MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_4_(Distro_A).pdf

PDF 77 KB Posted

Attached to
Mobile Protected Firepower
Solicitation number
W56HZV18R0001
Issued by

About this file

MPF RFP W56HZV-18-R-0001 - QandA Batch 4 (Distro A)

View the file

Other files

File Type Posted
MPF_RFP_W56HZV-18-R-0001_-_Questions_and_Answers_BATCH_8_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_QandA_Batch_7_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_6_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-_Questions_and_Answers_Batch_5_(Distro_A).pdf PDF
W56HZV-18-R-0001,_Conformed_Copy__(through_Amendment_0002).pdf PDF
W56HZV-18-R-0001-0002.pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_3_(Distro_A).pdf PDF
W56HZV-18-R-0001_Conformed_copy_(through_AMD1).pdf PDF
Attachment_28_-_Equipment_Publications_Defects_List.pdf PDF
Attachment_55_-_Technical_Data,_Computer_Software_and_Patent_License_Identification_and_Assertions.xlsx XLSX spreadsheet
W56HZV18R0001-0001.pdf PDF
Attachment_54_-_Force_Structure_Worksheet.xlsx XLSX spreadsheet
Attachment_35_-EMD__Pricing_Spreadsheet.xlsx XLSX spreadsheet
MPF_W56HZV-18-R-0001_-_Questions_and_Answers_-_BATCH_2_(Distro_A).pdf PDF
Attachment_40_-_EMD_VATEP_Adjustment_Spreadsheet.xlsx XLSX spreadsheet
Attachment_51_-_Identification_and_Assertion_of_Restrictions.xlsx XLSX spreadsheet
Attachment_56_-_Special_License_Requirements.pdf PDF
Attachment_36_-_LRIP_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_01_-_DD254.pdf PDF
Q&A-Batch_1-Distro_A.pdf PDF
Attachment 28 - Equipment Publications Defects List.pdf PDF
Attachment 38 - SBP Workbook Instructions.pdf PDF
Attachment 41 - Logistics Product Data - Packaging Data Requirements.pdf PDF
Attachment 33 - Performance Requirements Worksheet.pdf PDF
Attachment 12 - Vehicle Dynamics Data Sheet.xlsx XLSX spreadsheet
Attachment 02 - IEEE 15288-2 FCA-SVR-PCA Criteria Tailoring.pdf PDF
Attachment 47 - CARC Paint Drawing.pdf PDF
Attachment 11 - Vehicle Propulsion Data Sheet.xlsx XLSX spreadsheet
Attachment 03 - MPF Production Readiness Review Checklist.xlsx XLSX spreadsheet
Attachment 44 - Design Maturity Self Assessment.xlsx XLSX spreadsheet
Attachment 29 - LRC Design Proposal Format.pdf PDF
Attachment 01 - MPF DD Form 254.pdf PDF
W56HZV-18-R-0001.pdf PDF
Attachment 26 - Attribute Selection Sheet.pdf PDF
Attachment 39 - SBP Certification Subcontractor.pdf PDF
Attachment 37 - SBP Workbook.xlsx XLSX spreadsheet
Attachment 19 - Request for Use of Prohibited Materals.pdf PDF
Attachment 51 - Assertions for Tech Data and Computer Software.xlsx XLSX spreadsheet
Attachment 35 - Pricing Spreadsheet.xlsx XLSX spreadsheet
Attachment 27 - Critical Stockage List.pdf PDF
Attachment 10 - ATPD-2407 PDF
Attachment 04 - CSDR Plan.pdf PDF
Attachment 06 - MPF OPSEC Plan.pdf PDF
Attachment 30 - Critical Task List.pdf PDF
Attachment 20 - Production Government Format TDP Requirements.pdf PDF
Attachment 31 - Weld Standards Table 1.pdf PDF
Attachment 42 - Incoming Transaction Format.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# RFP Reference Question Response

1 RFP

L.4.1.1.2

What format does the Government want for the FEA grid submission for underbelly analysis?

Does the Government want the material property cards and input decks delivered with the proposal, if so in what format?

Section L.4.1.1.2 is updated in RFP Amendment 2 to request

"underbody simulation input data with Finite Element Analysis

(FEA) results to include static images, description of material properties, attachments/integration, dynamic and plastic deformation, and global and local vehicle acceleration plots."

If available the vendor may submit LS-DYNA keyword (.k) files.

2 C.1.1.4 and C.2.1.4 Issue: C.1.1.4 and C.2.1.4 Government Furnished Property requirement may conflict with existing, DCMA approved business practices.

Recommendation: Allow Offerors to use their current DCMA approved systems and business practices in lieu of the specified directions listed in the requirement.

Rationale: The requirement as written levies specific additional requirements on the

FAR/DFARS that could require an Offeror to either seek a waiver or require changes to their current DCMA approved business systems. The impact of such changes could invalidate their existing approved Property Management System and affect other programs.

Contractors shall comply with the RFP terms as no specific conflicts have been identified.

3 CDRL A092 Question: For the Battle Damage Assessment Repair manual, does the Government’s requirement include weld repair of damage hull and turret structures?

There is no requirement for hull/turret weld repair in the Battle

Damage Assessment and Repair manual. This does not relieve the contractors from developing hull/turret weld repair procedures in

DMWR's, NMWR's, compliance with Section E requirements, etc.

Please refer to MIL-STD-40051-2C within CDRL A092 and A130 for clarification.

4 L.4.1.2.1 Bullet (e) Resource hours/dollars

Is the expectation for this section to have an all-encompassing IMS that includes hours and dollars or is the request asking for hours or dollars?

The IMS shall include both hours and dollars.

MPF RFP W56HZV-18-R-0001 - Questions and Answers BATCH 4 (Distro A)

C.1.5.1.2.3, C.1.5.1.3.4

1) Both paragraphs require FSR’s to “operate vehicle” is it the Government’s intent to have contractors drive vehicles on test courses during the test, or is this to move around the work space?

2) Will the Government provide office space, with internet connections and space for SSP storage at all test locations?

1) Per the referenced SOW paragraphs, "The contractor shall provide onsite FSR suppoer for vehicle operations, maintenance, instrumentation, and test setup activities at

Government test locations." For clarification, this does NOT involve driving the vehciles on test courses nor around the workspace. ATC personnel will drive the pre-production (and

LRIP) vehicles. Contractor/FSR personnel will not drive the assets, however will provide support regarding operations, etc.

2) The US Government will provide office space and space for

CONEX SSP Storage. The contractor shall be responsible for internet and telephone connections.

6 C.2.8.4.15 Depot Maintenance Work Requirement (DMWR) Development - Requirement is to perform a pre-pilot overhaul of the MPF, what vehicle will the Government release to contractors for this effort?

The Contractor shall use the 2nd or 3rd Retrofit vehcile (PDR2 or

PDR3) that was delivered under CLIN 1002 after the successful completion of Log Demo.

7 Section L- Volume 1 Can we include video files in our proposal in Volume 1? Yes, videos may be submitted.

File details come from the government source that posted it.