Attachment_0002_MEO_B1295_W58RGZ-19-R-0050.pdf
PDF 594 KB Posted
- Attached to
- Solicitation for the Overhaul/Repair of the UH-60 Tail Rotor Blade with Pitch Horn Replacement
- Solicitation number
- W58RGZ-19-R-0050
About this file
Attachment 0002_MEO B1295_W58RGZ-19-R-0050
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2)
MEO NO.
DATE PAGE 1 of
TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:
Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°
APPLICABILITY CSI Critical Characteristic Affected?
Impact Statement Attached?
REFERENCES FOR RDECOM USE ONLY
DOCUMENT(S) AFFECTED
PURPOSE OR PROBLEM
PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE
MED FORM 15-DEC-09 1401-R-E
B 1295 Aug 27, 2013 7
UH-60 Tail Rotor Blade Depot Maintenance Overhaul Requirements (DMWR) Errata
P/N 70101-11200-044 / -043
Administrative
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
MEO CHANGE TYPE
3) High - Has a business or process impactPRIORITY IMPLEMENTATION CATEGORY
UH60 DAA
DMWR 1-1615-287 dtd 30 Dec 2011 TN 125766
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
Correct errors in publication for Change 1, dated 17 June 2013.
SOLBERG.JOH
N.B.1230311427
Digitally signed by
SOLBERG.JOHN.B.1230311427
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=SOLBERG.JOHN.B.1230311427 Date: 2013.08.21 05:09:43 -05'00'
RADER.KARL.AN
DREW.10443758
Digitally signed by
RADER.KARL.ANDREW.1044375849
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=CONTRACTOR, cn=RADER.KARL.ANDREW.1044375849 Date: 2013.08.20 16:00:13 -05'00'
Karl Rader
REIFENBERGER
.ROBERT.ANDR
EW.1079786663
Digitally signed by
REIFENBERGER.ROBERT.ANDREW.107978666
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=REIFENBERGER.ROBERT.ANDREW.107978 Date: 2013.08.21 11:47:02 -05'00'
John Solberg FOR Ron Horn PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
3-26
3-37
3-67
3-74
3-75
3-78
3-13.7.n
3-13.8.l
Tbl 3-1
OIP 1,
No. 10
Fig 3-10
Fig 3-13
CHANGE Dwell Time to read: "<1"
CHANGE OIP 1, Inspection No. 10, Requisite, "3-13.30.2 to "3-13.30.3."."
REPLACE Figure 3-10 with new figure 3-10 on page 5 of this MEO.
REPLACE the Tail Rotor Blade and Tip Cap drawings in Figure 3-13 (the top two views) with new drawings on page 6 of this MEO.
CHANGE paragraph 3-13.7.n to read: "Cure repair at 140° to 160°F (60° to 71°C) for at least 2 hours."
CHANGE paragraph 3-13.8.l to read: "Cure repair at 140° to 160°F (60° to 71°C) for at least 2 hours while maintaining pressure and contour of repair."
Formatted Cont. Sheet
W58RGZ-17-R-0237
Attachment 0002
Continuation Sheet
MEO NO.
PAGE of
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
MED FORM 15-DEC-09 1401-R-E
3-80
3-81
3-87
3-99
3-100
3-107
3-108
3-109
3-111
3-127
3-128
3-132
3-133
3-137
3-13.9.m
3-13.12.c (9)
3-13.16.n
3-13.16.q (8)
3-13.18.c (1)(c)
3-13.18.c (2)(f)
3-13.18.m
3-13.19.k
3-13.23.6.
d
3-13.24.f
(13)(e)
(14)(h)
3-13.25.r
Fig 3-16
B 1295
CHANGE paragraph 3-13.9.m to read: "Cure repair at 140° to 160°F (60° to 71° C) for at least 2 hours."
CHANGE last line in Note 5 to read: "(APP C, ITEM 56, 60, or 65)."
CHANGE paragraph 3-13.12.c(9) to read: "Vacuum bag repair per paragraph 3-13.33 and cure at 140° to 160°F (60° to 71°C) for at least 2 hours."
CHANGE paragraph 3-13.16.n to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.16.q(8) to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.18.c.(1)(c) to read: "Vacuum bag cure repairs per paragraph 3-13.33 at 140° to 160°F (60°to 71°C) for at least 2 hours."
CHANGE paragraph 3-13.18.c(2)(f) to read: "Vacuum bag cure repairs per paragraph 3-13.33 at 140° to 160°F (60° to 71°C) for at least 2 hours."
CHANGE the second sentence of paragraph 3-13.18.m to read: "Cure repair at 140° to 160°F (60° to 71°C) for at least 2 hours or at room temperature (70° to 85°F/ 21° to 29°C) for at least 24 hours."
CHANGE paragraph 3-13.19.k to read: "Secure patch with masking tape (App C, item 37) and cure repair at 140° to 160°F (60° to 71°C) for at least 2 hours or at room temperature (70° to 85°F/ 21° to 29°C) for at least 24 hours."
CHANGE paragraph 3-13.23.6.d to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.24.f to read: "Repair bond separations in torque tube region (Rotor Station 15.062 - 40.00) as follows:"
CHANGE paragraph 3-13.24.f(13)(e) to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.24.f(14)(h) to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.25.r to read: "Vacuum bag repair per paragraph
Formatted Cont. Sheet
Continuation Sheet
MEO NO.
PAGE of
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
3-144
3-147
3-148
3-151
3-154
3-160
3-162
3-163
3-163
3-166
3-169
3-170
3-13.28.i
3-13.28.1.
d.(4)
3-13.28.1 (j).(5)
3-13.29.1.
r
3-13.29.2.
r
3-13.30.1.
k
3-13.30.1.
aa
3-13.30.2.
e
3-13.30.2.
h
3-13.30.3.
q
3-13.32.1.
w
3-13.32.2.
f
CHANGE paragraph 3-13.28.i to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.28.1.d.(4) to read: "Vacuum bag bond per paragraph
CHANGE first sentence of paragraph 3-13.28.1.(j).(5) to read: "Applying 12-15 psi (nom), cure the nylon wrap-to-spar bond at 140° to 160 °F (60° to 71 °C) for 2 hours, minimum."
CHANGE paragraph 3-13.29.1.r to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.29.2.r to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.30.1.k to read: "Vacuum bag repair per paragraph 3-13.33 and cure at 140° to 160°F (60° to 71°C) for at least 2 hours or at room temperature (70° to 85°F/ 21° to 29°C) for at least 24 hours."
CHANGE paragraph 3-13.30.1.aa to read: "Vacuum bag repair per paragraph 3-13.33 and cure repair at 140° to 160°F (60° to 71°C) for at least 2 hours or at room temperature (70° to 85°F/ 21° to 29°C) for at least 24 hours."
CHANGE third sentence of paragraph 3-13.30.2.e to read: "Vacuum bag repair per paragraph 3-13.33 using a vacuum pressure of 10 to 12 psi (20.4 – 28.5 in Hg vacuum) and cure at 140° to 160°F (60° to 71°C) for at least 2 hours or at 70° to 85°F (21 to 29°C) for a minimum of 24 hours."
CHANGE second sentence of paragraph 3-13.30.2.h to read: "Vacuum bag repair per paragraph 3-13.33 using a vacuum pressure of 10 to 12 psi (20.4 –
28.5 in Hg vacuum) and cure at 140° to 160°F (60° to 71°C) for at least 2 hours or at 70° to 85°F (21° to 29°C) for a minimum of 24 hours."
CHANGE paragraph 3-13.30.3.q to read: "Vacuum bag repair per paragraph 3-13.33 and cure at 140° to 160°F (60° to 71°C) for at least 2 hours or at room temperature (70° to 85°F/ 21° to 29°C) for at least 24 hours."
CHANGE paragraph 3-13.32.1.w to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.32.2.f to read: "Vacuum bag repair per paragraph 3-13.33 and cure assembly at 140° to 160°F (60° to 71°C) for at least 2 hours."
B 1295
Formatted Cont. Sheet
Continuation Sheet
MEO NO.
PAGE of
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
3-172
3-174
3-177
3-184
3-189
C-5
3-13.32.3.
g
3-13.32.4.
d
3-13.33.q
Fig 3-45
Fig 3-49
APP C
CHANGE paragraph 3-13.32.3.g to read: "Vacuum bag repair per paragraph
CHANGE paragraph 3-13.32.4.d to read: "Vacuum bag repair per paragraph
REPLACE the Repair Section II drawing in Figure 3-45 with the corrected Repair Section II drawing on page 7 of this MEO.
CHANGE the fourth sentence of paragraph 3-13.33.q to read: "Cure for at least 2 hours or at room temperature (70° to 85°F/ 21° to 29°C) for at least 24 hours."
CHANGE Note 4 in Figure 3-49 to read: "DO NOT PAINT NICKEL ABRASION
STRIP OR NICKEL ABRASION STRIP ON TIP CAP."
CHANGE Item 83, second entry, Description and U/M, to read:
Description: EA9309.3NA EZ-PAK GRACO SUPPLY(SUPPLIER)
(04347) (ITEM NUMBER)
U/M: 50 grams
B 1295
Formatted Cont. Sheet
Continuation Sheet
MEO NO.
PAGE of
Figure 3-10. Repair Surface Corrosion on Horn Outboard Faces
Formatted Cont. Sheet
W58RGZ-17-R-0237
Attachment 0002
ClaryDL Line
Continuation Sheet
(REMOVED)
A A
Fig 3-13. Repair Tip Cap Attachment Holes or Rib Damage
B 1295
Formatted Cont. Sheet
W58RGZ-17-R-0237
Attachment 0002
Continuation Sheet
REPAIR SECTION II
Figure 3-45. Viton Repair Sections (Sheet 1 of 3)
Formatted Cont. Sheet
W58RGZ-17-R-0237
Attachment 0002
RDMR-AEM
MEMORANDUM FOR RECORD:
SUBJECT: Impact of AED Maintenance Engineering Order (MEO) on maintenance using ,affecting system:
Enclosed MEO is issued by this office and is provided as part of our Technical Data user support mission.
4. THIS MEO CHANGES THE FOLLOWING (Check all that apply):
1.
Consumables
Materials
Expendables
Repairable Bill of Materials (RBOM)Impact
3. PRIORITY IMPLEMENTATION CATEGORY :
6. Comments:
7. Point of contact for this action is
2. FOR AMCOM ACQUISITION CENTER USE ONLY:
This MEO was written as a request from a contractor/KO on an active M&O contract.
Request that MEO be transmitted to the contractor as soon as possible.
b.Items checked in this area are considered Normal Priority Implementation Category.
Illustrated Parts Breakdown Change Mandatory Replacement Part
TSO/TSN Change Configuration Change
Publication New Change
Hardware Tooling Equipment
New/Revised Procedure/Process
Process Improvement Project Inspection
Special Process Testing Cost Savings a.Items checked in this area are considered High Priority Implementation Category.
5. Reason(s) MEO Written:
Other
Other
B 1295
DMWR 1-1615-287 dtd 30 Dec 2011 UH60
B 1295
3)High-MEO has a business or process impact
CCAD Request
Results from review of Change 1 to the DMWR.
John Solberg; 361-961-3551; email: john.b.solberg.CIV@mail.mil Dan Grzelecki; 361-961-4062; daniel.p.grzelecki.civ@mail.mil
SOLBERG.JOHN.B.123031
Digitally signed by SOLBERG.JOHN.B.1230311427 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=SOLBERG.JOHN.B.1230311427 Date: 2013.08.21 05:09:55 -05'00'
John Solberg
File details come from the government source that posted it.