Attachment_0005_MEO_B1586_W58RGZ-19-R-0050.pdf

PDF 504 KB Posted

Attached to
Solicitation for the Overhaul/Repair of the UH-60 Tail Rotor Blade with Pitch Horn Replacement
Solicitation number
W58RGZ-19-R-0050
Issued by

About this file

Attachment_0005_MEO_B1586_W58RGZ-19-R-0050.pdf

View the file

Other files

File Type Posted
Solicitation_W58RGZ-19-R-0050.pdf PDF
Exhibit_C_Data_Item_A003_W58RGZ-19-R-0050.pdf PDF
Attachment_0004_MEO_B1576A_W58RGZ-19-R-0050.pdf PDF
Attachment_0019_DD_Form_1348-1A_Example_W58RGZ-19-R-0050.pdf PDF
Attachment_0017_Report_of_Discrepancy_(ROD)_Guidance_W58RGZ-19-R-0050.pdf PDF
Attachment_0013_MEO_B2469_W58RGZ-19-R-0050.pdf PDF
Attachment_0012_MEO_B2142_W58RGZ-19-R-0050.pdf PDF
Attachment_0003_MEO_B1389_W58RGZ-19-R-0050.pdf PDF
Attachment_0023_Critical_Characteristics_W58RGZ-19-R-0050.pdf PDF
Exhibit_B_Data_Item_A002_W58RGZ-19-R-0050.pdf PDF
Attachment_0018_Frozen_Plan_Description_and_Guidance_W58RGZ-19-R-0050.pdf PDF
Attachment_0021_HQAMC-Level_Protest_Procedures_(October_2015)_W58RGZ-19-R-0050.pdf PDF
Attachment_0007_MEO_B1739A_W58RGZ-19-R-0050.pdf PDF
Exhibit_F_Data_Item_A006_W58RGZ-19-R-0050.pdf PDF
Exhibit_D_Data_Item_A004_W58RGZ-19-R-0050.pdf PDF
Attachment_0011_MEO_B2059_W58RGZ-19-R-0050.pdf PDF
Attachment_0014_MEO_B2474_W58RGZ-19-R-0050.pdf PDF
Exhibit_A_Data_Item_A001_W58RGZ-19-R-0050.pdf PDF
Attachment_0016_MEO_T1356D_W58RGZ-19-R-0050.pdf PDF
Attachment_0002_MEO_B1295_W58RGZ-19-R-0050.pdf PDF
Attachment_0008_MEO_B1754A_W58RGZ-19-R-0050.pdf PDF
Attachment_0006_MEO_B1613_W58RGZ-19-R-0050.pdf PDF
Attachment_0015_MEO_B2481_W58RGZ-19-R-0050.pdf PDF
Attachment_0009_MEO_B1887_W58RGZ-19-R-0050.pdf PDF
Exhibit_E_Data_Item_A005_W58RGZ-19-R-0050.pdf PDF
Attachment_0010_MEO_B2033_W58RGZ-19-R-0050.pdf PDF
Attachment_0022_Packaging_Requirements_W58RGZ-19-R-0050.pdf PDF
Attachment_0024_Document_Summary_List_W58RGZ-19-R-0050.pdf PDF
Attachment_0020_CDM_Production_Report_Sample_W58RGZ-18-R-0067.pdf.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE ENGINEERING ORDER

(AMCOM Reg. 750-2)

MEO NO.

DATE PAGE 1 of

TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:

Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°

APPLICABILITY CSI Critical Characteristic Affected?

Impact Statement Attached?

REFERENCES FOR RDECOM USE ONLY

DOCUMENT(S) AFFECTED

PURPOSE OR PROBLEM

PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE

MED FORM 15-DEC-09 1401-R-E

B 1586 Jun 17, 2014 1

Tail Rotor Blade Assembly (70101-11200-044 and 70101-31000-043) - Tip Cap Installation, Oversize Rivet (CR3242-4-2)

Technical

INTERIM USE OF THIS MEO IS AUTHORIZED

UNTIL AFFECTED DOCUMENT IS UPDATED.

MEO CHANGE TYPE

3) High - Has a business or process impactPRIORITY IMPLEMENTATION CATEGORY

UH60 DAA

DMWR 1-1615-287 dtd 30 December 2011

DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None

3-13.7.e: Added NOTE to specify required hole diameter (.143/.146) for installation of oversize rivet (CR3242-4-2).

MEDRANO.RICH

ARD.P.12719978

Digitally signed by

MEDRANO.RICHARD.P.1271997864

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=MEDRANO.RICHARD.P.1271997864 Date: 2014.06.16 14:45:24 -05'00'

GRZELECKI.DAN

IEL.P.125929525

Digitally signed by

GRZELECKI.DANIEL.P.1259295250

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=GRZELECKI.DANIEL.P.1259295250 Date: 2014.06.16 14:28:45 -05'00'

Daniel Grzelecki

HORN.REINHOL

D.J.1087783495

Digitally signed by

HORN.REINHOLD.J.1087783495

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HORN.REINHOLD.J.1087783495 Date: 2014.06.16 15:41:50 -05'00'

Richard Medrano Ron Horn PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT

CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.

WP NO. PAGE

NO.

PARA-

GRAPH

FIGURE/

TABLE

NO.

CHANGES

(EXACT WORDING OF CHANGES MUST BE GIVEN)

3-71 3-13.7.e ADD new NOTE after the existent NOTE as follows:

"NOTE

Required hole size for installation of the CR3242-4-2 rivet is .143/.146 diameter. If hole diameter exceeds .146, then replace tip cap and perform doubler repair of the tip cap attachment holes in the tip rib beginning with step e."

MED FORM 06 MAR 2014

Formatted Cont. Sheet

W58RGZ-17-R-0237

Attachment 0005

RDMR-AEM

MEMORANDUM FOR RECORD:

SUBJECT: Impact of AED Maintenance Engineering Order (MEO) on maintenance using ,affecting system:

Enclosed MEO is issued by this office and is provided as part of our Technical Data user support mission.

4. THIS MEO CHANGES THE FOLLOWING (Check all that apply):

1.

Consumables

Materials

Expendables

Repairable Bill of Materials (RBOM)Impact

3. PRIORITY IMPLEMENTATION CATEGORY :

6. Comments:

7. Point of contact for this action is

2. FOR AMCOM ACQUISITION CENTER USE ONLY:

This MEO was written as a request from a contractor/KO on an active M&O contract.

Request that MEO be transmitted to the contractor as soon as possible.

b.Items checked in this area are considered Normal Priority Implementation Category.

Illustrated Parts Breakdown Change Mandatory Replacement Part

TSO/TSN Change Configuration Change

Publication New Change

Hardware Tooling Equipment

New/Revised Procedure/Process

Process Improvement Project Inspection

Special Process Testing Cost Savings a.Items checked in this area are considered High Priority Implementation Category.

5. Reason(s) MEO Written:

Other

Other

B 1586

DMWR 1-1615-287 dtd 30 December 2011 UH60 Blades

B 1586

3) High - Has a business or process impact

CCAD Request

Daniel Grzelecki, RDMR-AEM, daniel.p.grzelecki.civ@mail.mil

W58RGZ-17-R-0237

Attachment 0005

File details come from the government source that posted it.