Attachment 0012- QA Report Daily Log ENG FORM 2538-1.pdf

PDF 38 KB Posted

Attached to
Detroit Arsenal Construction MATOC
Solicitation number
W56HZV20RL812
Issued by

About this file

This document is a quality assurance report daily log template for construction projects for the military. It requires daily reporting on construction progress including any issues that could lead to changes, test and inspection results, safety incidents, and notes on delays. The form includes fields for the report and contract numbers, date, project name, contractor, weather, construction quality control phases attended, test results and deficiencies, instructions to the contractor, updates on progress and delays, safety issues and corrective actions taken, and signatures of the quality assurance representative, supervisor, and their names and titles.

The related federal contract opportunity is a multiple award task order contract solicitation for construction services at the Detroit Arsenal, Selfridge Air National Guard Base, and other locations. Services include design-build, design-bid-build, sustainment, restoration, modernization, repair, and minor construction of buildings and structures. The issuing agency is the Department of the Army Materiel Command TACOM Life Cycle Management Command.

View the file

Other files

File Type Posted
DTA Construction MATOC RFP Questions as of 02 April 2020.pdf PDF
DTA Construction MATOC RFP Questions as of 27 March 2020.pdf PDF
W56HZV-20-R-L812 RFP Amendment 0003.pdf PDF
DTA Construction MATOC RFP Questions as of 25 March 2020.pdf PDF
W56HZV-20-R-L812 RFP Conformed through Amendment 0003.pdf PDF
DTA Construction MATOC RFP Questions as of 23 March 2020.pdf PDF
W56HZV-20-R-L812 Amendment 0002.pdf PDF
W56HZV-20-R-L812 Conformed Through Amendment 0002.pdf PDF
DTA Construction MATOC RFP Questions as of 13 March 2020.pdf PDF
DTA Construction MATOC RFP Questions as of 05 March 2020.pdf PDF
DTA Construction MATOC RFP Questions 04 March 2020.pdf PDF
W56HZV-20-R-L812 Conformed Through Amendment 0001.pdf PDF
W56HZV-20-R-L812 Amendment 0001.pdf PDF
Attachment 0005- STA Form 17.pdf PDF
Attachment 0016- Sample Design Build Task Order SOW.pdf PDF
Attachment 0006- Eng Form 4025.pdf PDF
Attachment 0014- HAZMART User Handbook (Appendix H).pdf PDF
Attachment 0019- BAS Standard Requirements Detroit Arsenal.pdf PDF
Attachment 0009- DD 1354 Real Property Transfer.pdf PDF
Attachment 0013- Construction Impact Notification Form.doc DOC document
Attachment 0001- Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0011- Contractor Quality Control Report.pdf PDF
DTA MATOC RFP- W56HZV-20-R-L812.pdf PDF
Attachment 0007- RFI Form.doc DOC document
Attachment 0003- DBA wage Determination MI20200091 14 February 2020.pdf PDF
Attachment 0008- DPW Drawing Standards (Appendix C).pdf PDF
Attachment 0010- STA 1901 Camera Pass.pdf PDF
Attachment 0018- Environmental (Appendix A).pdf PDF
Exhibit A- CDRLS.pdf PDF
Attachment 0017- Sample Design Bid Build Task Order SOW.pdf PDF
Attachment 0004- Use of Existing Government-Furnished Property.pdf PDF
Attachment 0015- New Equipment Checklist.pdf PDF
Attachment 0002- Past Performance Questionnaire.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10. HAS ANYTHING DEVELOPED ON THE WORK, WHICH MIGHT LEAD TO A CHANGE ORDER OR FINDING OF FACT?

ENG FORM 2538-1, MAY 1994 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

VERSION 1.0

3. DATE (YYYYMMDD)

1. REPORT NUMBER

QUALITY ASSURANCE REPORT (QAR) DAILY LOG OF

CONSTRUCTION - MILITARY

For use of this form see ER 1180-1-6; the proponent agency is CEMP-CE.

YES

NOTE: THE OCR WILL BE ATTACHED TO OR FILED WITH THE QAR.

2. PROJECT 4. CONTRACT NUMBER

5. CONTRACTOR (or hired labor)

6. WEATHER

7. CQC CONTROL PHASES ATTENDED AND INSTRUCTION GIVEN

8. RESULTS OF QA ACTIVITIES AND TESTS, DEFICIENCIES OBSERVED, ACTIONS TAKEN AND CORRECTIVE ACTION OF CONTRACTOR.

INCLUDE COMMENT PERTAINING TO CONTRACTORS CQC ACTIVITIES.

9. VERBAL INSTRUCTION GIVEN TO CONTRACTOR (Include names, reactions and remarks)

NO

ENG FORM 2538-1, MAY 1994 Page 2 of 2

c. QA REPRESENTATIVE'S SIGNATUREb. DATE (YYYYMMDD)

11. INFORMATION ON PROGRESS OF WORK, CAUSES FOR DELAYS AND EXTENT OF DELAYS, WEATHER, PLANT, MATERIAL, ETC.,

12. INFORMATION, INSTRUCTIONS OR ACTIONS TAKEN NOT COVERED ON QCR REPORT OR DISAGREEMENTS.

13. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel. Specify corrective action taken.)

14. REMARKS: (Include visitors to project and miscellaneous remarks pertinent to work.)

15a. NAME AND TITLE (Last, First MI)

c. SUPERVISOR'S SIGNATUREb. DATE (YYYYMMDD)16a. NAME AND TITLE (Last, First MI)

ENG FORM 2538-1, MAY 1994 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

VERSION 1.0

QUALITY ASSURANCE REPORT (QAR) DAILY LOG OF CONSTRUCTION - MILITARY

For use of this form see ER 1180-1-6; the proponent agency is CEMP-CE.

NOTE: THE OCR WILL BE ATTACHED TO OR FILED WITH THE QAR.

ENG FORM 2538-1, MAY 1994 Page 2 of 2 1.1 Form Design Team CEIT-PMO-I ENG FORM 2538-1 Quality Assurance Report QAR Daily Log of Construction Military MAY 1994 Mark Cooper ENG FORM 2538-1 Quality Assurance Report QAR Daily Log of Construction Military MAY 1994 mark.a.cooper@usace.army.mil 20110817 20110817

CAPTIONS:
PrintForm:
YYYYMMDD:
Button1:
CheckBox1: 0
CheckBox1: 0
repsign:
repdate:
rep:
supsign:
supdate:
supname: