Attachment_0004_MEO_B1576A_W58RGZ-19-R-0050.pdf
PDF 660 KB Posted
- Attached to
- Solicitation for the Overhaul/Repair of the UH-60 Tail Rotor Blade with Pitch Horn Replacement
- Solicitation number
- W58RGZ-19-R-0050
About this file
Attachment_0004_MEO_B1576A_W58RGZ-19-R-0050.pdf
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2)
MEO NO.
DATE PAGE 1 of
TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:
Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°
APPLICABILITY CSI Critical Characteristic Affected?
Impact Statement Attached?
REFERENCES FOR RDECOM USE ONLY
DOCUMENT(S) AFFECTED
PURPOSE OR PROBLEM
PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE
MED FORM 5-DEC-09 1401-R-E
B 1576 Rev. A Oct 30, 2014 3
Tail Rotor Blade Horn Assembly (PN 70101-11220-042/102) - Addition of Local Blend Limits in Overhaul Inspection Procedure
Technical
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
MEO CHANGE TYPE
3) High - Has a business or process impactPRIORITY IMPLEMENTATION CATEGORY
UH60 DAA
DMWR 1-1615-287 dated 30 December 2011 TN 127083
MEC B179093, B181417
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
Add minimum material condition dimensional limits to overhaul inspection procedure for local blending repair of horn assembly. (Rev. A - Corrects "Reference Letter "F" Figure: horn box section minimum wall thickness , WAS .170 min, NOW: .200 min.)
GRZELECKI.DAN
IEL.P.125929525
Digitally signed by
GRZELECKI.DANIEL.P.1259295250
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=GRZELECKI.DANIEL.P.1259295250 Date: 2014.10.27 14:18:11 -05'00'
MEDRANO.RICH
ARD.P.12719978
Digitally signed by
MEDRANO.RICHARD.P.1271997864
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=MEDRANO.RICHARD.P.1271997864 Date: 2014.10.09 13:26:06 -05'00'
HORN.REINHOL
D.J.1087783495
Digitally signed by
HORN.REINHOLD.J.1087783495
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HORN.REINHOLD.J.1087783495 Date: 2014.10.27 14:40:31 -05'00'
PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
3-46
3-47
3-47
OIP 6,
No. 2
No. 3
No. 9
Change No. 2 as follows:
"REF LTR: F"
"REQUISITE: Damage not deeper than 0.008. Corner damage not deeper than 0.018. Repair per paragraph 3-13.4.1"
Change No. 3 as follows:
"REF LTR: F"
"REQUISITE: Not deeper than 0.008 on horn surface. Repair per para 3-13.2. If corrosion exists on horn and extends under the bond line between the horn and blade paddle, no repairs are allowed."
Change Item 9 as follows:
"REF LTR: F"
"Requisite: Not greater than 0.5001 inside diameter. Repair per 3-13.4. Note: For horn bushing installation bore damage beyond
0.5001 see oversize bushing repair 3-13.4.5."
Add Figure: "REF LTR F: Minimum Material Dimensions After Repair Per OIP Parameters" found on page 3 of this MEO.
Distribution Statement D:- Distribution authorized to Department of Defense and U.S. DoD contractors only to protect critical technology effective as of 26 June 2014. Other requests for this document must be referred to U.S. Army Aviation and Missile Research, Development and Engineering Center, ATTN: RDMR -AEM , Corpus Christi, TX 78419-5211
MED FORM 26 JUN 2014
W58RGZ-17-R-0237
Attachment 0004
Continuation Sheet
MEO NO.
PAGE of
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
MED FORM 15-DEC-09 1401-R-E
3-54 3-13.2.e
3-13.2.f
3-13.4.1.a
3-13.4.1.a .1
3-13.4.1.d
Replace with the following:
"e. Blend out treated areas by blending to a minimum 10 to 1 length to depth ratio in all directions using an abrasive as course as 80-grit and finishing with a finer grit aluminum oxide abrasive cloth (APP C,item 41) as required to establish a 125 RMS finish or better. Blend 0.001-0.002 inch beyond visible depth of damage to ensure complete damage removal. Do not blend beyond the limits specified in OIP 6 REF LTR F."
Add f. as follows:
"f. Remove surface flow of metal in blended area(s) by etching with Keller's etchant per 3-13.4.2.b."
Replace with the following:
"a. Completely remove scratches, nicks, and burrs from damaged surfaces by blending to a minimum 10 to 1 length to depth ratio in all directions using an abrasive as course as 80-grit and finishing with a finer grit aluminum oxide abrasive cloth (APP C,item 41) as required to establish a 125 RMS finish or better.
Blend 0.001-0.002 inch beyond visible depth of damage to ensure complete damage removal. Do not blend beyond the limits specified in OIP 6 REF LTR F.
Add a.1 as follows:
"a.1. Remove surface flow of metal in blended area(s) by etching with Keller's etchant per 3-13.4.2.b."
Replace with the following:
"d. Paint reworked area per paragraph 3-13.34."
MED FORM 26 JUN 2014
B 1576 Rev. A
Continuation Sheet
MEO NO.
PAGE of
MED FORM 15-DEC-09 1401-R-E
MED FORM 26 JUN 2014
B 1576 Rev. A
RDMR-AEM
MEMORANDUM FOR RECORD:
SUBJECT: Impact of AED Maintenance Engineering Order (MEO) on maintenance using ,affecting system:
Enclosed MEO is issued by this office and is provided as part of our Technical Data user support mission.
4. THIS MEO CHANGES THE FOLLOWING (Check all that apply):
1.
Consumables
Materials
Expendables
Repairable Bill of Materials (RBOM)Impact
3. PRIORITY IMPLEMENTATION CATEGORY :
6. :
. Point of contact for this action is
2. FOR AMCOM ACQUISITION CENTER USE ONLY:
This MEO was written as a request from a contractor/KO on an active M&O contract.
Request that MEO be transmitted to the contractor as soon as possible.
b.Items checked in this area are considered Normal Priority Implementation Category.
Illustrated Parts Breakdown Change Mandatory Replacement Part
TSO/TSN Change Configuration Change
Publication New Change
Hardware Tooling Equipment
New/Revised Procedure/Process
Process Improvement Project Inspection
Special Process Testing Cost Savings a.Items checked in this area are considered High Priority Implementation Category.
5. Reason(s) MEO Written:
Other
Other
B 1576 Rev. A
DMWR 1-1615-287 dated 30 December 2011 UH60
B 1576 Rev. A
3) High - Has a business or process impact
CCAD Request
Sikorsky
This MEO supports TN 127083
Richard P. Medrano
MEDRANO.RICHARD.P.12
71997864
Digitally signed by MEDRANO.RICHARD.P.1271997864 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=MEDRANO.RICHARD.P.1271997864 Date: 2014.10.09 13:26:32 -05'00'
File details come from the government source that posted it.