W56HZV-20-R-L812 RFP Conformed through Amendment 0003.pdf
PDF 939 KB Posted
- Attached to
- Detroit Arsenal Construction MATOC
- Solicitation number
- W56HZV20RL812
About this file
This solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to provide a broad range of minor construction projects at Detroit Arsenal in Detroit, Michigan and surrounding locations including Selfridge Air National Guard Base.
The Government intends to award approximately fifteen firm fixed price contracts to small businesses as this is a 100% small business set-aside. The total maximum value for task orders over the five year ordering period for all contracts is $92 million. Individual task order maximum is $12 million. Task orders will have a 12 month period of performance.
The statement of work includes a variety of construction trades such as carpentry, road repair, roofing, excavation, electrical, HVAC, fire protection, telecommunications, plumbing, painting, demolition and welding. Work will require knowledge of facility operations and minimizing disruption. The prevailing Davis Bacon wage determination will be provided with each task order. Questions are due by March 9th and the solicitation closes on April 3rd.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE RESULTANT CONTRACTS WILL BE FIRM FIXED PRICE, MULTIPLE AWARD INDEFINITE DELIVERY, INDEFINITE QUANTITY (MA IDIQ)
CONTRACTS CONSIST OF FIVE ORDERING PERIODS.
A. This acquisition is 100% Set-Aside for Small Business.
B. Assigned NAICS Codes is 236220, "Commercial and Institutional Building Construction" w ith a small business size standard of $39.5 million.
C. The number of contracts that may be aw arded as a result of this solicitation is approximately f if teen individual MA IDIQ contracts.
D. The total maximum value for task orders to be placed over all ordering periods for all IDIQ contracts is $92 million.
E. Block 11, Period of Performance, w ill be cited w ithin the individual Task Orders.
F. Block 12, Performance and Payments Bonds, are applicable to the individual Task Orders as required.
G. Solicitation, any information, notices, and amendments for this solicitation w ill be posted to http://w w w .beta.sam.gov.
MATHEW STOCKER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Feb-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________03 Apr 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL MI 48937-5000
W56HZV
PAGE OF PAGES
1 OF
CODE W56HZV
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
ACC-DTA
6501 E. 11 MILE RD
DETROIT ARSENAL MI 48397-500
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W56HZV20RL812 133
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W56HZV20RL812
Section SF 30 - BLOCK 14 CONTINUATION PAGE
PURPOSE OF AMENDMENT 0001:
The purpose of amendment 0001 is to adjust mandatory fill in clauses from being included by reference to full text.
1. Mandatory fill in clause FAR 52.204-8 “ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)” is included as full text.
2. Mandatory fill in clause FAR 52.203-2 “Certificate Of Independent Price Determination (APR 1985)” is included as full text.
3. Mandatory fill-in clause FAR 52.222-22 “PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)” is included as full text.
4. Mandatory fill-in clause FAR 52.222-23 “NOTICE OF REQUIREMENT FOR
AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR
CONSTRUCTION (FEB 1999)” is included as full text.
PURPOSE OF AMENDMENT 0002
The purpose of amendment 0002 is adjust and remove language in section L as follows:
1. Adjust language in paragraph L.2.2.1.4
a) From “Unless otherwise specified, it is recommended that the proposal be formatted for 8.5 inch x 11 inch paper with a minimum font size of 10 pt. and with a minimum of 0.5 margins. Schedules, drawings and other documents more appropriate to larger size shall be formatted for no larger than 8.5 inch x 14 inch dimensions.”
b) To “Unless otherwise specified, it is recommended that the proposal be formatted for 8.5 inch x 11 inch paper with a minimum font size of 10 pt. and with a minimum of 0.5 margins. Schedules, drawings and other documents more appropriate to larger size shall be formatted for no larger than 24 inch x 36 inch dimensions.”
2. Remove L.5.7 as subcontractor past performance is not required on this solicitation.
3. Remove local narrative LS7001 due to a conflict with language in section L.
4. Remove FAR 52.217-8 and all corresponding references to the clause throughout the RFP.
PURPOSE OF AMENDMENT 0003
The purpose of amendment 0003 is to extend to the solicitation as follows:
1. The solicitation close date is extended from 27 March 2020 at 11:00AM to 03 April 2020 at 11:00AM.
Section A - Solicitation/Contract Form
A. EXECUTIVE SUMMARY
W56HZV-20-R-L812
The U.S. Army Contracting Command (ACC) in Warren, MI proposes to release an Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) Solicitation W56HZV-20-R-L812 with a 5 year ordering period for a broad range of minor construction projects to support real property sustainment, restoration, modernization, repair and minor construction of buildings, structures and other real property at Detroit Arsenal in Detroit Arsenal, MI and surrounding locations including Selfridge Air National Guard Base (SANGB). The Government intends to award approximately fifteen (15) contracts to small businesses, as this is a 100% small business set-aside. This is an estimate only. The Government reserves the right to vary the number of awards depending on the number of responsive quotations submitted. The Government also reserves the right to On Ramp approximately two-and-one-half (2.5) years into the MATOC ordering period to maintain an optimal mix of prime contractors. These tasks are typical projects performed in a variety of trades including carpentry, road repair, roofing, excavation, interior electrical, exterior electrical, heating, ventilating, and air conditioning (HVAC), fire protection, telecommunications, steam fitting, plumbing, sheet metal, painting, demolition, concrete masonry and welding.
SOLICITATION FORMATTING: This solicitation utilizes a combination of both Construction Contract Format and the Uniform Contract Format. The Construction Contract Format references numerical sections and is used throughout this solicitation. Please note that some sections will reference both the alphabetical Uniform Contract Format letter, as well as the equivalent Construction Contract Format number. This has been added to provide additional clarity as sections are referenced.
FILL-INS: Please note this solicitation contains fill-ins, so please be careful to read and complete each clause and provision.
TYPE OF CONTRACT AND PAYMENT SCHEDULE: The task orders awarded against this IDIQ MATOC will be Firm-Fixed-Price (FFP). Each ordering period the task orders are awarded against will be 12 months long, totaling 60 months (5 years). The statement-of-work is included in this document in Section C.
INCONSISTENCIES: This Executive Summary has been prepared as an aid for potential offeror(s). We havemade every attempt to accurately reflect the requirements and information contained in the balance of this solicitation.
However, if you find any inconsistency between this executive summary and the solicitation, the solicitation takes precedence.
ON RAMPS: To maintain an optimal mix of prime contractors, ACC-WRN may conduct an Open Season approximately two-and one-half (2- 1/2) years into the MA IDIQ performance period during which new contractors may be added, via On-Ramping.
QUESTION / ANSWERS: A question and answer period is available until 11:00 AM EASTERN STANDARD TIME on 09 March 2020. NO PHONE CALLS WILL BE ACCEPTED FOR ANY REASON. ALL QUESTIONS SHALL BE IN WRITING. Questions and answers will be posted publicly to the Detroit Arsenal Construction MATOC posting on beta.sam.gov at the following website: https://www.beta.sam.gov. Questions that are received by this office after the deadline will be considered late and may not be answered. Questions regarding this solicitation should be directed to: Mathew Stocker, in writing via e-mail, at usarmy.detroit.acc.mbx.dta-matoc@mail.mil.
Exhibits – Contract Data Requirements List (CDRL): The Master CDRL list herein are any CDRLs that may be required with individual task orders completed after award of this 5 year contract.
Ordering Limitations: The maximum order for a single item is $12,000,000.00 or $12,000,000.00 for a combination of items. The overall contract maximum for this requirement is $92,000,000.00.
Contractual Minimum: In accordance with FAR Part 16.504(a)(2), the contractual minimum of this IDIQ MATOC is $1,000.00; CDRL AC01: Corporate Quality Control Plan, listed under Exhibit A, will be submitted in order to receive the contractual minimum.
SECTION A LOCAL NARRATIVES
AS7001 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
AS7040 ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
AS7526 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)
Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
AS7527 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc).
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0011 1 Job Construction Ordering Period 1
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
FOB: Destination
PSC CD: Y1EZ
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0012 1 Job Construction Ordering Period 2
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
UNIT UNIT PRICE MAX AMOUNT
0013 1 Job Construction Ordering Period 3
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
UNIT UNIT PRICE MAX AMOUNT
0014 1 Job Construction Ordering Period 4
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
UNIT UNIT PRICE MAX AMOUNT
0015 1 Job Construction Ordering Period 5
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
UNIT UNIT PRICE MAX AMOUNT
9000 1 Job Contract Data Requirements List
FFP
CDRLs are to be NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
9001 1 Job Contractor Manpower Reporting
FFP
This CLIN is not separately priced. The contractor shall report all labor hours in accordance with C.42.3.
Section C - Descriptions and Specifications
DTA MATOC SOW
C.1 GENERAL
C.1.1 The contractor shall furnish, upon receipt of an individual Task Order award, all materials, supplies, tools, parts (to include system components), supervision, engineering review and design, transportation, quality control, management, and labor necessary to perform all work in accordance with the specifications and technical criteria listed in each task order. The contractor’s work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide all repair and construction related services as specified in each individual task order. The contractor may be required to meet compressed schedules, to deal with emergency or urgent requirements. The site location for performance will be identified in each Task Order.
Work will vary from site to site and will require extensive knowledge of the functional operation relating to the efficient use of the facility, equipment, facility support systems, and building structures. Since the facilities may be in operation, the contractor shall be required to minimize interference with Government operations and personnel.
C.1.2 The work shall be conducted by the Contractor in accordance with the Unified Facilities Criteria (UFC), Army Regulations (AR), the Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), the Architectural Barriers Act (ABA), the National Fire Protection Association (NFPA) standards, the American National Standards Institute (ANSI), the American Society of Heating, Refrigerating and Air- Conditioning Engineers (ASHRAE) standards, Federal Energy Efficiency Standards, Federal and DoD Cybersecurity standards, Michigan Occupational Safety & Health Administration (MIOSHA), Michigan Department of Environment, Great Lakes, and Energy, Michigan Department of Transportation, Michigan Department of Labor and requirements, and all other Federal, state, and local laws, regulations, codes, standards, and directives as specified in this contract. The compliance with codes and regulations shall be based on the most stringent requirements, in case there is a conflict between any two codes or any two regulations. The UFC and UFGS are available at the Whole Building Design Guide (WBDG) website (http://dod.wbdg.org/). UFGS Specification Section 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS includes a list of standards publishing organizations and contact information.
C.1.3 The contractor shall minimize environmental pollution and damage or potential damage that may result from their operations. Environmental resources within the project boundaries and those affected outside the project boundaries shall be protected for the duration of the contract. The contractor shall be responsible for work delays resulting from failure to comply with environmental laws and regulations. Failure to comply with environmental requirements is not grounds for an equitable adjustment to the performance schedule. The contractor shall confine all activities to areas defined by the design drawings and specifications. The contractor shall be responsible for the actions of its subcontractors to ensure they adhere to all environmental requirements.
The Army's goal is to have no enforcement actions for noncompliance in regards to environmental and sustainability regulations at any installation. The contractor's actions and support are absolutely essential to achieve this goal at the United States Army Garrison-Detroit Arsenal (USAG-DTA). In the event the USAG- DTA is issued an enforcement action, the contractor shall be liable for the cost of all fines and penalties resulting from the violation of any laws due to its actions or failure to perform in accordance with (IAW) Federal, State or local environmental requirements. Also, the contractor shall be responsible to reimburse the Government for all expenses incurred because of the receipt of any enforcement actions due to the fault or negligence of the contractor. The contractor shall notify the Contracting Officer or Contracting Officer's Representative (COR) if any actual environmental issues are encountered or potential environmental issues may be encountered.
C.2 TASK ORDER COMPETITION
C.2.1 Individual Task Order awards (Task Order) will be based on competitive proposals received exclusively from MATOC contractors in accordance with the fair opportunity process from FAR 16.505(b)(1).
C.2.2 All eligible MATOC contract contractors will be provided a fair opportunity to be considered for each Task Order under this contract unless a statutory exception from FAR 16.505(b)(2) applies.
C.2.3 The Contracting Officer may exercise broad discretion in determining the basis upon which the selection will be made for each task order. The submission requirements and basis for award will be included in each individual task order request. The task order basis for award can include, but is not limited to the following:
-Price -Past Performance (including performance on this MATOC) -Technical
C.3 TASK ORDER REQUEST FOR PROPOSAL (TASK ORDER RFP)
C.3.1 Notification of Task Order RFP. Notifications of task order requests for construction related projects will be sent via e-mail to MATOC contract holders. Therefore, MATOC contract holders shall keep an up-to-date e-mail address on file with the Contracting Officer at all times. Backup addresses are encouraged. Upon notification of a Task Order RFP, the contractor shall acknowledge receipt by return e-mail. The Government will not be responsible for lack of notification(s) for MATOC contractor holders who fail to maintain current e-mail addresses or fail to acknowledge receipt.
C.3.1.1 In the event an offeror is unable to submit a proposal in response to a Task Order RFP, the contractor shall notify the Contracting Officer, or the Contract Specialist identified within the Task Order RFP, via e-mail.
C.3.2 Task Order RFP Format. The Task Order RFP shall contain the following information:
1. Date of Issuance
2. Project Title and Description
3. Magnitude of the Project
4. Plans and Specifications
5. Performance Period
6. Bonding Requirements
7. Liquidated Damages (If applicable)
8. Wage Determination
9. Site Visit Information
10. Basis for Award
11. Proposal Due Date
12. Proposal Submission Requirements
13. Any other pertinent data determined appropriate by the Contracting Officer
C.3.3 Plans and Specifications. The MATOC contract holder will be provided an electronic copy of the Statement of Work (with pertinent supplemental specifications and construction drawings as applicable) upon issue of each Task Order RFP. All reproduction shall be at the contractor’s expense.
C.3.3.1 Design Standards & Guides. The design, construction, and repair of facilities shall comply with the Attachments and Appendices provided in Task Order RFP.
C.3.3.2 Default Specifications. The Unified Facilities Guide Specifications (UFGS) are the Default Specifications for the MATOC contract and all Task Orders. Specification paragraphs and subparagraphs shall not be rewritten by the contractor which lessens the quality of the original technical specification sections, unless otherwise noted in the Task Order RFP. The UFGS specifications describe the type and quality of material and installation normally acceptable for United States Army construction and often represent specific agreement between the Government and the applicable industry. The provisions of the UFGS technical specifications shall not be changed without justification. If bracketed choices are not selected by the Government in the Task Order RFP, then the contractor shall edit the choice. Contractor editing of UFGS specifications shall not lessen the quality of the UFGS unless the contractor provides the Contracting Officer documentation as to why the standards established by the UFGS sections cannot be met and the Contracting Officer approves. The technical specifications shall be complete and fully coordinated with the drawings. Special sections shall be prepared to cover those subjects for which no pattern guide specifications are available. Notes to the designer that accompany specifications shall be used in editing technical guide specifications. All specification indexes shall be completely edited to reflect the paragraphs retained in the body of the specification. All UFGS specifications shall be edited in accordance with the requirements stated here and in this Task Order Statement of Work.
C.3.3.2.1 Design-Build. The Government will provide minimum project design drawings and technical specifications for Design-Build projects. The contractor shall provide the complete design drawings and edited Specifications, and execute construction in accordance with the Government approved final contract documents, drawings, and Specifications.
C.3.3.2.2 Design-Bid-Build. The Government will develop project design drawings and technical specifications for Design-Bid-Build projects. The contractor shall provide construction based on the Government prepared design. Certain aspects of Design-Bid-Build projects may require contractor design services as specified in the Task Order RFP. Required contractor design services for Design-Bid-Build projects may include fire protection design, structural design, or any other design specified in the Task Order RFP.
C.3.4 Site Visits. Upon issuance of the Task Order RFP, a site visit will be scheduled. MATOC contract holder’s attendance at site visits is considered vital to preparation of competitive and cost-effective offers, and to understand the total requirements desired by the Government. In some cases, a site visit may be determined mandatory for MATOC contract holders to submit proposals. Such requirement will be stated in the Task Order RFP. Failure to attend site visits may not be used as an excuse for omission or miscalculation in offers. Any failure of the Contractor to attend a site visit will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government. See FAR clause 52.236-3, Site Investigation and Conditions Affecting the Work.
C.3.5 Davis Bacon. The prevailing Davis Bacon Wage Determination shall be included into each Task Order RFP per FAR 22.404, “Davis-Bacon Act wage determinations.” Offerors shall be notified of any changes to the prevailing Davis Bacon Wage Determination before the issuance of Task Orders.
C.4. TASK ORDERS INCLUDING DESIGN AND CONSTRUCTION SERVICES
C.4.1 The design of architectural, structural, HVAC, plumbing, electrical, communications, fire protection, civil, or other engineering features of the work shall be accomplished or reviewed and approved by architects or engineers registered to legally practice in the particular professional field the United States, Puerto Rico, or in the District of Columbia. Projects requiring a designer to be licensed in the State of Michigan will be denoted at the task order level. All plans shall be stamped and signed by the design professional. The contractor shall identify the Designer of Record for each area of work, also to be indicated in the Design Quality Control Plan. One Designer of Record may be responsible for more than one area. All areas of design disciplines shall be accounted for by a listed, State Licensed Designer of Record in good standing. The Designers of Record shall stamp, sign, and date each design drawing submitted under their responsible discipline for the 100 Percent Design; Corrected Final Design; and Released for Construction Design submittals.
C.4.2 Responsibility of the Contractor for Design. See FAR clause, 52.236-23, Responsibility of the Architect- Engineer Contractor, for responsibility of the contractor for design.
C.4.3 Notice to Proceed (NTP). After receipt of the NTP, the contractor shall initiate design, comply with all design submission requirements, and obtain Government review and approval of each submission. No construction may be started until the Government approves the final design submission and determines it satisfactory for purposes of beginning construction. The Contracting Officer or COR will notify the contractor when the design is cleared for construction by issuing a Released for Construction letter. Unless otherwise approved by the contracting officer through issuance of a partial release for construction letter.
C.4.4 If the Government allows the contractor to proceed with limited construction based on pending minor revisions to the final design submission, no payment will be made for any materials incorporated in the work related to the pending revisions until they are approved by the Government.
C.5. TASK ORDER AWARD
C.5.1 Contract Type. The Task Orders will be Firm-Fixed-Price.
C.5.2 Issuing Authority. The Contracting Officer is designated as issuing authority for Task Orders placed against the MATOC contract.
C.5.3 Task Order Issuance. Task Order awards will be issued on DD Form 1155 and will be sent via e-mail.
Upon award of a Task Order, the contractor shall acknowledge receipt of the Task Order.
C.5.4 Task Order Award Format. Each Task Order Award shall contain the following information:
1. Effective date of Task Order Award.
2. Contract number and Task Order number.
3. Task Order price, delivery and performance data.
4. Accounting and appropriation data.
5. Wage Determination.
6. Bonding Requirements.
7. Liquidated damages.
8. Scope of Work.
9. Drawings, if applicable.
10. Any other pertinent data determined appropriate by the Contracting Officer.
C.5.5 Bonding Requirements. Payment and performance bonds, if applicable shall be provided to the Contracting Officer within five calendar days after award.
C.5.6 Pre-Construction Meeting and Notice to Proceed. After receipt of acceptable performance and payment bonds, if required, a pre-construction meeting will be held prior to any start of work. A NTP agreement will be issued by the Contracting Officer and shall be signed by an official of the company authorized to sign contracts and related material. The contractor shall promptly commence the work specified and in accordance with the terms of the contract.
C.5.7 The Contractor’s Site Supervisor and Government representatives shall hold weekly progress meetings for the duration of each Task Order.
C.6 CONTRACT DATA REQUIREMENT LIST
C.6.1 Contractor shall submit the required information to the Government as indicated below:
TITLE FREQUENCY CDRL REFERENCE NUMBER
Corporate Contract Quality Plan One time - 30 days after Task order award date Exhibit A, CDRL AC01
Schedules As required per Task Order Exhibit A, CDRL A001 Request For Information As required per Task Order Exhibit A, CDRL A002 65 Percent Design As required per Task Order Exhibit A, CDRL A003
100 Percent Design As required per Task Order Exhibit A, CDRL A004 Release for Construction As required per Task Order Exhibit A, CDRL A005 Photographs As required per Task Order Exhibit A, CDRL A006 Meeting Minutes As required per Task Order Exhibit A, CDRL A007 Quality Control As required per Task Order Exhibit A, CDRL A008 Safety Plan As required per Task Order Exhibit A, CDRL A009 Closeout Documents As required per Task Order Exhibit A, CDRL A010 Environmental Protection Plan As required per Task Order Exhibit A, CDRL A011 Construction Impact As required per Task Order Exhibit A, CDRL A012 Waste Recycle Report As required per Task Order Exhibit A, CDRL A013 Schedule of Values As Required per Task Order Exhibit A, CDRL A014 Security As Required per Task Order Exhibit A, CDRL A015
C.7 REPORT OF ERROR AND DISCREPANCIES
C.7.1 The contractor shall be responsible for any and all discrepancies in work due to failure to obtain dimensions and investigate conditions at the building before fabrication and installation. Any failure of the Contractor to attend a site visit will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government. See FAR clause 52.236-3, Site Investigation and Conditions Affecting the Work.
C.7.2 In design-bid-build projects, the contractor shall promptly notify the Contracting Officer in writing of any discrepancies in the drawings or in the specifications in accordance with FAR clause 52.236-21, Specifications and Drawings for Construction.
C.7.3 Any proposed changes to the specifications by the contractor must be submitted in writing to the Contracting Officer for approval.
C.8 DESIGNATION OF GOVERNMENT REPRESENTATIVES
C.8.1 Contracting Officer. The Contracting Officer is the administrating representative of all Task Orders. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government. The Contracting Officer is the sole individual with authority to make changes to the contract terms and conditions.
C.8.2 Contracting Officer’s Representative (COR). The Contracting Officer shall appoint a qualified COR.
The COR is designated as the technical representative of the Contracting Officer for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under contract. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
C.9 CONTRACTOR STAFFING AND KEY PERSONNEL
C.9.1 Contractor Information. Prior to the issuance of the first Task Order, MATOC contract holders shall provide the Contracting Officer with a telephone number, fax number, and e-mail address at which the contractor may be contacted during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate action.
C.9.2 Staffing. The manpower and staffing requirements for work will vary. The contractor shall employ adequate manpower capabilities to perform the functions detailed in each Task Order.
C.9.3 Contractor’s Quality Control (CQC) System Manager. The contractor shall identify an individual within its organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the contractor. The contractor’s CQC is responsible for the overall production and quality of work on the job. The superintendent shall maintain a physical presence at the site at all times and shall be responsible for construction and construction related activities at the site. This CQC System Manager shall be on the site at all times during construction and will be employed by the contractor. The CQC System Manager may serve as the Safety Manager or it may be a separate position. The CQC System Manager may serve as the Safety Manager but shall not have any other duties outside of these two positions. An alternate for the CQC System Manager will be identified in the plan to serve in the event of the system manager's absence.
The requirements for the alternate will be the same as for the designated CQC Manager. All work shall be accomplished with adequate internal controls and review procedures that will eliminate conflicts, errors, and omissions and ensure the technical accuracy of all output. See Section C.37, “Contractor Quality Control” for further guidance.
C.9.4 Personnel. The contractor shall be responsible to employ and utilize only experienced journeymen overseeing certified apprentices in the field they are working and capable persons in the performance of work under contract.
All employees must be citizens of the United States or authorized aliens and shall be able to furnish proof of citizenship or a legal work visa if required by the Contracting Officer. Only authorized contractor personnel shall be admitted to the worksite at all times.
C.9.5 Removal of Personnel. The Contracting Officer may require the contractor to remove from the job those employees who endanger persons or property; those who manufacture, distribute, dispense, possess, or use controlled substances at the worksite and those whose continued employment under this contract is inconsistent with the interest of military security in accordance with FAR clause 52.236-5, Material and Workmanship.
C.9.6 Liability. The contractor hereby agrees to release the Government (to include its officer, enlisted personnel, agents, and employees) from any liability for any loss, damage, or injury sustained by the contractor or its’ employees during the performance of this contract. The contractor also agrees to indemnify the Government for any loss, damage, or injury to Government personnel or agents or other third parties, provided such loss to the Government is caused by the negligence of the contractor or its’ personnel while performing this contract.
C.10 MINIMUM QUALIFICATIONS OF KEY PERSONNEL
C.10.1 The Contractor’s Quality Control (CQC) System Manager shall have a minimum of ten years construction experience on construction projects similar to this contract and similar in size and complexity. In addition, the CQC Manager shall complete the course entitled "Construction Quality Management for Contractors" prior to start of construction. For further information, contact the nearest USACE Construction Division Office.
https://www.lre.usace.army.mil/Missions/Civil-Works/Engineering-and-Construction/CQM-Information/.
C.11 CONSTRUCTION SCHEDULING AND WORK PROGRESS
C.11.1 Weekly progress meetings will be held between the contractor, COR, and Contracting Officer, if necessary, to discuss work progress and any issues. Contractors shall attend these meetings at no additional cost to the Government.
C.11.2 Prior to commencing work, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premise and buildings; space for storage of materials and equipment; delivery of materials and use of approaches, use of corridors, stairways, and similar means of passage.
C.11.3 Portable furniture in the immediate project area shall be moved by the contractor to a location designated by the COR and replaced in its original position, or an alternate location as determined by the COR, upon completion of the work. Schedules for movement of furniture and equipment and delivery of materials shall be incorporated in the progress schedule and shall be made with a minimum of interference to Government operations and personnel. So far as practicable, the work shall be completed by section and confined to limited areas. Coordination with the COR and the user activity shall be accomplished at least three days in advance.
C.12 WORK SCHEDULING
C.12.1 Unless otherwise indicated by special project phasing instructions, the contractor shall be prepared to pursue the contracted work during the Contract Normal Working period of 7:30 a.m. to 4:00 p.m., Monday through Friday, exclusive of recognized Federal Holidays outlined hereunder, and the Friday after Thanksgiving. Also, if a Federal Holiday falls on a Saturday, the DTA Base will be closed on the Friday before, and if a Federal Holiday falls on a Sunday, the DTA Base will be closed on the following Monday. If the 4th of July Holiday falls on a Thursday, the Detroit Arsenal Base will be closed on the Friday after. Unless prior approval is received from the contracting officer or COR, the contractor will not be allowed to work during Federal holidays, which are:
New Year’s Day - 1 January Martin Luther King JR’s Birthday - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - Last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran's Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
C.12.2 If the contractor determines that work is required prior to or after normal working hours, then the contractor shall submit a written request to the Contracting Officer for approval, no later than 72 hours prior to the work to be performed. All weekend requests shall be submitted to the Contracting Officer for approval no later than 72 hours prior to the weekend work that is to be performed. Once approved, government will provide listing to Access Control Point (ACP) personnel. Should the contractor be required to perform work during other than normal hours, including Saturday, Sundays and Government Legal Holidays, due to contractor and subcontractor delay, in order to maintain contract completion dates, the Government shall not be held liable for additional costs.
C.12.3 The installation buildings are places of employment for the Government employees and are occupied by the Government employees during the Government employees' working hours. Contractor shall identify and minimize activities and equipment that emit toxic or hazardous fumes, odors, vapors, chemicals, or smells that adversely impacts the Government employees. Contractor shall mitigate other life-health-safety in regards to noise, fumes, odors, vapors, chemicals, or smells that adversely impacts the Government employees. Work outside of core government hours may be required, and will be specified in each task order. The contractor shall provide a mitigation plan as part of the CDRL A009, Safety Plan.
C.12.4 Prior to commencing work on the job initially, resumption of work after prolonged interruption (seven calendar days or more), commencement of any warranty work, and upon completion of warranty work the contractor must notify the Contracting Officer and COR. When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the COR is sufficient. Notification should be accomplished sufficiently in advance to allow scheduling of inspection forces. The above precautions are to ensure construction inspection and recording of work proceedings.
C.13 METHOD OF CARRYING ON THE WORK
C.13.1 All work under the contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The contractor shall consult with the Contracting Officer and the COR as to methods or sequence of carrying on the work.
C.13.2 Activities in the vicinity of this project may be kept in full or partial operation during construction. The contractor shall coordinate with the COR and schedule construction activities.
C.14 LAYOUT AND GRADES
C.14.1 All lines and grade work not presently established at the site shall be laid out by the contractor in accordance with the drawings and specifications. The contractor shall be responsible for maintaining benchmarks and other survey markers and shall replace any benchmarks or survey markers that may have become disturbed or destroyed.
C.15 SCHEDULING OF PRE-FINAL AND FINAL INSPECTIONS
C.15.1 Notification for Pre-Final Inspection. The contractor and the Government will jointly conduct a pre-final inspection prior to any final inspection. Prior to requesting a pre-final inspection, the contractor shall inspect its’ work thoroughly and make required corrections. Request for the pre-final inspection shall be made in writing to the COR at least five calendar days prior to the desired date.
C.15.2 Pre-Final Inspection. Discrepancies noted will be furnished by the COR. The COR is responsible for furnishing a complete punch list, in writing, to the contractor. Items noted on the punch list will be completed prior to scheduling a final inspection. These inspections and any deficiency corrections required by this paragraph must be accomplished within the time slated for completion of the entire work.
C.15.3 As-Built drawings, real property data, warranties, O&M manuals, equipment list etc., shall be submitted as specified in the Task Order.
C.15.4 Notification for Final Inspection. When the contractor is ready for final inspection, he shall request so in writing to the COR at least five calendar days prior to the desired date and include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection.
C.15.5 Final Inspection. The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, the Contracting Officer's Representative, and representative of the using activity must be in attendance at the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost in accordance with the contract clause, 52.246-12, Inspection of Construction.
C.16 DIVISION OF WORK
C.16.1 The arrangement and order of these divisions have been made for convenience only, and it is not the intent, nor shall it be so construed, a particular trade or subcontractor must perform that work included in any one division.
C.16.2 The organization of the UFGS and Task Order specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.
C.17 CONTRACTOR RESPONSE – CONSTRUCTION SITE SPECIFIC
C.17.2 For non-emergency situations, the contractor is required to respond by QC Manager being physical presence to project site to notification within two calendar days of such notification. For emergency (life, health and safety) situations, the contractor shall respond by QC Manager being physical presence to the project site within 60 minutes of notification.
C.18 TRANSPORTATION AND HANDLING
C.18.1 The contractor shall coordinate with suppliers and shippers to ensure incoming materials are properly identified with the contractor’s name, contract number, and project title. The contractor shall be available to receive shipment.
C.19 MISPLACED MATERIALS
C.19.1 Any material that is deposited elsewhere than areas designated as approved by the COR shall be re-handled and deposited to the designated areas. Re-handling of such material will be at no cost to the Government.
The Contracting Officer will notify contractor of any noncompliance with the foregoing provisions.
C.20 STORAGE
C.20.1 Secure storage space will not be provided by the Government. The Government will not be responsible for property belonging to or under the present control of the contractor. The contractor is to protect their materials. An unsecured, open area will be designated by the COR for storage of construction equipment and materials during the period covered by a Task Order.
C.20.2 Storage of contractor-acquired supplies, materials, and equipment on the project site shall be accomplished in such a manner to prevent mechanical and climatic damage, fenced off, and loss due to vandalism or theft. Government equipment temporarily removed from the site in the performance of work and stored on the job site shall be stored and protected in accordance with the previous paragraphs, and shall be replaced in a condition compatible with its original state. Security for the contractor's equipment and material removal from the job site or for temporary storage until reuse shall be the responsibility of the contractor.
C.21 TELEPHONE AND COMMUNICATIONS SECURITY MONITORING
C.21.1 All communications with DoD organizations are subject to communication security (COMSEC) review.
Contractor shall be aware telephone communication networks are continually subject to intercept by unfriendly intelligence organizations. The DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is notified that any time contractor personnel place a call to, or receive a call from, a U.S. Army organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DoD information.
C.22 UTILITIES
C.22.1 If it becomes determined by the government that Government-operated utilities (to be specified in the Task Order) are adequate they will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, and charges will be made as determined by the Contracting Officer. Any expense incurred to gain access to these utilities shall be the responsibility of the contractor and all utilities shall be returned to their original configurations at the end of the each Task Order. The contractor is responsible for verifying, flagging, and locating all above ground and underground utilities for the task order. The contractor shall be responsible for utilizing ground penetrating radar to verify all underground utilities. No alterations to existing utilities shall be accomplished without the written permission of the Contracting Officer or COR.
C.22.2 The contractor shall notify the COR and obtain Fire Department approval prior to connecting to any base fire hydrant.
C.23 UTILITY AND OTHER BASE INTERRUPTIONS
C.23.1 If it becomes necessary to interrupt work activities in buildings or areas for construction purposes, permission to do so must be requested in writing to the COR at least 14 calendar days prior to commencing work and shall be subject to COR approval. Written requests for street closing or parking impacts shall be submitted for approval to the Contracting Officer and COR at least 14 calendar days prior to closing the street.
C.23.2 Shutoff of utilities that will cause interruption of Government work operation as determined by the COR shall be accomplished during Government non-work hours or on non-work days of the Using agency without any additional cost to the Government.
C.23.3 The contractor shall communicate all vehicular, pedestrian, and utility interruptions in detail by submitting the Construction Impact Notification Form. A copy of the current Construction Impact Notification Form can be obtained from the COR upon request. The Directorate of Public Works (DPW) Chief of Engineering must have up to 14 calendar days’ notice from the contractor prior to permission being secured.
C.23.4 Work in connection with this contract which requires utility outages (electrical, water, gas, steam,) which will close down or limit (as determined by the COR) normal activities in the building, construction area, or other affected areas, shall be performed by the contractor at a time other than regular working hours of the organization occupying the facility.