Attachment 9 - Seed Project Drawings 4702.pdf
PDF 17 MB Posted
- Attached to
- Fort Sill MATOC - Solicitation Federal contract opportunity
- Solicitation number
- W9124L-23-B-0001
About this file
This document provides details for a solicitation to establish a Multiple Award Task Order Contract for maintenance, repair, and minor construction services at Fort Sill. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis as number W9124L-23-B-0001. Work under the MATOC may include multiple construction disciplines such as general building repair, HVAC, civil, structural, mechanical, painting, roofing, paving, and related incidental work. The scope involves execution of a broad range of construction affecting real property at Fort Sill, including demolition, repair, and alteration of buildings.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 9 - SEED Project Drawings 4702 W9124L-23-B-0001 Fort Sill MATOC
TAG MANUFACTURER
MODEL REFRIGERANT CAPACITY (TON)
NOMINAL / REFRIGERATION
COOLING
FLUID
EWT / LWT
(°F)
DESIGN / MIN
(GPM)
FPD
(FT-H2O)
EAT
(°F) V / PH / HZ TOTAL POWER
(KW)
OC-2 TRANE / CGAM R410A 30.00 / 26.97 10% PG 56.00 / 44.00 54.89 / 33.40 11.7 100.0 208 / 3 / 60 33.57
NOTES
PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE
SUBMITTED FOR APPROVAL.
PROVIDE WITH: ISOLATION VALVES, INSULATION, HEAT TRACE, AND A 100 GAL BUFFER TANK INSTALLED IN MECHANICAL ROOM.
MUST COMPLY WITH AHRI 370 AND ASHRAE 90.1/CSA.
PROVIDE TAB AND SOUND TEST REPORTS.
TAG MANUFACTURER
MODEL
DIMENSIONS (IN)
H x W x L V / HZ / PH FLA / MCA
(A)
MOTOR
(HP)
SUPPLY
(CFM) BHP ESP
(IN-H2O)
FLUID
TYPE
EFT / LFT
(°F) GPM WPD
(FT-H2O)
EAT / DAT
(DBT °F)
CAPACITY
(MBH)
FLUID
TYPE
EFT / LFT
(°F) GPM WPD
(FT-H2O)
EAT (°F)
(DBT / WBT)
LAT (°F)
(DBT / WBT)
CAPACITY (MBH)
TOTAL / SENSIBLE
FLUID
TYPE
EFT / LFT
(°F) GPM WPD
(FT-H2O)
EAT / DAT
(DBT °F)
CAPACITY
(MBH)
DOA-1 TRANE / CSAA012 83.0 x 66.5 x 118.1 200-208 / 60 / 3 23.50 / 29.00 5.00 4800 4.889 2.00 WATER 180.00 / 160.00 27.97 2.44 16.00 / 72.00 280.11 10% PG 44.00 / 56.00 48.6 5.50 100.00 / 73.00 55.00 / 54.64 287.58 / 229.11 WATER 180.00 / 160.00 15.27 0.76 50.00 / 79.38 152.95
NOTES
5 THE UNIT SHALL NOT BE RUN DURING CONSTRUCTION TO COOL OR HEAT THE BUILDING.
PROVIDE WITH 2 SETS 2-INCH PLEATED MERVR8 DISPOSABLE FILTER.
ELECTRICAL INFO FAN INFOUNIT INFO PRE-HEAT COIL INFO COOLING COIL INFO RE-HEAT COIL INFO
PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR APPROVAL.
100% OUTSIDE AIR UNIT WITH NO RETURN AIR.
PROVIDE SOFT SATRT.
PROVIDE WITH SINGLE POINT POWER CONNECTION WITH FUSED DISCONNECT.
TAG MANUFACTURER MODEL SERVICE RATED MBH
(INPUT / OUTPUT)
NATURAL GAS
KPA
(MIN / MAX)
FLUID
TYPE
EFT / LFT
(°F)
RATED GPM
(AT Δ20°F)
MIN / MAX
GPM
FPD
(PSI / FT-H2O) V / PH / HZ FLA
(AMP)
AHRI THERMAL
EFFICIENCY (%)
HB-1 FULTON EDR-1500 HEATING 1,500 / 1,402.50 1 / 7 WATER 180 / 160 140 N/A 0.80 / 1.85 120 / 1 / 60 20 93.50
NOTES PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR
APPROVAL.
TAG MANUFACTURER MODEL PD
(FT-H2O)
PIPE SIZE
(IN)
DESIGN
(PSI / °F) NOTES
AD-1 TACO 4904ADHR-125 0.36 4 150 / 240 1
AD-2 TACO 49025ADHTR-125 0.38 2.5 150 / 240 1
AD-3 TACO 4904ADHR-125 0.44 4 150 / 240 1
NOTES
PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER
AND/OR MODEL OF THE SAME CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.
PROVIDE WITH AUTOMATIC AIR VENT, FLUSH VALVE, AND BLOWDOWN VALVE.
TAG MANUFACTURER / TACO FLOW RATE
(GPM)
HEAD
(FT-H2O)
MOTOR
(HP) V / PH / HZ NOTES
HP-1 TACO / SCI2506D 135 25 1.5 208 / 3 / 60 1, 2, 3
HP-2 TACO / SCI1506D 55 17 1.5 208 / 3 / 60 1, 2, 3
HP-3 TACO / SCI2506D 150 20 1.5 208 / 3 / 60 1, 2, 3
NOTES
PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER
AND/OR MODEL OF THE SAME CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.
CLOSE-COUPLED END SUCTION PUMPS.
PROVIDE WITH STRAINER TYPE SUCTION DIFFUSER.
ALIGN THE PUMPS PRIOR TO GROUTING IN BASE.
TAG MANUFACTURER MODEL VOLUME
(GPM)
DESIGN
(PSI / °F) NOTES
XT-1~3 TACO CA90-125 23 150 / 240 1, 2
NOTES
PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY.
ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME
CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.
ACCEPTANCE BLADDER TYPE EXPANSION TANK.
PROVIDE WITH AUTOMATIC VENT.
TAG MANUFACTURER
TYPE SIZE QTY V / HZ / PH MOTOR
HP
DESIGN
CFM
FLUID
TYPE
EFT / LFT
(°F) GPM WPD
(FT-H2O)
TOTAL
MBH
FLUID
TYPE
EFT / LFT
(°F) GPM WPD
(FT-H2O)
TOTAL
MBH
FC-1 TRANE / FCDB 100 2 115 / 60 / 1 0.13 / 0.22 800 10% PG 44.00 / 55.87 4.27 6.65 25.00 WATER 180.00 / 160.00 2.98 3.11 29.82 1, 2, 3, 4, 5
FC-2 TRANE / FCCB 60 39 115 / 60 / 1 0.22 700 10% PG 44.00 / 55.63 2.25 2.70 13.00 WATER 180.00 / 160.00 1.84 0.80 18.40 1, 2, 3, 6
FC-3 TRANE / FCCB 100 1 115 / 60 / 1 0.13 / 0.22 600 10% PG 44.00 / 55.61 3.49 4.70 20.00 WATER 180.00 / 160.00 2.61 2.46 26.13 1, 2, 3, 4, 6
FC-4 TRANE / FCCB 60 5 115 / 60 / 1 0.22 700 10% PG 44.00 / 55.20 2.54 3.35 14.00 WATER 180.00 / 160.00 1.84 0.80 18.41 1, 2, 3, 6
FC-5 TRANE / FCCB 40 7 115 / 60 / 1 0.13 400 10% PG 44.00 / 54.64 1.91 8.08 10.00 WATER 180.00 / 160.00 1.09 0.25 10.92 1, 2, 3, 6
FC-6 TRANE / FCHB 100 2 115 / 60 / 1 0.13 / 0.22 750 10% PG 44.00 / 55.60 4.20 6.45 24.00 WATER 180.00 / 160.00 2.89 2.95 28.95 1, 2, 3, 4, 7
NOTES
7 PROVIDE WITH FRONT STAMP LOUVER INLET AND FRONT STAMPED LOUVER OUTLET.
PROVIDE WITH EMERGENCY DRAIN PAN & CONDENSATION OVER FLOW DITECTION.
PROVIDE WITH 2-WAY MODULATING PIPE PACKAGE WITH AUTO FLOW VALVES.
PROVIDE WITH 1-INCH THROW AWAY FILTER.
PROVIDE WITH BOTTOM STAMPED LOUVER INLET AND FRONT BAR GRILLE OUTLET.
PROVIDE WITH BACK DUCT COLLAR INLET AND FRONT DUCT COLLAR OUTLET.
TWO MOTOR FAN UNIT.
PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR APPROVAL.
FAN INFO COOLING COILUNIT INFO HEATING COIL
NOTES
TAG CFM
(RANGE)
SIZE
(IN)
NECK SIZE
(IN) FUNCTION ΔP
(IN-H2O) MATERIAL COLOR MANUFACTURER
MODEL NOTES
MD-A 30 ~ 60 12 x 12 4 MAKE-UP 0.01 STEEL WHITE TITUS / TMS 1, 5
RG-B 295 ~ 540 24 x 24 22 x 22 RETURN 0.01 STEEL WHITE TITUS / PXP 2, 5
SD-C 350 ~ 400 22 x 8 20 x 6 SUPPLY - STEEL WHITE TITUS / 300 RL 3, 6, 7
TG-D 50 14 x 8 12 x 6 TRANSFER 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6
EG-E 50 10 x 8 8 x 6 EXHAUST 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6
SD-F 600 50 x 8 48 x 6 SUPPLY 0.05 STEEL WHITE TITUS / 300 RL 3, 6, 7
MD-G 140 ~ 150 12 x 12 8 MAKE-UP 0.03 ALUMINUM WHITE TITUS / TMS-AA 1, 5, 7
MD-H 250 18 x 6 16 x 6 MAKE-UP 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6
SD-I 400 44 x 8 42 x 6 SUPPLY 0.05 STEEL WHITE TITUS / 300 RL 3, 6, 7
EG-J 20 8 x 8 6 x 6 EXHAUST < 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6
SD-K 350 24 x 24 12 SUPPLY 0.03 STEEL WHITE TITUS / TMS 1, 5
NOTES
LAY-IN, T-BAR MOUNTING
SURFACE, SIDEWALL MOUNTING
OPPOSED BLADE DAMPER
PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF
THE SAME CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.
LOUVERED, 3-CONE CEILING TYPE DIFFUSER
PERFORATED
DOUBLE DEFLECTION 3/4" SPACING 22 DEG ANGLE
SIGLE DEFLECTION 1/2" SPACING 35 DEG ANGLE
TAG MANUFACTURER MODEL CFM ESP
(IN-H2O)
MOTOR
(HP)
FLA
(AMP) VOLT / HZ / PH
SF-1 GREENHECK SS1-14-436-A 2,520 0.15 1/3 7.2 115 / 60 / 1
EF-1 GREENHECK CUBE-140 1,600 0.1 1/4 2.4 208 / 60 / 3
EF-2 GREENHECK CUBE-100 740 0.1 1/4 2.4 208 / 60 /3
NOTES PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER
AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR APPROVAL.
Attachment 9 - SEED Project Drawings 4702
BUILDING OCCUPANTS SHALL BE ABLE TO ADJUST THE SPACE TEMPERATURE 2 DEGREES UP
OR DOWN FROM THE FRONT END CONTROLLED SPACE SETPOINT. SPACE TEMPERATURE
SENSORS SHALL HAVE A MANUAL OVERRIDE THAT PLACES THE BUILDING IN THE OCCUPIED
MODE FOR A PERIOD OF 2 HOURS (ADJUSTABLE).
THE CONTROLS SYSTEM SHALL PROVIDE CONTINUOUS MONITORING FOR THE FOLLOWING
SYSTEMS AND/OR COMPONENTS. THIS MONITORING SHALL BE ACCOMPLISHED THROUGH
EQUIPMENT SENSORS AND CONTROL DEVICES. PROVIDE ADDITIONAL DEVICES AS REQUIRED
TO ACCOMPLISH THIS MONITORING. THE DDC SYSTEM SHALL BE CAPABLE OF DATA LOGGING
THIS INFORMATION AND REPORTING TO THE EMCS.
A. CONSTANT AND VARIABLE MOTOR LOADS
B. VFD OPERATION.
C. SUPPLY AIR TEMPERATURE.
D. OUTSIDE AIR TEMPERATURE.
E. HEATING WATER DIFFERENTIAL PRESSURE.
F. CHILLED WATER DIFFERENTIAL PRESSURE.
G. HEATING WATER SUPPLY AND RETURN TEMPERATURE.
H. CHILLED WATER SUPPLY AND RETURN TEMPERATURES.
I. BUILDING/EQUIPMENT ALARMS.
G R
A P
H
IC
A N
A
LO
G H
A R
D W
A R
E
IN
P U
T (A
I)
B
IN
A R
Y H
A R
D W
A R
E
IN
P U
T (B
I)
A N
A
LO
G H
A R
D W
A R
E O
U
TP
U T
(A O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
S O
FT
W
A R
E P
O
IN
T (S
FT
H A
R D
W A
R E
IN
TE
R
LO
C K
(H D
W
W
IR
E
LE
S S
(W
LS
N E
TW
O
R K
(N E
T)
H
IG
H A
N A
LO
G
L
IM
IT
LO
W
A N
A
LO
G L
IM
IT
B
IN
A R
Y
LA
TC
H D
IA
G
N O
S
TI
C
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
TI
O
N F
A
IL
CHWP CHILLED WATER PUMP
START STOP
X X
CHWP CHILLED WATER PUMP
STATUS
X X
CHWP CHILLED WATER PUMP
VFD SPEED
X X
CHWR T CHILLED WATER RETURN
TEMPERATURE
X X X X
CHWS T CHILLED WATER SUPPLY
TEMPERATURE
X X X X
CH CHW DP CHILLER CHILLED WATER
DIFFERENTIAL PRESSURE
X X X X
CH CHW FLW CHILLER CHILLED WATER
FLOW STATUS
X X
CH CHWP R CHILLER CHILLED WATER PUMP
REQUEST FROM CHILLER
X X
BAS COM BAS COMMUNICATION STATE X X
SYS EN CHILLER PLANT ENABLE X X
CHW SUP TMP SP CHILLED WATER SUPPLY
TEMPERATURE SETPOINT
X
OAT ENA SP OUTDOOR AIR TEMPERATURE
ENABLE SETPOINT
X
POINT ALARMSYSTEM POINT DESCRIPTION
OUTSIDE CHILLER UNIT POINT LIST
G R
A P
H
IC
A N
A
LO
G H
A R
D W
A R
E
IN
P U
T (A
I)
B
IN
A R
Y H
A R
D W
A R
E
IN
P U
T (B
I)
A N
A
LO
G H
A R
D W
A R
E O
U
TP
U T
(A O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
S O
FT
W
A R
E P
O
IN
T (S
FT
H A
R D
W A
R E
IN
TE
R
LO
C K
(H D
W
W
IR
E
LE
S S
(W
LS
N E
TW
O
R K
(N E
T)
H
IG
H A
N A
LO
G
L
IM
IT
LO
W
A N
A
LO
G L
IM
IT
B
IN
A R
Y
LA
TC
H D
IA
G
N O
S
TI
C
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
TI
O
N F
A
IL
B ALM BOILER ALARM X X X
B ALM BOILER ENABLE COMMAND X X
B LOOP T BOILER LOOP TEMPERATURE LOCAL X X X X
BP BOILER PUMP START STOP OUTPUT X X
BP BOILER PUMP STATUS X X
HW DP HOT WATER DIFFERENTIAL
PRESSURE
X X X
HWR T HOT WATER RETURN TEMPERATURE
LOCAL
X X X X
HWS T HOT WATER SUPPLY TEMPERATURE
LOCAL
X X X X
BAS COM BAS COMMUNICATION STATE X
HW RES HL HOT WATER RESET HIGH LIMIT X
HW RES LL HOT WATER RESET LOW LIMIT X
HWS T SP HOT WATER DISTRIBUTION SUPPLY
TEMPERATURE SETPOINT
X
OAT ENA SP OUTSIDE AIR TEMPERATURE ENABLE
SETPOINT
X
POINT ALARMSYSTEM POINT DESCRIPTION
HEATING BOILER POINT LIST
DDC SYSTEM – GENERAL:
DIRECT DIGITAL CONTROLS (DDC) SYSTEM SHALL BE PROVIDED TO OPERATE BUILDING
MECHANICAL SYSTEMS AS DESCRIBED IN THE SEQUENCE OF OPERATION.
ALL CONTROL DEVICES SHALL BE ELECTRICALLY OR ELECTRONICALLY OPERATED.
PNEUMATIC CONTROL DEVICES SHALL NOT BE USED.
INDIVIDUAL CONTROLLERS SHALL BE PROVIDED FOR EACH PIECE OF EQUIPMENT OR ALL
CONTROLLERS SHALL COMMUNICATE WITH THE MASTER TEMPERATURE CONTROL PANEL.
THE MASTER TEMPERATURE CONTROL PANEL SHALL BE CAPABLE OF INTERFACING WITH ALL
EQUIPMENT AND SYSTEMS CONTROLLERS THROUGHOUT THE DDC SYSTEM. ALL SETPOINTS
AND PARAMETERS SHALL BE ACCESSIBLE THROUGH THE MASTER TEMPERATURE CONTROL
PANEL AND FRONT END TERMINAL.
THE BUILDING CONTROLS SYSTEM INTERFACE SHALL BE THROUGH BACNET FRONT END AT
BLDG 1950.
PROVIDE EMERGENCY SHUTDOWN SWITCH. THE SWITCH SHALL SHUTDOWN ALL HVAC
EQUIPMENT AND CLOSE ALL OUTSIDE AIR INTAKES. MANUAL RESET IS REQUIRED.
BUILDING AUTOMATION SYSTEM:
THE BUILDING AUTOMATION SYSTEM (BAS) SHALL BE A SINGLE COMPLETE SYSTEM SUITABLE
FOR, BUT NOT LIMITED TO, DIRECT DIGITAL CONTROL (DDC) OF THE HEATING, VENTILATING
AND AIR CONDITIONING (HVAC) SYSTEMS. THE BAS SHALL BE BASED ON AN OPEN
IMPLEMENTATION OF BACNET TECHNOLOGY.
A. THE SYSTEM SHALL BE OPEN IN THAT IT IS DESIGNED AND INSTALLED SUCH THAT THE
GOVERNMENT OR ITS AGENTS ARE ABLE TO PERFORM REPAIR, REPLACEMENT,
UPGRADES, AND EXPANSIONS OF THE SYSTEM WITHOUT FURTHER DEPENDENCE ON
THE ORIGINAL CONTRACTOR.
B. NECESSARY DOCUMENTATION (INCLUDING RIGHTS TO DOCUMENTATION AND DATA),
CONFIGURATION INFORMATION, CONFIGURATION TOOLS, PROGRAMS, DRIVERS, AND
OTHER SOFTWARE SHALL BE LICENSED TO AND OTHERWISE REMAIN WITH.
THE BAS SHALL MONITOR THE SCHEDULED OCCUPIED/UNOCCUPIED TIME, SPACE SETPOINTS
AND SPACE TEMPERATURE TO OPTIMIZE SYSTEM-LEVEL AND UNIT-LEVEL CONTROLS.
CHILLED WATER SYSTEM SEQUENCE OF OPERATION:
THE CHILLED WATER SYSTEM CONSISTS OF 70 TON (OC-1) AND 30 TON (OC-2) AIR COOLED
OUTSIDE CHILLER UNITS, COUPLED WITH AND DEDICATED VARIABLE FLOW CHILLED WATER
PUMPS (HP-1 AND HP-2 RESPECTIVELY).
CHILLER – RUN CONDITIONS:
THE CHILLER SHALL BE ENABLED TO RUN WHENEVER:
A FAN COIL UNIT CALLS FOR COOLING (OC-1)
A DOA UNIT CALLS FOR COOLING, AND/OR FOR DEHUMIDIFICATION (OC-2)
AND THE OUTSIDE AIR TEMPERATURE IS GREATER THAN (ADJUSTABLE) 55°F (OC-2)
TO PREVENT SHORT CYCLING, THE CHILLER SHALL RUN FOR AND BE OFF FOR A MINIMUM OF
15 MINUTES (BOTH USER DEFINABLE), UNLESS SHUTDOWN ON SAFETIES OR OUTSIDE AIR
CONDITIONS.
THE CHILLER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.
CHILLED WATER PUMP:
THE CHILLED WATER PUMP CONTROL SHALL BE INTEGRATED INTO THE CHILLER CONTROLS.
THE SYSTEM SHALL START A CHILLED WATER PUMP THROUGH A CONTACT CLOSURE OF THE
PUMP’S VARIABLE FREQUENCY DRIVE (VFD) RUN-ENABLE CONTACTS.
THE SYSTEM SHALL MONITOR THE CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE
SENSOR. WHEN THE PUMP VFD IS ENABLED, THE SYSTEM SHALL CONTROL THE ANALOG
SPEED SIGNAL THAT IS SENT TO THE PUMP VFD TO MAINTAIN THE CHILLED WATER
DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE).
THE CHILLED WATER PUMP OPERATION SHALL BE VERIFIED THROUGH VFD CURRENT
SENSOR. THE CURRENT SENSOR SHALL INITIATE AN ALARM SIGNAL TO THE PUMP
CONTROLLER WHENEVER THE PUMP IS NOT OPERATIONAL. UPON A PUMP FAILURE
(COMMANDED ON, BUT THE STATUS IS OFF), THE DDC SYSTEM SHALL SEND AN ALARM TO
THE FRONT END.
CHILLER:
THE CHILLER SHALL BE ENABLED AT USER ADJUSTABLE TIME AFTER PUMP STATUS IS
PROVEN ON. THE CHILLER SHALL THEREFORE HAVE A USER ADJUSTABLE DELAY ON START.
THE DELAY TIME SHALL BE SET APPROPRIATELY TO ALLOW FOR ORDERLY CHILLED WATER
SYSTEM START-UP, SHUTDOWN AND SEQUENCING.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
CHILLER FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
CHILLER RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
CHILLER RUNTIME EXCEEDED: STATUS RUN TIME EXCEEDS A USER DEFINABLE LIMIT.
CHILLED WATER SUPPLY TEMPERATURE:
THE CHILLED WATER SUPPLY TEMPERATURE SETPOINT SHALL RESET BASED ON RETURN
WATER TEMPERATURE. THE CHILLED WATER SUPPLY TEMPERATURE SHALL NOT EXCEED
50°F (ADJUSTABLE) IN ANY CASE.
THE FOLLOWING TEMPERATURES SHALL BE MONITORED:
CHILLED WATER SUPPLY.
CHILLED WATER RETURN
ALARMS SHALL BE PROVIDED AS FOLLOWS:
HIGH CHILLED WATER SUPPLY TEMPERATURE: IF THE CHILLED WATER SUPPLY
TEMPERATURE IS GREATER THAN 55°F (ADJUSTABLE).
LOW CHILLED WATER SUPPLY TEMPERATURE: IF THE CHILLED WATER SUPPLY
TEMPERATURE IS LESS THAN 40°F (ADJUSTABLE)
BOILER:
THE BOILER’S INTERNAL CONTROLS SHALL MODULATE THE FIRING RATE AS NEEDED TO
MAINTAIN THE HEATING WATER TEMPERATURE AT SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
BOILER FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
HEATING WATER SUPPLY TEMPERATURE:
THE HEATING WATER TEMPERATURE SETPOINT SHALL RESET LINEARLY BASED ON OUTSIDE
AIR TEMPERATURE. THE HEATING WATER SETPOINT SHALL BE 120°F (ADJUSTABLE) AT AN
OUTSIDE AIR TEMPERATURE OF 50°F (ADJUSTABLE) OR ABOVE. THE SETPOINT SHALL
INCREASE TO 180°F (ADJUSTABLE) AT AN OUTSIDE AIR TEMPERATURE OF 20°F (ADJUSTABLE)
OR LOWER.
THE FOLLOWING TEMPERATURES SHALL BE MONITORED:
HEATING WATER SUPPLY
HEATING WATER RETURN
ALARMS SHALL BE PROVIDED AS FOLLOWS:
HIGH HEATING WATER SUPPLY TEMPERATURE: IF THE HEATING WATER SUPPLY
TEMPERATURE IS GREATER THAN 195°F (ADJUSTABLE)
LOW HEATING WATER SUPPLY TEMPERATURE: IF THE HEATING WATER SUPPLY
TEMPERATURE IS LESS THAN 100°F (ADJUSTABLE)
THE BOILER SHALL HAVE A FIELD MANUAL RESET LIMIT OF 225°F.
HEATING WATER SYSTEM SEQUENCE OF OPERATION:
HYDRONIC HEATING SYSTEM CONSISTS OF A HEATING BOILER (HB-1) AND A DEDICATED
VARIABLE FLOW HEATING WATER PUMP (HP-3).
BOILER – RUN CONDITIONS:
THE BOILER SHALL BE ENABLED TO RUN WHENEVER:
UPON A CALL FROM A ZONE TEMPERATURE SENSOR
THE OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJUSTABLE)
COMMAND FOR DEHUMIDIFICATION
THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.
HEATING WATER PUMP:
THE HOT WATER PUMP CONTROL SHALL BE INTEGRATED INTO THE BOILER CONTROLS.
THE SYSTEM SHALL START A HOT WATER PUMP THROUGH A CONTACT CLOSURE OF THE
PUMP’S VARIABLE FREQUENCY DRIVE (VFD) RUN-ENABLE CONTACTS.
THE SYSTEM SHALL MONITOR THE HEATING WATER SYSTEM DIFFERENTIAL PRESSURE
SENSOR. WHEN THE PUMP VFD IS ENABLED, THE SYSTEM SHALL CONTROL THE ANALOG
SPEED SIGNAL THAT IS SENT TO THE PUMP VFD TO MAINTAIN THE HEATING WATER
DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE).
THE HEATING WATER PUMP OPERATION SHALL BE VERIFIED THROUGH VFD CURRENT
SWITCH. THE CURRENT SENSOR SHALL INITIATE AN ALARM SIGNAL TO THE PUMP
CONTROLLER WHENEVER THE PUMP IS NOT OPERATIONAL. UPON A PUMP FAILURE
(COMMANDED ON, BUT THE STATUS IS OFF), THE DDC SYSTEM SHALL SEND AN ALARM TO
THE FRONT END.
Attachment 9 - SEED Project Drawings 4702
A P
H
IC
A N
A
LO
G H
A R
D W
A R
E
IN
P U
T (A
I)
B
IN
A R
Y H
A R
D W
A R
E
IN
P U
T (B
I)
A N
A
LO
G H
A R
D W
A R
E O
U
TP
U T
(A O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
S O
FT
W
A R
E P
O
IN
T (S
FT
H A
R D
W A
R E
IN
TE
R
LO
C K
(H D
W
W
IR
E
LE
S S
(W
LS
N E
TW
O
R K
(N E
T)
H
IG
H A
N A
LO
G
L
IM
IT
LO
W
A N
A
LO
G L
IM
IT
B
IN
A R
Y
LA
TC
H D
IA
G
N O
S
TI
C
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
TI
O
N F
A
IL
CHW LVL CHILLED WATER VALVE X X
CND OVRFL CONDENSATE OVERFLOW DETECTION
LOCAL
X X X X
DAT DISCHARGE AIR TEMPERATURE X X X X X
FIL FILTER STATUS LOCAL X X X
HW VLV HOT WATER VALVE X X
RA SD RETURN AIR SMOKE DETECTOR X
SPH SPACE HUMIDITY SENSOR LOCAL X X X X
SPT SPACE TEMPERATURE LOCAL X X X X X
SPT SP SPACE TEMPERATURE SETPOINT
LOCAL
X X
SAF SUPPLY FAN STATUS LOCAL X X
SAF LO SUPPLY FAN OUTPUT 1 X X
SAF MD SUPPLY FAN OUTPUT 2 X X
SAF HI SUPPLY FAN OUTPUT 3 X X
BAS COM BAS COMMUNICATION STATE X X
MNT REQ MAINTENANCE REQUIRED X X
SP DEH SP SPACE DEHUMIDIFICATION SETPOINT X
SPT CL SP SPACE COOLING TEMPERATURE
SETPOINT
X X
SPT HT SP SPCE HEATING TEMPERATURE
SETPOINT
X X
SPT SP ACT SPACE TEMPERATURE SETPOINT
ACTIVE
X X
POINT ALARMSYSTEM POINT DESCRIPTION
FAN COIL UNITS
G R
A P
H
IC
A N
A
LO
G H
A R
D W
A R
E
IN
P U
T (A
I)
B
IN
A R
Y H
A R
D W
A R
E
IN
P U
T (B
I)
A N
A
LO
G H
A R
D W
A R
E O
U
TP
U T
(A O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
S O
FT
W
A R
E P
O
IN
T (S
FT
H A
R D
W A
R E
IN
TE
R
LO
C K
(H D
W
W
IR
E
LE
S S
(W
LS
N E
TW
O
R K
(N E
T)
H
IG
H A
N A
LO
G
L
IM
IT
LO
W
A N
A
LO
G L
IM
IT
B
IN
A R
Y
LA
TC
H D
IA
G
N O
S
TI
C
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
TI
O
N F
A
IL
LLT COIL LEAVING AIR LOW
TEMPERATURE CUTOUT ALARM
X X
CC LAT COOLING COIL LEAVING
TEMPERATURE
X X X X X
CLG COOLING OUTPUT COMMAND X X
MAT MAKE-UP AIR TEMPERATURE X X X X X
MAH MAKE-UP AIR HUMIDITY X X X
DCT P DUCT STATIC PRESSURE LOCAL X X X X X
FIL FILTER STATUS X X X
HSP ALM HIGH STATIC ALARM X X X X
OAD OUTSIDE AIR DAMPER COMMAND X X
OA LLT OUTSIDE AIR LOW TEMPERATURE
CUTOUT ALARM
X X
OAT OUTSIDE AIR TEMPERATURE LOCAL X X X X
OAH OUTSIDE AIR HUMIDITY X X X
OAD OUTDOOR AIR DAMPER COMMAND X X
OA FLW OUTDOOR AIR FLOW X X
OA LLT OUTSIDE AIR TEMPERATURE LOW
LIMIT SETPOINT
X
PH LAT PREHEAT LEAVING COIL
TEMPERATURE LOCAL
X X X
PH PREHEAT OUTPUT COMMAND X X
RH LAT REHEAT LEAVING COIL
TEMPERATURE
X X X
RH REHEAT OUTPUT COMMAND X X
SF SUPPLY FAN SPEED COMMAND X X
SF SUPPLY FAN START STOP COMMAND X X
SF SUPPLY FAN STATUS X X
BAS COM BAS COMMUNICATION INPUT X X
FZ STAT FREEZE STAT X X X X X
MA SD MAKE-UP AIR SMOKE DETECTOR X
MA CL SP MAKE-UP AIR COOLING SETPOINT X
MA HT SP MAKE-UP AIR HEATING SETPOINT X
OCC CL SP OCCUPIED COOLING SETPOINT X X
OCC HT SP OCCUPIED HEATING SETPOINT X X
POINT ALARMSYSTEM POINT DESCRIPTION
DEDICATED OUTSIDE AIR UNIT POINT LIST
STATUS AND ALARMS:
MONITOR FAN OUTPUT STATUS AND SEND ALARM TO FRONT END IF FAN HAS FAILED. SEND
SIGNAL TO FRONT END FOR FILTER CHANGE-OUT BASED ON FAN RUN TIME. PROVIDE
CONDENSATE FLOAT/OVERFLOW SWITCH IN AUXILIARY DRAIN PAIN. FAN COIL UNIT SHALL BE
SHUT DOWN AND ALARM SENT TO FRONT END ON HIGH CONDENSATE ALARM.
ALARM SHALL REQUIRE MANUAL RESET.
DEDICATED OUTSIDE AIR UNITS (DOA-1):
THE DEDICATED OUTSIDE AIR UNITS (DOA) CONSIST OF AN OUTSIDE AIR INLET SECTION,
FILTER SECTION, HEATING WATER COILS (PRE-HEAT LOCATION AND RE-HEAT LOCATION),
CHILLED WATER COIL, AND SUPPLY FAN SECTION.
THE DOA SHALL OPERATE AS A CONSTANT AIR VOLUME UNIT.
SUPPLY FAN SHALL BE SOFT START.
THE CONTROLLER SHALL OPERATE THE DOA UNIT IN OCCUPIED MODE AND EMERGENCY
SHUTDOWN MODE.
FAN OPERATION:
THE SUPPLY FAN SHALL RUN CONTINUOUSLY IN THE OCCUPIED MODE.
THE SUPPLY FAN SHALL BE ON IF THE CONTROL IS HEATING OR COOLING IN THE
UNOCCUPIED MODE.
OPERATION SHALL BE VERIFIED THROUGH A CURRENT SENSOR. THE CURRENT SENSOR
SHALL INITIATE AN ALARM SIGNAL TO THE CONTROLLER WHENEVER THE FAN(S) IS NOT
OPERATIONAL. UPON A FAN FAILURE, THE DDC SYSTEM WILL SEND AN ALARM TO THE FRONT
END.
PREHEAT COIL OPERATION:
MODULATE 3-WAY CONTROL VALVE TO MAINTAIN MAKE-UP AIR TEMPERATURE SETPOINT OF
70°F AT 50% RH (ADJUSTABLE). THE CONTROL VALVE SHALL FAIL TO THE OPEN POSITION.
COOLING COIL OPERATIOIN:
MODULATE 3-WAY CHILLED WATER VALVE TO MAINTAIN MAKE-UP AIR TEMPERATURE
SETPOINT OF 70°F AT 50% RH (ADJUSTABLE). THE CONTROL VALVE SHALL FAIL TO THE
CLOSED POSITION.
REHEAT COIL OPERATION:
MODULATE 3-WAY CONTROL VALVE TO MAINTAIN MAKE-UP AIR TEMPERATURE SETPOINT OF
70°F AT 50% RH (ADJUSTABLE). THE CONTROL VALVE SHALL FAIL TO THE OPEN POSITION.
FILTER MAINTENANCE:
DIFFERENTIAL PRESSURE SWITCH WITH SENSOR TAPS ON UPSTREAM AND DOWNS TREAM
SIDE OF FILTER SHALL SIGNAL CONTROLLER WHEN THE DIFFERENTIAL PRESSURE IS EQUAL
OR GREATER THAN THE SETPOINT. THE CONTROLLER SHALL INITIATE A MAINTENANCE
ALARM SIGNAL INDICATING A DIRTY FILTER.
FREEZESTAT:
UPON SENSING A PREHEAT COIL LEAVING AIR TEMPERATURE LESS THAN 35°F (ADJUSTABLE),
THE FREEZESTAT SHALL SIGNAL AN ALARM TO THE CONTROLLER AND THE SUPPLY FAN
SHALL DE-ENERGIZE, OUTSIDE AIR DAMPER SHALL CLOSE AND CONTROL VALVES SHALL
OPEN FLOW TO COILS. ALARM CONDITION REQUIRES MANUAL RESET.
SMOKE DETECTOR:
UPON AN ALARM SIGNAL FROM THE DUCT MOUNTED SMOKE DETECTOR, THE CONTROLLER
SHALL DE-ENERGIZE THE SUPPLY FAN AND CLOSE THE OUTSIDE AIR DAMPER. SEND SIGNAL
TO FRONT END AND FIRE ALARM PANEL. MANUAL RESET IS REQUIRED.
OCCUPIED MODE:
OPERATE SUPPLY FAN CONTINUOUSLY, MODULATE HEATING WATER OR CHILLED WATER
VALVES TO MAINTAIN SUPPLY AIR DISCHARGE SETPOINTS.
ENERGENCY SHUTDOWN MODE (ATFP):
PROVIDE SPACE MOUNTED EMERGENCY POWER OFF (EPO) SWITCH TO INITIATE SHUTDOWN
MODE. IN SHUTDOWN MODE STOP SUPPLY FAN AND CLOSE OUTSIDE AIR DAMPER. SEND
ALARM TO FRONT END.
FAN COIL UNITS:
EACH FAN COIL UNITS SHALL BE PROIVDED ZONE SENSORS TO MONITOR THE FOLLOWING:
A. SPACE TEMPERATURE
B. SPACE HUMIDITY
THE CONTROLLER SHALL OPERATE USING DEFAULT MODES AND SETPOINTS IN CASE
COMMUNICATION IS LOST WITH THE BAS.
SPACE TEMPERATURE CONTROL:
DURING THE OCCUPIED PERIODS, THE SPACE TEMPERATURE SHALL BE MAINTAINED
BETWEEN THE SPACE HEATING TEMPERATURE SETPOINTS OF 68.0 °F (ADJUSTABLE) AND THE
SPACE COOLING TEMPERATURE SETPOINTOF 76.0 °F (ADJUSTABLE), WHILE MAINTAINING THE
SPACE RELATIVE HUMIDITY AT THE RELATIVE HUMIDITY SETPOINT OF 50% WITH THE
RELATIVE HUMIDITY OFFSET OF 5% (ADJUSTABLE).
THE UNIT SHALL TRANSITION TO HEATING MODE WHEN THE SPACE TEMPERATURE FALLS
BELOW THE OCCUPIED HEATING SETPOINT.
THE UNIT SHALL TRANSITION TO COOLING MODE WHEN THE SPACE TEMEPERATURE RISES
ABOVE THE OCCUPIED COOLING SETPOINT.
SPACE HUMIDITY CONTROL:
THE UNIT SHALL TANSITION TO DEHUMIDIFICATION MODE AND MODULATE THE CHILLED
WATER VALVE TO MAINTAIN THE SPACE RELATIVE HUMIDITY AND HOT WATER VALVE TO
MAINTAIN THE SPACE TEMPERATURE COOLING SETPOINT, UNTIL THE SPACE RELATIVE
HUMIDITY FALLS BELOW THE RELATIVE HUMIDITY SETPOINT MINUST THE RELATIVE HUMIDITY
OFFSET.
FAN SPEED SWITCH:
OFF:
FAN IS OFF; CONTROL VALVES CLOSE. THE LOW AIR TEMPERATURE DETECTION OPTION IS
STILL ACTIVE.
AUTO:
FAN SPEED CONTROL IN THE AUTO SETTING ALLOWS THE MODULATING (3-WIRE FLOATING
POINT) CONTROL VALVE OPTION AND 3-SPEED FAN TO WORK COOPERATIVELY TO MEET
PRECISE CAPACITY REQUIREMENTS, WHILE MINIMIZING FAN SPEED
(MOTOR/ENERGY/ACOUSTICS) AND VALVE POSITION (PUMP/ENERGY/CHILLED WATER RESET).
AS THE CAPACITY REQUIREMENT INCREASES AT LOW FAN SPEED, THE WATER VALVE OPENS.
WHEN THE LOW FAN SPEED CAPACITY SWITCH POINT IS REACHED, THE FAN SWITCHES TO
MEDIUM SPEED AND THE WATER VALVE REPOSTIONS TO MAINTAIN AN EQUIVALENT
CAPACITY. THE REVERSE SEQUENCE TAKES PLACE WITH A DECREASE IN REQUIRED
CAPACITY.
LOW, MEDIUM, HIGH:
THE FAN WILL RUN CONTINUOUSLY AT THE SELECTED SPEED AND THE VALVE OPTION WILL
CYCLE TO MEET SETPOINT.
SMOKE DETECTOR SHUTDOWN:
THE UNIT SHALL BE INTERLOCKED TO THE SMOKE DETECTOR THROUGH THEY DRY
CONTACTS OF THE SMOKE DECTECTOR. THE UNIT SHALL SHUT DOWN IN RESPONSE TO A
SIGNAL FROM THE SMOKE DECTECTOR INDICATING THE PRESENCE OF SMOKE AND SEND
ALARM TO FRONT END. A MANUAL RESET OF THE SMOKE DECTECTOR SHALL BE REQUIRED
TO RESTART THE UNIT.
A P
H
IC
A N
A
LO
G H
A R
D W
A R
E
IN
P U
T (A
I)
B
IN
A R
Y H
A R
D W
A R
E
IN
P U
T (B
I)
A N
A
LO
G H
A R
D W
A R
E O
U
TP
U T
(A O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
S O
FT
W
A R
E P
O
IN
T (S
FT
H A
R D
W A
R E
IN
TE
R
LO
C K
(H D
W
W
IR
E
LE
S S
(W
LS
N E
TW
O
R K
(N E
T)
H
IG
H A
N A
LO
G
L
IM
IT
LO
W
A N
A
LO
G L
IM
IT
B
IN
A R
Y
LA
TC
H D
IA
G
N O
S
TI
C
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
TI
O
N F
A
IL
EF S/S EXHAUST FAN START STOP COMMAND X X
EF STAT EXHAUST FAN STATUS X X X X
EFD EXHAUST FAN DAMPER OPEN CLOSE X X
POINT ALARMSYSTEM POINT DESCRIPTION
EXHAUST FAN POINT LIST
EXHAUST FAN (EF-1~2) SEQUENCE OF OPERATION:
THE CONTROLLER SHALL OPERATE THE EXHAUST FAN UNITS IN OCCUPIED MODE AND
EMERGENCY SHUTDOWN MODE.
OCCUPIED MODE:
WHEN THE BUILDING IS IN THE OCCUPIED MODE THE DAMPER SHALL BE COMMANDED TO
OPEN, UPON THE DAMPER END SWITCH CLOSING THE EXHAUST FAN SHALL BE STARTED AND
RUN CONTINUOUSLY.
IF THE FAN IS COMMANDED ON BUT STATUS IS NOT PROVEN THEN AN EXHAUST FAN FAILURE
ALARM SHALL BE ANNUCIATED TO THE BAS.
ENERGENCY SHUTDOWN MODE (ATFP):
PROVIDE SPACE MOUNTED EMERGENCY POWER OFF (EPO) SWITCH TO INITIATE SHUTDOWN
MODE. IN SHUTDOWN MODE, THE EXHAUST FAN SHALL SHUT DOWN REGARDLESS OF HAND
OR AUTO. ALL ASSOCIATED DAMPERS SHALL CLOSE. AN ALARM SHALL BE SENT TO THE
FRONT END.
E
OHP
UGP
UGS
SEW
X X
D
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E1
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A
IR
H V
A C
S
Y S
T E
M
CONTROL WIRING NOT SHOWN ON THE DRAWINGS SHALL BE
PROVIDED.
OF EQUIPMENT, CONDUITS AND WIRING. THE CONTRACTOR SHALL
BECOME FAMILIAR WITH ALL DETAILS OF THE WORK AND VERIFY ALL
DIMENSIONS IN THE FIELD SO THAT THE OUTLETS AND EQUIPMENT
SHALL BE RESTORED TO ITS ORIGINAL CONDITION BY WORKERS
SKILLED IN THE TRADES INVOLVED, AT NO ADDITIONAL COST TO THE
GOVERNMENT.
9. CONTRACTOR SHALL ARRANGE A WORK SCHEDULE WITH CONTRACTING
7. REMOVE ITEMS AS INDICATED ON THE DRAWINGS.
2. THE DRAWINGS INDICATE THE GENERAL LOCATION AND ARRANGEMENT
THE EXISTING CIRCUITS.
WILL BE PROPERLY LOCATED AND READILY ACCESSIBLE.
12.
PIPES OR DUCTS, AND IF EXISTING ELECTRICAL ITEMS ARE IN THE WAY,
CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL ITEMS AND SHALL
PROVIDE NEW WIRING AS REQUIRED FOR INSTALLING THE RELOCATED
ELECTRICAL ITEMS, AT NO ADDITIONAL COST TO THE GOVERNMENT.
PIPES OR DUCTS, AND IF EXISTING ELECTRICAL ITEMS ARE DAMAGED BY
4.
5.
BORING, CONTRACTOR SHALL RESTORE THEM TO THEIR ORIGINAL
CONDITION, AT NO ADDITIONAL COST TO THE GOVERNMENT.
10.
1. THE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE
11.
CONTRACTOR SHALL VERIFY EXISTING CIRCUITS PRIOR TO REMOVING
CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR FOR
THE EXACT LOCATIONS OF THE MECHANICAL EQUIPMENT.
GENERAL NOTES:
KEEP THE FACILITIES IN OPERATION DURING THE CONSTRUCTION PERIOD.
6. CONTRACTOR SHALL PROVIDE TEMPORARY POWER AS REQUIRED TO
3. ALL UTILITIES AND ANY ITEMS DAMAGED BY CONSTRUCTION OPERATIONS
COLOR OF PAINT SHALL MATCH THE COLOR OF ADJACENT SURFACE.
SHALL BE PATCHED. THE PATCHED AREAS SHALL BE PAINTED. THE
AFTER REMOVING ELECTRICAL ITEMS, HOLES IN WALLS AND CEILINGS8.
OFFICER AND USER TWO WEEKS PRIOR TO STARTING ANY WORK.
IF FLOORS OR WALLS ARE NECESSARY TO BE BORED FOR INSTALLING
IF FLOORS OR WALLS ARE NECESSARY TO BE BORED FOR INSTALLING
NEW WIRING, LONG CROSS MARKS INDICATE PHASE
AND NEUTRAL, SHORT CROSS MARK INDICATES
GROUND
NEW HOMERUN CIRCUIT, CIRCUIT #1, 3 & 5 WITH
NEUTRAL AND A GROUND HOMERUN TO PANEL "A"
A-1,3,5
NEW HOMERUN CIRCUIT, NO CROSS MARK INDICATES TWO
CONDUCTORS AND ONE GROUND CONDUCTOR HOMERUN
NUMBER.
B-3
TO PANEL "B". THE NUMBER "3" INDICATES THE CIRCUIT
NEW SAFETY SWITCH, NUMBER INDICATES THE SWITCH
NUMBER IN THE "NEW SAFETY SWITCH SCHEDULE"
CONDUCTORS AND ONE GROUND CONDUCTOR
NEW WIRING, NO CROSS MARKS INDICATES TWO
D FOR DETAIL AND S FOR SECTION
SHEET NUMBER WHERE TAKEN
SHEET NUMBER WHERE SHOWN
THE "NEW MOTOR SCHEDULE".
NEW MOTOR, NUMBER INDICATES THE TYPE OF MOTOR IN
NEW JUNCTION BOXJ
EXISTING WIRES AND CONDUIT TO BE REMOVED.
EXISTING MOTOR TO BE REMOVED.
EXISTING SAFETY SWITCH TO BE REMOVED.
EXISTING STARTER TO BE REMOVED.
NEW MAGNETIC STARTER
ALL THE WAY BACK TO EXISTING PANEL.
EXISTING HOMERUN WIRES AND CONDUIT TO BE REMOVED
ELECTRICAL LEGEND:
EXISTING WIRES AND CONDUIT TO REMAIN.
EXISTING SAFETY SWITCH TO REMAIN.
EXISTING WOOD POLE TO REMAIN.
EXISTING 300 KVA PAD MOUNTED TRANSFORMR TO REMAIN.
EXISTING DOWN GUY TO REMAIN.
EXISTING OVERHEAD PRIMARY LINES TO REMAIN.
EXISTING UNDERGROUND PRIMARY LINES TO REMAIN.
EXISTING UNDERGROUND SECONDARY LINES TO REMAIN.
DESCRIPTION PHASE
POLE
NEMA
SIZE
ENCLOSURE
NEMA TYPE
TYPE
TYPE POWER
TYPE
FULL VOLTAGE
TYPE
FULL VOLTAGE
REMARKS
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
3 TYPE
FULL VOLTAGE
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
TYPE
FULL VOLTAGE
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
125 1
TYPE
FULL VOLTAGE
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
3R
NEW MOTOR SCHEDULE
11115 120 0
CHILLER
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
TYPE
FULL VOLTAGE
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
1233 18
TYPE
FULL VOLTAGE
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
MOUNTED ON ROOF,
TYPE
FULL VOLTAGE
200 208
1211 1
TYPE
FULL VOLTAGE120
DIRIVE
FREQENCY
VARIABLE
60 HP
MAGNETIC STARTER UNLESS OTHERWISE INDICATED
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
BRACKET AS REQUIRED.
PROVIDE RGS MOUNTING
UNIT (FC)
FAN COIL
AHU
UNIT (FC)
FAN COIL
UNIT (FC)
FAN COIL
UNIT (FC)
FAN COIL
1/3 HP
1/2 HP
1/4 HP
3/4 HP
5 HP
5 HP 200
VOLTAGE
SYSTEMVOLTAGE
MOYOR
208200
200 3 208 3
TYPE
FULL VOLTAGECWP-1
CWP-2
HWP-1
2 HP
3 HP
HWP-2 115 1 120 0
BOILER PUMP 115
NOTES FOR THIS SHEET:
MAXIMUM POWER FOR THIS FAN COIL UNIT IS 1/4 HP.
MAXIMUM POWER FOR THIS FAN COIL UNIT IS 1/3 HP.
MAXIMUM POWER FOR THIS FAN COIL UNIT IS 1/2 HP.
MAXIMUM POWER FOR THIS FAN COIL UNIT IS 3/4 HP.
5 MAXIMUM POWER FOR CWP-2 IS 1/2 HP.
GROUNDG
ELECTRICAL METALLIC TUBINGEMT
N NEUTRAL
OII PHASE
ELECTRICAL ABBREVIATIONS:
MLO MAIN LUGS ONLY
A.I.C. AMPS INTERRUPTING CAPACITY
1 HP
1/2 HP
NEW GROUND ROD, 3/4" X 10', COPPER CLAD.
SCH
RGS RIGID GALVANIZED STEEL
UG UNDERGROUND
SCHEDULE
CONTRACTOR SHALL COORDINATE ALL OUTAGES AND CHANGE
OVER WITH CONTRACTING OFFICER.
CABLES WITHIN TRENCHING AREA TWO WEEKS PRIOR TO EXCAVATIONS.
CONTRACTOR SHALL CALL "OKIE" TO LOCATE EXISTING UNDERGROUND
PVC CONDUIT CROSSES OVER EXISTING UNDERGROUND UTILITIES.
CONTRACTOR SHALL HANDDIG THE AREAS WHERE THE NEW 3" SCH 80
CROSSES OVER EXISTING UNDERGROUND UTULITIES.
UNDERGROUND UTULITIES WHERE THE NEW 3" SCH 80 PVC CONDUIT
NEW 3" SCH 80 PVC CONDUIT SHALL BE INSTALLED 12" ABOVE EXISTING
13.
14.
15.
16.
EXISTING SEWAGE PIPE TO REMAIN.
33.57 kW
EXISTING METAL PLANK FENCE TO REMAIN.
EXISTING DUCT TO REMAIN.
W WEATHERPROOF
N O
T E S L
E G
E N
D
D
S
C H
E D
U L E
INDICATED OR SHOWN.
NFPA 70 AND ANSI C2 UNLESS MORE STRINGENT REQUIREMENTS ARE
Attachment 9 - SEED Project Drawings 4702
D1
E2 E6
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E2
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
JU
L
10 2 4 6 8 10 12 14 16 18 20 22 24
SCALE: „" = 1'-0"
PARTIAL ELECTRICAL DEMOLITION PLAN - BLDG. 4702
N O
R T
H
BASEMENT
P L
A N
"TBB"
Attachment 9 - SEED Project Drawings 4702
UGS
U G
S
E
SEW
SEW
S E
W
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E3
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
10 2 4 6 8 10 12 14 16 18 20 22 24
SCALE: „" = 1'-0"
PARTIAL ELECTRICAL DEMOLITION PLAN - BLDG. 4702
N O
R T
H
FIRST FLOOR
P
OHP
U G
S
NOTES FOR THIS SHEET:
EXISTING 300 KVA PAD MOUNTED TRANSFORMER TO REMAIN.
FOR DETAIL AND EXACT LOCATION.
EXISTING FAN COIL UNIT TO BE REMOVED. SEE MECHANICAL
ARE NOT SHOWN ON THIS DRAWING.
EXISTING PANELS EVEN THOUGH THESE WIRES AND CONDUITS
THIS EXISTING FAN COIL UNIT ALL THE WAY BACK TO
REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO
4 5 4 5 4 5 4 5
4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5
4 5 4 5 4 5
4 5 4 5
4 5
4 5
4 5
4 5
4 54 5
4 5
4 5
EXISTING PANEL "1P1" TO REMAIN7
EXISTING PANEL "1P2" TO REMAIN8
EXISTING PANEL "1P3" TO REMAIN9
EXISTING PANEL "1P4" TO REMAIN10
EXISTING PANEL "1P5" TO REMAIN11
COMM.
COMM.
10 11
4 5
EXISTING CHILLER TO REMAIN.
EXISTING 400A 3-POLE SAFETY SWITCH TO REMAIN.
NOT USED.
U G
P
1P1-19
1P1-21
1P1-23
1P1-25
LOUNGE
1P4-25
D DD
P
N O
T
S
D
P
L A
N
Attachment 9 - SEED Project Drawings 4702
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E4
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
PARTIAL ELECTRICAL DEMOLITION PLAN - BLDG. 4702
N O
R T
H
SECOND FLOOR
4 5
4 54 54 54 54 54 54 54 5
4 5 4 5 4 5 4 5 4 5 4 5 4 5
NOTES FOR THIS SHEET:
FOR DETAIL AND EXACT LOCATION.
EXISTING FAN COIL UNIT TO BE REMOVED. SEE MECHANICAL
ARE NOT SHOWN ON THIS DRAWING.
EXISTING PANELS EVEN THOUGH THESE WIRES AND CONDUITS
THIS EXISTING FAN COIL UNIT ALL THE WAY BACK TO
REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO
EXISTING PANEL "2P4" TO REMAIN
EXISTING PANEL "2P5" TO REMAIN
2P1-19
EXISTING PANEL "2P1" TO REMAIN
EXISTING PANEL "2P2" TO REMAIN
EXISTING PANEL "2P3" TO REMAIN
4 5
P
6 7
4 5 4 5
4 5 4 5
4 5
4 5
4 5
4 5
4 5
COMM.
COMM.
2P1-25
2P4-21
2P4-25
2P1-232P1-21
N O
T E S
A
N D
P
L A
N
Attachment 9 - SEED Project Drawings 4702
D2
E5 E6
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E5
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
N O
R T
H
BASEMENT
NEW PARTIAL POWER PLAN - BLDG. 4702
"TBB"
P L
A N
Attachment 9 - SEED Project Drawings 4702
D1
E2
D2
E6 E5 E6
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E6
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
SCALE: 1/4" = 1'-0"
4 150
N O
R T
H
ENLARGED PARTIAL ELECTRICAL DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
4 150
N O
R T
H
ENLARGED NEW PARTIAL POWER PLAN
BASEMENT BASEMENT
MECHANICAL FOR DETAIL AND EXACT LOCATION.
EXISTING HEATING HOT WATER PUMP TO BE REMOVED. SEE
MECHANICAL FOR DETAIL AND EXACT LOCATION.
EXISTING CHILLED WATER PUMP TO BE REMOVED. SEE
ARE NOT SHOWN ON THIS DRAWING.
EXISTING PANELS EVEN THOUGH THESE WIRES AND CONDUITS
THIS EXISTING AIR HANDLER UNIT ALL THE WAY BACK TO
REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO
MECHANICAL FOR DETAIL AND EXACT LOCATION.
EXISTING AIR HANDLER UNIT TO BE REMOVED. SEE
NOTES FOR THIS SHEET:
EXISTING PANEL "BP" TO REMAIN.
EXISTING MAIN DISTRIBUTION SWITCHBOARD "MDP" TO REMAIN.
3 8
DETAIL AND EXACT LOCATION.
EXISTING BOILER TO BE REMOVED. SEE MECHANICAL FOR
NOT SHOWN ON THIS DRAWING.
PANELS EVEN THOUGH THESE WIRES AND CONDUITS ARE
THIS EXISTING BOILER ALL THE WAY BACK TO EXISTING
REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO
4 5
LOCATION.
NEW AHU. SEE MECHANICAL FOR DETAIL AND EXACT
LOCATION.
NEW BOILER. SEE MECHANICAL FOR DETAIL AND EXACT
BP-1,3,5
BP-7,9,11
BP-13,15,17
BP-28
AS REQUIRED FOR MOUNTING STARTER.
NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED
AS REQUIRED FOR MOUNTING SAFETY SWITCH.
NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED
LOCATION.
NEW BOILER PUMP. SEE MECHANICAL FOR DETAIL AND EXACT
LOCATION.
NEW CWP-1. SEE MECHANICAL FOR DETAIL AND EXACT
LOCATION.
NEW CWP-2. SEE MECHANICAL FOR DETAIL AND EXACT
BP-2,4,6
20 LOCATION.
NEW HWP-1. SEE MECHANICAL FOR DETAIL AND EXACT
LOCATION.
NEW HWP-2. SEE MECHANICAL FOR DETAIL AND EXACT
BP-21
BP-23
NEW 4 #6 THHN, 1 #8 THHN G IN 1" EMT.
NEW 4 #8 THHN, 1 #8 THHN G IN 3/4" EMT.
NEW 3 #6 THHN, 1 #8 THHN G IN 1" EMT.
NEW 3 #8 THHN, 1 #8 THHN G IN 3/4" EMT.
NEW 2 #8 THHN, 1 #8 THHN G IN 3/4" EMT.
N O
T
D
P
L A
N S
Attachment 9 - SEED Project Drawings 4702
U G
S
U G
UGS
10'
W W
UG
X X
X X
X XX X X
X X
X X
X
XXXXX
X
X
X
BRACKETS SHALL BE PROVIDED AS REQUIRED.
CONCRETE PAD, NEW RGS CHANNEL MOUNTING
THE RGS CONDUIT SHALL BE MOUNTED ON EXISTING
D1
E7 E10
E7 E10
D2
D D
D D
D
D
D
SEW
S E
W
SEW
SEW
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E7
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
4 5
SCALE: „" = 1'-0"
N O
R T
H
FIRST FLOOR
OHP
U G
S
NEW PARTIAL POWER PLAN - BLDG. 4702
1P1-19
1P1-23
1P1-25
1P4-25
P
NOTES FOR THIS SHEET:
EXISTING 300 KVA PAD MOUNTED TRANSFORMER TO REMAIN.
EXISTING PANEL "1P1" TO REMAIN7
EXISTING PANEL "1P2" TO REMAIN8
EXISTING PANEL "1P3" TO REMAIN9
EXISTING PANEL "1P4" TO REMAIN10
EXISTING PANEL "1P5" TO REMAIN11
8 9
COMM.
10 11
COMM.
3 3 3 3
3 3 3 3 3 3 3 3
AS REQUIRED FOR MOUNTING STARTER AND SAFETY SWITCH.
NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED
LOCATION.
NEW FAN COIL UNIT. SEE MECHANICAL FOR DETAIL AND EXACT
4 5 4 5 4 5 4 5 4 5 4 5 4 5
4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5
4 5
4 5
4 5
4 5
4 5
4 54 5
4 54 5
3 4 5
7 8 9
1011121314151617
NEW 2 #10 THHN, 1 #10 THHN G IN •" EMT.14
1P1-21
15 NEW PANEL "A".
A
A-21
1P4-38,40,42
NEW 4 #1 THHN, 1 #6 THHN IN 2" EMT.16
PANEL.
CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING
FOR THE NEW PANEL "A". THE NEW 100A , 3-P0LE, 240V
THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42
PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN
J
A-1,3,5
A-2,4,6
A-7,9,11 14 18
A-13,15,17
A-8,10,12
18 NEW 3 #10 THHN, 1 #10 THHN G IN 1/2 " EMT.
A-14,16,18
4 5
P
J
J
J
JJ
9 11
JJ
7,9
8,10
J17
NEW 4 #10 THHN, 1 #10 THHN G IN 3/4" EMT.
THE COLOR OF ADJACENT WALL.
PANELBOARD. THE COLOR OF THE CHASE SHALL MATCH
CONDUITS FROM EXISTING CEILING TO NEW ELECTRICAL
CONTRACTOR SHALL BUILD A CHASE TO COVER EXPOSED
J
NEW 200A 3-POLE SAFETY SWITCH.
25 29
27 28
13 29
TRANSFORMER FOR NEW CHILLER.
3 PHASE, 120/208V FROM THIS EXISTING PAD MOUNTED
PHASE TERMINAL LUGS AND NEUTRAL TERMINAL LUG TO OBTAIN
CONNECT 4 NEW #2/0 RHW-2 WIRES TO EXISTING SECONDARY
NEW 4 #2/0 RHW-2 IN 3" SCH 80 PVC CONDUIT.
NEW 4 #2/0 RHW-2 IN 3" RGS CONDUIT.
TO EXISTING PAD MOUNTED TRANSFORMER.
SHALL BE PROVIDED AS REQUIRED FOR CONNECTING NEW WIRES
NEW COPPER EXTENSION LUGS AND COPPER TERMINAL LUGS
REQUIRED.
NEW COPPER TERMINAL LUGS SHALL BE PROVIDED AS
NEW 4 #2/0 RHW-2, 1 #6 RHW-2 G IN 3" RGS CONDUIT. 32
DETAIL AND EXACT LOCATION.
NEW CHILLER, 33.57 KW, 208V, 3-PHASE . SEE MECHANICAL FOR
EXISTING CHILLER TO REMAIN.
6' X 3' X 6" CONCRETE PAD.
MOUNTING RACK SHALL BE MOUNTED ON A NEW
POWER METER AND SAFETY SWITCH. THE NEW
MOUNTING CURRENT TRANSFORMERS ENCLOSURE,
PROVIDE NEW GALVANIZED STEEL MOUNTING RACK FOR
NEW #2 BARE COPPER IN 1" RGS CONDUIT. 22
NEW #2 BARE COPPER, 2' BELOW GRADE.
2' BELOW GRADE.
NEW EXOTHERMICALLY WELDED CONNECTION,
MANUFACTURER'S RECOMMENDATIONS.
PROVIDE FUSES IN ACCORDANCE WITH
NEW 4 #12 RHW-2, 1 #12 RHW-2 G IN 3/4" RGS CONDUIT.26
IN NEMA 3R ENCLOSURE, 24" X 24" X 10".
2 WIRE, 4" WINDOW, 0.3 ANSI ACCURACY CLASS,
3 NEW CURRENT TRANSFORMERS, 300:5A, 60HZ,
NEW POWER METER IN NEMA 4X ENCLOSURE.
EXISTING 400A 3-POLE SAFETY SWITCH TO REMAIN.
U G
P
J J
34 NEW 4 #2/0 RHW-2 IN 3" RGS CONDUIT.
EXISTING DUCT TO REMAIN.36
JUNCTION BOX.
AS REQUIRED FOR MOUNTING THE NEW
NEW RGS MOUNTING RACK SHALL BE PROVIDED
LOUNGE
D DD
N O
T
D
P
L A
N
Attachment 9 - SEED Project Drawings 4702
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E8
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
N O
R T
H
SECOND FLOOR
NOTES FOR THIS SHEET:
EXISTING PANEL "2P4" TO REMAIN
EXISTING PANEL "2P5" TO REMAIN
EXISTING PANEL "2P1" TO REMAIN
EXISTING PANEL "2P2" TO REMAIN
EXISTING PANEL "2P3" TO REMAIN
P
6 7
NEW PARTIAL POWER PLAN - BLDG. 4702
2P1-21
2P1-25
2P4-25
COMM.
COMM.
3 3 3 3 3 3 3 3
3 3 3 3 3 3
LOCATION.
NEW FAN COIL UNIT. SEE MECHANICAL FOR DETAIL AND EXACT
AS REQUIRED FOR MOUNTING STARTER AND SAFETY SWITCH.
NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED
4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5
4 54 54 54 5 4 54 54 54 5
4 5 4 5
4 54 5
4 5
4 5
4 5
4 5
4 5
4 5 28
29 30 31 32
34 35 36
3738394041424344
2P4-38,40,42
J
B-1,3,5
B-2,4,6
2P1-19
2P1-23
B-7,9,11
B-8,10,12
8 12
B-13,15,17
P
B-14,16,18
B
B-21
NEW 2 #10 THHN, 1 #10 THHN G IN •" EMT.8
9 NEW PANEL "B".
NEW 4 #1 THHN, 1 #6 THHN IN 2" EMT.10
PANEL.
CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING
FOR THE NEW PANEL "B". THE NEW 100A , 3-P0LE, 240V
THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42
PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN
12 NEW 3 #10 THHN, 1 #10 THHN G IN 1/2 " EMT.
13 NEW 4 #10 THHN, 1 #10 THHN G IN 3/4" EMT.
THE COLOR OF ADJACENT WALL.
PANELBOARD. THE COLOR OF THE CHASE SHALL MATCH
CONDUITS FROM EXISTING CEILING TO NEW ELECTRICAL
CONTRACTOR SHALL BUILD A CHASE TO COVER EXPOSED
J17
JJ
7,9
JJ
10 12
8,10
8 8
J
J 2,4
J
J
N O
T
D
P
L A
N
Attachment 9 - SEED Project Drawings 4702
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
E9
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
SAFETY
SWITCH
NUMBER
RATED
VOLT
RATED
AMP
NO. OF
POLES
FUSIBLE
FUSE
VOLT AMP TYPE
NEMA
TYPE
REMARKS
DUAL
ELEMENT
DUAL
ELEMENT
240 1
DUAL
ELEMENT
YES
YES
YES
YES
YES
DUAL
DUAL
ELEMENT
ELEMENT
YES
YES
YES
YES
YES
YES
YES
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
30 YES
DUAL
ELEMENT
30 YES
DUAL
ELEMENT
24014
30 250
30 YES
DUAL
ELEMENT
24015 250
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
YES
YES
YES
YES
YES
DUAL
DUAL
ELEMENT
ELEMENT
YES
YES
YES
YES
YES
YES
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
30 YES
DUAL
ELEMENT
30 YES
DUAL
ELEMENT
24028
30 250
30 YES
DUAL
ELEMENT
24029 250
2 15
HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
DUAL
ELEMENT
DUAL
ELEMENT
YES
YES
YES
YES
DUAL
DUAL
ELEMENT
ELEMENT
YES
YES
YES
YES
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
30 YES
DUAL
ELEMENT
30 YES
DUAL
ELEMENT
24039
30 250
30 YES
DUAL
ELEMENT
24040 250
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
SAFETY
SWITCH
NUMBER
RATED
VOLT
RATED
AMP
NO. OF
POLES
FUSIBLE
FUSE
VOLT AMP TYPE
NEMA
TYPE
REMARKS
DUAL
ELEMENT
DUAL
ELEMENT
YES
YES
YES
YES
YES
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
240 30
30 250
NEW SAFETY SWITCH SCHEDULE NEW SAFETY SWITCH SCHEDULE
1 HEAVY DUTY, SINGLE THROW
HEAVY DUTY, SINGLE THROW
HEAVY DUTY, SINGLE THROW
HEAVY DUTY, SINGLE THROW
HEAVY DUTY, SINGLE THROW
DUAL
ELEMENT
DUAL
ELEMENT
240 1
DUAL
ELEMENT
YES
YES
YES
YES
YES
YES
YES
YES
YES
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
240 30
30 250
2 12
HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
1 HEAVY DUTY, SINGLE THROW
S C
H E
D U
L E S S
Attachment 9 - SEED Project Drawings 4702
PLANK FENCE AS REQUIRED.
SAW OFF EXISTING METAL
CONCRETE PAD
EXISTING
PLANK FENCE AS REQUIRED.
SAW OFF EXISTING METAL
CONCRETE PAD
EXISTING
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
1 1
1 2
GN 0A 0B 0C
NEUTRAL
BAR GROUND BAR
SPARE
SPARE
20A
20A
20A
20A
20A
20A
20A
20A
20A
100A
100A
20A
20A
20A
20A
20A
FC UNIT
FC UNIT
120/208V, 3 PHASE, 60Hz, 100A, 22,000 A.I.C., SURFACE
MOUNTED, MLO, WITH NEUTRAL BAR, GROUND BAR, AND
BRANCH CIRCUIT BREAKERS AS SHOWN BELOW
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
SPARE
SCALE: NOT TO SCALE
NEW PANEL "A" SCHEDULE
20A
20A
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
20A
20A
20A
20A
20A
FC UNIT
FC UNIT
FC UNIT
FC UNIT
SPARE
25 26
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
20A
20A
20A 23
1 1
1 2
GN 0A 0B 0C
NEUTRAL
BAR GROUND BAR
SPARE
SPARE
20A
20A
20A
20A
20A
20A
20A
20A
20A
100A
100A
20A
20A
20A
20A
20A
FC UNIT
FC UNIT
120/208V, 3 PHASE, 60Hz, 100A, 22,000 A.I.C., SURFACE
MOUNTED, MLO, WITH NEUTRAL BAR, GROUND BAR, AND
BRANCH CIRCUIT BREAKERS AS SHOWN BELOW
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
SPARE
SCALE: NOT TO SCALE
NEW PANEL "B" SCHEDULE
20A
20A
FC UNIT
FC UNIT
FC UNIT
FC UNIT
FC UNIT
20A
20A
20A
20A
20A
FC UNIT
FC UNIT
FC UNIT
FC UNIT
SPARE
25 26
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
20A
20A
20A
30 YES
DUAL
ELEMENT
24055 2503 25 1
DUAL
ELEMENT
DUAL
ELEMENT
240 1
YES
YES
YES
YES
YES
DUAL
ELEMENT
DUAL
ELEMENT
DUAL
ELEMENT
240 30
30 250
3 12
25 RGS MOUNTING BRACKET AS REQUIRED.
HEAVY DUTY, SINGLE THROW, PROVIDE
RGS MOUNTING BRACKET AS REQUIRED.
HEAVY DUTY, SINGLE THROW, PROVIDE
RGS MOUNTING BRACKET AS REQUIRED.
HEAVY DUTY, SINGLE THROW, PROVIDE
RGS MOUNTING BRACKET AS REQUIRED.
HEAVY DUTY, SINGLE THROW, PROVIDE
SAFETY
SWITCH
NUMBER
RATED
VOLT
RATED
AMP
NO. OF
POLES
FUSIBLE
FUSE
VOLT AMP TYPE
NEMA
TYPE
REMARKS
NEW SAFETY SWITCH SCHEDULE
17.5
RGS MOUNTING BRACKET AS REQUIRED.
HEAVY DUTY, SINGLE THROW, PROVIDE
RGS MOUNTING BRACKET AS REQUIRED.
HEAVY DUTY, SINGLE THROW, PROVIDE
61 240 3RYES
DUAL
ELEMENT
2503200 175
200A COPPER EQUIPPMENT GROUNDING BAR.
WITH 200A COPPER NEUTRAL BAR AND
HEAVY DUTY, SINGLE THROW, EQUIPPED
SCALE: NOT TO SCALE
DETAILD1
E7
NEW DOUBLE
LOCKNUTS & BUSHINGS
GRADE
NEW SCH 80 PVC
SCREW COVER, PAINT
NEW WEATHERPROOF
NEMA 3R JUNCTION BOX,
24" X 24" X10 " WITH
METAL PLANK FENCE
TO MATCH EXISTING
PLANK FENCE
EXISTING METAL
NEW RGS COUPLING,3"
PLASTIC COATED
NEW 3" RGS ELBOW,
CONDUIT, 3"
NEW 3" RGS ELBOW
NEW 3" RGS CONDUIT
NEW RGS CONDUIT STRAP
TRANSFORMER
PAD MOUNTED
TO EXISTING
NEMA 3R JUNCTION BOX
TO NEW WEATHERPROOF
SCALE: NOT TO SCALE
DETAILD2
E7 E10
E10
NEW DOUBLE
LOCKNUTS & BUSHINGS
GRADE
NEW SCH 80 PVC
SCREW COVER, PAINT
NEW WEATHERPROOF
NEMA 3R JUNCTION BOX,
24" X 24" X10 " WITH
METAL PLANK FENCE
TO MATCH EXISTING
PLANK FENCE
EXISTING METAL
NEW RGS COUPLING,3"
PLASTIC COATED
NEW 3" RGS ELBOW,
CONDUIT, 3"
NEW 3" RGS ELBOW
NEW RGS CHANNEL
NEW 3" RGS CONDUIT
NEW RGS CONDUIT STRAP
NEMA 3R JUNCTION BOX
TO NEW WEATHERPROOF
ENCLOSURE
TRANSFORMER
TO NEW CURRENT
NEW 3" RGS CONDUIT
NEW 3" RGS CONDUIT
NEW RGS CHANNEL
ADAPTER,3"
NEW STEEL TO PVC
ADAPTER, 3"
NEW STEEL TO PVC
NEW RGS COUPLING,3"
E10
S C
H E
D U
L
T
A
IL
S
NEW RGS COUPLING,3"
Attachment 9 - SEED Project Drawings 4702
16 16 16 16
15 15 15 1515 15
SCALE: NOT TO SCALE
10'
$$$$$$$$$$USER$$$$$$$$$$
SYTIME$$$$$$$$$$$
C e n te r o f
E x c e ll e n c e
DRAWING NO
D E S
IG
N E
D B
Y D
R A
W N B
Y C
H
IE
F E
N G
R D
IV
P R
O
JE
C T N
O D
A T E
D A
T E
D E S
C R
IP
T
IO
N B
Y
C H
E C
K E
D B
Y
F O
R T S
IL
L
O K
L A
H O
M A
R E
V
IS
IO
N
D
IR
E C
T O
R A
T E
P U
B L
IC
W
O R
K S
O F
G .Y
G .Y
F P
D
21007
JU
L
B U
IL
D
IN
G
K Q -7 J
R E P
A C
S
Y S
T E
EXISTING MAIN DISTRIBUTION SWITCHBOARD "MDP"
2 3 4 5 6 7
EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
EXISTING EXISTING EXISTING EXISTING
100A M.L.O.
PANELBOARD
120/208V
3PH, 4W
100A M.L.O.
PANELBOARD
120/208V
3PH, 4W
NEW
"A"
NEW
"B"
EXISTING SWITCHBOARD SCHEDULE
DESCRIPTIONMARK
NOTES FOR THIS SHEET:
NEW 4 #1 THHN, 1 #6 THHN IN 2" EMT.
EXISTING SERVICE ENTRANCE GROUND TO REMAIN.
EXISTING 300 KVA PAD MOUNTED TRANSFORMER TO REMAIN.
1 1
REQUIRED.
NEW COPPER TERMINAL LUGS SHALL BE PROVIDED AS
ESTIMATED DEMAND: 150.5kVA
TOTAL CONNECTED LOAD: 453.7kVA
COPPER
800A
120/208V; 3PH; 4W
NEUTRAL RATING:ENCLOSURE TYPE:
SWITCHBOARD ID:
TRIP
BUS MATERIAL:
BUS RATING:
VOLTAGE:
FRAMEMARK POLES
800ASURFACE
MDP
LOAD DESCRIPTION kVA
INCOMING FEED: TOP AVAILABLE FAULT CURRENT:18,000A
PANELBOARD "BP"225 225 3 37.2
PANELBOARD "1P1"225 225 3 124.1
PANELBOARD "1P4"225 225 3 70.0
PANELBOARD "2P1"225 225 3 122.6
PANELBOARD "2P4"225 225 3 71.0
800A; 3PH; 4W; 120/208V
SPARE
"BP"
120/208V
3PH, 4W
225A M.L.O.
PANELBOARD
225A/3P
"1P2"
120/208V
3PH, 4W
100A M.L.O.
PANELBOARD PANELBOARD
100A M.L.O.
3PH, 4W
120/208V
"1P3"
225A/3P
"1P1"
120/208V
3PH, 4W
225A M.L.O.
PANELBOARD
PANELBOARD
"2P2"
120/208V
3PH, 4W
100A M.L.O.
PANELBOARD
"2P3"
100A M.L.O.
3PH, 4W
120/208V
225A M.L.O.
"2P1"
PANELBOARD
3PH, 4W
120/208V
225A/3P
100A M.L.O.
PANELBOARD
120/208V
3PH, 4W
"1P5"
225A M.L.O.
"1P4"
PANELBOARD
3PH, 4W
120/208V
225A/3P
120/208V
PANELBOARD
100A M.L.O.
3PH, 4W
"2P5"
120/208V
PANELBOARD
225A M.L.O.
3PH, 4W
"2P4"
225A/3P 100A/3P
800A M.C.B.
13200-120/208V
25A
DUAL SENSING
10kV
TYPE K
30A
EXISTING OVERHEAD PRIMARY; 13.2kV
10kV
CIRCUIT
MONITOR
SPARE100 100 3 14.4
100 100 3 SPARE 14.4
DEMAND AMPS: 418A
SPARE
100A/3P
8 100 - 3 SPACE ONLY -
9 SPACE ONLY100 - 3 -
10 SPACE ONLY100 - 3 -
3#4 CU PRI, 1#4 CU NEUT TO REMAIN
4"C-3#2-15kV,1/C,SHIELDED,133%,1-#2 600V
GND, 1-4"C SPARE
2-3"C-4#500
1 1/4"C-4#2,1#8GND
2 1/2"C-4#4/0,1#4GND
#2/0 BARE COPPER
#2 SOLID COPPER
#1/0 BARE COPPER
PANEL.
CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING
FOR THE NEW PANEL "A". THE NEW 100A , 3-P0LE, 240V
THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42
PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN
PANEL.
CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING
FOR THE NEW PANEL "B". THE NEW 100A , 3-P0LE, 240V
THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42
PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN
9 10
NEW ELECTRICAL RISER DIAGRAM - BLDG. 4702
NEW 200A 3-POLE SAFETY SWITCH.
NEW #2 BARE COPPER IN 1" RGS CONDUIT.
NEW #2 BARE COPPER, 2' BELOW GRADE.
2' BELOW GRADE.
NEW EXOTHERMICALLY WELDED CONNECTION,
MANUFACTURER'S RECOMMENDATIONS.
PROVIDE FUSES IN ACCORDANCE WITH
NEW 4 #12 RHW-2, 1 #12 RHW-2 G IN 3/4" RGS CONDUIT.
18 19 17
IN NEMA 3R ENCLOSURE, 24" X 24" X 10".
2 WIRE, 4" WINDOW, 0.3 ANSI ACCURACY CLASS,
3 NEW CURRENT TRANSFORMERS, 300:5A, 60HZ,
EXISTING
CHILLER
84.8kW
350AF
400AS
DETAIL AND EXACT LOCATION.
NEW CHILLER, 33.57 KW, 208V, 3-PHASE . SEE MECHANICAL FOR
NEW 4 #2/0 RHW-2 IN 3" SCH PVC CONDUIT.
NEW 4 #2/0 RHW-2, 1 #6 RHW-2 G IN 3" RGS CONDUIT.
NEW 4 #2/0 RHW-2 IN 3" RGS CONDUIT.
TO EXISTING PAD MOUNTED TRANSFORMER.
SHALL BE PROVIDED AS REQUIRED FOR CONNECTING NEW WIRES
NEW COPPER EXTENSION LUGS AND COPPER TERMINAL LUGS
TRANSFORMER FOR NEW CHILLER.
3 PHASE, 120/208V FROM THIS EXISTING PAD MOUNTED
PHASE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .