About this file

This document provides details for a solicitation to establish a Multiple Award Task Order Contract for maintenance, repair, and minor construction services at Fort Sill. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis as number W9124L-23-B-0001. Work under the MATOC may include multiple construction disciplines such as general building repair, HVAC, civil, structural, mechanical, painting, roofing, paving, and related incidental work. The scope involves execution of a broad range of construction affecting real property at Fort Sill, including demolition, repair, and alteration of buildings.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Sill MATOC - Solicitation, newest first.
File Type Posted
Solicitation W9124L23B0001-0006 MATOC 4-25-2023.pdf PDF
Amendment W9124L23B0001-0006 4-25-2023.pdf PDF
Attachment 2 - Fort Sill MATOC Base Specifications - Rev 2-4-25-2023.pdf PDF
Amendment W9124L23B0001-0005 4-24-2023.pdf PDF
Attachment 19 - Fort Sill MATOC QA Technical.pdf PDF
Solicitation W9124L23B0001-0005 MATOC 4-24-2023.pdf PDF
Amendment W9124L23B0001-0004 MATOC.pdf PDF
Attachment 18 - Fort Sill MATOC QA Technical.pdf PDF
Solicitation W9124L23B0001-0004 MATOC.pdf PDF
Solicitation W9124L23B0001-0003 MATOC.pdf PDF
Attachment 16-Ft Sill Air Cooled Chiller Options R07-22-2022.pdf PDF
Attachment 17 Ft Sill Mechanical Design Guide R03-14-2023.pdf PDF
Attachment 14- AS BUILTS 4-6-2023.pdf PDF
Attachment 8 - SEED Project SOW - Specifications-Rev1-4-6-2023.pdf PDF
Attachment 2 - Fort Sill MATOC Base Specifications-Rev1-4-6-2023.pdf PDF
Attachment 15-Asbestos Inspection Report -1-17-2013.pdf PDF
Attachment 13- Fort Sill MATOC QA Technical.pdf PDF
Amendment W9124L23B0001-0003 MATOC.pdf PDF
Attachment 9- SEED Project Drawings 4702-Revised 0003.pdf PDF
Attachment 10-TOC 21-007 SUBMITTAL REGISTER-Rev1-4-6-2023.pdf PDF
Exhibit G - Fort Sill OK Contractor Weather Report Submittal.pdf PDF
Amendment 2 - W9124L23B0001 0002.pdf PDF
Exhibit H - Fort Sill OK Contractor Material Delay Time Extension Request.pdf PDF
Solicitation - W9124L23B0001 0002.pdf PDF
Attachment 12 - Fort Sill MATOC QA MICC.pdf PDF
Solicitation - W9124L23B0001 0001.pdf PDF
Attachment 11 - Site Visit Attendees 3.8.2023_Redacted.pdf PDF
Amendment 1 - W9124L23B0001 0001.pdf PDF
Exhibit F - FS Form 94_PAYMENT ESTIMATE - CONTRACT PERFORMANCE.pdf PDF
Exhibit A -ContractProgressReport.pdf PDF
Attachment 4 - General Decision Number OK20230023 - Heavy - dated 01.06.2023.pdf PDF
Attachment 2 - Fort Sill MATOC Base Specifications.pdf PDF
Attachment 1 - SOW MATOC SILL-Rev3-2-14-2023.pdf PDF
Exhibit B - ContractorsQualityControlDailyReport.pdf PDF
Exhibit C-FS_Form_4025.pdf PDF
Exhibit D -SF1413.pdf PDF
Attachment 7 - ODOT 2019 -FULL-SPEC-Web-Version.pdf PDF
Attachment 6 - General Decision Number OK20230077 - Residential - dated 01.06.2023.pdf PDF
Attachment 8 - SEED Project SOW Specifications.pdf PDF
Attachment 3 - General Decision Number OK20230014 - Highway - dated 01.06.2023.pdf PDF
Exhibit E -SWPPP review 2023 check sheet.pdf PDF
Attachment 10 - TOC 21-007 SUBMITTAL REGISTER.pdf PDF
Attachment 5 - General Decision Number OK20230043 - Building - dated 02.10.2023.pdf PDF
Solicitation W9124L23B0001-2-24-2023.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 9 - SEED Project Drawings 4702 W9124L-23-B-0001 Fort Sill MATOC

TAG MANUFACTURER

MODEL REFRIGERANT CAPACITY (TON)

NOMINAL / REFRIGERATION

COOLING

FLUID

EWT / LWT

(°F)

DESIGN / MIN

(GPM)

FPD

(FT-H2O)

EAT

(°F) V / PH / HZ TOTAL POWER

(KW)

OC-2 TRANE / CGAM R410A 30.00 / 26.97 10% PG 56.00 / 44.00 54.89 / 33.40 11.7 100.0 208 / 3 / 60 33.57

NOTES

PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE

SUBMITTED FOR APPROVAL.

PROVIDE WITH: ISOLATION VALVES, INSULATION, HEAT TRACE, AND A 100 GAL BUFFER TANK INSTALLED IN MECHANICAL ROOM.

MUST COMPLY WITH AHRI 370 AND ASHRAE 90.1/CSA.

PROVIDE TAB AND SOUND TEST REPORTS.

TAG MANUFACTURER

MODEL

DIMENSIONS (IN)

H x W x L V / HZ / PH FLA / MCA

(A)

MOTOR

(HP)

SUPPLY

(CFM) BHP ESP

(IN-H2O)

FLUID

TYPE

EFT / LFT

(°F) GPM WPD

(FT-H2O)

EAT / DAT

(DBT °F)

CAPACITY

(MBH)

FLUID

TYPE

EFT / LFT

(°F) GPM WPD

(FT-H2O)

EAT (°F)

(DBT / WBT)

LAT (°F)

(DBT / WBT)

CAPACITY (MBH)

TOTAL / SENSIBLE

FLUID

TYPE

EFT / LFT

(°F) GPM WPD

(FT-H2O)

EAT / DAT

(DBT °F)

CAPACITY

(MBH)

DOA-1 TRANE / CSAA012 83.0 x 66.5 x 118.1 200-208 / 60 / 3 23.50 / 29.00 5.00 4800 4.889 2.00 WATER 180.00 / 160.00 27.97 2.44 16.00 / 72.00 280.11 10% PG 44.00 / 56.00 48.6 5.50 100.00 / 73.00 55.00 / 54.64 287.58 / 229.11 WATER 180.00 / 160.00 15.27 0.76 50.00 / 79.38 152.95

NOTES

5 THE UNIT SHALL NOT BE RUN DURING CONSTRUCTION TO COOL OR HEAT THE BUILDING.

PROVIDE WITH 2 SETS 2-INCH PLEATED MERVR8 DISPOSABLE FILTER.

ELECTRICAL INFO FAN INFOUNIT INFO PRE-HEAT COIL INFO COOLING COIL INFO RE-HEAT COIL INFO

PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR APPROVAL.

100% OUTSIDE AIR UNIT WITH NO RETURN AIR.

PROVIDE SOFT SATRT.

PROVIDE WITH SINGLE POINT POWER CONNECTION WITH FUSED DISCONNECT.

TAG MANUFACTURER MODEL SERVICE RATED MBH

(INPUT / OUTPUT)

NATURAL GAS

KPA

(MIN / MAX)

FLUID

TYPE

EFT / LFT

(°F)

RATED GPM

(AT Δ20°F)

MIN / MAX

GPM

FPD

(PSI / FT-H2O) V / PH / HZ FLA

(AMP)

AHRI THERMAL

EFFICIENCY (%)

HB-1 FULTON EDR-1500 HEATING 1,500 / 1,402.50 1 / 7 WATER 180 / 160 140 N/A 0.80 / 1.85 120 / 1 / 60 20 93.50

NOTES PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR

APPROVAL.

TAG MANUFACTURER MODEL PD

(FT-H2O)

PIPE SIZE

(IN)

DESIGN

(PSI / °F) NOTES

AD-1 TACO 4904ADHR-125 0.36 4 150 / 240 1

AD-2 TACO 49025ADHTR-125 0.38 2.5 150 / 240 1

AD-3 TACO 4904ADHR-125 0.44 4 150 / 240 1

NOTES

PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER

AND/OR MODEL OF THE SAME CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.

PROVIDE WITH AUTOMATIC AIR VENT, FLUSH VALVE, AND BLOWDOWN VALVE.

TAG MANUFACTURER / TACO FLOW RATE

(GPM)

HEAD

(FT-H2O)

MOTOR

(HP) V / PH / HZ NOTES

HP-1 TACO / SCI2506D 135 25 1.5 208 / 3 / 60 1, 2, 3

HP-2 TACO / SCI1506D 55 17 1.5 208 / 3 / 60 1, 2, 3

HP-3 TACO / SCI2506D 150 20 1.5 208 / 3 / 60 1, 2, 3

NOTES

PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER

AND/OR MODEL OF THE SAME CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.

CLOSE-COUPLED END SUCTION PUMPS.

PROVIDE WITH STRAINER TYPE SUCTION DIFFUSER.

ALIGN THE PUMPS PRIOR TO GROUTING IN BASE.

TAG MANUFACTURER MODEL VOLUME

(GPM)

DESIGN

(PSI / °F) NOTES

XT-1~3 TACO CA90-125 23 150 / 240 1, 2

NOTES

PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY.

ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME

CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.

ACCEPTANCE BLADDER TYPE EXPANSION TANK.

PROVIDE WITH AUTOMATIC VENT.

TAG MANUFACTURER

TYPE SIZE QTY V / HZ / PH MOTOR

HP

DESIGN

CFM

FLUID

TYPE

EFT / LFT

(°F) GPM WPD

(FT-H2O)

TOTAL

MBH

FLUID

TYPE

EFT / LFT

(°F) GPM WPD

(FT-H2O)

TOTAL

MBH

FC-1 TRANE / FCDB 100 2 115 / 60 / 1 0.13 / 0.22 800 10% PG 44.00 / 55.87 4.27 6.65 25.00 WATER 180.00 / 160.00 2.98 3.11 29.82 1, 2, 3, 4, 5

FC-2 TRANE / FCCB 60 39 115 / 60 / 1 0.22 700 10% PG 44.00 / 55.63 2.25 2.70 13.00 WATER 180.00 / 160.00 1.84 0.80 18.40 1, 2, 3, 6

FC-3 TRANE / FCCB 100 1 115 / 60 / 1 0.13 / 0.22 600 10% PG 44.00 / 55.61 3.49 4.70 20.00 WATER 180.00 / 160.00 2.61 2.46 26.13 1, 2, 3, 4, 6

FC-4 TRANE / FCCB 60 5 115 / 60 / 1 0.22 700 10% PG 44.00 / 55.20 2.54 3.35 14.00 WATER 180.00 / 160.00 1.84 0.80 18.41 1, 2, 3, 6

FC-5 TRANE / FCCB 40 7 115 / 60 / 1 0.13 400 10% PG 44.00 / 54.64 1.91 8.08 10.00 WATER 180.00 / 160.00 1.09 0.25 10.92 1, 2, 3, 6

FC-6 TRANE / FCHB 100 2 115 / 60 / 1 0.13 / 0.22 750 10% PG 44.00 / 55.60 4.20 6.45 24.00 WATER 180.00 / 160.00 2.89 2.95 28.95 1, 2, 3, 4, 7

NOTES

7 PROVIDE WITH FRONT STAMP LOUVER INLET AND FRONT STAMPED LOUVER OUTLET.

PROVIDE WITH EMERGENCY DRAIN PAN & CONDENSATION OVER FLOW DITECTION.

PROVIDE WITH 2-WAY MODULATING PIPE PACKAGE WITH AUTO FLOW VALVES.

PROVIDE WITH 1-INCH THROW AWAY FILTER.

PROVIDE WITH BOTTOM STAMPED LOUVER INLET AND FRONT BAR GRILLE OUTLET.

PROVIDE WITH BACK DUCT COLLAR INLET AND FRONT DUCT COLLAR OUTLET.

TWO MOTOR FAN UNIT.

PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR APPROVAL.

FAN INFO COOLING COILUNIT INFO HEATING COIL

NOTES

TAG CFM

(RANGE)

SIZE

(IN)

NECK SIZE

(IN) FUNCTION ΔP

(IN-H2O) MATERIAL COLOR MANUFACTURER

MODEL NOTES

MD-A 30 ~ 60 12 x 12 4 MAKE-UP 0.01 STEEL WHITE TITUS / TMS 1, 5

RG-B 295 ~ 540 24 x 24 22 x 22 RETURN 0.01 STEEL WHITE TITUS / PXP 2, 5

SD-C 350 ~ 400 22 x 8 20 x 6 SUPPLY - STEEL WHITE TITUS / 300 RL 3, 6, 7

TG-D 50 14 x 8 12 x 6 TRANSFER 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6

EG-E 50 10 x 8 8 x 6 EXHAUST 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6

SD-F 600 50 x 8 48 x 6 SUPPLY 0.05 STEEL WHITE TITUS / 300 RL 3, 6, 7

MD-G 140 ~ 150 12 x 12 8 MAKE-UP 0.03 ALUMINUM WHITE TITUS / TMS-AA 1, 5, 7

MD-H 250 18 x 6 16 x 6 MAKE-UP 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6

SD-I 400 44 x 8 42 x 6 SUPPLY 0.05 STEEL WHITE TITUS / 300 RL 3, 6, 7

EG-J 20 8 x 8 6 x 6 EXHAUST < 0.01 ALUMINUM WHITE TITUS / 355 FL 4, 6

SD-K 350 24 x 24 12 SUPPLY 0.03 STEEL WHITE TITUS / TMS 1, 5

NOTES

LAY-IN, T-BAR MOUNTING

SURFACE, SIDEWALL MOUNTING

OPPOSED BLADE DAMPER

PRODUCT LISTED ABOVE IS THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER AND/OR MODEL OF

THE SAME CAPACITY AN QUALITY MAY BE SUBMITTED FOR APPROVAL.

LOUVERED, 3-CONE CEILING TYPE DIFFUSER

PERFORATED

DOUBLE DEFLECTION 3/4" SPACING 22 DEG ANGLE

SIGLE DEFLECTION 1/2" SPACING 35 DEG ANGLE

TAG MANUFACTURER MODEL CFM ESP

(IN-H2O)

MOTOR

(HP)

FLA

(AMP) VOLT / HZ / PH

SF-1 GREENHECK SS1-14-436-A 2,520 0.15 1/3 7.2 115 / 60 / 1

EF-1 GREENHECK CUBE-140 1,600 0.1 1/4 2.4 208 / 60 / 3

EF-2 GREENHECK CUBE-100 740 0.1 1/4 2.4 208 / 60 /3

NOTES PRODUCTS LISTED ABOVE ARE THE BASIS OF DESIGN ONLY. ALTERNATIVE MANUFACTURER

AND/OR MODEL OF THE SAME CAPACITY AND QUALITY MAY BE SUBMITTED FOR APPROVAL.

Attachment 9 - SEED Project Drawings 4702

BUILDING OCCUPANTS SHALL BE ABLE TO ADJUST THE SPACE TEMPERATURE 2 DEGREES UP

OR DOWN FROM THE FRONT END CONTROLLED SPACE SETPOINT. SPACE TEMPERATURE

SENSORS SHALL HAVE A MANUAL OVERRIDE THAT PLACES THE BUILDING IN THE OCCUPIED

MODE FOR A PERIOD OF 2 HOURS (ADJUSTABLE).

THE CONTROLS SYSTEM SHALL PROVIDE CONTINUOUS MONITORING FOR THE FOLLOWING

SYSTEMS AND/OR COMPONENTS. THIS MONITORING SHALL BE ACCOMPLISHED THROUGH

EQUIPMENT SENSORS AND CONTROL DEVICES. PROVIDE ADDITIONAL DEVICES AS REQUIRED

TO ACCOMPLISH THIS MONITORING. THE DDC SYSTEM SHALL BE CAPABLE OF DATA LOGGING

THIS INFORMATION AND REPORTING TO THE EMCS.

A. CONSTANT AND VARIABLE MOTOR LOADS

B. VFD OPERATION.

C. SUPPLY AIR TEMPERATURE.

D. OUTSIDE AIR TEMPERATURE.

E. HEATING WATER DIFFERENTIAL PRESSURE.

F. CHILLED WATER DIFFERENTIAL PRESSURE.

G. HEATING WATER SUPPLY AND RETURN TEMPERATURE.

H. CHILLED WATER SUPPLY AND RETURN TEMPERATURES.

I. BUILDING/EQUIPMENT ALARMS.

G R

A P

H

IC

A N

A

LO

G H

A R

D W

A R

E

IN

P U

T (A

I)

B

IN

A R

Y H

A R

D W

A R

E

IN

P U

T (B

I)

A N

A

LO

G H

A R

D W

A R

E O

U

TP

U T

(A O

B

IN

A R

Y H

A R

D W

A R

E O

U

TP

U T

(B O

S O

FT

W

A R

E P

O

IN

T (S

FT

H A

R D

W A

R E

IN

TE

R

LO

C K

(H D

W

W

IR

E

LE

S S

(W

LS

N E

TW

O

R K

(N E

T)

H

IG

H A

N A

LO

G

L

IM

IT

LO

W

A N

A

LO

G L

IM

IT

B

IN

A R

Y

LA

TC

H D

IA

G

N O

S

TI

C

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

TI

O

N F

A

IL

CHWP CHILLED WATER PUMP

START STOP

X X

CHWP CHILLED WATER PUMP

STATUS

X X

CHWP CHILLED WATER PUMP

VFD SPEED

X X

CHWR T CHILLED WATER RETURN

TEMPERATURE

X X X X

CHWS T CHILLED WATER SUPPLY

TEMPERATURE

X X X X

CH CHW DP CHILLER CHILLED WATER

DIFFERENTIAL PRESSURE

X X X X

CH CHW FLW CHILLER CHILLED WATER

FLOW STATUS

X X

CH CHWP R CHILLER CHILLED WATER PUMP

REQUEST FROM CHILLER

X X

BAS COM BAS COMMUNICATION STATE X X

SYS EN CHILLER PLANT ENABLE X X

CHW SUP TMP SP CHILLED WATER SUPPLY

TEMPERATURE SETPOINT

X

OAT ENA SP OUTDOOR AIR TEMPERATURE

ENABLE SETPOINT

X

POINT ALARMSYSTEM POINT DESCRIPTION

OUTSIDE CHILLER UNIT POINT LIST

G R

A P

H

IC

A N

A

LO

G H

A R

D W

A R

E

IN

P U

T (A

I)

B

IN

A R

Y H

A R

D W

A R

E

IN

P U

T (B

I)

A N

A

LO

G H

A R

D W

A R

E O

U

TP

U T

(A O

B

IN

A R

Y H

A R

D W

A R

E O

U

TP

U T

(B O

S O

FT

W

A R

E P

O

IN

T (S

FT

H A

R D

W A

R E

IN

TE

R

LO

C K

(H D

W

W

IR

E

LE

S S

(W

LS

N E

TW

O

R K

(N E

T)

H

IG

H A

N A

LO

G

L

IM

IT

LO

W

A N

A

LO

G L

IM

IT

B

IN

A R

Y

LA

TC

H D

IA

G

N O

S

TI

C

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

TI

O

N F

A

IL

B ALM BOILER ALARM X X X

B ALM BOILER ENABLE COMMAND X X

B LOOP T BOILER LOOP TEMPERATURE LOCAL X X X X

BP BOILER PUMP START STOP OUTPUT X X

BP BOILER PUMP STATUS X X

HW DP HOT WATER DIFFERENTIAL

PRESSURE

X X X

HWR T HOT WATER RETURN TEMPERATURE

LOCAL

X X X X

HWS T HOT WATER SUPPLY TEMPERATURE

LOCAL

X X X X

BAS COM BAS COMMUNICATION STATE X

HW RES HL HOT WATER RESET HIGH LIMIT X

HW RES LL HOT WATER RESET LOW LIMIT X

HWS T SP HOT WATER DISTRIBUTION SUPPLY

TEMPERATURE SETPOINT

X

OAT ENA SP OUTSIDE AIR TEMPERATURE ENABLE

SETPOINT

X

POINT ALARMSYSTEM POINT DESCRIPTION

HEATING BOILER POINT LIST

DDC SYSTEM – GENERAL:

DIRECT DIGITAL CONTROLS (DDC) SYSTEM SHALL BE PROVIDED TO OPERATE BUILDING

MECHANICAL SYSTEMS AS DESCRIBED IN THE SEQUENCE OF OPERATION.

ALL CONTROL DEVICES SHALL BE ELECTRICALLY OR ELECTRONICALLY OPERATED.

PNEUMATIC CONTROL DEVICES SHALL NOT BE USED.

INDIVIDUAL CONTROLLERS SHALL BE PROVIDED FOR EACH PIECE OF EQUIPMENT OR ALL

CONTROLLERS SHALL COMMUNICATE WITH THE MASTER TEMPERATURE CONTROL PANEL.

THE MASTER TEMPERATURE CONTROL PANEL SHALL BE CAPABLE OF INTERFACING WITH ALL

EQUIPMENT AND SYSTEMS CONTROLLERS THROUGHOUT THE DDC SYSTEM. ALL SETPOINTS

AND PARAMETERS SHALL BE ACCESSIBLE THROUGH THE MASTER TEMPERATURE CONTROL

PANEL AND FRONT END TERMINAL.

THE BUILDING CONTROLS SYSTEM INTERFACE SHALL BE THROUGH BACNET FRONT END AT

BLDG 1950.

PROVIDE EMERGENCY SHUTDOWN SWITCH. THE SWITCH SHALL SHUTDOWN ALL HVAC

EQUIPMENT AND CLOSE ALL OUTSIDE AIR INTAKES. MANUAL RESET IS REQUIRED.

BUILDING AUTOMATION SYSTEM:

THE BUILDING AUTOMATION SYSTEM (BAS) SHALL BE A SINGLE COMPLETE SYSTEM SUITABLE

FOR, BUT NOT LIMITED TO, DIRECT DIGITAL CONTROL (DDC) OF THE HEATING, VENTILATING

AND AIR CONDITIONING (HVAC) SYSTEMS. THE BAS SHALL BE BASED ON AN OPEN

IMPLEMENTATION OF BACNET TECHNOLOGY.

A. THE SYSTEM SHALL BE OPEN IN THAT IT IS DESIGNED AND INSTALLED SUCH THAT THE

GOVERNMENT OR ITS AGENTS ARE ABLE TO PERFORM REPAIR, REPLACEMENT,

UPGRADES, AND EXPANSIONS OF THE SYSTEM WITHOUT FURTHER DEPENDENCE ON

THE ORIGINAL CONTRACTOR.

B. NECESSARY DOCUMENTATION (INCLUDING RIGHTS TO DOCUMENTATION AND DATA),

CONFIGURATION INFORMATION, CONFIGURATION TOOLS, PROGRAMS, DRIVERS, AND

OTHER SOFTWARE SHALL BE LICENSED TO AND OTHERWISE REMAIN WITH.

THE BAS SHALL MONITOR THE SCHEDULED OCCUPIED/UNOCCUPIED TIME, SPACE SETPOINTS

AND SPACE TEMPERATURE TO OPTIMIZE SYSTEM-LEVEL AND UNIT-LEVEL CONTROLS.

CHILLED WATER SYSTEM SEQUENCE OF OPERATION:

THE CHILLED WATER SYSTEM CONSISTS OF 70 TON (OC-1) AND 30 TON (OC-2) AIR COOLED

OUTSIDE CHILLER UNITS, COUPLED WITH AND DEDICATED VARIABLE FLOW CHILLED WATER

PUMPS (HP-1 AND HP-2 RESPECTIVELY).

CHILLER – RUN CONDITIONS:

THE CHILLER SHALL BE ENABLED TO RUN WHENEVER:

A FAN COIL UNIT CALLS FOR COOLING (OC-1)

A DOA UNIT CALLS FOR COOLING, AND/OR FOR DEHUMIDIFICATION (OC-2)

AND THE OUTSIDE AIR TEMPERATURE IS GREATER THAN (ADJUSTABLE) 55°F (OC-2)

TO PREVENT SHORT CYCLING, THE CHILLER SHALL RUN FOR AND BE OFF FOR A MINIMUM OF

15 MINUTES (BOTH USER DEFINABLE), UNLESS SHUTDOWN ON SAFETIES OR OUTSIDE AIR

CONDITIONS.

THE CHILLER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.

CHILLED WATER PUMP:

THE CHILLED WATER PUMP CONTROL SHALL BE INTEGRATED INTO THE CHILLER CONTROLS.

THE SYSTEM SHALL START A CHILLED WATER PUMP THROUGH A CONTACT CLOSURE OF THE

PUMP’S VARIABLE FREQUENCY DRIVE (VFD) RUN-ENABLE CONTACTS.

THE SYSTEM SHALL MONITOR THE CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE

SENSOR. WHEN THE PUMP VFD IS ENABLED, THE SYSTEM SHALL CONTROL THE ANALOG

SPEED SIGNAL THAT IS SENT TO THE PUMP VFD TO MAINTAIN THE CHILLED WATER

DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE).

THE CHILLED WATER PUMP OPERATION SHALL BE VERIFIED THROUGH VFD CURRENT

SENSOR. THE CURRENT SENSOR SHALL INITIATE AN ALARM SIGNAL TO THE PUMP

CONTROLLER WHENEVER THE PUMP IS NOT OPERATIONAL. UPON A PUMP FAILURE

(COMMANDED ON, BUT THE STATUS IS OFF), THE DDC SYSTEM SHALL SEND AN ALARM TO

THE FRONT END.

CHILLER:

THE CHILLER SHALL BE ENABLED AT USER ADJUSTABLE TIME AFTER PUMP STATUS IS

PROVEN ON. THE CHILLER SHALL THEREFORE HAVE A USER ADJUSTABLE DELAY ON START.

THE DELAY TIME SHALL BE SET APPROPRIATELY TO ALLOW FOR ORDERLY CHILLED WATER

SYSTEM START-UP, SHUTDOWN AND SEQUENCING.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

CHILLER FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.

CHILLER RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.

CHILLER RUNTIME EXCEEDED: STATUS RUN TIME EXCEEDS A USER DEFINABLE LIMIT.

CHILLED WATER SUPPLY TEMPERATURE:

THE CHILLED WATER SUPPLY TEMPERATURE SETPOINT SHALL RESET BASED ON RETURN

WATER TEMPERATURE. THE CHILLED WATER SUPPLY TEMPERATURE SHALL NOT EXCEED

50°F (ADJUSTABLE) IN ANY CASE.

THE FOLLOWING TEMPERATURES SHALL BE MONITORED:

CHILLED WATER SUPPLY.

CHILLED WATER RETURN

ALARMS SHALL BE PROVIDED AS FOLLOWS:

HIGH CHILLED WATER SUPPLY TEMPERATURE: IF THE CHILLED WATER SUPPLY

TEMPERATURE IS GREATER THAN 55°F (ADJUSTABLE).

LOW CHILLED WATER SUPPLY TEMPERATURE: IF THE CHILLED WATER SUPPLY

TEMPERATURE IS LESS THAN 40°F (ADJUSTABLE)

BOILER:

THE BOILER’S INTERNAL CONTROLS SHALL MODULATE THE FIRING RATE AS NEEDED TO

MAINTAIN THE HEATING WATER TEMPERATURE AT SETPOINT.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

BOILER FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.

HEATING WATER SUPPLY TEMPERATURE:

THE HEATING WATER TEMPERATURE SETPOINT SHALL RESET LINEARLY BASED ON OUTSIDE

AIR TEMPERATURE. THE HEATING WATER SETPOINT SHALL BE 120°F (ADJUSTABLE) AT AN

OUTSIDE AIR TEMPERATURE OF 50°F (ADJUSTABLE) OR ABOVE. THE SETPOINT SHALL

INCREASE TO 180°F (ADJUSTABLE) AT AN OUTSIDE AIR TEMPERATURE OF 20°F (ADJUSTABLE)

OR LOWER.

THE FOLLOWING TEMPERATURES SHALL BE MONITORED:

HEATING WATER SUPPLY

HEATING WATER RETURN

ALARMS SHALL BE PROVIDED AS FOLLOWS:

HIGH HEATING WATER SUPPLY TEMPERATURE: IF THE HEATING WATER SUPPLY

TEMPERATURE IS GREATER THAN 195°F (ADJUSTABLE)

LOW HEATING WATER SUPPLY TEMPERATURE: IF THE HEATING WATER SUPPLY

TEMPERATURE IS LESS THAN 100°F (ADJUSTABLE)

THE BOILER SHALL HAVE A FIELD MANUAL RESET LIMIT OF 225°F.

HEATING WATER SYSTEM SEQUENCE OF OPERATION:

HYDRONIC HEATING SYSTEM CONSISTS OF A HEATING BOILER (HB-1) AND A DEDICATED

VARIABLE FLOW HEATING WATER PUMP (HP-3).

BOILER – RUN CONDITIONS:

THE BOILER SHALL BE ENABLED TO RUN WHENEVER:

UPON A CALL FROM A ZONE TEMPERATURE SENSOR

THE OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJUSTABLE)

COMMAND FOR DEHUMIDIFICATION

THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.

HEATING WATER PUMP:

THE HOT WATER PUMP CONTROL SHALL BE INTEGRATED INTO THE BOILER CONTROLS.

THE SYSTEM SHALL START A HOT WATER PUMP THROUGH A CONTACT CLOSURE OF THE

PUMP’S VARIABLE FREQUENCY DRIVE (VFD) RUN-ENABLE CONTACTS.

THE SYSTEM SHALL MONITOR THE HEATING WATER SYSTEM DIFFERENTIAL PRESSURE

SENSOR. WHEN THE PUMP VFD IS ENABLED, THE SYSTEM SHALL CONTROL THE ANALOG

SPEED SIGNAL THAT IS SENT TO THE PUMP VFD TO MAINTAIN THE HEATING WATER

DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE).

THE HEATING WATER PUMP OPERATION SHALL BE VERIFIED THROUGH VFD CURRENT

SWITCH. THE CURRENT SENSOR SHALL INITIATE AN ALARM SIGNAL TO THE PUMP

CONTROLLER WHENEVER THE PUMP IS NOT OPERATIONAL. UPON A PUMP FAILURE

(COMMANDED ON, BUT THE STATUS IS OFF), THE DDC SYSTEM SHALL SEND AN ALARM TO

THE FRONT END.

Attachment 9 - SEED Project Drawings 4702

A P

H

IC

A N

A

LO

G H

A R

D W

A R

E

IN

P U

T (A

I)

B

IN

A R

Y H

A R

D W

A R

E

IN

P U

T (B

I)

A N

A

LO

G H

A R

D W

A R

E O

U

TP

U T

(A O

B

IN

A R

Y H

A R

D W

A R

E O

U

TP

U T

(B O

S O

FT

W

A R

E P

O

IN

T (S

FT

H A

R D

W A

R E

IN

TE

R

LO

C K

(H D

W

W

IR

E

LE

S S

(W

LS

N E

TW

O

R K

(N E

T)

H

IG

H A

N A

LO

G

L

IM

IT

LO

W

A N

A

LO

G L

IM

IT

B

IN

A R

Y

LA

TC

H D

IA

G

N O

S

TI

C

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

TI

O

N F

A

IL

CHW LVL CHILLED WATER VALVE X X

CND OVRFL CONDENSATE OVERFLOW DETECTION

LOCAL

X X X X

DAT DISCHARGE AIR TEMPERATURE X X X X X

FIL FILTER STATUS LOCAL X X X

HW VLV HOT WATER VALVE X X

RA SD RETURN AIR SMOKE DETECTOR X

SPH SPACE HUMIDITY SENSOR LOCAL X X X X

SPT SPACE TEMPERATURE LOCAL X X X X X

SPT SP SPACE TEMPERATURE SETPOINT

LOCAL

X X

SAF SUPPLY FAN STATUS LOCAL X X

SAF LO SUPPLY FAN OUTPUT 1 X X

SAF MD SUPPLY FAN OUTPUT 2 X X

SAF HI SUPPLY FAN OUTPUT 3 X X

BAS COM BAS COMMUNICATION STATE X X

MNT REQ MAINTENANCE REQUIRED X X

SP DEH SP SPACE DEHUMIDIFICATION SETPOINT X

SPT CL SP SPACE COOLING TEMPERATURE

SETPOINT

X X

SPT HT SP SPCE HEATING TEMPERATURE

SETPOINT

X X

SPT SP ACT SPACE TEMPERATURE SETPOINT

ACTIVE

X X

POINT ALARMSYSTEM POINT DESCRIPTION

FAN COIL UNITS

G R

A P

H

IC

A N

A

LO

G H

A R

D W

A R

E

IN

P U

T (A

I)

B

IN

A R

Y H

A R

D W

A R

E

IN

P U

T (B

I)

A N

A

LO

G H

A R

D W

A R

E O

U

TP

U T

(A O

B

IN

A R

Y H

A R

D W

A R

E O

U

TP

U T

(B O

S O

FT

W

A R

E P

O

IN

T (S

FT

H A

R D

W A

R E

IN

TE

R

LO

C K

(H D

W

W

IR

E

LE

S S

(W

LS

N E

TW

O

R K

(N E

T)

H

IG

H A

N A

LO

G

L

IM

IT

LO

W

A N

A

LO

G L

IM

IT

B

IN

A R

Y

LA

TC

H D

IA

G

N O

S

TI

C

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

TI

O

N F

A

IL

LLT COIL LEAVING AIR LOW

TEMPERATURE CUTOUT ALARM

X X

CC LAT COOLING COIL LEAVING

TEMPERATURE

X X X X X

CLG COOLING OUTPUT COMMAND X X

MAT MAKE-UP AIR TEMPERATURE X X X X X

MAH MAKE-UP AIR HUMIDITY X X X

DCT P DUCT STATIC PRESSURE LOCAL X X X X X

FIL FILTER STATUS X X X

HSP ALM HIGH STATIC ALARM X X X X

OAD OUTSIDE AIR DAMPER COMMAND X X

OA LLT OUTSIDE AIR LOW TEMPERATURE

CUTOUT ALARM

X X

OAT OUTSIDE AIR TEMPERATURE LOCAL X X X X

OAH OUTSIDE AIR HUMIDITY X X X

OAD OUTDOOR AIR DAMPER COMMAND X X

OA FLW OUTDOOR AIR FLOW X X

OA LLT OUTSIDE AIR TEMPERATURE LOW

LIMIT SETPOINT

X

PH LAT PREHEAT LEAVING COIL

TEMPERATURE LOCAL

X X X

PH PREHEAT OUTPUT COMMAND X X

RH LAT REHEAT LEAVING COIL

TEMPERATURE

X X X

RH REHEAT OUTPUT COMMAND X X

SF SUPPLY FAN SPEED COMMAND X X

SF SUPPLY FAN START STOP COMMAND X X

SF SUPPLY FAN STATUS X X

BAS COM BAS COMMUNICATION INPUT X X

FZ STAT FREEZE STAT X X X X X

MA SD MAKE-UP AIR SMOKE DETECTOR X

MA CL SP MAKE-UP AIR COOLING SETPOINT X

MA HT SP MAKE-UP AIR HEATING SETPOINT X

OCC CL SP OCCUPIED COOLING SETPOINT X X

OCC HT SP OCCUPIED HEATING SETPOINT X X

POINT ALARMSYSTEM POINT DESCRIPTION

DEDICATED OUTSIDE AIR UNIT POINT LIST

STATUS AND ALARMS:

MONITOR FAN OUTPUT STATUS AND SEND ALARM TO FRONT END IF FAN HAS FAILED. SEND

SIGNAL TO FRONT END FOR FILTER CHANGE-OUT BASED ON FAN RUN TIME. PROVIDE

CONDENSATE FLOAT/OVERFLOW SWITCH IN AUXILIARY DRAIN PAIN. FAN COIL UNIT SHALL BE

SHUT DOWN AND ALARM SENT TO FRONT END ON HIGH CONDENSATE ALARM.

ALARM SHALL REQUIRE MANUAL RESET.

DEDICATED OUTSIDE AIR UNITS (DOA-1):

THE DEDICATED OUTSIDE AIR UNITS (DOA) CONSIST OF AN OUTSIDE AIR INLET SECTION,

FILTER SECTION, HEATING WATER COILS (PRE-HEAT LOCATION AND RE-HEAT LOCATION),

CHILLED WATER COIL, AND SUPPLY FAN SECTION.

THE DOA SHALL OPERATE AS A CONSTANT AIR VOLUME UNIT.

SUPPLY FAN SHALL BE SOFT START.

THE CONTROLLER SHALL OPERATE THE DOA UNIT IN OCCUPIED MODE AND EMERGENCY

SHUTDOWN MODE.

FAN OPERATION:

THE SUPPLY FAN SHALL RUN CONTINUOUSLY IN THE OCCUPIED MODE.

THE SUPPLY FAN SHALL BE ON IF THE CONTROL IS HEATING OR COOLING IN THE

UNOCCUPIED MODE.

OPERATION SHALL BE VERIFIED THROUGH A CURRENT SENSOR. THE CURRENT SENSOR

SHALL INITIATE AN ALARM SIGNAL TO THE CONTROLLER WHENEVER THE FAN(S) IS NOT

OPERATIONAL. UPON A FAN FAILURE, THE DDC SYSTEM WILL SEND AN ALARM TO THE FRONT

END.

PREHEAT COIL OPERATION:

MODULATE 3-WAY CONTROL VALVE TO MAINTAIN MAKE-UP AIR TEMPERATURE SETPOINT OF

70°F AT 50% RH (ADJUSTABLE). THE CONTROL VALVE SHALL FAIL TO THE OPEN POSITION.

COOLING COIL OPERATIOIN:

MODULATE 3-WAY CHILLED WATER VALVE TO MAINTAIN MAKE-UP AIR TEMPERATURE

SETPOINT OF 70°F AT 50% RH (ADJUSTABLE). THE CONTROL VALVE SHALL FAIL TO THE

CLOSED POSITION.

REHEAT COIL OPERATION:

MODULATE 3-WAY CONTROL VALVE TO MAINTAIN MAKE-UP AIR TEMPERATURE SETPOINT OF

70°F AT 50% RH (ADJUSTABLE). THE CONTROL VALVE SHALL FAIL TO THE OPEN POSITION.

FILTER MAINTENANCE:

DIFFERENTIAL PRESSURE SWITCH WITH SENSOR TAPS ON UPSTREAM AND DOWNS TREAM

SIDE OF FILTER SHALL SIGNAL CONTROLLER WHEN THE DIFFERENTIAL PRESSURE IS EQUAL

OR GREATER THAN THE SETPOINT. THE CONTROLLER SHALL INITIATE A MAINTENANCE

ALARM SIGNAL INDICATING A DIRTY FILTER.

FREEZESTAT:

UPON SENSING A PREHEAT COIL LEAVING AIR TEMPERATURE LESS THAN 35°F (ADJUSTABLE),

THE FREEZESTAT SHALL SIGNAL AN ALARM TO THE CONTROLLER AND THE SUPPLY FAN

SHALL DE-ENERGIZE, OUTSIDE AIR DAMPER SHALL CLOSE AND CONTROL VALVES SHALL

OPEN FLOW TO COILS. ALARM CONDITION REQUIRES MANUAL RESET.

SMOKE DETECTOR:

UPON AN ALARM SIGNAL FROM THE DUCT MOUNTED SMOKE DETECTOR, THE CONTROLLER

SHALL DE-ENERGIZE THE SUPPLY FAN AND CLOSE THE OUTSIDE AIR DAMPER. SEND SIGNAL

TO FRONT END AND FIRE ALARM PANEL. MANUAL RESET IS REQUIRED.

OCCUPIED MODE:

OPERATE SUPPLY FAN CONTINUOUSLY, MODULATE HEATING WATER OR CHILLED WATER

VALVES TO MAINTAIN SUPPLY AIR DISCHARGE SETPOINTS.

ENERGENCY SHUTDOWN MODE (ATFP):

PROVIDE SPACE MOUNTED EMERGENCY POWER OFF (EPO) SWITCH TO INITIATE SHUTDOWN

MODE. IN SHUTDOWN MODE STOP SUPPLY FAN AND CLOSE OUTSIDE AIR DAMPER. SEND

ALARM TO FRONT END.

FAN COIL UNITS:

EACH FAN COIL UNITS SHALL BE PROIVDED ZONE SENSORS TO MONITOR THE FOLLOWING:

A. SPACE TEMPERATURE

B. SPACE HUMIDITY

THE CONTROLLER SHALL OPERATE USING DEFAULT MODES AND SETPOINTS IN CASE

COMMUNICATION IS LOST WITH THE BAS.

SPACE TEMPERATURE CONTROL:

DURING THE OCCUPIED PERIODS, THE SPACE TEMPERATURE SHALL BE MAINTAINED

BETWEEN THE SPACE HEATING TEMPERATURE SETPOINTS OF 68.0 °F (ADJUSTABLE) AND THE

SPACE COOLING TEMPERATURE SETPOINTOF 76.0 °F (ADJUSTABLE), WHILE MAINTAINING THE

SPACE RELATIVE HUMIDITY AT THE RELATIVE HUMIDITY SETPOINT OF 50% WITH THE

RELATIVE HUMIDITY OFFSET OF 5% (ADJUSTABLE).

THE UNIT SHALL TRANSITION TO HEATING MODE WHEN THE SPACE TEMPERATURE FALLS

BELOW THE OCCUPIED HEATING SETPOINT.

THE UNIT SHALL TRANSITION TO COOLING MODE WHEN THE SPACE TEMEPERATURE RISES

ABOVE THE OCCUPIED COOLING SETPOINT.

SPACE HUMIDITY CONTROL:

THE UNIT SHALL TANSITION TO DEHUMIDIFICATION MODE AND MODULATE THE CHILLED

WATER VALVE TO MAINTAIN THE SPACE RELATIVE HUMIDITY AND HOT WATER VALVE TO

MAINTAIN THE SPACE TEMPERATURE COOLING SETPOINT, UNTIL THE SPACE RELATIVE

HUMIDITY FALLS BELOW THE RELATIVE HUMIDITY SETPOINT MINUST THE RELATIVE HUMIDITY

OFFSET.

FAN SPEED SWITCH:

OFF:

FAN IS OFF; CONTROL VALVES CLOSE. THE LOW AIR TEMPERATURE DETECTION OPTION IS

STILL ACTIVE.

AUTO:

FAN SPEED CONTROL IN THE AUTO SETTING ALLOWS THE MODULATING (3-WIRE FLOATING

POINT) CONTROL VALVE OPTION AND 3-SPEED FAN TO WORK COOPERATIVELY TO MEET

PRECISE CAPACITY REQUIREMENTS, WHILE MINIMIZING FAN SPEED

(MOTOR/ENERGY/ACOUSTICS) AND VALVE POSITION (PUMP/ENERGY/CHILLED WATER RESET).

AS THE CAPACITY REQUIREMENT INCREASES AT LOW FAN SPEED, THE WATER VALVE OPENS.

WHEN THE LOW FAN SPEED CAPACITY SWITCH POINT IS REACHED, THE FAN SWITCHES TO

MEDIUM SPEED AND THE WATER VALVE REPOSTIONS TO MAINTAIN AN EQUIVALENT

CAPACITY. THE REVERSE SEQUENCE TAKES PLACE WITH A DECREASE IN REQUIRED

CAPACITY.

LOW, MEDIUM, HIGH:

THE FAN WILL RUN CONTINUOUSLY AT THE SELECTED SPEED AND THE VALVE OPTION WILL

CYCLE TO MEET SETPOINT.

SMOKE DETECTOR SHUTDOWN:

THE UNIT SHALL BE INTERLOCKED TO THE SMOKE DETECTOR THROUGH THEY DRY

CONTACTS OF THE SMOKE DECTECTOR. THE UNIT SHALL SHUT DOWN IN RESPONSE TO A

SIGNAL FROM THE SMOKE DECTECTOR INDICATING THE PRESENCE OF SMOKE AND SEND

ALARM TO FRONT END. A MANUAL RESET OF THE SMOKE DECTECTOR SHALL BE REQUIRED

TO RESTART THE UNIT.

A P

H

IC

A N

A

LO

G H

A R

D W

A R

E

IN

P U

T (A

I)

B

IN

A R

Y H

A R

D W

A R

E

IN

P U

T (B

I)

A N

A

LO

G H

A R

D W

A R

E O

U

TP

U T

(A O

B

IN

A R

Y H

A R

D W

A R

E O

U

TP

U T

(B O

S O

FT

W

A R

E P

O

IN

T (S

FT

H A

R D

W A

R E

IN

TE

R

LO

C K

(H D

W

W

IR

E

LE

S S

(W

LS

N E

TW

O

R K

(N E

T)

H

IG

H A

N A

LO

G

L

IM

IT

LO

W

A N

A

LO

G L

IM

IT

B

IN

A R

Y

LA

TC

H D

IA

G

N O

S

TI

C

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

TI

O

N F

A

IL

EF S/S EXHAUST FAN START STOP COMMAND X X

EF STAT EXHAUST FAN STATUS X X X X

EFD EXHAUST FAN DAMPER OPEN CLOSE X X

POINT ALARMSYSTEM POINT DESCRIPTION

EXHAUST FAN POINT LIST

EXHAUST FAN (EF-1~2) SEQUENCE OF OPERATION:

THE CONTROLLER SHALL OPERATE THE EXHAUST FAN UNITS IN OCCUPIED MODE AND

EMERGENCY SHUTDOWN MODE.

OCCUPIED MODE:

WHEN THE BUILDING IS IN THE OCCUPIED MODE THE DAMPER SHALL BE COMMANDED TO

OPEN, UPON THE DAMPER END SWITCH CLOSING THE EXHAUST FAN SHALL BE STARTED AND

RUN CONTINUOUSLY.

IF THE FAN IS COMMANDED ON BUT STATUS IS NOT PROVEN THEN AN EXHAUST FAN FAILURE

ALARM SHALL BE ANNUCIATED TO THE BAS.

ENERGENCY SHUTDOWN MODE (ATFP):

PROVIDE SPACE MOUNTED EMERGENCY POWER OFF (EPO) SWITCH TO INITIATE SHUTDOWN

MODE. IN SHUTDOWN MODE, THE EXHAUST FAN SHALL SHUT DOWN REGARDLESS OF HAND

OR AUTO. ALL ASSOCIATED DAMPERS SHALL CLOSE. AN ALARM SHALL BE SENT TO THE

FRONT END.

E

OHP

UGP

UGS

SEW

X X

D

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E1

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A

IR

H V

A C

S

Y S

T E

M

CONTROL WIRING NOT SHOWN ON THE DRAWINGS SHALL BE

PROVIDED.

OF EQUIPMENT, CONDUITS AND WIRING. THE CONTRACTOR SHALL

BECOME FAMILIAR WITH ALL DETAILS OF THE WORK AND VERIFY ALL

DIMENSIONS IN THE FIELD SO THAT THE OUTLETS AND EQUIPMENT

SHALL BE RESTORED TO ITS ORIGINAL CONDITION BY WORKERS

SKILLED IN THE TRADES INVOLVED, AT NO ADDITIONAL COST TO THE

GOVERNMENT.

9. CONTRACTOR SHALL ARRANGE A WORK SCHEDULE WITH CONTRACTING

7. REMOVE ITEMS AS INDICATED ON THE DRAWINGS.

2. THE DRAWINGS INDICATE THE GENERAL LOCATION AND ARRANGEMENT

THE EXISTING CIRCUITS.

WILL BE PROPERLY LOCATED AND READILY ACCESSIBLE.

12.

PIPES OR DUCTS, AND IF EXISTING ELECTRICAL ITEMS ARE IN THE WAY,

CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL ITEMS AND SHALL

PROVIDE NEW WIRING AS REQUIRED FOR INSTALLING THE RELOCATED

ELECTRICAL ITEMS, AT NO ADDITIONAL COST TO THE GOVERNMENT.

PIPES OR DUCTS, AND IF EXISTING ELECTRICAL ITEMS ARE DAMAGED BY

4.

5.

BORING, CONTRACTOR SHALL RESTORE THEM TO THEIR ORIGINAL

CONDITION, AT NO ADDITIONAL COST TO THE GOVERNMENT.

10.

1. THE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE

11.

CONTRACTOR SHALL VERIFY EXISTING CIRCUITS PRIOR TO REMOVING

CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR FOR

THE EXACT LOCATIONS OF THE MECHANICAL EQUIPMENT.

GENERAL NOTES:

KEEP THE FACILITIES IN OPERATION DURING THE CONSTRUCTION PERIOD.

6. CONTRACTOR SHALL PROVIDE TEMPORARY POWER AS REQUIRED TO

3. ALL UTILITIES AND ANY ITEMS DAMAGED BY CONSTRUCTION OPERATIONS

COLOR OF PAINT SHALL MATCH THE COLOR OF ADJACENT SURFACE.

SHALL BE PATCHED. THE PATCHED AREAS SHALL BE PAINTED. THE

AFTER REMOVING ELECTRICAL ITEMS, HOLES IN WALLS AND CEILINGS8.

OFFICER AND USER TWO WEEKS PRIOR TO STARTING ANY WORK.

IF FLOORS OR WALLS ARE NECESSARY TO BE BORED FOR INSTALLING

IF FLOORS OR WALLS ARE NECESSARY TO BE BORED FOR INSTALLING

NEW WIRING, LONG CROSS MARKS INDICATE PHASE

AND NEUTRAL, SHORT CROSS MARK INDICATES

GROUND

NEW HOMERUN CIRCUIT, CIRCUIT #1, 3 & 5 WITH

NEUTRAL AND A GROUND HOMERUN TO PANEL "A"

A-1,3,5

NEW HOMERUN CIRCUIT, NO CROSS MARK INDICATES TWO

CONDUCTORS AND ONE GROUND CONDUCTOR HOMERUN

NUMBER.

B-3

TO PANEL "B". THE NUMBER "3" INDICATES THE CIRCUIT

NEW SAFETY SWITCH, NUMBER INDICATES THE SWITCH

NUMBER IN THE "NEW SAFETY SWITCH SCHEDULE"

CONDUCTORS AND ONE GROUND CONDUCTOR

NEW WIRING, NO CROSS MARKS INDICATES TWO

D FOR DETAIL AND S FOR SECTION

SHEET NUMBER WHERE TAKEN

SHEET NUMBER WHERE SHOWN

THE "NEW MOTOR SCHEDULE".

NEW MOTOR, NUMBER INDICATES THE TYPE OF MOTOR IN

NEW JUNCTION BOXJ

EXISTING WIRES AND CONDUIT TO BE REMOVED.

EXISTING MOTOR TO BE REMOVED.

EXISTING SAFETY SWITCH TO BE REMOVED.

EXISTING STARTER TO BE REMOVED.

NEW MAGNETIC STARTER

ALL THE WAY BACK TO EXISTING PANEL.

EXISTING HOMERUN WIRES AND CONDUIT TO BE REMOVED

ELECTRICAL LEGEND:

EXISTING WIRES AND CONDUIT TO REMAIN.

EXISTING SAFETY SWITCH TO REMAIN.

EXISTING WOOD POLE TO REMAIN.

EXISTING 300 KVA PAD MOUNTED TRANSFORMR TO REMAIN.

EXISTING DOWN GUY TO REMAIN.

EXISTING OVERHEAD PRIMARY LINES TO REMAIN.

EXISTING UNDERGROUND PRIMARY LINES TO REMAIN.

EXISTING UNDERGROUND SECONDARY LINES TO REMAIN.

DESCRIPTION PHASE

POLE

NEMA

SIZE

ENCLOSURE

NEMA TYPE

TYPE

TYPE POWER

TYPE

FULL VOLTAGE

TYPE

FULL VOLTAGE

REMARKS

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

3 TYPE

FULL VOLTAGE

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

TYPE

FULL VOLTAGE

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

125 1

TYPE

FULL VOLTAGE

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

3R

NEW MOTOR SCHEDULE

11115 120 0

CHILLER

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

TYPE

FULL VOLTAGE

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

1233 18

TYPE

FULL VOLTAGE

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

MOUNTED ON ROOF,

TYPE

FULL VOLTAGE

200 208

1211 1

TYPE

FULL VOLTAGE120

DIRIVE

FREQENCY

VARIABLE

60 HP

MAGNETIC STARTER UNLESS OTHERWISE INDICATED

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

BRACKET AS REQUIRED.

PROVIDE RGS MOUNTING

UNIT (FC)

FAN COIL

AHU

UNIT (FC)

FAN COIL

UNIT (FC)

FAN COIL

UNIT (FC)

FAN COIL

1/3 HP

1/2 HP

1/4 HP

3/4 HP

5 HP

5 HP 200

VOLTAGE

SYSTEMVOLTAGE

MOYOR

208200

200 3 208 3

TYPE

FULL VOLTAGECWP-1

CWP-2

HWP-1

2 HP

3 HP

HWP-2 115 1 120 0

BOILER PUMP 115

NOTES FOR THIS SHEET:

MAXIMUM POWER FOR THIS FAN COIL UNIT IS 1/4 HP.

MAXIMUM POWER FOR THIS FAN COIL UNIT IS 1/3 HP.

MAXIMUM POWER FOR THIS FAN COIL UNIT IS 1/2 HP.

MAXIMUM POWER FOR THIS FAN COIL UNIT IS 3/4 HP.

5 MAXIMUM POWER FOR CWP-2 IS 1/2 HP.

GROUNDG

ELECTRICAL METALLIC TUBINGEMT

N NEUTRAL

OII PHASE

ELECTRICAL ABBREVIATIONS:

MLO MAIN LUGS ONLY

A.I.C. AMPS INTERRUPTING CAPACITY

1 HP

1/2 HP

NEW GROUND ROD, 3/4" X 10', COPPER CLAD.

SCH

RGS RIGID GALVANIZED STEEL

UG UNDERGROUND

SCHEDULE

CONTRACTOR SHALL COORDINATE ALL OUTAGES AND CHANGE

OVER WITH CONTRACTING OFFICER.

CABLES WITHIN TRENCHING AREA TWO WEEKS PRIOR TO EXCAVATIONS.

CONTRACTOR SHALL CALL "OKIE" TO LOCATE EXISTING UNDERGROUND

PVC CONDUIT CROSSES OVER EXISTING UNDERGROUND UTILITIES.

CONTRACTOR SHALL HANDDIG THE AREAS WHERE THE NEW 3" SCH 80

CROSSES OVER EXISTING UNDERGROUND UTULITIES.

UNDERGROUND UTULITIES WHERE THE NEW 3" SCH 80 PVC CONDUIT

NEW 3" SCH 80 PVC CONDUIT SHALL BE INSTALLED 12" ABOVE EXISTING

13.

14.

15.

16.

EXISTING SEWAGE PIPE TO REMAIN.

33.57 kW

EXISTING METAL PLANK FENCE TO REMAIN.

EXISTING DUCT TO REMAIN.

W WEATHERPROOF

N O

T E S L

E G

E N

D

D

S

C H

E D

U L E

INDICATED OR SHOWN.

NFPA 70 AND ANSI C2 UNLESS MORE STRINGENT REQUIREMENTS ARE

Attachment 9 - SEED Project Drawings 4702

D1

E2 E6

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E2

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

JU

L

10 2 4 6 8 10 12 14 16 18 20 22 24

SCALE: „" = 1'-0"

PARTIAL ELECTRICAL DEMOLITION PLAN - BLDG. 4702

N O

R T

H

BASEMENT

P L

A N

"TBB"

Attachment 9 - SEED Project Drawings 4702

UGS

U G

S

E

SEW

SEW

S E

W

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E3

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

10 2 4 6 8 10 12 14 16 18 20 22 24

SCALE: „" = 1'-0"

PARTIAL ELECTRICAL DEMOLITION PLAN - BLDG. 4702

N O

R T

H

FIRST FLOOR

P

OHP

U G

S

NOTES FOR THIS SHEET:

EXISTING 300 KVA PAD MOUNTED TRANSFORMER TO REMAIN.

FOR DETAIL AND EXACT LOCATION.

EXISTING FAN COIL UNIT TO BE REMOVED. SEE MECHANICAL

ARE NOT SHOWN ON THIS DRAWING.

EXISTING PANELS EVEN THOUGH THESE WIRES AND CONDUITS

THIS EXISTING FAN COIL UNIT ALL THE WAY BACK TO

REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO

4 5 4 5 4 5 4 5

4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5

4 5 4 5 4 5

4 5 4 5

4 5

4 5

4 5

4 5

4 54 5

4 5

4 5

EXISTING PANEL "1P1" TO REMAIN7

EXISTING PANEL "1P2" TO REMAIN8

EXISTING PANEL "1P3" TO REMAIN9

EXISTING PANEL "1P4" TO REMAIN10

EXISTING PANEL "1P5" TO REMAIN11

COMM.

COMM.

10 11

4 5

EXISTING CHILLER TO REMAIN.

EXISTING 400A 3-POLE SAFETY SWITCH TO REMAIN.

NOT USED.

U G

P

1P1-19

1P1-21

1P1-23

1P1-25

LOUNGE

1P4-25

D DD

P

N O

T

S

D

P

L A

N

Attachment 9 - SEED Project Drawings 4702

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E4

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

PARTIAL ELECTRICAL DEMOLITION PLAN - BLDG. 4702

N O

R T

H

SECOND FLOOR

4 5

4 54 54 54 54 54 54 54 5

4 5 4 5 4 5 4 5 4 5 4 5 4 5

NOTES FOR THIS SHEET:

FOR DETAIL AND EXACT LOCATION.

EXISTING FAN COIL UNIT TO BE REMOVED. SEE MECHANICAL

ARE NOT SHOWN ON THIS DRAWING.

EXISTING PANELS EVEN THOUGH THESE WIRES AND CONDUITS

THIS EXISTING FAN COIL UNIT ALL THE WAY BACK TO

REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO

EXISTING PANEL "2P4" TO REMAIN

EXISTING PANEL "2P5" TO REMAIN

2P1-19

EXISTING PANEL "2P1" TO REMAIN

EXISTING PANEL "2P2" TO REMAIN

EXISTING PANEL "2P3" TO REMAIN

4 5

P

6 7

4 5 4 5

4 5 4 5

4 5

4 5

4 5

4 5

4 5

COMM.

COMM.

2P1-25

2P4-21

2P4-25

2P1-232P1-21

N O

T E S

A

N D

P

L A

N

Attachment 9 - SEED Project Drawings 4702

D2

E5 E6

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E5

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

N O

R T

H

BASEMENT

NEW PARTIAL POWER PLAN - BLDG. 4702

"TBB"

P L

A N

Attachment 9 - SEED Project Drawings 4702

D1

E2

D2

E6 E5 E6

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E6

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

SCALE: 1/4" = 1'-0"

4 150

N O

R T

H

ENLARGED PARTIAL ELECTRICAL DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

4 150

N O

R T

H

ENLARGED NEW PARTIAL POWER PLAN

BASEMENT BASEMENT

MECHANICAL FOR DETAIL AND EXACT LOCATION.

EXISTING HEATING HOT WATER PUMP TO BE REMOVED. SEE

MECHANICAL FOR DETAIL AND EXACT LOCATION.

EXISTING CHILLED WATER PUMP TO BE REMOVED. SEE

ARE NOT SHOWN ON THIS DRAWING.

EXISTING PANELS EVEN THOUGH THESE WIRES AND CONDUITS

THIS EXISTING AIR HANDLER UNIT ALL THE WAY BACK TO

REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO

MECHANICAL FOR DETAIL AND EXACT LOCATION.

EXISTING AIR HANDLER UNIT TO BE REMOVED. SEE

NOTES FOR THIS SHEET:

EXISTING PANEL "BP" TO REMAIN.

EXISTING MAIN DISTRIBUTION SWITCHBOARD "MDP" TO REMAIN.

3 8

DETAIL AND EXACT LOCATION.

EXISTING BOILER TO BE REMOVED. SEE MECHANICAL FOR

NOT SHOWN ON THIS DRAWING.

PANELS EVEN THOUGH THESE WIRES AND CONDUITS ARE

THIS EXISTING BOILER ALL THE WAY BACK TO EXISTING

REMOVE ALL EXISTING WIRES AND CONDUITS CONNECTED TO

4 5

LOCATION.

NEW AHU. SEE MECHANICAL FOR DETAIL AND EXACT

LOCATION.

NEW BOILER. SEE MECHANICAL FOR DETAIL AND EXACT

BP-1,3,5

BP-7,9,11

BP-13,15,17

BP-28

AS REQUIRED FOR MOUNTING STARTER.

NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED

AS REQUIRED FOR MOUNTING SAFETY SWITCH.

NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED

LOCATION.

NEW BOILER PUMP. SEE MECHANICAL FOR DETAIL AND EXACT

LOCATION.

NEW CWP-1. SEE MECHANICAL FOR DETAIL AND EXACT

LOCATION.

NEW CWP-2. SEE MECHANICAL FOR DETAIL AND EXACT

BP-2,4,6

20 LOCATION.

NEW HWP-1. SEE MECHANICAL FOR DETAIL AND EXACT

LOCATION.

NEW HWP-2. SEE MECHANICAL FOR DETAIL AND EXACT

BP-21

BP-23

NEW 4 #6 THHN, 1 #8 THHN G IN 1" EMT.

NEW 4 #8 THHN, 1 #8 THHN G IN 3/4" EMT.

NEW 3 #6 THHN, 1 #8 THHN G IN 1" EMT.

NEW 3 #8 THHN, 1 #8 THHN G IN 3/4" EMT.

NEW 2 #8 THHN, 1 #8 THHN G IN 3/4" EMT.

N O

T

D

P

L A

N S

Attachment 9 - SEED Project Drawings 4702

U G

S

U G

UGS

10'

W W

UG

X X

X X

X XX X X

X X

X X

X

XXXXX

X

X

X

BRACKETS SHALL BE PROVIDED AS REQUIRED.

CONCRETE PAD, NEW RGS CHANNEL MOUNTING

THE RGS CONDUIT SHALL BE MOUNTED ON EXISTING

D1

E7 E10

E7 E10

D2

D D

D D

D

D

D

SEW

S E

W

SEW

SEW

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E7

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

4 5

SCALE: „" = 1'-0"

N O

R T

H

FIRST FLOOR

OHP

U G

S

NEW PARTIAL POWER PLAN - BLDG. 4702

1P1-19

1P1-23

1P1-25

1P4-25

P

NOTES FOR THIS SHEET:

EXISTING 300 KVA PAD MOUNTED TRANSFORMER TO REMAIN.

EXISTING PANEL "1P1" TO REMAIN7

EXISTING PANEL "1P2" TO REMAIN8

EXISTING PANEL "1P3" TO REMAIN9

EXISTING PANEL "1P4" TO REMAIN10

EXISTING PANEL "1P5" TO REMAIN11

8 9

COMM.

10 11

COMM.

3 3 3 3

3 3 3 3 3 3 3 3

AS REQUIRED FOR MOUNTING STARTER AND SAFETY SWITCH.

NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED

LOCATION.

NEW FAN COIL UNIT. SEE MECHANICAL FOR DETAIL AND EXACT

4 5 4 5 4 5 4 5 4 5 4 5 4 5

4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5

4 5

4 5

4 5

4 5

4 5

4 54 5

4 54 5

3 4 5

7 8 9

1011121314151617

NEW 2 #10 THHN, 1 #10 THHN G IN •" EMT.14

1P1-21

15 NEW PANEL "A".

A

A-21

1P4-38,40,42

NEW 4 #1 THHN, 1 #6 THHN IN 2" EMT.16

PANEL.

CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING

FOR THE NEW PANEL "A". THE NEW 100A , 3-P0LE, 240V

THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42

PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN

J

A-1,3,5

A-2,4,6

A-7,9,11 14 18

A-13,15,17

A-8,10,12

18 NEW 3 #10 THHN, 1 #10 THHN G IN 1/2 " EMT.

A-14,16,18

4 5

P

J

J

J

JJ

9 11

JJ

7,9

8,10

J17

NEW 4 #10 THHN, 1 #10 THHN G IN 3/4" EMT.

THE COLOR OF ADJACENT WALL.

PANELBOARD. THE COLOR OF THE CHASE SHALL MATCH

CONDUITS FROM EXISTING CEILING TO NEW ELECTRICAL

CONTRACTOR SHALL BUILD A CHASE TO COVER EXPOSED

J

NEW 200A 3-POLE SAFETY SWITCH.

25 29

27 28

13 29

TRANSFORMER FOR NEW CHILLER.

3 PHASE, 120/208V FROM THIS EXISTING PAD MOUNTED

PHASE TERMINAL LUGS AND NEUTRAL TERMINAL LUG TO OBTAIN

CONNECT 4 NEW #2/0 RHW-2 WIRES TO EXISTING SECONDARY

NEW 4 #2/0 RHW-2 IN 3" SCH 80 PVC CONDUIT.

NEW 4 #2/0 RHW-2 IN 3" RGS CONDUIT.

TO EXISTING PAD MOUNTED TRANSFORMER.

SHALL BE PROVIDED AS REQUIRED FOR CONNECTING NEW WIRES

NEW COPPER EXTENSION LUGS AND COPPER TERMINAL LUGS

REQUIRED.

NEW COPPER TERMINAL LUGS SHALL BE PROVIDED AS

NEW 4 #2/0 RHW-2, 1 #6 RHW-2 G IN 3" RGS CONDUIT. 32

DETAIL AND EXACT LOCATION.

NEW CHILLER, 33.57 KW, 208V, 3-PHASE . SEE MECHANICAL FOR

EXISTING CHILLER TO REMAIN.

6' X 3' X 6" CONCRETE PAD.

MOUNTING RACK SHALL BE MOUNTED ON A NEW

POWER METER AND SAFETY SWITCH. THE NEW

MOUNTING CURRENT TRANSFORMERS ENCLOSURE,

PROVIDE NEW GALVANIZED STEEL MOUNTING RACK FOR

NEW #2 BARE COPPER IN 1" RGS CONDUIT. 22

NEW #2 BARE COPPER, 2' BELOW GRADE.

2' BELOW GRADE.

NEW EXOTHERMICALLY WELDED CONNECTION,

MANUFACTURER'S RECOMMENDATIONS.

PROVIDE FUSES IN ACCORDANCE WITH

NEW 4 #12 RHW-2, 1 #12 RHW-2 G IN 3/4" RGS CONDUIT.26

IN NEMA 3R ENCLOSURE, 24" X 24" X 10".

2 WIRE, 4" WINDOW, 0.3 ANSI ACCURACY CLASS,

3 NEW CURRENT TRANSFORMERS, 300:5A, 60HZ,

NEW POWER METER IN NEMA 4X ENCLOSURE.

EXISTING 400A 3-POLE SAFETY SWITCH TO REMAIN.

U G

P

J J

34 NEW 4 #2/0 RHW-2 IN 3" RGS CONDUIT.

EXISTING DUCT TO REMAIN.36

JUNCTION BOX.

AS REQUIRED FOR MOUNTING THE NEW

NEW RGS MOUNTING RACK SHALL BE PROVIDED

LOUNGE

D DD

N O

T

D

P

L A

N

Attachment 9 - SEED Project Drawings 4702

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E8

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

N O

R T

H

SECOND FLOOR

NOTES FOR THIS SHEET:

EXISTING PANEL "2P4" TO REMAIN

EXISTING PANEL "2P5" TO REMAIN

EXISTING PANEL "2P1" TO REMAIN

EXISTING PANEL "2P2" TO REMAIN

EXISTING PANEL "2P3" TO REMAIN

P

6 7

NEW PARTIAL POWER PLAN - BLDG. 4702

2P1-21

2P1-25

2P4-25

COMM.

COMM.

3 3 3 3 3 3 3 3

3 3 3 3 3 3

LOCATION.

NEW FAN COIL UNIT. SEE MECHANICAL FOR DETAIL AND EXACT

AS REQUIRED FOR MOUNTING STARTER AND SAFETY SWITCH.

NEW GALVANIZED STEEL MOUNTING RACK SHALL BE PROVIDED

4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5

4 54 54 54 5 4 54 54 54 5

4 5 4 5

4 54 5

4 5

4 5

4 5

4 5

4 5

4 5 28

29 30 31 32

34 35 36

3738394041424344

2P4-38,40,42

J

B-1,3,5

B-2,4,6

2P1-19

2P1-23

B-7,9,11

B-8,10,12

8 12

B-13,15,17

P

B-14,16,18

B

B-21

NEW 2 #10 THHN, 1 #10 THHN G IN •" EMT.8

9 NEW PANEL "B".

NEW 4 #1 THHN, 1 #6 THHN IN 2" EMT.10

PANEL.

CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING

FOR THE NEW PANEL "B". THE NEW 100A , 3-P0LE, 240V

THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42

PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN

12 NEW 3 #10 THHN, 1 #10 THHN G IN 1/2 " EMT.

13 NEW 4 #10 THHN, 1 #10 THHN G IN 3/4" EMT.

THE COLOR OF ADJACENT WALL.

PANELBOARD. THE COLOR OF THE CHASE SHALL MATCH

CONDUITS FROM EXISTING CEILING TO NEW ELECTRICAL

CONTRACTOR SHALL BUILD A CHASE TO COVER EXPOSED

J17

JJ

7,9

JJ

10 12

8,10

8 8

J

J 2,4

J

J

N O

T

D

P

L A

N

Attachment 9 - SEED Project Drawings 4702

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

E9

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

SAFETY

SWITCH

NUMBER

RATED

VOLT

RATED

AMP

NO. OF

POLES

FUSIBLE

FUSE

VOLT AMP TYPE

NEMA

TYPE

REMARKS

DUAL

ELEMENT

DUAL

ELEMENT

240 1

DUAL

ELEMENT

YES

YES

YES

YES

YES

DUAL

DUAL

ELEMENT

ELEMENT

YES

YES

YES

YES

YES

YES

YES

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

30 YES

DUAL

ELEMENT

30 YES

DUAL

ELEMENT

24014

30 250

30 YES

DUAL

ELEMENT

24015 250

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

YES

YES

YES

YES

YES

DUAL

DUAL

ELEMENT

ELEMENT

YES

YES

YES

YES

YES

YES

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

30 YES

DUAL

ELEMENT

30 YES

DUAL

ELEMENT

24028

30 250

30 YES

DUAL

ELEMENT

24029 250

2 15

HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

DUAL

ELEMENT

DUAL

ELEMENT

YES

YES

YES

YES

DUAL

DUAL

ELEMENT

ELEMENT

YES

YES

YES

YES

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

30 YES

DUAL

ELEMENT

30 YES

DUAL

ELEMENT

24039

30 250

30 YES

DUAL

ELEMENT

24040 250

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

SAFETY

SWITCH

NUMBER

RATED

VOLT

RATED

AMP

NO. OF

POLES

FUSIBLE

FUSE

VOLT AMP TYPE

NEMA

TYPE

REMARKS

DUAL

ELEMENT

DUAL

ELEMENT

YES

YES

YES

YES

YES

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

240 30

30 250

NEW SAFETY SWITCH SCHEDULE NEW SAFETY SWITCH SCHEDULE

1 HEAVY DUTY, SINGLE THROW

HEAVY DUTY, SINGLE THROW

HEAVY DUTY, SINGLE THROW

HEAVY DUTY, SINGLE THROW

HEAVY DUTY, SINGLE THROW

DUAL

ELEMENT

DUAL

ELEMENT

240 1

DUAL

ELEMENT

YES

YES

YES

YES

YES

YES

YES

YES

YES

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

240 30

30 250

2 12

HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

1 HEAVY DUTY, SINGLE THROW

S C

H E

D U

L E S S

Attachment 9 - SEED Project Drawings 4702

PLANK FENCE AS REQUIRED.

SAW OFF EXISTING METAL

CONCRETE PAD

EXISTING

PLANK FENCE AS REQUIRED.

SAW OFF EXISTING METAL

CONCRETE PAD

EXISTING

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

1 1

1 2

GN 0A 0B 0C

NEUTRAL

BAR GROUND BAR

SPARE

SPARE

20A

20A

20A

20A

20A

20A

20A

20A

20A

100A

100A

20A

20A

20A

20A

20A

FC UNIT

FC UNIT

120/208V, 3 PHASE, 60Hz, 100A, 22,000 A.I.C., SURFACE

MOUNTED, MLO, WITH NEUTRAL BAR, GROUND BAR, AND

BRANCH CIRCUIT BREAKERS AS SHOWN BELOW

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

SPARE

SCALE: NOT TO SCALE

NEW PANEL "A" SCHEDULE

20A

20A

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

20A

20A

20A

20A

20A

FC UNIT

FC UNIT

FC UNIT

FC UNIT

SPARE

25 26

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

20A

20A

20A 23

1 1

1 2

GN 0A 0B 0C

NEUTRAL

BAR GROUND BAR

SPARE

SPARE

20A

20A

20A

20A

20A

20A

20A

20A

20A

100A

100A

20A

20A

20A

20A

20A

FC UNIT

FC UNIT

120/208V, 3 PHASE, 60Hz, 100A, 22,000 A.I.C., SURFACE

MOUNTED, MLO, WITH NEUTRAL BAR, GROUND BAR, AND

BRANCH CIRCUIT BREAKERS AS SHOWN BELOW

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

SPARE

SCALE: NOT TO SCALE

NEW PANEL "B" SCHEDULE

20A

20A

FC UNIT

FC UNIT

FC UNIT

FC UNIT

FC UNIT

20A

20A

20A

20A

20A

FC UNIT

FC UNIT

FC UNIT

FC UNIT

SPARE

25 26

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

20A

20A

20A

30 YES

DUAL

ELEMENT

24055 2503 25 1

DUAL

ELEMENT

DUAL

ELEMENT

240 1

YES

YES

YES

YES

YES

DUAL

ELEMENT

DUAL

ELEMENT

DUAL

ELEMENT

240 30

30 250

3 12

25 RGS MOUNTING BRACKET AS REQUIRED.

HEAVY DUTY, SINGLE THROW, PROVIDE

RGS MOUNTING BRACKET AS REQUIRED.

HEAVY DUTY, SINGLE THROW, PROVIDE

RGS MOUNTING BRACKET AS REQUIRED.

HEAVY DUTY, SINGLE THROW, PROVIDE

RGS MOUNTING BRACKET AS REQUIRED.

HEAVY DUTY, SINGLE THROW, PROVIDE

SAFETY

SWITCH

NUMBER

RATED

VOLT

RATED

AMP

NO. OF

POLES

FUSIBLE

FUSE

VOLT AMP TYPE

NEMA

TYPE

REMARKS

NEW SAFETY SWITCH SCHEDULE

17.5

RGS MOUNTING BRACKET AS REQUIRED.

HEAVY DUTY, SINGLE THROW, PROVIDE

RGS MOUNTING BRACKET AS REQUIRED.

HEAVY DUTY, SINGLE THROW, PROVIDE

61 240 3RYES

DUAL

ELEMENT

2503200 175

200A COPPER EQUIPPMENT GROUNDING BAR.

WITH 200A COPPER NEUTRAL BAR AND

HEAVY DUTY, SINGLE THROW, EQUIPPED

SCALE: NOT TO SCALE

DETAILD1

E7

NEW DOUBLE

LOCKNUTS & BUSHINGS

GRADE

NEW SCH 80 PVC

SCREW COVER, PAINT

NEW WEATHERPROOF

NEMA 3R JUNCTION BOX,

24" X 24" X10 " WITH

METAL PLANK FENCE

TO MATCH EXISTING

PLANK FENCE

EXISTING METAL

NEW RGS COUPLING,3"

PLASTIC COATED

NEW 3" RGS ELBOW,

CONDUIT, 3"

NEW 3" RGS ELBOW

NEW 3" RGS CONDUIT

NEW RGS CONDUIT STRAP

TRANSFORMER

PAD MOUNTED

TO EXISTING

NEMA 3R JUNCTION BOX

TO NEW WEATHERPROOF

SCALE: NOT TO SCALE

DETAILD2

E7 E10

E10

NEW DOUBLE

LOCKNUTS & BUSHINGS

GRADE

NEW SCH 80 PVC

SCREW COVER, PAINT

NEW WEATHERPROOF

NEMA 3R JUNCTION BOX,

24" X 24" X10 " WITH

METAL PLANK FENCE

TO MATCH EXISTING

PLANK FENCE

EXISTING METAL

NEW RGS COUPLING,3"

PLASTIC COATED

NEW 3" RGS ELBOW,

CONDUIT, 3"

NEW 3" RGS ELBOW

NEW RGS CHANNEL

NEW 3" RGS CONDUIT

NEW RGS CONDUIT STRAP

NEMA 3R JUNCTION BOX

TO NEW WEATHERPROOF

ENCLOSURE

TRANSFORMER

TO NEW CURRENT

NEW 3" RGS CONDUIT

NEW 3" RGS CONDUIT

NEW RGS CHANNEL

ADAPTER,3"

NEW STEEL TO PVC

ADAPTER, 3"

NEW STEEL TO PVC

NEW RGS COUPLING,3"

E10

S C

H E

D U

L

T

A

IL

S

NEW RGS COUPLING,3"

Attachment 9 - SEED Project Drawings 4702

16 16 16 16

15 15 15 1515 15

SCALE: NOT TO SCALE

10'

$$$$$$$$$$USER$$$$$$$$$$

SYTIME$$$$$$$$$$$

C e n te r o f

E x c e ll e n c e

DRAWING NO

D E S

IG

N E

D B

Y D

R A

W N B

Y C

H

IE

F E

N G

R D

IV

P R

O

JE

C T N

O D

A T E

D A

T E

D E S

C R

IP

T

IO

N B

Y

C H

E C

K E

D B

Y

F O

R T S

IL

L

O K

L A

H O

M A

R E

V

IS

IO

N

D

IR

E C

T O

R A

T E

P U

B L

IC

W

O R

K S

O F

G .Y

G .Y

F P

D

21007

JU

L

B U

IL

D

IN

G

K Q -7 J

R E P

A C

S

Y S

T E

EXISTING MAIN DISTRIBUTION SWITCHBOARD "MDP"

2 3 4 5 6 7

EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

EXISTING EXISTING EXISTING EXISTING

100A M.L.O.

PANELBOARD

120/208V

3PH, 4W

100A M.L.O.

PANELBOARD

120/208V

3PH, 4W

NEW

"A"

NEW

"B"

EXISTING SWITCHBOARD SCHEDULE

DESCRIPTIONMARK

NOTES FOR THIS SHEET:

NEW 4 #1 THHN, 1 #6 THHN IN 2" EMT.

EXISTING SERVICE ENTRANCE GROUND TO REMAIN.

EXISTING 300 KVA PAD MOUNTED TRANSFORMER TO REMAIN.

1 1

REQUIRED.

NEW COPPER TERMINAL LUGS SHALL BE PROVIDED AS

ESTIMATED DEMAND: 150.5kVA

TOTAL CONNECTED LOAD: 453.7kVA

COPPER

800A

120/208V; 3PH; 4W

NEUTRAL RATING:ENCLOSURE TYPE:

SWITCHBOARD ID:

TRIP

BUS MATERIAL:

BUS RATING:

VOLTAGE:

FRAMEMARK POLES

800ASURFACE

MDP

LOAD DESCRIPTION kVA

INCOMING FEED: TOP AVAILABLE FAULT CURRENT:18,000A

PANELBOARD "BP"225 225 3 37.2

PANELBOARD "1P1"225 225 3 124.1

PANELBOARD "1P4"225 225 3 70.0

PANELBOARD "2P1"225 225 3 122.6

PANELBOARD "2P4"225 225 3 71.0

800A; 3PH; 4W; 120/208V

SPARE

"BP"

120/208V

3PH, 4W

225A M.L.O.

PANELBOARD

225A/3P

"1P2"

120/208V

3PH, 4W

100A M.L.O.

PANELBOARD PANELBOARD

100A M.L.O.

3PH, 4W

120/208V

"1P3"

225A/3P

"1P1"

120/208V

3PH, 4W

225A M.L.O.

PANELBOARD

PANELBOARD

"2P2"

120/208V

3PH, 4W

100A M.L.O.

PANELBOARD

"2P3"

100A M.L.O.

3PH, 4W

120/208V

225A M.L.O.

"2P1"

PANELBOARD

3PH, 4W

120/208V

225A/3P

100A M.L.O.

PANELBOARD

120/208V

3PH, 4W

"1P5"

225A M.L.O.

"1P4"

PANELBOARD

3PH, 4W

120/208V

225A/3P

120/208V

PANELBOARD

100A M.L.O.

3PH, 4W

"2P5"

120/208V

PANELBOARD

225A M.L.O.

3PH, 4W

"2P4"

225A/3P 100A/3P

800A M.C.B.

13200-120/208V

25A

DUAL SENSING

10kV

TYPE K

30A

EXISTING OVERHEAD PRIMARY; 13.2kV

10kV

CIRCUIT

MONITOR

SPARE100 100 3 14.4

100 100 3 SPARE 14.4

DEMAND AMPS: 418A

SPARE

100A/3P

8 100 - 3 SPACE ONLY -

9 SPACE ONLY100 - 3 -

10 SPACE ONLY100 - 3 -

3#4 CU PRI, 1#4 CU NEUT TO REMAIN

4"C-3#2-15kV,1/C,SHIELDED,133%,1-#2 600V

GND, 1-4"C SPARE

2-3"C-4#500

1 1/4"C-4#2,1#8GND

2 1/2"C-4#4/0,1#4GND

#2/0 BARE COPPER

#2 SOLID COPPER

#1/0 BARE COPPER

PANEL.

CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING

FOR THE NEW PANEL "A". THE NEW 100A , 3-P0LE, 240V

THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42

PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN

PANEL.

CIRCUIT BREAKER SHALL BE COMPATIBLE WITH EXISTING

FOR THE NEW PANEL "B". THE NEW 100A , 3-P0LE, 240V

THIS EXISTING PANEL FOR THE NEW CIRCUITS #38,40,42

PROVIDE A NEW 100A, 3-POLE, 240V CIRCUIT BREAKER IN

9 10

NEW ELECTRICAL RISER DIAGRAM - BLDG. 4702

NEW 200A 3-POLE SAFETY SWITCH.

NEW #2 BARE COPPER IN 1" RGS CONDUIT.

NEW #2 BARE COPPER, 2' BELOW GRADE.

2' BELOW GRADE.

NEW EXOTHERMICALLY WELDED CONNECTION,

MANUFACTURER'S RECOMMENDATIONS.

PROVIDE FUSES IN ACCORDANCE WITH

NEW 4 #12 RHW-2, 1 #12 RHW-2 G IN 3/4" RGS CONDUIT.

18 19 17

IN NEMA 3R ENCLOSURE, 24" X 24" X 10".

2 WIRE, 4" WINDOW, 0.3 ANSI ACCURACY CLASS,

3 NEW CURRENT TRANSFORMERS, 300:5A, 60HZ,

EXISTING

CHILLER

84.8kW

350AF

400AS

DETAIL AND EXACT LOCATION.

NEW CHILLER, 33.57 KW, 208V, 3-PHASE . SEE MECHANICAL FOR

NEW 4 #2/0 RHW-2 IN 3" SCH PVC CONDUIT.

NEW 4 #2/0 RHW-2, 1 #6 RHW-2 G IN 3" RGS CONDUIT.

NEW 4 #2/0 RHW-2 IN 3" RGS CONDUIT.

TO EXISTING PAD MOUNTED TRANSFORMER.

SHALL BE PROVIDED AS REQUIRED FOR CONNECTING NEW WIRES

NEW COPPER EXTENSION LUGS AND COPPER TERMINAL LUGS

TRANSFORMER FOR NEW CHILLER.

3 PHASE, 120/208V FROM THIS EXISTING PAD MOUNTED

PHASE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .