SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56HZV-18-R-0001
X
2017NOV21
2018MAR0112:00pm
DOA4
2017NOV21 SEE SCHEDULE
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
MATTHEW KUNKEL
(586)282-6563
CCTA-AHL-C
MATTHEW.D.KUNKEL2.CIV@MAIL.MIL
1 208
X 1
X 15 X 27
X 101 X 103 X 110
X 118
X 120
X 140
X 172
X 173
X 185
X 200
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: MATTHEW KUNKEL
Buyer Office Symbol/Telephone Number: CCTA-AHL-C/(586)282-6563
Type of Contract 1: Firm Fixed Price
Type of Contract 2: Fixed Price Incentive (Cost Based)
Kind of Contract: Research and Development Contracts
*** End of Narrative A0000 ***
Mobile Protected Firepower
Executive Summary
1) MPF Program Overview:_________________________
a. The Mobile Protected Firepower (MPF) vehicle is a new combat vehicle required to address the capability gap identified within the Armys Infantry Brigade Combat Teams (IBCTs). This vehicle will be incorporated in the IBCT structure as a weapon system solution to provide a protected, long range, cyber resilient, precision, direct fire capability for early/forcible entry operations. The MPF vehicle will be a new system within the IBCT designed to support the full range of military actions, and will operate in concert with the Ground
Mobility Vehicle (GMV) and Light Reconnaissance Vehicle (LRV) within the IBCT. The total MPF quantity is 504 vehicles at the brigade level and below.
b. Since its inception, the MPF program has represented an innovative approach to Army acquisition by focusing on delivering an essential new capability to the IBCTs while under a significantly reduced timeline, as compared to traditional acquisition efforts.
This was achieved by leveraging existing material solutions with proven capabilities coupled with new technologies to meet the requirements. This approach allows the program to enter at Milestone B, and alleviate a 2-3 year Technical Development phase.
2) Solicitation________________
a. This solicitation covers both the Engineering, Manufacturing, and Development (EMD) Phase and Low Rate Initial Production
(LRIP). This solicitation includes two primary contract types: Firm Fixed Price for EMD and Fixed Price Incentive (Firm) for the LRIP vehicle options.
b. Offerors shall submit proposals in six separate volumes by 01 March 2018 in accordance with L.2.1. The Offerors may submit optional Armor Coupons and an optional Bid Sample to support the proposals in accordance with L.2.8 by 02 April 2018. The Bid Sample and/or Armor Coupons will be evaluated, if submitted, as substantiating data to the proposals in accordance with Attachment 43.
3) EMD Proposal Evaluation___________________________
a. The Government will conduct a full and open competition using Best Value Source Selection procedures for the award of up to two contracts for the EMD phase.
b. The Government will evaluate Offerors proposals based on the below evaluation criteria and in accordance with Section M.4 of the RFP:
i. Schedule - The Government will assess the probability/risk that the Offerors design will successfully meet the program requirements within the delivery schedule in accordance with Section F. The Schedule Factor is composed of two Sub-Factors: 1) Design
Maturity and 2) Integrated Master Schedule/Integrated Master Plan. Both Sub-Factors are equal in importance.
ii. Performance - The Performance Factor contains two Sub-Factors: 1) Primary Technical and 2) Objective Technical. Primary
Technical is more important than Objective Technical. The Primary and Objective Technical Sub-factors will assess the probability/risk that the Offerors MPF will achieve the Governments defined threshold performance levels for the requirements identified in Table 1 of
2 208
REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Attachment 45 (Mandatory Compliance Requirements List) and the Government's defined objective performance levels in Attachment 46
(Objective Technical Requirements), respectively.
iii. Value Adjusted Total Evaluated Price (VATEP) - The VATEP Factor will be used in the trade-off evaluation to determine best value. The Performance Specification (P-Spec) includes a tiering structure. Compliance to the Tier 1 requirements in the P-Spec are mandatory. Tiers 2 and 3 are tradeable requirements with Tier 2 weighted higher than Tier 3, and individually are not mandatory, however a minimum quantity (approximately half) must be met to be eligible for award. These tradeable requirements will be evaluated in the form of a VATEP adjustment (i.e. Technical and Objective adjustments). These adjustments will be calculated based on the Offerors proposed compliance to the requirements. In order to be eligible for award the Offerors must propose a minimum of roughly half of any combination of Tiers 2 and 3 of the tradeable requirements. Tier 4 requirements are objective only and also receive an adjustment if proposed. For Tier 4 requirements, no credit will be assigned for partial compliance. Offerors proposed compliance to Tiers 2 through 4 will be incorporated into the resulting contract, if selected.
iv. Small Business Participation - The Government will evaluate the extent of the Offerors approach to achieving the
Government's objective of providing maximum practicable opportunities in meeting the small business participation goals identified in this solicitation.
c. Relative of Importance of Factors: The Schedule Factor is slightly more important than Performance. Performance and VATEP are equal in importance to each other. Performance and VATEP are each, on an individual basis, significantly more important than Small
Business Participation. As required to be defined by FAR 15.304(e), the non- VATEP factors, when combined, are significantly more important than the VATEP Factor.
4) EMD Phase: __________
Up to two EMD contracts are targeted for award during the first quarter of FY19. Each contractor is required to deliver 12 pre-production vehicles in accordance with the Scope of Work and P-Spec. In addition, the contractor(s) shall deliver two Ballistic Hull and Turrets (BH&T), System Support Packages (SSP) and Special Tools and Test Equipment (STTE), Armor Coupons, and a Cyber Bench, if proposed with its design, during EMD. During the EMD phase, the vehicle shall be developed, designed, and tested within the affordability constraints described in Section M.3.2, and the vehicles will be used to support Pre-Production Testing, and a Soldier
Vehicle Assessment (SVA) used to measure prototype effectiveness and provide feedback. Pre-production vehicles shall be transferred to the Government through use of a DD Form 1149, Requisition and Invoice/Shipping Document. The MPF program includes a comprehensive provisioning program to allow for crew and field-level organic Army support by First Unit Equipped in 2025.
5) Funding and Affordability:_____________________________
The Government will provide funds for EMD on an incremental basis. Any proposal received in response to this RFP that proposes a total price in excess of the cumulative available funding by fiscal year for in EMD or the LRIP option(s) available funding will be considered unaffordable in accordance with M.3.2.
EMD Available Funding by FY (for each offeror) Cumulative Available______________________________________________ ____________________
FY2019 $176M
FY2020 $311M
FY2021 $360M
FY2022 $376M
LRIP Affordability__________________
Sum of CLINs 1001 (Ceiling Price) and 1003 $378M
CLIN 1002 $16M
CLIN 2001 (Ceiling Price) $311M
6) Low Rate Initial Production (LRIP) Option(s) ____________________________________________
a. The Government intends to award the option(s) on only one of the two EMD contracts. The contractors awarded EMD contracts will deliver prototype vehicles that will be evaluated in a subsequent competitive evaluation for their ability to meet MPF System requirements. The contractor whose system best meets the evaluation criteria will be awarded the LRIP option(s). Only one EMD contractor will be selected for LRIP. The LRIP options include a total of 54 vehicles (26 vehicles for Option 1 and 28 for Option 2)
LRIP also includes the retrofit of 8 EMD vehicles, SSP, STTE, Logistics Products, and Government Test Support.
b. The Government will convene an Evaluation Board to determine which contractor offers the best value to the Government for LRIP.
LRIP options will be exercised for one of the two EMD contracts. The Government will evaluate contractor proposals based on the below evaluation criteria and in accordance with Section H.10.
i. Performance - The Performance Factor contains two Sub-Factors: 1) Technical and 2) Force Structure. The technical Sub-Factor will assess the probability/risk that the contractors MPF will achieve the contractors proposed performance levels for the requirements identified in Attachment 34 (LRIP Down-Select Requirements List). The Force Structure Sub-Factor will assess the probability/risk that a contractor can meet the tasks identified in Attachment 54 (Force Structure Worksheet).
3 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ii. VATEP - The VATEP Factor will be used in the trade-off evaluation to determine best value. The VATEP Factor includes the
Evaluated Options Price, a LRIP Technical Adjustment, GFP Use and Charges Adjustment, and an Operations and Sustainment Adjustment.
iii. Data and Background Patent Rights - The Government will assess and evaluate the extent the additional proposed Data and
Patent Rights allows the Government to (1) organically perform or to compete the depot maintenance and gun barrel production; (2) compete spare parts procurement; (3) secure additional sources for the MPF system and equipment; and (4) use submitted technical data or computer software and background patent rights for any other Government programs.
iv. Small Business Participation - The Government will evaluate the extent of the Offerors approach to achieving the
Government's objective of providing maximum practicable opportunities in meeting the small business participation goals identified in this solicitation.
Relative Order of Importance of Factors: Performance is more important than VATEP and VATEP is slightly more important than Data and
Background Patent Rights. Data and Background Patent Rights is significantly more important than Small Business Participation. As required to be defined by FAR 15.304(e), the non-VATEP factors, when combined, are significantly more important than the VATEP
Factor.The Performance Factor is more important than VATEP.
c. LRIP includes a performance incentive for reliability. Cost will be incentivized by use of an FPIF contract. The terms and conditions for the reliability incentive is set forth in Section H.5.
7) Administrative: _______________
a. Eligibility requirements for award and Rejection Criteria are included in the RFP. Offerors should carefully review the RFP to insure all requirements for award are met.
b. Access to Classified, FOUO, and Export Controlled Documents: All Offerors must have a valid facility clearance of SECRET or higher in order to respond to this RFP. See the DD Form 254 (Attachment 01) for security requirements. For Export Controlled information, it is the responsibility of the Offeror, not the Government, to obtain the appropriate export licenses, or process the appropriate export license exemption, necessary for authorization to share information with foreign subcontractors. Offerors who previously received FOUO attachments for solicitation W56HZV-16-R-0244 will be provided all FOUO attachments for this solicitation.
Offerors who have not had prior access to FOUO attachments shall send their request to the Contract Specialists identified below. Your request shall include the following:
-Your Company's name and address
-Your Name, Title, Office phone number and email address
-Copy of the approved DD2345
c. Assertion of Restrictions: The offeror shall include in its EMD proposal submission, each of the following: Non-Commercial
Technical Data, Non-Commercial Computer Software and Software Documentation, Commercial Technical Data, and Commercial Computer Software and Software Documentation on its Assertion of Restrictions listing required under DFARS 252.227-7017.
d. Waivers: Prohibited Material: If the contractor desires to use a prohibited material, it shall submit a waiver request using the Request for Use of Prohibited Materials form (Attachment 19). The contractor shall not use or deliver any prohibited materials without prior Government waiver acceptance.
Note: This Executive Summary is provided as a convenience to highlight the program requirements contained within the RFP. In the event of any inconsistencies, the RFP requirements take precedence.
Points of Contact:__________________
Shannon Zemke Procuring Contracting Officer 586-282-6040 mailto:shannon.b.zemke.civ@mail.mil
Jamie Barnett Contract Specialist 586-282-5130 mailto:jamie.l.barnett8.civ@mail.mil
Matt Kunkel Contract Specialist 586-282-6563 mailto:matthew.d.kunkel2.civ@mail.mil
*** END OF NARRATIVE A0001 ***
A.1 ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
4 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
<http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html>
A.2 PUBLIC ACTIVITY INVOLVEMENT
Subcontract opportunities under this solicitation and any resulting contracts are open to competition between Department of Defense activities and private firms. In addition, Army Industrial Facilities are available to sell manufactured articles or to perform work at such Facilities on behalf of Offerors, in certain circumstances and as permitted by law. Rock Island Arsenal, Watervliet Arsenal, Anniston Army Depot, Sierra Army Depot, or Red River Army Depot have expressed interest in securing subcontracting opportunities under this RFP. For information related to the capabilities of these facilities visit the following links:
http://www.amc.army.mil/Portals/9/Documents/AMC%20Publications/AMC%20P3Contact%20Information.pdf?ver=2017-09-18-073343-597 http://www.amc.army.mil/Portals/9/Documents/AMC%20Publications/AMC_0817_RESOURCE-GUIDE.pdf?ver=2017-10-03-110207-990
A.3 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date in the box below:
Amendment Number: Date: __________________ _____
A.4 Freedom Of Information Act (FOIA):
Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
A.5 For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement
Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
*** END OF NARRATIVE A0002 ***
Solicitation: W56HZV18R0001
Amendment: 0001
1. The purpose of Amendment 0001 to solicitation W56HZV-18-R-0001 is to add detailed LRIP down-select criteria and incorporate
5 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
other minor revisions as follows:
2. Section A Supplemental Information ___________________________________
a. Revise Narrative A0001 Mobile "Protected Firepower Executive Summary" to add Section 6) b. for the Low Rate Initial
Production down-select evaluation summary and add excerpt "EMD" within paragraph 7) c.
3. Section B Supplies or Services and Prices/Costs ________________________________________________
a. Revise CLIN 2001 narrative B001 in part
From:
"This CLIN funds all of Section C.2."
To:
"This CLIN funds work performed in accordance with Section C.2, except the paragraphs noted in separate CLINS 1002-1004."
4. Section C Description/Specifications/Work Statement ____________________________________________________
a. Revise Section C.1.1.1.4 in part to add "The contractor shall flow down the DAL requirements to its subcontractors."
b. Revise Section C.1.2.6 in part
From:
"The contractor shall develop and deliver an E3 Control Plan and an E3 Verification Plan in accordance with CDRL A028."
To:
"The contractor shall develop an E3 Control Plan. The contractor shall develop and deliver the E3 Verification Plan in accordance with CDRL A028."
c. Revise Section C.1.2.8.3 in part
From:
"The contractor shall obtain a Government Gun Safety Certification for the primary weapon system prior to delivery of the
PPT vehicles."
To:
"The contractor shall obtain a Government Gun Safety Release for the primary weapon system prior to delivery of the PPT vehicles." This is an administrative change for clarity.
d. Revise Section C.1.2.10.3 to delete excerpt "and identification of the Government rights in each computer software component."
e. Revise Section C.1.2.10.4 to add excerpt "and open source software".
f. Revise Sections C.1.5.1.2 and C.2.6.1.1 to add excerpt "Government R&M testing will be conducted in both day and night shifts."
g. Revise Section C.1.5.1.3.10 to delete excerpt "CDRL A006" and replace with "CDRL A066".
h. Revise Section C.1.5.1.4.9 to delete excerpt "CDRL A006" and replace with "CDRL A066".
i. Revise Section C.1.6.3 to add excerpt "identification of opportunities to utilize Army Industrial facilities for potential Government Furnished Material (GFM) or Contractor Furnished Material (CFM)"
j. Add Sections C.1.7.6.5 and C.2.8.5.5 to incorporate the following paragraph:
"The contractor shall acquire and deliver the copyright releases for any use of manuals or materials in the Operator Manual
(CDRL A065), Field Maintenance Manual with RPSTL (CDRL A091), and BDAR Manual (CDRL A092). The contractor shall deliver the copyright releases as part of each delivery of CDRL A065, CDRL A091, and CDRL A092. The copyright release shall be written for the Government's use and shall not prohibit duplications, release, or website publication. The contractor shall ensure that Government has the right to use, copy, and distribute the manuals, and electronic data files delivered under this contract."
5. Section H Special Contract Requirements ________________________________________
6 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. Section H.4.5 has been added in its entirety.
b. Revise Section H.5.1
From:
"The Government will conduct Test Incident Report (TIR) Scoring Conferences during and immediately after Government test in accordance with Section C.2.6.1.1.8.2. The Government will make its determination regarding the MPF vehicle MMBSA as part of this scoring/assessment conference process. The contractor will be notified of MMBSA results within 20 calendar days after completion of the final Scoring and Assessment Conference. If the contractor earns an incentive fee in conjunction with this reliability performance incentive, the Government will issue a unilateral contract modification to fund the incentive fee under CLIN 1004 within 90 calendar days after completion of the Scoring Conference. The contractor shall not submit an invoice for payment under CLIN 1004 until the unilateral contract modification has been executed by the
Government funding the final Incentive Fee. The USG reserves the unilateral right to reduce the amount of funding obligated on CLIN 1004 to the amount of the incentive fee earned. The criteria for scoring of the Reliability incentive are provided in H.5.1.1 below."
To:
The Government will conduct Test Incident Report (TIR) Scoring Conferences during and immediately after Government test in accordance with Section C.2.6.1.1.8.2. To prove that the MMBSA incentive has been demonstrated, the Program Management
Office with the support of ATEC and TRADOC will evaluate the scored System Aborts from all completed PQT testing to date.
The contractor will be notified of the MMBSA results within 20 calendar days after completion of the final Scoring
Conference. If the contractor earns an incentive fee in conjunction with this reliability performance incentive, the
Government will issue a unilateral contract modification to fund the incentive fee under CLIN 1004 within 90 calendar days after completion of the Scoring Conference. The contractor shall not submit an invoice for payment under CLIN 1004 until the unilateral contract modification has been executed by the Government funding the final Incentive Fee. The USG reserves the unilateral right to reduce the amount of funding obligated on CLIN 1004 to the amount of the incentive fee earned.
c. Delete Section H.5.1.1 in its entirety.
d. Revise Section H.8 from "Reserved" to incorporate requirements for "Identification and Assertion of Restrictions on
Technical Data and Computer Software"
e. Revise Section H.9 to "LRIP- Instructions, Conditions, and Notices to Contractors" and Section H.10 has been added for
"LRIP- Evaluation Factors for Award" to incorporate the LRIP down-select evaluation criteria. They represent Sections L and M respectively for the LRIP down-select.
6. Section I Contract Clauses ___________________________
a. Add clause 52.227-9 "Refund of Royalties"
7. Section J List Of Attachments ______________________________
a. Revise Exhibit A "Contract Data Requirements Lists (CDRLS)"
(i) Revise CDRL A006 Block 5 Contract Reference to delete "C.1.5.2.3.10" and "C.1.5.1.4.9"
(ii) Revise CDRL A044 Block 16 Remarks in part
Add:
"Block 4: DI-PSSS-82046 (T) is tailored as follows:
Replace "aircraft" with "vehicle" within Table 1: Field Definitions and Instructions
(iii) Revise CDRL A053 Block 16 Remarks in part
From:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to each TRR, the Supportability
Assessment, and the Log Demo."
To:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to each TRR (except Armor Coupon TRR), the
Supportability Assessment, and the Log Demo."
(iv) Revise CDRL A055 Block 16 Remarks in part
7 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
From:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to each TRR, the Supportability Analysis, and the Log Demo."
To:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to each TRR (except Armor Coupon TRR), the
Supportability Analysis, and the Log Demo."
(v) Revise CDRL A129 Block 16 Remarks in part
From:
"Blocks 10, 11, 12, and 13: The data item is due 60 calendar days after contract award."
To:
"Blocks 10, 11, 12, and 13: The data item is due 30 calendar days after contract award."
b. Revise Attachment 1 - MPF DD FORM 254 for administrative clarity and incorporation of the current form.
c. Revise Attachment 7 - Mobile Protected Firepower Performance Specification.
d. Revise Attachment 9 - MPF Government Furnished Property Listing to add Serially Managed Items List line items 93-418 and
Non-Serially Managed Items List line items 44-87 for LRIP option quantities.
e. Revise Attachment 16 - MPF System Security Plan to incorporate formatted appendices for administrative purposes.
f. Revise Attachment 20 - Production Government Format TDP Requirements to add additional information within the appendices.
g. Revise Attachment 21 - Government Test Schedule.
h. Revise Attachment 23 - Reliability Growth Plan.
i. Revise Attachment 28 - Equipment Publications Defects List.
j. Revise Attachment 35 - to rename it from Pricing Spreadsheet to EMD Pricing Spreadsheet for administrative clarity.
k. Revise Attachment 40 - to rename it from VATEP Adjustment Spreadsheet to EMD VATEP Adjustment Spreadsheet for administrative clarity. The distribution statement for this attachment has also been revised.
l. Revise Attachment 43 - Bid Sample Evaluation Plan.
m. Revise Attachment 51 - Technical Data and Computer Software Assertion of Restrictions for administrative clarity.
n. The following LRIP Down-Select Attachments have been added as follows:
(i) Attachment 34 - LRIP Down-Select Requirements List
(ii) Attachment 36 - LRIP Pricing Spreadsheet
(iii) Attachment 48 - LRIP VATEP Adjustment
(iv) Attachment 54 - Force Structure Worksheet
(v) Attachment 55 - Technical Data, Computer Software and Patent License Identification and Assertions
(vi) Attachment 56 - Specially Negotiated Rights Template
8. Section K Representations, Certifications, and Other Statements of Offerors ____________________________________________________________________________
a. Add clause 52.227-6 "Royalty Information"
9. Section L Instructions, Conditions, and Notices to Offerors ____________________________________________________________
a. Revise all Section L paragraphs that reference excerpt "cost/price" to "price".
b. Revise all Section L paragraphs that reference excerpt "(Pricing Spreadsheet)" to "(EMD Pricing Spreadsheet)"
c. Revise Section L.4.2 in part
From:
8 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"The Contract Performance Specification shall not be tiered and shall contain the values proposed under Attachment 45 and
Attachment 46 as thresholds. Non-proposed Tier 2, Tier 3, and Tier 4 requirements shall be removed, to include non-proposed objective requirements. No other language in these Performance Specification Paragraphs may be modified."
To:
"The Contract Performance Specification shall not be tiered and shall contain the performance proposed under Attachment 45 and Attachment 46 as thresholds. Objective performance for proposed Performance Specifications shall be retained. Non-proposed Tier 2, Tier 3, and Tier 4 requirements shall be removed. No other language in these Performance Specification
Paragraphs may be modified."
d. Revise Section L.4.2.1 in part to add "The Offeror shall provide a single worksheet (Attachment 33) for each requirement in Table 1 of Attachment 45 (Mandatory Compliance Requirements List)."
e. Revise Section L.4.2.1.1 excerpt from "If the Offeror uses third party test data to substantiate requirements" to "If the Offeror uses third party or Offeror test data to substantiate requirements"
f. Revise Section L.4.3 to delete excerpt "and contract deliverable"
g. Revise Section L.4.3.1.3 excerpt from "shall not proposed an alternative share ratios" to "shall not propose alternative share ratios"
h. Revise Section L.4.5.2 excerpt from "shall be included in the solicitation, or any exception. Offeror's proposal, along with or any exceptions" to "shall be included in the Offeror's proposal, along with any exceptions"
i. Revise Section L.5 to delete the entire paragraph and mark reserved.
10. Section M Evaluation Factors For Award _______________________________________
a. Revise all Section M paragraphs that reference excerpt "cost/price" to "price".
b. Revise all Section M paragraphs that reference excerpt "(Pricing Spreadsheet)" to "(EMD Pricing Spreadsheet)"
c. Revise Section M.2 in part to add "(k) In accordance with the authority granted to the Government by FAR 52.204-22, Offers that do not comply with the line items specified in this solicitation will be determined nonresponsive or unacceptable."
d. Revise Section M.4.2.1 excerpt from "achieve the Governments defined threshold performance levels" to "achieve the proposed performance levels"
e. Revise Section M.4.2.1.1 to add excerpts "proportional" and "Offerors proposing performance at Government defined threshold performance levels identified in Table 1 of Attachment 45 (Mandatory Compliance Requirements List) that is supported by credible substantiating data and assessed at a reduced risk of achieving the threshold performance level may be assessed an additional strength."
f. Revise Section M.4.2.1.3
Delete excerpt:
"may be assessed at a reduced risk of achieving the threshold performance level and"
Add excerpt:
"The proposed performance level for the requirements levels identified in Table 1 of Attachment 45 (Mandatory Compliance
Requirements List) will be incorporated as a Threshold Performance requirement in the resulting contract."
g. Revise Section M.4.2.2.2 excerpt from "proposed Cost/Price" to "Evaluated Contract Price"
h. Revise Section M.4.3.1.1 in part
From:
"The Evaluated Contract Cost/Price will consist of the sum of the following:"
To:
"The Evaluated Contract Price is calculated in the "Summary" tab of Attachment 35 - EMD Pricing Spreadsheet, and consists of the sum of the following:"
9 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0003 ***
Solicitation: W56HZV-18-R-0001
Amendment: 0002
1. The purpose of Amendment 0002 to solicitation W56HZV-18-R-0001 is to incorporate minor revisions as stated below.
2. Section C - Description/Specifications/Work Statement _____________________________________________________
a. Revise Section C.1.5.1.1.5 to delete excerpt "Maintenance" and replace with "Mechanics".
3. Section D - Packaging and Marking _________________________________
a. Delete paragraph D.1.2 in its entirety and mark as "Reserved".
4. Section H - Special Contract Requirements _________________________________________
a. Add Section H.11 "Government furnished rate for Test Site Facilities. Pending test site approval, the contractor is authorized to receive test services from a Major Range Test Facility Base and receive the Government furnished rate."
b. Revise Section H.9.6.1.9 to correspond with the changes outlined below in Section L.4.3.1.4.5.
c. Revise Section H.9.6.3 to correspond with the changes outlined below in Section L.4.3.4.
d. Revise Section H.10.13.3 to correspond with the changes outlined below in Section M.4.3.4.
5. Section J - List of Attachments _______________________________
a. Revise Exhibit A "Contract Data Requirements List (CDRL)
(i) Revise CDRL A053 Block 16 Remarks in part
From:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to each TRR (except Armor Coupon TRR), the
Supportability Assessment, and the Log Demo."
To:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to the BH&T and PPT TRR, and the FUSL and PQT TRR."
(ii) Revise CDRL A055 Block 116 Remarks in part
From:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to each TRR (except Armor Coupon TRR), the
Supportability Analysis, and the Log Demo."
To:
"Blocks 10, 11, 12, and 13: The data item is due 45 calendar days prior to the BH&T and PPT TRR, and the FUSL and PQT TRR."
(iii) Revise CDRL A094 Block 16 in part
From:
"Blocks 10, 11, 12, and 13: The data item shall be delivered concurrent with the initial submittal of the Operator, Field
Maintenance (with RPSTL), and BDAR DEPs."
To:
"Blocks 10, 11, 12, and 13: The data item shall be delivered concurrent with the initial submittal of the Operator, Field
10 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Maintenance (with RPSTL), and BDAR PTMs."
b. Revise Attachment 7 - MPF Performance Specification
c. Revise Attachment 14 - MPF OMS/MP
c. Revise Attachment 43 - Bid Sample Evaluation Plan
d. Revise Attachment 45 - Mandatory Compliance Requirements List (text updated to coincide with Attachment 7)
f. Revise Attachment 53 - Cyber Security Scope
6. Section K - Representations, Certifications, and Other Statements of Offerors _____________________________________________________________________________
a. Revise DFARS Clause 252.204-7007 "Alternate A, Annual Representations and Certifications" to incorporate clause 252.225-7000
"Buy American - Balance of Payments Program Certificate"
6. Section L - Instructions, Conditions, and Notices to Offerors _____________________________________________________________
a. Revise Section L.2.1.1 to add excerpt "Offerors who intend to submit Armor Coupons shall identify its intent within its proposal submission.
b. Revise Section L.2.1.2 to add excerpt "Offerors who intend to submit a Bid Sample shall identify its intent within its proposal submission."
c. Revise Section L.2.8 in part
From:
"Additionally the Bid Sample will not be evaluated unless and ATEC Safety Certification is obtained as identified in Attachment 43
(Bid Sample Evaluation Plan)."
To:
"In addition, the Bid Sample will not be evaluated unless the ATEC Safety Assessment is completed and the bid sample deemed safe to operate as identified in Attachment 43 (Bid Sample Evaluation Plan)."
d. Revise Section L.4.1.1.2 in part
From:
"An Error Budget Allocation to include narrative of the fire control architecture and stabilization, Transportability spec sheet, Night Vision Integrated Performance Model (NVIPM) input data and results, underbody simulation input data with Finite Element Analysis
(FEA) results shall also be submitted."
To:
"An Error Budget Allocation (standard and quasi-combat) to include narrative of the fire control architecture and stabilization, Transportability spec sheet, Night Vision Integrated Performance Model (NVIPM) input and output data results (NVIPM v1.6 or later, up to v1.9), and underbody simulation input data with Finite Element Analysis (FEA) results to include static images, description of material properties, attachments/integration, dynamic and plastic deformation, and global and local vehicle acceleration plots."
e. Revise Section L.4.1.2 in part
From:
"Each IMP task shall have a task description that includes inputs required for successful accomplishment of the task, the accomplishment criteria, and outputs for the task."
To:
"Each IMP event shall have a description that includes inputs required for successful accomplishment of the event, the criteria to close the accomplishment, and artifacts needed to close the criteria."
f. Revise Section L.4.2 to add excerpt "Proposed level of compliance identified in Attachment 40 for Tiers 2 and 3 requirements shall also be included in the contractor PSPEC."
g. Revise Section L.4.3.1.4.5 to add excerpt "Identify any rental costs for use of Government property included in the price."
h. Revise Section L.4.3.4
From:
"Should the Offeror propose to utilize GFP beyond the required integration of GFP identified in Attachment 09 (GFP List), the offeror must provide a list of Government-Owned Property that includes the acquisition cost, age, and type of Government-Owned Property
11 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
in accordance with M.4.3.4. If proposed, the contractor shall include evidence that it obtained the approvals from the cognizant contracting officer to utilize the GFP on a rent-free basis. The final evaluation factors calculated in accordance with Section M.4.3.4 shall be separately set forth by the offeror."
To:
"Should the Offeror propose to utilize GFP beyond the required integration of GFP identified in Attachment 09 (GFP List) on a rent-free basis, the offeror must provide a list of Government-Owned Property that includes the acquisition cost, age, and type of Government-
Owned Property and additional information in accordance with M.4.3.4. If proposed, the offeror shall include evidence that it obtained the approvals from the cognizant contracting officer to utilize the GFP on a rent-free basis. The offeror will also obtain any rental equivalent amounts (or the data required) from the cognizant contracting officer necessary to determine the evaluation factors calculated in accordance with Section M.4.3.4. The offeror shall separately set forth the evaluation factors and the basis of its calculations including the rationale for any allocations to each CLIN."
i. Revise Section L.4.5.11.1 to delete excerpt "The Tolliver Group, Inc. (TTGI)" and add "Booz Allen Hamilton"
7. Section M - Evaluation Factors for Award ________________________________________
a. Revise Section M.4.3.4
From:
"M.4.3.4 GFP Use and Charges Adjustment and Evaluation of Use of Existing Government-Owned Property
(a) Rent-free use of existing facilities, special test equipment, and/or special tooling, title to which is in the Government or to which the Government has the right to take title to it (all of which is herein described as property), including rent-free use by prospective subcontractors, will be a consideration in the evaluation of responses to this solicitation. Contractor must provide with their proposal, the list of Government Furnished Property (GFP), the acquisition cost, age, and type of GFP.
(b) For purposes of evaluation only, the unit evaluation factors for each classification of property, computed as follows, shall be added by the Government to the price or prices offered. The evaluation factors shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. A minimum of one month of use shall be required for purposes of evaluation. Fractional portions of a month shall be counted as a full month. This final product shall then be divided by the total quantity of units to be produced using such property to determine the unit evaluation factors. The factors shall be separately set forth by the offeror under the offered unit prices.
Monthly Rental Rates
(1) For land and land preparation, buildings, building installations, and land installations other than those items specified in (2) below: the prevailing commercial rate.
(2) For industrial plant equipment of the types covered by Federal Supply Classification Code Numbers 3405, 3408, 3410, 3411 through 3419 (machine tools), and 3441 through 3449 (secondary metal forming and cutting machines), the following rates shall apply:
Age of Equipment Monthly Rental Rates________________ ____________________
0-2 years 3.00%
Over 2 to 3 years 2.00%
Over 3 to 6 years 1.50%
Over 6 to 10 years 1.00%
Over 10 years 0.75%
(3) For personal property and equipment not covered in (1) and (2) above (including all production equipment not in the
Federal Supply Classification Codes set forth above, and including special tooling and special test equipment), the following rates shall apply:
-- Two percent (2.00%) per month for electronic test equipment and automotive equipment;
-- One percent (1.00%) per month for special tooling and for all other property and equipment.
(c) If any item of property is to be used on other work for which use has been authorized during the period such property is requested for use on any contract resulting from this solicitation, the evaluation factors shall be calculated in accordance with the following: the acquisition cost of each item of property shall be multiplied by the rental rates specified for the applicable classification of property set forth above, and the product obtained shall then be multiplied by the number of months of rent-free use requested. The resulting product shall be multiplied by a fraction, the numerator of which is the amount of use of the property proposed under this solicitation, and the denominator of which is the sum of the previously-authorized use of the property during the period of proposed use and the use proposed under this solicitation. The final product shall then be divided by the total quantity of units to determine the unit evaluation factor. The measurement unit for determining the amount of use to be considered in establishing the
12 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
fraction referred to in the foregoing calculation shall be direct labor hours, sales, hours of use, or any other measurement unit which will result in an equitable apportionment of the factor. The measurement unit used and the amount of respective uses in sufficient detail to support the proration shall be set forth for each item of property.
(d) For the purposes of determining the evaluation factors set forth above, the following definitions apply:
(1)The term acquisition cost means the total cost to the Government for an item of property, including the cost of (i) transportation, (ii) installation, (iii) accessories to be used with the item, and (iv) any rebuilding and modernization which has enhanced the original capability of the item;
(2) The age of an item of property shall be based on the year in which it was manufactured, with an annual birthday on 1 January of each year thereafter. On 1 January following the date of manufacture, the item shall be considered one year old; and on each succeeding January 1st, it shall become one year older (thus, an item manufactured on 15 July 1978 would be one year old on 1 January
1979, and over two years old on and after 1 January 1980).
(e) Where the solicitation provides that the property is offered for use on an as-is basis, F.O.B. loading dock at present location, the Government shall add to the offered price, in addition to the evaluation factors described above, a factor, for purposes of evaluation, which will be composed of the costs to the Government of making such property available at the F.O.B. point, including the costs of disconnection, preparation for shipment, and placement on the loading dock."
To:
"M.4.3.4 GFP Use and Charges Adjustment and Evaluation of Use of Existing Government-Owned Property
(a) Rent-free use of existing facilities, special test equipment, and/or special tooling, title to which is in the Government or to which the Government has the right to take title to it (all of which is herein described as property), including rent-free use by prospective subcontractors, will be a consideration in the evaluation of responses to this solicitation. The offeror shall provide with its proposal, the list of Government Furnished Property (GFP), the acquisition cost, age, and type of GFP and the value of any
Government-furnished services.
(b) For purposes of evaluation only, the evaluation factors for each classification of property and services, computed as follows, shall be added by the Government to the price or prices offered. A minimum of one month of use shall be required for purposes of evaluation.
Fractional portions of a month shall be counted as a full month. This final product shall be applied to the applicable effort(s)/CLIN(s). For CLINs with multiple quantities, divide by the total quantity of units to be produced using the property to determine unit evaluation factors. The factors shall be separately set forth by the offeror with the offered prices.
Monthly Rental Rates
(1) (i) For land and land preparation, buildings, building installations, and land installations other than those items specified in (2) below: the prevailing commercial monthly rate or the monthly rate established by the Government. (ii)For services provided by the government (utilities, etc.), the monthly rate (or the amount for the period divided by the months of usage). (iii) For (i) and (ii) above, the evaluation factor shall be computed by multiplying the monthly rate specified above by the number of months of use proposed.
The amounts will be allocated to each applicable CLIN on an equitable basis.
(2) For industrial plant equipment of the types covered by Federal Supply Classification Code Numbers 3405, 3408, 3410, 3411 through
3419 (machine tools), and 3441 through 3449 (secondary metal forming and cutting machines), the evaluation factors shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. The following rates shall apply:
Age of Equipment Monthly Rental Rates________________ ____________________
0-2 years 3.00%
Over 2 to 3 years 2.00%
Over 3 to 6 years 1.50%
Over 6 to 10 years 1.00%
Over 10 years 0.75%
(3) For personal property and equipment not covered in (1) and (2) above (including all production equipment not in the Federal Supply
Classification Codes set forth above, and including special tooling and special test equipment), the evaluation factors shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. The following rates shall apply:
-- Two percent (2.00%) per month for electronic test equipment and automotive equipment;
-- One percent (1.00%) per month for special tooling and for all other property and equipment.
13 208
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) If any item of property under (2) or (3) above is to be used on other work for which use has been authorized during the period such property is requested for use on any contract resulting from this solicitation, the evaluation factors shall be calculated in accordance with the following: the acquisition cost of each item of property shall be multiplied by the rental rates specified for the applicable classification of property set forth above, and the product obtained shall then be multiplied by the number of months of rent-free use requested. The resulting product shall be multiplied by a fraction, the numerator of which is the amount of use of the property proposed under this solicitation, and the denominator of which is the sum of the previously-authorized use of the property during the period of proposed use and the use proposed under this solicitation. The final product shall be applied to the applicable effort(s)/CLIN(s). For
CLINs with multiple quantities, divide by the total quantity of units to be produced using the property to determine unit evaluation factors. The measurement unit for determining the amount of use to be considered in establishing the fraction referred to in the foregoing calculation shall be direct labor hours, sales, hours of use, or any other measurement unit which will result in an equitable apportionment of the factor. The measurement unit used and the amount of respective uses in sufficient detail to support the proration shall be set forth for each item of property.
(d) For the purposes of determining the evaluation factors set forth above, the following definitions apply: