Attachment 0001- Pricing Workbook.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Detroit Arsenal Construction MATOC
- Solicitation number
- W56HZV20RL812
About this file
This file contains a pricing workbook template for a federal construction multiple award task order contract (MATOC) solicitation. The solicitation seeks pricing for construction labor categories across five potential ordering periods.
The U.S. Army Garrison - Detroit Arsenal Directorate of Public Works has a need for design-build and design-bid-build construction services at facilities in Detroit, Selfridge Air National Guard Base, and other locations. The solicitation identifies 16 labor categories subject to the Davis Bacon Act along with their occupational codes and minimum wage rates. Offerors must propose direct labor rates and fringe benefits at or above the prevailing rates. The template requires offerors to input hourly pricing for each labor category across five potential task orders, along with proposed material, overhead, G&A, and profit rates. Pricing will be evaluated for a total contract value of $41 million over an unspecified period of performance.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Order of Merit
| Order of Merit based on manhours: | |||||
| DPW Data | GVSC Data | $81mil total (DPW + GVSC) | $93Mil interpolated for MATOC actual | ||
| 1 | Electrician: | 56012 | 19212 | 80036 | 93637 |
| 2 | Project Management | 20902 | 26975 | 47777 | 55836 |
| 3 | Concrete Laborer: | 35857 | 8162 | 44,019 | 51444 |
| 4 | Boiler Maker/pipe fitter: | 879 | 32641 | 33,520 | 39174 |
| 5 | Electrician (com): | 7144 | 13469 | 20613 | 24090 |
| 6 | Roofer: | 15656 | 2890 | 18,546 | 21674 |
| 7 | Operator: | 5158 | 10688 | 15,864 | 18519 |
| 8 | Carpenter (2): | 11870 | 13872 | 11,870 | 13872 |
| 9 | Laborer asbestos: | 1824 | 9916 | 11,740 | 13720 |
| 10 | Carpenter (1): | 0 | 7933 | 7,933 | 9271 |
| 11 | Sheet metal worker | 2614 | 3654 | 6,268 | 7325 |
| 12 | Plumber | 2196 | 3360 | 5,556 | 6493 |
| 13 | Cement Mason/Finisher | 862 | 4019 | 4,881 | 5704 |
| 14 | Iron Worker/Structural | 93 | 3300 | 3,393 | 3965 |
| 15 | Painter | 2082 | 1087 | 3,169 | 3704 |
| 16 | Sprinkler Fitter | 1049 | 2090 | 3,139 | 3668 |
| Assumptions: | |||||
| 1 | Average Davis Bacon wage +/- $100 | ||||
| 2 | 40% of contract total is labor | ||||
| 3 | PM may/may not be applicable | ||||
| 4 | Boiler Maker/ Pipe fitter is an outlying point |
Instructions
| Solicitation: W56HZV-20-R-L812 |
| Attachment 0001 - Pricing Workbook |
| Instructions |
1. Cells that require inputs are highlighted in yellow.
2. All cells highlighted in yellow on each tab must be completed, including offeror name and date on the SUMMARY tab.
3. Do not adjust formulas or otherwise manipulate any of the non-yellow highlighted cells.
4. Do not alter or make changes to this attachment except for inputting values in those cells highlighted in yellow. Do not print to adobe PDF, this spreadsheet is to be completed and submitted as an excel attachment.
| 5. Avoid proposing partial cents, i.e. amounts beyond a penny ($0.01). Round to the nearest penny for every yellow highlighed cell requiring input. All dollar amounts proposed will be displayed to the nearest $0.01. Avoid proposing a formula in any yellow highlighted cells, instead use amounts. |
| 6. For labor categories subject to the Davis Bacon Act, the Government has provided the Davis Bacon Act (DBA) Occupational Code within Tabs “Ordering Period (OP) 1” through “OP 5” of this attachment. For those labor categories subject to the Davis Bacon Act (i.e. it has a DBA Occupational Code associated with it), the offeror is required to propose direct labor rates and fringe at or above the rates contained within the prevailing wage determination for each locality. For the purpose of evaluation only, assume the DBA wages will remain constant for all ordering periods. See the "Wage Determination Minimums" tab below for all minimums by category and location. |
To identify the prevailing Davis Bacon Act wage determinations for a locality, you can also go to the website https://wdol.gov/ and search for DBA WD number MI20200091 dated 02/14/2020.
Wage Determination Minimums General Decision Number: MI20200091 02/14/2020
| Direct Labor Category Description | DBA | Occupational Code or Position Description | Direct Labor | |
| ($ per hour) | Fringe |
($ per hour)
| Carpenter: Ceiling, Drywall, Form Work, Metal Stud, & Scaffold Building) | CARP0687-003 | $ 32.70 | $ 28.94 |
| Carpenter: Floor Layer - Carpet, Resilient, & Vinyl Flooring) | CARP1045-001 | $ 29.60 | $ 24.33 |
| Electrician: Low Voltage and Wiring/Installation of Alarms- Technician | ELEC0058-001 | $ 36.21 | $ 13.27 |
| Electrician | ELEC0058-001 | $ 38.73 | $ 23.85 |
| Laborer: Asbestos Abatement | LABO0259-002 | $ 29.03 | $ 12.92 |
| Painter: Drywall / Finishing / Taping | PAIN0022-003 | $ 27.05 | $ 18.26 |
| Sprinkler Fitter | SFMI0704-001 | $ 44.25 | $ 28.68 |
| Sheet Metal Worker | SHEE0080-004 | $ 41.05 | $ 26.66 |
| Boilermaker/Pipefitter | BOIL0169-001 | $ 38.65 | $ 26.22 |
| Ironworker, Structural | IRON0025-022 | $ 36.77 | $ 29.03 |
| Laborer: Concrete | LABO1191-002 | $ 28.55 | $ 16.85 |
| Cement Mason/Concrete Finisher | PLAS0067-001 | $ 30.63 | $ 14.07 |
| Plumber | PLUM0098-001 | $ 35.77 | $ 35.13 |
| Roofer | ROOF0149-001 | $ 36.97 | $ 23.16 |
Summary
| Solicitation: W56HZV-20-R-L812 |
| Attachment 0001 - Pricing Workbook |
| Summary |
Offer Name Enter Date Completed
| Item | Proposed Price |
| Labor - Ordering Period 1 | $0 |
| Labor - Ordering Period 2 | $0 |
| Labor - Ordering Period 3 | $0 |
| Labor - Ordering Period 4 | $0 |
| Labor - Ordering Period 5 | $0 |
| Material | $41,000,000 |
| Total Evaluated Price | $41,000,000 |
Ordering Period 1
| Solicitation: W56HZV-20-R-L812 | |||||||
| Attachment 0001 - Pricing Workbook | |||||||
| Ordering Period 1 | |||||||
| Offer Name | |||||||
| Direct Labor Category Description | DBA | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Carpenter: Ceiling, Drywall, Form Work, Metal Stud, & Scaffold Building) | CARP0687-003 | 6,346 | $ - 0 | $ - 0 | |||
| Carpenter: Floor Layer - Carpet, Resilient, & Vinyl Flooring) | CARP1045-001 | 8,984 | $ - 0 | $ - 0 | |||
| Electrician: Low Voltage and Wiring/Installation of Alarms- Technician | ELEC0058-001 | 15,775 | $ - 0 | $ - 0 | |||
| Electrician | ELEC0058-001 | 24,220 | $ - 0 | $ - 0 | |||
| Laborer: Asbestos Abatement | LABO0259-002 | 7,933 | $ - 0 | $ - 0 | |||
| Painter: Drywall / Finishing / Taping | PAIN0022-003 | 4,717 | $ - 0 | $ - 0 | |||
| Sprinkler Fitter | SFMI0704-001 | 1,673 | $ - 0 | $ - 0 | |||
| Sheet Metal Worker | SHEE0080-004 | 2,923 | $ - 0 | $ - 0 | |||
| Boilermaker/Pipefitter | BOIL0169-001 | 6,529 | $ - 0 | $ - 0 | |||
| Ironworker, Structural | IRON0025-022 | 4,640 | $ - 0 | $ - 0 | |||
| Laborer: Concrete | LABO1191-002 | 6,530 | $ - 0 | $ - 0 | |||
| Cement Mason/Concrete Finisher | PLAS0067-001 | 3,215 | $ - 0 | $ - 0 | |||
| Plumber | PLUM0098-001 | 2,688 | $ - 0 | $ - 0 | |||
| Roofer | ROOF0149-001 | 7,313 | $ - 0 | $ - 0 | |||
| Total Labor - Ordering Period 1 | $ - 0 |
OP 2
| Solicitation: W56HZV-20-R-L812 | |||||||
| Attachment 0001 - Pricing Workbook | |||||||
| Ordering Period 2 | |||||||
| Offer Name | |||||||
| Direct Labor Category Description | DBA | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Carpenter: Ceiling, Drywall, Form Work, Metal Stud, & Scaffold Building) | CARP0687-003 | 6,346 | $ - 0 | $ - 0 | |||
| Carpenter: Floor Layer - Carpet, Resilient, & Vinyl Flooring) | CARP1045-001 | 8,984 | $ - 0 | $ - 0 | |||
| Electrician: Low Voltage and Wiring/Installation of Alarms- Technician | ELEC0058-001 | 15,775 | $ - 0 | $ - 0 | |||
| Electrician | ELEC0058-001 | 24,220 | $ - 0 | $ - 0 | |||
| Laborer: Asbestos Abatement | LABO0259-002 | 7,933 | $ - 0 | $ - 0 | |||
| Painter: Drywall / Finishing / Taping | PAIN0022-003 | 4,717 | $ - 0 | $ - 0 | |||
| Sprinkler Fitter | SFMI0704-001 | 1,673 | $ - 0 | $ - 0 | |||
| Sheet Metal Worker | SHEE0080-004 | 2,923 | $ - 0 | $ - 0 | |||
| Boilermaker/Pipefitter | BOIL0169-001 | 6,529 | $ - 0 | $ - 0 | |||
| Ironworker, Structural | IRON0025-022 | 4,640 | $ - 0 | $ - 0 | |||
| Laborer: Concrete | LABO1191-002 | 6,530 | $ - 0 | $ - 0 | |||
| Cement Mason/Concrete Finisher | PLAS0067-001 | 3,215 | $ - 0 | $ - 0 | |||
| Plumber | PLUM0098-001 | 2,688 | $ - 0 | $ - 0 | |||
| Roofer | ROOF0149-001 | 7,313 | $ - 0 | $ - 0 | |||
| Total Labor - Ordering Period 2 | $ - 0 |
OP 3
| Solicitation: W56HZV-20-R-L812 | |||||||
| Attachment 0001 - Pricing Workbook | |||||||
| Ordering Period 3 | |||||||
| Offer Name | |||||||
| Direct Labor Category Description | DBA | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Carpenter: Ceiling, Drywall, Form Work, Metal Stud, & Scaffold Building) | CARP0687-003 | 6,346 | $ - 0 | $ - 0 | |||
| Carpenter: Floor Layer - Carpet, Resilient, & Vinyl Flooring) | CARP1045-001 | 8,984 | $ - 0 | $ - 0 | |||
| Electrician: Low Voltage and Wiring/Installation of Alarms- Technician | ELEC0058-001 | 15,775 | $ - 0 | $ - 0 | |||
| Electrician | ELEC0058-001 | 24,220 | $ - 0 | $ - 0 | |||
| Laborer: Asbestos Abatement | LABO0259-002 | 7,933 | $ - 0 | $ - 0 | |||
| Painter: Drywall / Finishing / Taping | PAIN0022-003 | 4,717 | $ - 0 | $ - 0 | |||
| Sprinkler Fitter | SFMI0704-001 | 1,673 | $ - 0 | $ - 0 | |||
| Sheet Metal Worker | SHEE0080-004 | 2,923 | $ - 0 | $ - 0 | |||
| Boilermaker/Pipefitter | BOIL0169-001 | 6,529 | $ - 0 | $ - 0 | |||
| Ironworker, Structural | IRON0025-022 | 4,640 | $ - 0 | $ - 0 | |||
| Laborer: Concrete | LABO1191-002 | 6,530 | $ - 0 | $ - 0 | |||
| Cement Mason/Concrete Finisher | PLAS0067-001 | 3,215 | $ - 0 | $ - 0 | |||
| Plumber | PLUM0098-001 | 2,688 | $ - 0 | $ - 0 | |||
| Roofer | ROOF0149-001 | 7,313 | $ - 0 | $ - 0 | |||
| Total Labor - Ordering Period 3 | $ - 0 |
OP 4
| Solicitation: W56HZV-20-R-L812 | |||||||
| Attachment 0001 - Pricing Workbook | |||||||
| Ordering Period 4 | |||||||
| Offer Name | |||||||
| Direct Labor Category Description | DBA | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Carpenter: Ceiling, Drywall, Form Work, Metal Stud, & Scaffold Building) | CARP0687-003 | 6,346 | $ - 0 | $ - 0 | |||
| Carpenter: Floor Layer - Carpet, Resilient, & Vinyl Flooring) | CARP1045-001 | 8,984 | $ - 0 | $ - 0 | |||
| Electrician: Low Voltage and Wiring/Installation of Alarms- Technician | ELEC0058-001 | 15,775 | $ - 0 | $ - 0 | |||
| Electrician | ELEC0058-001 | 24,220 | $ - 0 | $ - 0 | |||
| Laborer: Asbestos Abatement | LABO0259-002 | 7,933 | $ - 0 | $ - 0 | |||
| Painter: Drywall / Finishing / Taping | PAIN0022-003 | 4,717 | $ - 0 | $ - 0 | |||
| Sprinkler Fitter | SFMI0704-001 | 1,673 | $ - 0 | $ - 0 | |||
| Sheet Metal Worker | SHEE0080-004 | 2,923 | $ - 0 | $ - 0 | |||
| Boilermaker/Pipefitter | BOIL0169-001 | 6,529 | $ - 0 | $ - 0 | |||
| Ironworker, Structural | IRON0025-022 | 4,640 | $ - 0 | $ - 0 | |||
| Laborer: Concrete | LABO1191-002 | 6,530 | $ - 0 | $ - 0 | |||
| Cement Mason/Concrete Finisher | PLAS0067-001 | 3,215 | $ - 0 | $ - 0 | |||
| Plumber | PLUM0098-001 | 2,688 | $ - 0 | $ - 0 | |||
| Roofer | ROOF0149-001 | 7,313 | $ - 0 | $ - 0 | |||
| Total Labor - Ordering Period 4 | $ - 0 |
OP 5
| Solicitation: W56HZV-20-R-L812 | |||||||
| Attachment 0001 - Pricing Workbook | |||||||
| Ordering Period 5 | |||||||
| Offer Name | |||||||
| Direct Labor Category Description | DBA | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Carpenter: Ceiling, Drywall, Form Work, Metal Stud, & Scaffold Building) | CARP0687-003 | 6,346 | $ - 0 | $ - 0 | |||
| Carpenter: Floor Layer - Carpet, Resilient, & Vinyl Flooring) | CARP1045-001 | 8,984 | $ - 0 | $ - 0 | |||
| Electrician: Low Voltage and Wiring/Installation of Alarms- Technician | ELEC0058-001 | 15,775 | $ - 0 | $ - 0 | |||
| Electrician | ELEC0058-001 | 24,220 | $ - 0 | $ - 0 | |||
| Laborer: Asbestos Abatement | LABO0259-002 | 7,933 | $ - 0 | $ - 0 | |||
| Painter: Drywall / Finishing / Taping | PAIN0022-003 | 4,717 | $ - 0 | $ - 0 | |||
| Sprinkler Fitter | SFMI0704-001 | 1,673 | $ - 0 | $ - 0 | |||
| Sheet Metal Worker | SHEE0080-004 | 2,923 | $ - 0 | $ - 0 | |||
| Boilermaker/Pipefitter | BOIL0169-001 | 6,529 | $ - 0 | $ - 0 | |||
| Ironworker, Structural | IRON0025-022 | 4,640 | $ - 0 | $ - 0 | |||
| Laborer: Concrete | LABO1191-002 | 6,530 | $ - 0 | $ - 0 | |||
| Cement Mason/Concrete Finisher | PLAS0067-001 | 3,215 | $ - 0 | $ - 0 | |||
| Plumber | PLUM0098-001 | 2,688 | $ - 0 | $ - 0 | |||
| Roofer | ROOF0149-001 | 7,313 | $ - 0 | $ - 0 | |||
| Total Labor - Ordering Period 5 | $ - 0 |
Material
| Solicitation: W56HZV-20-R-L812 |
| Attachment 0001 - Pricing Workbook |
| Material |
Offer Name
| Material | Rate | Dollars |
| Direct Material Cost | $41,000,000 | |
| Indirect Rate (to include material handling, overhead, G&A, etc.) | $0 | |
| Profit | $0 |
Total Material Price $41,000,000
Interpolated Data
| Labor Hours | |||||||||||||||||||||||
| # | Project | Info | Carpenter 1 (hrs) | Carpenter 2 (hrs) | Electrician | ||||||||||||||||||
| (Comm) (hrs) | Electrician (hrs) | Laborer: Asbestos Abatement (hrs) | Painter (hrs) | Sprinkler Fitter (hrs) | Sheet Metal Worker | Boilermaker/pipe fitter | Iron Worker, Structural | Laborer: Concrete-General | Cement Mason/ | ||||||||||||||
| Concrete Finisher | Plumber | Roofer | Operator | TOTAL DBA | Project Management | ||||||||||||||||||
| 1 | B230 Roof Replacement (PWC001818; W56HZV-18-F-L970) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 215 | 0 | 0 | 3,884 | 415 | 4,514 | 677 | |||||
| 2 | B212 Repair Cardox (PWC0101113; W56HZV-14-C-L730) | 0 | 0 | 0 | 579 | 0 | 16 | 263 | 0 | 0 | 0 | 392 | 0 | 402 | 0 | 0 | 1,652 | 248 | |||||
| 3 | B229 Replace Chiller (IMA319109; W912CH-07-D-L507-0014) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 82 | 218 | 23 | 100 | 0 | 57 | 0 | 17 | 497 | 74 | |||||
| 4 | B231 Reconfigure 2nd FLR & Basement (ACC000314; W56HZV-14-C-L735) | $1,500,000 | 0 | 152 | 1,284 | 1,256 | 454 | 408 | 0 | 569 | 0 | 0 | 5,278 | 0 | 86 | 0 | 0 | 9,487 | |||||
| 5 | Repair Electrical Gear in B203 (PWC002518) | $195,192 | 0 | 0 | 0 | 850 | 0 | 0 | 0 | 0 | 0 | 0 | 128 | 120 | 0 | 0 | 0 | 1,098 | 165 | ||||
| 6 | ACP lighting (DTA002017) | $35,273 | 0 | 0 | 0 | 80 | 0 | 0 | 0 | 0 | 0 | 0 | 12 | 0 | 0 | 0 | 0 | 92 | 14 | ||||
| 7 | Repair Substation Load Breaker B229 (PWC002218) | $298,882 | 0 | 0 | 0 | 3,255 | 0 | 0 | 0 | 0 | 0 | 0 | 488 | 0 | 0 | 0 | 0 | 3,743 | 561 | ||||
| 8 | Repair Substation Load Breaker B231 (PWC002318) | $298,882 | 0 | 0 | 0 | 3,250 | 0 | 0 | 0 | 0 | 0 | 0 | 488 | 0 | 0 | 0 | 0 | 3,738 | 561 | ||||
| 9 | B230E - Repair Substation 4 (PWC002418 ) | $185,227 | 0 | 0 | 0 | 2,000 | 0 | 0 | 0 | 0 | 0 | 0 | 300 | 0 | 0 | 0 | 0 | 2,300 | 345 | ||||
| 10 | W-2 Parking Lot reconstruction project in Summer 2013 (DTA212830J) | 102,400SF/$1.10/SF | 0 | 8 | 0 | 25 | 0 | 94 | 0 | 0 | 0 | 0 | 1,104 | 94 | 0 | 0 | 853 | 2,178 | 555 | ||||
| 11 | B212 FA System (IMF00313) | $268,814 | 0 | 0 | 500 | 2,600 | 0 | 0 | 0 | 0 | 0 | 0 | 390 | 0 | 0 | 0 | 0 | 3,490 | 524 |
TOTAL (hrs) $2,782,270 0 160 1,784 13,895 454 518 263 651 218 23 8,895 214 545 3,884 1,285 32,788 4,918
| Robson/ interpolated hours for DPW | 0 | 640 | 7144 | 56012 | 1824 | 2082 | 1049 | 2614 | 879 | 93 | 35857 | 862 | 2196 | 15656 | 5158 | 20,902 | 152968 | ($15.2mil is approx 40% of $ 38Mil) |
| Robson/interpolated GVSC hours | 7933.00 | 11230.00 | 13469.00 | 24024.00 | 9916.00 | 1087.00 | 2090.00 | 3654.00 | 32641.00 | 3300.00 | 8162.00 | 4019.00 | 3360.00 | 2890.00 | 10688.00 | 26875.00 | 165338.00 | |
| Totals for $81Mil: | 7933 | 11870 | 20613 | 80036 | 11740 | 3169 | 3139 | 6268 | 33520 | 3393 | 44019 | 4881 | 5556 | 18546 | 15846 | 47,777 | 318306 | $32.4 mil is approx 40% of $81 Mil |
| Totals for $93 Mil: | 9271 | 13872 | 24090 | 93637 | 13720 | 3704 | 3668 | 7325 | 39174 | 3965 | 51444 | 5704 | 6493 | 21674 | 18519 | 55836 | 372096 | $37.2 Mil is approx 40% $93Mil |
| Labor Hours | ||||||||||||||||||||||||
| # | Project | Carpenter 1 | Carpenter 2 | Electrician | ||||||||||||||||||||
| (Comm) | Electrician | Laborer: Asbestos Abatement | Painter | Sprinkler Fitter | Sheet Metal Worker | Boilermaker/pipe fitter | Iron Worker, Structural | Laborer: Concrete | Cement Mason/ | |||||||||||||||
| Concrete Finisher | Plumber | Roofer | Operator | Project Management 5% | ||||||||||||||||||||
| 1 | 200A G1 Office Suite | 500.00 | 400.00 | 850.11 | 531.27 | 28.70 | 24.00 | 66.00 | 282.70 | 0.00 | 0.00 | 0.00 | 0.00 | 282.70 | 0.00 | 0.00 | 2150.00 | |||||||
| 2 | 200A2 GSES Office Renovation - Phase I | 2500.00 | 2500.00 | 5226.63 | 2746.42 | 46.40 | 393.10 | 333.00 | 1457.80 | 0.00 | 0.00 | 0.00 | 0.00 | 1457.80 | 200.00 | 0.00 | 2150.00 | |||||||
| 3 | 201 Office Renovation | 1000.00 | 800.00 | 2456.03 | 1135.31 | 41.90 | 0.00 | 447.00 | 349.30 | 0.00 | 0.00 | 0.00 | 0.00 | 349.30 | 200.00 | 0.00 | 2150.00 | |||||||
| 4 | SANG 521 GVR SIL | 150.00 | 100.00 | 0.00 | 531.27 | 0.00 | 0.00 | 0.00 | 75.50 | 0.00 | 0.00 | 0.00 | 0.00 | 75.50 | 100.00 | 0.00 | 2150.00 | |||||||
| 5 | 1200.00 | 1200.00 | 950.00 | 7500.00 | 0.00 | 0.00 | 295.00 | 209.30 | 0.00 | 150.00 | 750.00 | 375.00 | 209.30 | 750.00 | 350.00 | 2150.00 | ||||||||
| 6 | Design Studio | 396.00 | 1584.00 | 462.00 | 1650.00 | 0.00 | 1000.00 | 211.20 | 158.40 | 158.40 | 990.00 | 1980.00 | 990.00 | 118.34 | 422.40 | 1800.00 | 2150.00 | |||||||
| 7 | 200D SE PIF Expansion | 600.00 | 2400.00 | 700.00 | 2500.00 | 0.00 | 1300.00 | 320.00 | 240.00 | 240.00 | 1500.00 | 3000.00 | 1500.00 | 179.30 | 640.00 | 3200.00 | 2150.00 | |||||||
| 8 | 212 Cooling Water Replacement | 0.00 | 0.00 | 20.00 | 200.00 | 7813.10 | 0.00 | 0.00 | 50.00 | 24000.00 | 0.00 | 400.00 | 200.00 | 0.00 | 0.00 | 2000.00 | 2150.00 | |||||||
| 9 | SANG Bunkers | 0.00 | 0.00 | 100.00 | 2400.00 | 3.00 | 0.00 | 0.00 | 100.00 | 0.00 | 0.00 | 200.00 | 100.00 | 16.00 | 0.00 | 1000.00 | 2150.00 | |||||||
| 10 | 212 CARDOX Tank Replacement | 0.00 | 0.00 | 10.00 | 25.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1715.00 | 0.00 | 200.00 | 50.00 | 0.00 | 0.00 | 200.00 | 2150.00 | |||||||
| 17.2 is approx 40% of $43.0 mil | ||||||||||||||||||||||||
| TOTAL (hrs) | 6346 | 8984 | 10774.77 | 19219.27 | 7933.1 | 2717.1 | 1672.2 | 2923 | 26113.4 | 2640 | 6530 | 3215 | 2688.238 | 2312.4 | 8550.00 | 21500 | 134118.478 | |||||||
| 25% interp | 7933.00 | 11230.00 | 13469.00 | 24024.00 | 9916.00 | 1087.00 | 2090.00 | 3654.00 | 32641.00 | 3300.00 | 8162.00 | 4019.00 | 3360.00 | 2890.00 | 10688.00 | 26875.00 | 165338.00 |
File details come from the government source that posted it. Updated .