Attachment 0011- Contractor Quality Control Report.pdf

PDF 52 KB Posted

Attached to
Detroit Arsenal Construction MATOC
Solicitation number
W56HZV20RL812
Issued by

About this file

This document contains a contractor quality control report template to be used for construction projects under the Detroit Arsenal Construction Multiple Award Task Order Contract (MATOC) solicitation. The template requires reporting on preparatory, initial, and follow-up quality control phases with checklists; work description and testing; rework items identified and corrected; and remarks. It includes signatures by the contractor and government quality assurance representatives.

The solicitation seeks multiple indefinite-delivery/indefinite-quantity contracts for design-build and design-bid-build construction services in support of sustainment, restoration, modernization, repair, and minor construction projects at facilities including the Detroit Arsenal, Selfridge Air National Guard Base, and other satellite locations, as required by the U.S. Army Garrison - Detroit Arsenal Directorate of Public Works. The opportunity is available through the Department of the Army Materiel Command TACOM Life Cycle Management Command.

View the file

Other files

File Type Posted
DTA Construction MATOC RFP Questions as of 02 April 2020.pdf PDF
DTA Construction MATOC RFP Questions as of 27 March 2020.pdf PDF
W56HZV-20-R-L812 RFP Amendment 0003.pdf PDF
DTA Construction MATOC RFP Questions as of 25 March 2020.pdf PDF
W56HZV-20-R-L812 RFP Conformed through Amendment 0003.pdf PDF
DTA Construction MATOC RFP Questions as of 23 March 2020.pdf PDF
W56HZV-20-R-L812 Amendment 0002.pdf PDF
W56HZV-20-R-L812 Conformed Through Amendment 0002.pdf PDF
DTA Construction MATOC RFP Questions as of 13 March 2020.pdf PDF
DTA Construction MATOC RFP Questions as of 05 March 2020.pdf PDF
DTA Construction MATOC RFP Questions 04 March 2020.pdf PDF
W56HZV-20-R-L812 Conformed Through Amendment 0001.pdf PDF
W56HZV-20-R-L812 Amendment 0001.pdf PDF
Attachment 0005- STA Form 17.pdf PDF
Attachment 0012- QA Report Daily Log ENG FORM 2538-1.pdf PDF
Attachment 0016- Sample Design Build Task Order SOW.pdf PDF
Attachment 0006- Eng Form 4025.pdf PDF
Attachment 0014- HAZMART User Handbook (Appendix H).pdf PDF
Attachment 0019- BAS Standard Requirements Detroit Arsenal.pdf PDF
Attachment 0009- DD 1354 Real Property Transfer.pdf PDF
Attachment 0013- Construction Impact Notification Form.doc DOC document
Attachment 0001- Pricing Workbook.xlsx XLSX spreadsheet
DTA MATOC RFP- W56HZV-20-R-L812.pdf PDF
Attachment 0007- RFI Form.doc DOC document
Attachment 0003- DBA wage Determination MI20200091 14 February 2020.pdf PDF
Attachment 0008- DPW Drawing Standards (Appendix C).pdf PDF
Attachment 0010- STA 1901 Camera Pass.pdf PDF
Attachment 0018- Environmental (Appendix A).pdf PDF
Exhibit A- CDRLS.pdf PDF
Attachment 0017- Sample Design Bid Build Task Order SOW.pdf PDF
Attachment 0004- Use of Existing Government-Furnished Property.pdf PDF
Attachment 0015- New Equipment Checklist.pdf PDF
Attachment 0002- Past Performance Questionnaire.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4296/2 (9/98) SHEET 1 OF 1

CONTRACTOR QUALITY CONTROL REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

REPORT

NO

PHASE CONTRACT NO CONTRACT TITLE

PR

EP

A R

A

TO

R Y

WAS PREPARATORY PHASE WORK PERFORMED TODAY? YES NO

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST.

Schedule

Activity No. Definable Feature of Work Index #

IN

IT

IA

L

WAS INITIAL PHASE WORK PERFORMED TODAY? YES NO

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST.

Activity No. Definable Feature of Work Index #

FO

LL

O W

-U P

WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE? YES NO

WORK COMPLIES WITH SAFETY REQUIREMENTS? YES NO

Activity No.

Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present

REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)

Activity No. Description Schedule Activity No. Description

REMARKS (Also Explain Any Follow-Up Phase Checklist Item From Above That Was Answered "NO"), Manuf. Rep On-Site, etc.

On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report. AUTHORIZED QC MANAGER AT SITE DATE

GOVERNMENT QUALITY ASSURANCE REPORT DATE

QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT

GOVERNMENT QUALITY ASSURANCE MANAGER DATE

CONTRACTOR QUALITY CONTROL REPORT
GOVERNMENT QUALITY ASSURANCE REPORT

File details come from the government source that posted it. Updated .