. The Contractor will be required to commence work under this contract 10 calendar days after the date of receipt by him of notice to proceed, to prosecute said work diligently, and to complete the entire work ready to use no later than 240 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include 0 weather days, receipt of approved As-Built drawings, receipt of approved Operation and Maintenance manuals, all final close out documents, mobilization and final clean up.
B. The Contractor will be required to submit a Payment Estimate – Contract
Performance Statement, Fort Sill Form 94, in accordance with base
Attachment 8 - SEED SOW & Specification specification section 01 32 00. Close out documents, to include As-Built Drawings and Operations and Maintenance (O&M) Manuals shall be indicated as 15% of the job in section 11b.1 of FS Form 94. Liquidated Damages will be assessed if close out documents are not received and approved by the Government with the time period stated herein.
1.6 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
B. U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 Safety and Health Requirements Manual
1.7 MEASUREMENT AND PAYMENT
A. Payment for work under this contract and all costs associated shall be included in the applicable bid item to which the work pertains.
1.8 ASSIGNMENT OF WORK
A. Work will be assigned by the Contracting Officer only and will be in writing.
1.9 EXISTING WORK
A. Protect existing vegetation, structures, equipment, utilities, pavement and improvements. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work to remain or to be reused.
B. Repair or replace portions of existing work that has been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.10 INSPECTION OF WORK
A. Technical surveillance of workmanship and inspection of materials for work being performed for this project shall be the responsibility of the Director of Public Works.
Attachment 8 - SEED SOW & Specification
B. This provision in no way authorizes anyone other than the Contracting Officer to commit the government to changes in the terms of the contract. (FAR Clause 52.246-12)
1.11 SUBMITTALS
A. Provide submittals as required by the base contract specification and the task order specifications in accordance with base specification section 01 33 00.
Provide a submittal register for review and approval. The submittal register, TOC 21-007 SUBMITTAL REGISTER (Excel Spreadsheet used in lieu of ENG Form 4288-R) is attached. The submittals listed on the submittal register may not be all inclusive and any submittal required in the specifications but not shown on this list is still a requirement of this task order. Provide submittal information to the Contracting Officer’s Representative.
B. Government approval of submittals does not relieve the Contractor from providing all work in compliance with the contract.
C. As-Built Drawings: All sheets in the As-Built drawing set shall be dated and marked “As-Built”. As-Built drawings shall reflect the actual as-built construction. The one hard copy and two electronic copies of the As-Built drawings shall be submitted to the Contracting Officer. The electronic copies shall be in PDF format and a format editable by Microstation V8i. The As- Builts are required for all specification sections whether or not specifically indicated in each individual section. The drawings shall be in accordance with AEC CAD Standard.
1.12 OCCUPANCY OF PREMISES
A. Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, and space for storage of materials.
B. Coordination and notification of commencement of work shall be given to the appropriate facility occupants a minimum of two weeks prior to beginning work in the affected areas with approval through the Contracting Officer.
C. The Contractor shall provide signs, barriers, and barricades to provide a safe work area and protect facility occupant entry and egress.
1.13 ACCESS TO FORT SILL
A. Contractor Access to Fort Sill: Effective 30 January 2015, personnel requiring access to the installation shall possess a Common Access Card (CAC), Long Term Unescorted Access Pass or Military ID, or Individual temporary pass issued by the Fort Sill Directorate of Emergency Services (DES) pursuant to Army Directive 2014-05, Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Un-cleared Contractors.
Fort Sill will initiate a system which provides three forms of access documentation based upon the duration of required access and DOD Network requirements. The three forms are as follows: (1) Common Access Card (CAC); (2) Long Term Unescorted Access Pass or Military ID; or an (3) Individual Temporary Pass. The Contractor shall provide the COR the required documentation for each prime or sub-contract employee who requires a CAC or Long-Term Unescorted Access Pass as described below within 10 calendar days of contract award. The COR will initiate and coordinate the process for obtaining Contractor CACs or Long-Term Unescorted Passes (for contract employees not possessing a current CAC or military ID) with the Directorate of Emergency Services (DES). Failure to receive a CAC may result in the contractor personnel being denied admission to the installation. Failure to receive a Long-Term Unescorted Access Pass or Individual Temporary Pass will result in the contractor personnel being denied admission to the installation.
1. Long Term, Unescorted Access Pass: This pass is required for
Contractors, Sub-contractors and Vendors requiring physical access to the installation on a recurring basis (greater than 24 hours) and who do not require access to a DOD computer network. The expiration date of the access will be the end of the contract period of performance or 365 day whichever comes first. Sub-contractors shall be bound by this same requirement. Prime Contractors are responsible for obtaining timely sub-contractor documents necessary to secure required access documents.
Contractors and their employees shall pass a NCIC Interstate Identification Index check in order to secure this pass.
a. Military ID: Military ID cards for retirees, reservists and dependents are acceptable for unescorted access onto Fort Sill.
b. In order to avoid delays in gaining access to the installation, contractors are encouraged to contact their Contracting Officer Representative (COR) to begin the process of securing long term passes as soon as possible.
2. Individual Temporary Pass: All contractors and sub-contractors who do not possess a CAC, a valid Military ID, or a current long term unescorted pass shall report to the Visitors Control Center located near Sheridan gate to obtain an Individual temporary pass. A temporary pass will ONLY be issued to persons who produce a valid current federal or state issued ID with a picture and passes a NCIC Interstate Identification Index check and local exclusion roster. Acceptable forms of ID are:
a. Valid current REAL ID Act Compliant State issued Photo ID that is for driving or for identification.
b. Valid current Permanent Resident Card or Alien Registration Receipt Card (Form I-551)
c. Valid current Employment Authorization Document (Card) that contains a photograph (Form I-766)
d. Passport (Foreign Passports must show point of entry stamp).
3. The contractor shall return issued CACs and Passes to the designated COR at the end of the contract period of performance or the end of the individual employee’s tenure, whichever comes first. The contractor shall also coordinate with the COR for new or replacement CACs or Long-Term Unescorted Passes as required.
4. For additional information, see:
a. https://sill-www.army.mil/vcc/
b. Homeland Security Presidential Directive 12, Policy for a Common Identification Standard for Federal Employees and Contractors located at https://www.dhs.gov/homeland-security-presidential-directive-12#1
c. Army Regulation (AR) 190-13, the Army Physical Security Program located at Army Publishing Directorate – Army Regulations
1.14 ACCESS TO SITE
A. Normal duty hours for work shall be from 7:30 a.m. to 4:00 p.m., Monday through Friday. Access to the site shall be coordinated and approved by the Contracting Officer.
B. Requests for additional work periods shall require written approval from the Contracting Officer 7 days in advance of the proposed work period. Weekend work requests may be approved on a case-by-case basis on the Wednesday prior to the desired weekend.
1.15 DEFINITIONS
A. Whenever the specifications require approval or selection of any item, it shall be construed to mean approval or selection by the Contracting Officer in writing.
B. Whenever the specifications require submittal of reports or certifications, it shall be construed to mean submitted to the Contracting Officer in writing.
C. Approvals made by the Contracting Officer prior to final project inspection and acceptance do not relieve the Contractor from his obligation to perform the work in accordance with the specifications and drawings. These approvals do not prohibit the Government from subsequently asserting any other contract rights under this contract.
1.16 SAFETY
A. Requirements of EM 385-1-1 shall be strictly enforced and adhered to at all times at the job sites.
B. The contractor shall adhere to the requirements of the Occupational Safety and Health Administration as applicable to all work activities.
C. Each contractor shall have a properly trained Safety Officer (OSHA 30-hour Construction) that is responsible for the overall safety program for the company. The Safety Officer shall be familiar with the requirements of EM385- 1-1 and have experience in the areas of hazard identification and safety compliance. The Safety Officer shall make regular (minimum of 1 per week) safety inspections of each project site.
D. When working within six feet of any railroad track, the contractor shall ensure that all workers are trained in Blue Flag Protection in accordance with CFR49, part 218, the General Code of Operating Rules (GCOR), 5.13 and TM 4-14.21 Rail Safety; and are qualified on Roadway Worker Protection in accordance with CFR49, part 214. (Delete if not needed)
1.17 SEQUENCING AND SCHEDULING
A. Contractor shall furnish the Contracting Officer a Contract Progress Schedule in the form of a Gantt chart that clearly shows the critical path for construction progress. See section 01 33 00 SUBMITTAL PROCEDURES for a detailed description of the Progress Schedule. The Progress Schedule shall include, but is not limited to, the following information:
1. Projected dates of the start and completion of work.
2. Projected start and completion dates of each major phase of construction.
3. Major submittals and submittal processing time.
4. Major equipment lead time.
B. Changes to the Progress Schedule shall be submitted by the Contractor to the Contracting Officer, in writing, two weeks prior to the scheduled start of the affected work on the job sites, or as directed by the Contracting Officer.
1.18 UTILITIES
A. All reasonable amounts of water, electricity, and gas required for the performance of the work under this contract will be made available to the Contractor by the Government from existing distribution systems at no cost to the Contractor.
B. Connection and disconnection shall be the responsibility of the contractor.
C. Connection and disconnection shall be made in a manner approved by the Government.
D. Abuse of this policy may result in disconnection from utilities.
E. Contractor shall submit an energy and water conservation plan.
1. The plan shall outline all expected activities that will consume water, electricity, and natural gas along with estimates of consumption.
2. Plan shall outline a plan to install any and all necessary meters (i.e., job trailers or buildings unoccupied with exception of the contractor). It shall include a detailed map showing the location of the meters. Contractor shall install all meters for temporary utility hookups.
3. All meters shall comply with all local codes and regulations and will include any additional equipment necessary such as backflow preventers.
Contractor shall remove all temporary meters and equipment when project is completed.
4. Plan shall describe effort to comply with reporting standards stated herein and, on the website, https://sill-www.army.mil/USAG/dpw/BMB.html#tab-2.
5. Plan must demonstrate efforts to conserve electricity, natural gas and water in compliance with Ft. Sill policies and best management practices on conservation of electricity, natural gas, and water.
6. If there is a change in the project that will or may change the utility connection requirements, the Contractor shall submit a revised compliance plan to the Contracting Officer.
7. Contractor shall sign and return to the Contracting Officer a Memorandum of Understanding for Sale of Utility Services (DA2100-R) before utilities will be turned on.
8. Contractor shall report meter readings to the Contracting Officer or the Contracting Officer’s Representative on the 15th of each month or immediately upon disconnection of utilities.
Attachment 8 - SEED SOW & Specification
9. Meter readings shall be reported from the beginning of the construction to the completion of construction. This requirement includes recording meter readings from water points on post. The meter reading reports shall include project name and contract number.
1.19 SALVAGE MATERIAL AND EQUIPMENT
A. No salvage is required.
1.20 CLEAN UP
A. The job site shall be cleaned up on a daily basis.
B. All trash and debris, except metal, generated from the construction operation shall be delivered to the Fort Sill sanitary landfill or rubble pit as directed by the Contracting Officer.
C. All metal shall be disposed off Government property.
D. No material shall be burned at the project site. (FAR Clause 52.236-12)
1.21 CONDUCT OF EMPLOYEES
A. The Contractor's employees shall not be permitted to carry firearms or other lethal weapons while on Fort Sill in accordance with Fort Sill Regulation 190-1.
Knives or other bladed instruments or tools are authorized for use only for the utilitarian purpose for which it was designed.
B. The contractor and the contractor’s employees shall adhere to the United States Army’s sexual harassment and rape prevention (SHARP) policies and regulations in addition to state and federal laws.
1. Army’s Policy on sexual harassment
a. Sexual harassment is unacceptable and will not be tolerated.
b. Sexual harassment destroys teamwork and negatively affects combat readiness.
c. Army leadership at all levels will be committed to creating an environment conducive to maximum productivity and respect for human dignity.
d. The success of the mission can be achieved only in an environment free of sexual harassment for all personnel.
Attachment 8 - SEED SOW & Specification
e. The Army’s SHARP policies apply without regard to a person’s rank, age, gender, and are sexual orientation neutral. A person’s sexual orientation is a personal and private matter.
2. Army Policy on Sexual Assault
a. Sexual assault is a criminal offense.
b. It degrades mission readiness.
c. Soldiers and civilians who are aware of a sexual assault incident should report it immediately (within 24 hours).
d. Sexual assault is incompatible with Army Values and is punishable under the UCMJ and other federal and local civilian laws.
e. The Army’s SHARP policies apply without regard to a person’s rank, age, gender and sexual orientation neutral. A person’s sexual orientation is a personal and private matter.
f. All victims of sexual assault will be treated with dignity, fairness, and respect.
3. SHARP Contact information
a. 911
b. Department of Defense Safe Helpline (https://www.safehelpline.org/)
Helpline: 1-877-995-5247
c. RAINN (Rape, Abuse, and Incest National Network) https://www.rainn.org/ National Sexual Assault Hotline: 1-800-656-
HOPE (4673)
d. Oklahoma Coalition Against Domestic Violence and Sexual Assault (https://www.ocadvsa.org/) Oklahoma Safe line: 1-800-522-7233
e. Sexual assault victim advocate and counseling available FREE of charge. https://www.mariedetty.com/ Hotline: (580) 357-2500 Office:
(580) 357-6141
4. References
a. 29 CFR Part 1614
b. AR 600-20
c. AR 690-600
d. Title 42 United States Code Chapter 21 Subchapter VI
1.22 WORK FORCE
A. The contractor shall not hire persons not legally residing in the United States.
The contractor shall not subcontract work to companies that hire persons not legally residing in the United States.
B. The contractor shall adhere to the recommendations outlined in the attached memo titled “DoD Guidance for Protecting Personnel in Workplaces during COVID-19”. Coordinate with COR for guidance and notifications.
1.23 IDENTIFICATION OF CONTRACTOR EMPLOYEES AND VEHICLES
A. Each side of Contractor-owned vehicles shall bear the Contractor's name in 2-inch letters.
B. Each Contractor employee shall possess an identification card to include employee's name, name of Contractor, current photo, and card serial number.
Additionally, each Contractor employee shall display on his/her person a badge or nametag which shall include the name of the employee and the Contractor's name.
C. The Contractor shall collect Contractor-furnished identification badges upon termination of employee.
1.24 APACHE GATE DELIVERY INFORMATION
A. All delivery trucks, transportation trucks, vehicles pulling trailers, every type of cargo or construction vehicle must enter through Apache Gate. Location of Apache Gate: Take the Medicine Park exit 45 off Interstate 44, proceed west on highway 49 (approximately 1/2 mile). Entrance to Apache Gate is on the left (south).
1.25 ANTITERRORISM (AT)
A. Access and General Protection/Security Policy and Procedures: Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative).
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B. The Contractor must pre-screen Candidates using the E-verify Program https://www.uscis.gov/e-verify website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible
Attachment 8 - SEED SOW & Specification
Candidates must be provided to the COR no later than 3 business days after the initial contract award.
C. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf
D. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 35 calendar days after contract award. This training may be accomplished by viewing the video at the following website:
https://www.mepcom.army.mil/Home/Contractors.aspx (Click on iWatch video).
1.26 OPERATIONS SECURITY
A. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED
END OF SECTION
SECTION 03 20 00
CONCRETE REINFORCEMENT
1.1 SECTION INCLUDES
A. Reinforcing steel bars for cast-in-place concrete.
1.2 RELATED SECTIONS
A. Section 03 30 00 - Cast-in-Place Concrete.
B. Section 723 “Reinforcing Steel” ODOT - 2009 Standard Specifications for Highway Construction.
1.3 REFERENCES
A. ACI 318 - Building Code Requirements for Reinforced Concrete.
B. ACI SP-66 - American Concrete Institute - Detailing Manual.
C. ASTM A82 - Cold Drawn Steel Wire for Concrete Reinforcement.
D. ASTM A616 - Rail Steel Deformed and Plain Bars for Concrete Reinforcement.
E. ASTM A617 - Axle Steel Deformed and Plain Bars for Concrete
Reinforcement.
F. CRSI - Concrete Reinforcing Steel Institute - Manual of Practice.
G. CRSI 63 - Recommended Practice For Placing Reinforcing Bars.
H. CRSI 65 - Recommended Practice For Placing Bar Supports, Specifications and Nomenclature.
1.4 SUBMITTALS FOR REVIEW
A. The Manufacturer's Certificate shall accompany each separate shipment of reinforcing steel to the project.
B. The reinforcing bars shall be marked according to the Code of Standard
Practice of the Concrete Reinforcement Steel Institute.
C. Certified Mill Tests for reinforcing bars shall be submitted to the Government for review and approval. Any material incorporated into the work prior to the approval shall be subject to removal.
1.5 SUBMITTALS FOR INFORMATION
A. The contractor will verify in writing to the Government that all reinforcing steel utilized for incorporation into the project meets or exceeds requirements set forth by ODOT.
2.1 REINFORCEMENT
A. Reinforcement shall comply with Section 723 of ODOT – 2009 - Standard Specifications for Highway Construction.
2.2 ACCESSORIES
A. Metal bar supports that are in contact with an exterior surface of the concrete shall have protection conforming with CRSI Specifications, Class 1 for Plastic Protected Bar Supports or Class 2 for Stainless Steel Bar Supports, with the further provision that the plastic protection may be applied either by dipping operation or by the addition of pre-molded plastic tips to the leg supports.
B. Fiber reinforcement can be used in place of rebar. Fiber reinforced concrete must comply with ACI standard ACI PRC-544.33-08 Guild for Specifying, Proportioning and Production of Fiber-Reinforced Concrete.
C. When concrete is to rest on an excavated surface, layers of bars shall be supported above the surface by metal chairs or by precast mortar or concrete blocks. The use of rocks, pieces of stone or brick, pipe, wooden blocks, or chunks of concrete will not be permitted as bar supports or spacers.
3.1 PLACEMENT
A. Reinforcement shall be placed in accordance with Section 414.04 of ODOT 2009 - Standard Specifications for Highway Construction.
B. Reinforcement placed by the contractor shall be inspected and approved by the Government prior to the placement of concrete. Concrete placed in
Attachment 8 - SEED SOW & Specification violation of this provision may be rejected and removal required.
3.2 STORAGE AND HANDLING
A. Reinforcement shall be protected from damage. When placed in the work, it shall be free from dirt, detrimental rust or scale, paint, oil, or other foreign substance.
B. Steel reinforcement shall be stored above the ground on skids, platforms, or other supports.
END OF SECTION
Attachment 8 - SEED SOW & Specification
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
1.1 SECTION INCLUDES
A. Cast-in-place concrete
1.2 RELATED SECTIONS
A. Section 03 20 00 - Concrete Reinforcement.
1.3 REFERENCES
A. Section 509 “Structural Concrete” of ODOT 2009 - Standard Specifications for Highway Construction.
B. Section 701 “Portland Cement Concrete” of ODOT 2009 - Standard
C. Section 737 “Concrete Surface Finish for Structures” of ODOT 2009 - Standard Specifications for Highway Construction.
D. Section 701.08 “Joint Fillers and Sealers” of ODOT 2009 - Standard
1.4 SUBMITTALS FOR REVIEW
A. The contractor shall submit test results and/or certifications for all materials and detailed mix design data to the Government for review.
B. The documentation submitted with the mix design shall specify which design procedure was used to produce the concrete, and whether oven dry or saturated surface dry weights were used in the calculations.
C. The mix design will be approved based upon the compliance with the requirements set forth in Section 701.01 of ODOT 2009 - Standard Specifications for Highway Construction, for Class “AA” concrete, unless otherwise specified herein.
D. The compressive strength shall be equal to or greater than 4,000 psi at 28 days (Class AA).
1.5 SUBMITTALS FOR INFORMATION
Attachment 8 - SEED SOW & Specification
A. The contractor shall provide certified test reports for all concrete mix constituents as incorporated into the project that verifies compliance with Section 701.01 of ODOT - 2009 Standard Specifications for Highway Construction.
2.1 CONCRETE MATERIALS
A. Concrete materials shall comply with Section 701 of ODOT 2009 - Standard
2.2 CONCRETE MIX
A. Classification and mix design shall conform to Class “AA” Portland cement concrete as defined in Section 701 “Portland Cement Concrete” of ODOT 2009 - Standard Specifications for Highway Construction, unless otherwise specified herein.
B. The compressive strength shall meet or exceed 4,000 psi at 28 days (Class
AA).
C. Provide air entrained concrete between 5%-7% by volume.
3.1 EXAMINATION
A. The contractor shall verify requirements for concrete cover over reinforcement prior to placement.
B. The contractor shall verify that the reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete.
C. The contractor will notify the Government prior to the placement of concrete for review of the forms and reinforcing steel.
3.2 PREPARATION
A. Reinforcing shall be placed in accordance with Section 03 20 00.
B. Falsework for this item shall comply with Section 502 of ODOT 2009 -
C. Forms for this item shall comply with Section 502 of ODOT 2009 - Standard
3.3 PLACING CONCRETE
A. The contractor shall place the concrete in accordance with Section 509, ODOT 2009 - Standard Specifications for Highway Construction.
3.4 CONCRETE FINISHING
A. The concrete shall be finished in accordance with Section 737 of ODOT 2009 - Standard Specifications for Highway Construction, unless otherwise specified herein.
B. Immediately following the removal of forms, fins and irregular projections shall be removed from all surfaces except from those that are not to exposed or waterproofed.
C. On all surfaces, cavities, irregularities, or other defects shall be thoroughly cleaned, and after being saturated with water, shall be carefully pointed and trued with a mortar of cement and fine aggregate mixed in a proportion of 1:2.
D. All exposed corners shall a 3/4 inch fillet unless otherwise directed.
3.5 CURING AND FORM REMOVAL
A. The concrete shall be cured in accordance with Section 414 of ODOT 2009 -
B. Removal of forms and falsework shall be in accordance with Section 414 of
ODOT 2009 - Standard Specifications for Highway Construction.
3.6 QUALITY CONTROL
A. The contractor shall be responsible for quality control of materials during, handling, blending, mixing, transporting, and placement operations, and for necessary adjustments in proportioning of materials used to produce specific concrete.
B. The contractor shall be responsible for determining gradation and moisture content of the fine and coarse aggregate used in the concrete mixture and for testing the mixture, slump, and compressive strength.
Attachment 8 - SEED SOW & Specification
C. Acceptance of the aggregates, slump, and compressive strength of the concrete mix will by a lot of 50 cubic yards of mix.
D. The minimum frequency for strength acceptance shall be one set of tests for each lot, which location will be selected at random by the Government.
E. Aggregate gradations shall meet Section 701 of ODOT 2009 - Standard
F. Aggregates used in the concrete mix shall be sampled from the stockpile, tested for gradation, and accepted by the lot before being incorporated into the work.
G. Test location for slump and compressive strengths will be selected randomly by the Government. The slump and compressive strength testing will be in accordance with AASHTO T 119 and AASSHO T 22, respectively. Two cylinder test specimens for compressive strength will made in compliance with AASHTO T 23 of which the lot results will be based on the average of the two specimens.
H. Any concrete mixture not meeting the slump requirements set forth by
Section 701 of ODOT 2009 - Standard Specifications for Highway Construction will be rejected.
I. Compressive strength of any lot shall not be less than the specified f’c. Any lot placed less than the specified f’c shall be removed and replaced with concrete in compliance by the contractor at no additional cost.
J. Any lot of concrete not meeting the strength requirements will be subject to removal and replaced with concrete in compliance by the contractor at no additional cost.
K. The lot size may be adjusted by the Government.
SECTION 07 84 00
FIRESTOPPING
PART 1 - GENERAL
1.1 SUMMARY
A. Provide firestopping at locations required by code.
1.2 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.
B. Submit for approval test reports.
1.3 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers, which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions.
B. Fire Performance: UL 2079, ASTM E 814, and local regulations.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Manufacturers: Grace, W. R. & Co.. Hilti, Inc., Nelson Firestop Products, 3M;
Fire Protection Products Div., Tremco; Sealant/Weatherproofing Division, or approved equal.
B. Through-Penetration Firestop Systems: Subject to compliance with requirements, provide systems designed for use required, of one or more of the following types:
1. Endothermic, latex sealant and compounds.
2. Intumescent latex sealant, putty and wrap strips.
3. Job-mixed vinyl compound.
4. Mortar.
5. Pillows/bags.
6. Silicone foams and sealants.
C. Fire-Resistive Elastomeric Joint Sealants:
1. Single-component, neutral-curing, silicone sealant.
Attachment 8 - SEED SOW & Specification
2. Multi-component, nonsag, urethane sealant.
3. Single-component, nonsag, urethane sealant.
D. Perimeter Fire-Resistive Joint Systems: Provide Thermafiber LLC, or approved equal.
1. Insulation.
2. Sealer.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Review extent of work with authorities having jurisdiction and obtain approval of installation thicknesses and methods.
B. Sequence work to avoid need for removal of firestopping by work of other trades.
C. Comply with manufacturers' instructions and recommendations. Securely anchor insulation with safing clips. Install firestops without gaps or voids.
D. Protect, inspect and repair work until final acceptance.
SECTION 07 90 00
JOINT SEALERS
PART 1 - GENERAL
1.1 SUMMARY
A. Provide joint sealers at interior and exterior vertical and horizontal joints.
1.2 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.
B. Samples: Submit two representative samples of each material specified indicating visual characteristics and finish. Include range samples if variation of finish is anticipated.
1. Include manufacturer’s full range of color and finish options if additional selection is required.
1.3 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers, which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions.
B. Field-Constructed Mock-Ups: Each joint type.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Urethane Elastomeric Joint Sealants:
1. Manufacturers: Pecora Corp., Sika Corp., Sonneborn, Division of ChemRex
Inc, Tremco, or approved equal.
2. Type and Application: One-part nonsag urethane sealant, ASTM C 920:
a. Application: For joints in vertical surfaces.
b. Application: For joints in vertical and horizontal surfaces.
c. Application: For joints in horizontal surfaces.
d. Exterior use.
e. Exterior and interior use.
3. Type and Application: Multi-part nonsag urethane sealant, ASTM C 920:
a. Application: For joints in vertical surfaces.
b. Application: For joints in vertical and horizontal surfaces.
Attachment 8 - SEED SOW & Specification
c. Application: For joints in horizontal surfaces.
d. Exterior use.
e. Exterior and interior use.
B. Silicone Elastomeric Joint Sealants:
1. Manufacturers: Dow Corning, GE Silicones, Tremco, or approved equal.
2. Type and Application: One-part nonacid-curing silicone sealant, ASTM C
920, modulus as required for application:
a. Application: For joints in vertical surfaces.
b. Application: For joints in vertical and horizontal surfaces.
c. Application: For joints in horizontal surfaces.
d. Exterior use.
e. Exterior and interior use.
3. Type and Application: Multi-part nonacid-curing silicone sealant, ASTM C 920, modulus as required for application:
a. Application: For joints in vertical surfaces.
b. Application: For joints in vertical and horizontal surfaces.
c. Application: For joints in horizontal surfaces.
d. Exterior use.
e. Exterior and interior use.
4. Type and Application: One-part acid-curing silicone sealant, ASTM C 920, for joints in vertical surfaces:
a. Exterior use.
b. Exterior and interior use.
1. Type and Application: One-part mildew-resistant silicone sealant, ASTM C 920, for sanitary applications, interior use.
C. Polysulfide Elastomeric Joint Sealants:
1. Manufacturers: W. R. Meadows, Pecora Corp., Sonneborn Building
Products or approved equal.
2. Type and Application: Two-part nonsag polysulfide sealant, ASTM C 920, for joints in vertical surfaces:
a. Exterior use.
b. Exterior and interior use.
3. Type and Application: Two-part pourable polysulfide sealant, ASTM C 920, for joints in horizontal surfaces:
a. Exterior use.
b. Exterior and interior use.
4. Type and Application: Two-part polysulfide sealant, ASTM C 920, for water immersion.
D. Latex Joint Sealants:
1. Manufacturers: Pecora Corporation, Polymeric Systems, Inc., Sonneborn
Building Products, Tremco, or approved equal.
2. Type: Acrylic-emulsion, ASTM C 834.
3. Type: Silicone emulsion, ASTM C 834, and ASTM C 920.
Attachment 8 - SEED SOW & Specification
4. Application: Interior joints in vertical and overhead surfaces with limited movement.
E. Solvent-Release-Curing Joint Sealants:
1. Manufacturers: H.B. Fuller Company, Pecora Corporation, Polymeric
Systems, Inc., Sonneborn Building Products, Tremco, or approved equal.
2. Type: Acrylic, ASTM C 920.
3. Type: Butyl, FS TT-S-001657.
4. Application: Exterior vertical surfaces with limited movement.
F. Compression Seals:
1. Type: Preformed foam sealant.
2. Type: Preformed hollow neoprene gasket, ASTM D 2628.
3. Application: Wide exterior joints in vertical surfaces.
G. Fire-Resistive Joint Sealers:
1. Type: Foamed-in-place fire-stopping sealants.
2. Type: One part fire-stopping sealant.
3. Application: Penetrations in fire-rated floor and wall assemblies.
H. Specialty Sealants:
1. Type and Application: Synthetic rubber for acoustical sealant for concealed joints.
2. Type and Application: Butyl-polyisobutylene sealant and tape sealant for concealed joints.
I. Paving Joint Fillers:
1. Type: Self-expanding cork.
2. Type: Cork.
3. Type: Sponge rubber.
4. Type: Bituminous fiber.
5. Application: Filler for exterior paving joints.
J. Auxiliary Materials:
1. Plastic foam joint fillers.
2. Elastomeric tubing backer rods.
3. Bond breaker tape.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Examine substrate; report unsatisfactory conditions in writing. Beginning work means acceptance of substrates.
B. Provide sealants in colors as selected from manufacturer's standards.
Attachment 8 - SEED SOW & Specification
C. Install materials and systems in accordance with manufacturer's instructions and approved submittals. Install materials and systems in proper relation with adjacent construction and with uniform appearance. Coordinate with work of other sections. Clean and prime joints, and install bond breakers, backer rods and sealant as recommended by manufacturers.
D. Depth shall equal width up to 1/2 inch wide; depth shall equal 1/2 width for joints over 1/2 inch wide.
E. Cure and protect sealants as directed by manufacturers. Replace or restore damaged sealants. Clean adjacent surfaces to remove spillage.
SECTION 09 51 00
ACOUSTICAL CEILINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Provide acoustical lay-in panel ceilings and exposed metal suspension system.
1.2 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.
B. Samples: Submit two representative samples of each material specified indicating visual characteristics and finish. Include range samples if variation of finish is anticipated.
1.3 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers, which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions.
B. Performance: Fire, structural, and seismic performance meeting requirements of building code and local authorities. Acoustical performance based on project requirements.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Manufacturers: Armstrong World Industries, Celotex, USG, or approved equal.
B. Mineral Base Panels, Nodular, Cast or Molded Type:
1. Size: 24 by 24 inches by 3/4 inch.
2. Edge Detail: Reveal edge.
3. Pattern: Fissured.
4. Type and Form: Type III, mineral base with painted finish ASTM E 1264;
Form 1, nodular or Form 4, cast or molded.
C. Direct-Hung Suspension Systems, Fire-Resistance Rated:
1. Type: Wide-face, capped double web galvanized steel, ASTM C 635.
2. Suspension System Accessories: Attachment devices and hangers, ASTM
C 635.
3. Cap Material: Painted aluminum finish.
Attachment 8 - SEED SOW & Specification
D. Auxiliary Materials:
1. Edge molding and trim.
2. Hold-down clips and impact clips.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install materials and suspension systems in accordance with manufacturer's instructions and recommendations, and ASTM C 636. Coordinate installation with location of mechanical and electrical work to ensure proper locations and anchorage.
B. Level ceiling to within 1/8" in 10' in both directions. Scribe and cut panels to fit accurately. Measure and layout to avoid less than half panel units.
C. Removal and reinstallation at existing ceilings: Remove and store materials for reuse when allowed. Handle with gloves and avoid damaging corners and edges. Clean tiles and grid system, which have been removed. Provide additional materials to complete the work and to replace damaged existing materials. New materials shall match existing materials as approved.
D. Adjust, clean, and touch-up all system components.
SECTION 09 90 00
PAINTING
PART 1 - GENERAL
1.1 SUMMARY
A. Provide the following:
1. Surface preparation and painting for interior previously painted surfaces as scheduled.
1.2 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.
B. Samples: Submit two representative samples of each material specified indicating visual characteristics and finish. Include range samples if variation of finish is anticipated.
1. Include manufacturer’s full range of color and finish options if additional selection is required.
C. Extra Stock: Submit 2 unopened gallons of each paint and color used in the project.
1.3 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers, which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions.
B. Regulations: Compliance with VOC and environmental regulations.
2.1 PAINT
The term "paint" as used herein includes emulsions, enamels, paints, stains, varnishes, sealers, cement-emulsion filler, and other coatings, whether used as prime, intermediate, or finish coat.
2.2 MATERIALS
A. Manufacturers of Regular Paints: Benjamin Moore, Sherwin Williams, Olympic or approved equal.
B. Paints shall be low VOC latex.
C. Paints containing lead shall not be used.
D. Paints containing zinc chromate or strontium chromate pigments shall not be used.
Attachment 8 - SEED SOW & Specification
E. Colors for the interior surfaces shall match colors of existing surfaces.
3.1 INSTALLATION
A. Inspect surfaces, report unsatisfactory conditions in writing; beginning work means acceptance of substrate.
B. At existing areas to be repainted, remove blistered or peeling paint to sound substrates. Remove chalk deposits and mildew. Wash all surfaces with mild detergent. Perform related minor preparation including caulk and glazing compounds. Spot prime bare areas before priming and painting as specified.
Remove all existing hollow wall anchors. Provide patching materials appropriate for the surface being repaired. Remove all nails, staples, and hangers on existing wood picture molding, and fill remaining holes flush.
C. Comply with manufacturer's instructions and recommendations for preparation, priming and coating work. Apply coatings to match the existing painted surfaces.
D. Re-coat or remove and replace work which does not match or shows loss of adhesion. Clean up, touch up and protect work.
3.2 APPLICATION
A. Painting practices shall comply with applicable federal, state and local laws enacted to insure compliance with Federal Clean Air Standards. Unless otherwise specified or recommended by the paint manufacturer, paint may be applied by brush, roller, or spray. At the time of application, paint shall show no signs of deterioration. Uniform suspension of pigments shall be maintained during application. Each coat of paint shall be applied so dry film shall be of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish. Hiding shall be complete. Rollers for applying paints and enamels shall be of a type designed for the coating to be applied and the surface to be coated.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .