Attachment_0010_MEO_B2033_W58RGZ-19-R-0050.pdf
PDF 546 KB Posted
- Attached to
- Solicitation for the Overhaul/Repair of the UH-60 Tail Rotor Blade with Pitch Horn Replacement
- Solicitation number
- W58RGZ-19-R-0050
About this file
Attachment 0010_MEO B2033_W58RGZ-19-R-0050.pdf
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2)
MEO NO.
DATE PAGE 1 of
TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:
Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°
APPLICABILITY CSI Critical Characteristic Affected?
Impact Statement Attached?
REFERENCES FOR RDECOM USE ONLY
DOCUMENT(S) AFFECTED
PURPOSE OR PROBLEM
PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE
MED FORM 5-DEC-09 1401-R-E
B 2033
UH-60 Tail Rotor Blade Assembly - Add Embrittlement Relief Baking Requirement for Repair Bushing
P/N: 70101-11200-044 (NSN 1615-01-088-3230)
P/N: 70101-31000-043 (NSN 1615-01-113-8188)
Technical
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
MEO CHANGE TYPE
3) High - Has a business or process impactPRIORITY IMPLEMENTATION CATEGORY
UH60 DAA
DMWR 1-1615-287 dtd 30 December 2011 MEC B201345
SS8407, SAE AMS2759/9D
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
3-13.4.5.d.(6): Addition of Type II and Class 2 to SAE-AMS-QQ-P-416 cad plate requirement for bushing and a new step (7) for embrittlement relief baking requirement after cadmium plating ( 23 hours at 375+/-25°F).
GONZALEZ.LUI
S.III.1231164878
Digitally signed by
GONZALEZ.LUIS.III.1231164878
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=GONZALEZ.LUIS.III.1231164878 Date: 2015.07.06 13:41:13 -05'00'
GRZELECKI.DAN
IEL.P.125929525
Digitally signed by
GRZELECKI.DANIEL.P.1259295250
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=GRZELECKI.DANIEL.P.1259295250 Date: 2015.06.25 15:46:28 -05'00'
Daniel Grzelecki
HORN.REINHOL
D.J.1087783495
Digitally signed by
HORN.REINHOLD.J.1087783495
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HORN.REINHOLD.J.1087783495 Date: 2015.07.06 14:30:24 -05'00'
Luis Gonzalez lll Ron Horn PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
3-61 3-13.4.5 .d.(6)
3-13.4.5 .d (7)
ADD the following after "SAE-AMS-QQ-P-416" in the first sentence:
"Type II, Class 2"
ADD new paragraph "3-13.4.5.d (7)" as follows:
"(7) After cadmium plating of the bushings, perform embrittlement relief bake at 375+/-25°F for 23 hours and within 4 hours of the last step of the cadmium plating process. Bake time refers to the time at which the surface of part is at the specified bake temperature."
Distribution Statement D:- Distribution authorized to Department of Defense and U.S. DoD contractors only to protect critical technology effective as of 26 June 2014. Other requests for this document must be referred to U.S. Army Aviation and Missile Research, Development and Engineering Center, ATTN: RDMR -AEM , Corpus Christi, TX 78419-5211
MED FORM 18 NOV 2014
JULY 16 2015
W58RGZ-17-R-0237
Attachment 0010
File details come from the government source that posted it.