Attachment 0011- Contractor Quality Control Report.pdf
PDF 52 KB Posted
- Attached to
- Detroit Arsenal Construction MATOC
- Solicitation number
- W56HZV20RL812
About this file
This document contains a contractor quality control report template to be used for construction projects under the Detroit Arsenal Construction Multiple Award Task Order Contract (MATOC) solicitation. The template requires reporting on preparatory, initial, and follow-up quality control phases with checklists; work description and testing; rework items identified and corrected; and remarks. It includes signatures by the contractor and government quality assurance representatives.
The solicitation seeks multiple indefinite-delivery/indefinite-quantity contracts for design-build and design-bid-build construction services in support of sustainment, restoration, modernization, repair, and minor construction projects at facilities including the Detroit Arsenal, Selfridge Air National Guard Base, and other satellite locations, as required by the U.S. Army Garrison - Detroit Arsenal Directorate of Public Works. The opportunity is available through the Department of the Army Materiel Command TACOM Life Cycle Management Command.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4296/2 (9/98) SHEET 1 OF 1
CONTRACTOR QUALITY CONTROL REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
REPORT
NO
PHASE CONTRACT NO CONTRACT TITLE
PR
EP
A R
A
TO
R Y
WAS PREPARATORY PHASE WORK PERFORMED TODAY? YES NO
IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST.
Schedule
Activity No. Definable Feature of Work Index #
IN
IT
IA
L
WAS INITIAL PHASE WORK PERFORMED TODAY? YES NO
IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST.
Activity No. Definable Feature of Work Index #
FO
LL
O W
-U P
WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE? YES NO
WORK COMPLIES WITH SAFETY REQUIREMENTS? YES NO
Activity No.
Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present
REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)
Activity No. Description Schedule Activity No. Description
REMARKS (Also Explain Any Follow-Up Phase Checklist Item From Above That Was Answered "NO"), Manuf. Rep On-Site, etc.
On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report. AUTHORIZED QC MANAGER AT SITE DATE
GOVERNMENT QUALITY ASSURANCE REPORT DATE
QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT
GOVERNMENT QUALITY ASSURANCE MANAGER DATE