Attachment_54_-_Force_Structure_Worksheet.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Mobile Protected Firepower
Solicitation number
W56HZV18R0001
Issued by

About this file

Attachment 54 - Force Structure Worksheet

View the file

Other files

File Type Posted
MPF_RFP_W56HZV-18-R-0001_-_Questions_and_Answers_BATCH_8_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_QandA_Batch_7_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_6_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-_Questions_and_Answers_Batch_5_(Distro_A).pdf PDF
W56HZV-18-R-0001,_Conformed_Copy__(through_Amendment_0002).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_4_(Distro_A).pdf PDF
W56HZV-18-R-0001-0002.pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_3_(Distro_A).pdf PDF
W56HZV-18-R-0001_Conformed_copy_(through_AMD1).pdf PDF
Attachment_35_-EMD__Pricing_Spreadsheet.xlsx XLSX spreadsheet
MPF_W56HZV-18-R-0001_-_Questions_and_Answers_-_BATCH_2_(Distro_A).pdf PDF
Attachment_40_-_EMD_VATEP_Adjustment_Spreadsheet.xlsx XLSX spreadsheet
Attachment_51_-_Identification_and_Assertion_of_Restrictions.xlsx XLSX spreadsheet
Attachment_36_-_LRIP_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_28_-_Equipment_Publications_Defects_List.pdf PDF
Attachment_01_-_DD254.pdf PDF
Attachment_55_-_Technical_Data,_Computer_Software_and_Patent_License_Identification_and_Assertions.xlsx XLSX spreadsheet
W56HZV18R0001-0001.pdf PDF
Attachment_56_-_Special_License_Requirements.pdf PDF
Q&A-Batch_1-Distro_A.pdf PDF
Attachment 33 - Performance Requirements Worksheet.pdf PDF
Attachment 11 - Vehicle Propulsion Data Sheet.xlsx XLSX spreadsheet
Attachment 44 - Design Maturity Self Assessment.xlsx XLSX spreadsheet
Attachment 37 - SBP Workbook.xlsx XLSX spreadsheet
Attachment 39 - SBP Certification Subcontractor.pdf PDF
Attachment 30 - Critical Task List.pdf PDF
Attachment 06 - MPF OPSEC Plan.pdf PDF
Attachment 42 - Incoming Transaction Format.pdf PDF
Attachment 31 - Weld Standards Table 1.pdf PDF
Attachment 41 - Logistics Product Data - Packaging Data Requirements.pdf PDF
Attachment 03 - MPF Production Readiness Review Checklist.xlsx XLSX spreadsheet
Attachment 26 - Attribute Selection Sheet.pdf PDF
Attachment 19 - Request for Use of Prohibited Materals.pdf PDF
Attachment 51 - Assertions for Tech Data and Computer Software.xlsx XLSX spreadsheet
Attachment 35 - Pricing Spreadsheet.xlsx XLSX spreadsheet
Attachment 10 - ATPD-2407 PDF
Attachment 27 - Critical Stockage List.pdf PDF
Attachment 28 - Equipment Publications Defects List.pdf PDF
Attachment 38 - SBP Workbook Instructions.pdf PDF
Attachment 12 - Vehicle Dynamics Data Sheet.xlsx XLSX spreadsheet
Attachment 47 - CARC Paint Drawing.pdf PDF
Attachment 02 - IEEE 15288-2 FCA-SVR-PCA Criteria Tailoring.pdf PDF
W56HZV-18-R-0001.pdf PDF
Attachment 01 - MPF DD Form 254.pdf PDF
Attachment 29 - LRC Design Proposal Format.pdf PDF
Attachment 04 - CSDR Plan.pdf PDF
Attachment 20 - Production Government Format TDP Requirements.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page

UNCLASSIFIED

Attachment 54
Force Structure Worksheet

15-Dec-2017

DISTRIBUTION STATEMENT A: Approved for Public Release; distribution unlimited.

Distribution A only applies when form is not filled-in. Once completed reference the MPF Security Classification Guide for proper distribution statement/markings.

Other requests for this document shall be referred to the attention of the PM MPF Security Manager at: Program Executive Office Ground Combat Systems (PEO GCS), ATTN: SFAE-GCS-P, 6501 East Eleven Mile Road, Warren, MI 48397-5000.

"This document contains information that may be exempt from mandatory disclosure under the Freedom of Information Act."
UNCLASSIFIED

Instructions

Instructions for completing this attachment

Contractor are instructed to fill out the Force Structure Worksheet Tab per Section H.9.5.2 and the specific cell instructions below.

Contractor shall use the Referenced Technical Manual provided as GFI to determine the capabilities of the associated wrecker and if that capability is sufficient to perform the applicable recovery and material handling tasks per Column B. Contractor shall input Yes/No under the wrecker title for each task. Should a contractor input Yes, data substantiating the claim shall be referenced in the applicable columns and supplied. Contractors shall use ATP 4-31/MCRP 4-11.4A (Aug 2014) as the basis of the recovery scenarios per the definitions below. All tasks shall be accomplished with one wrecker unless otherwise stipulated below.

Task Definitions:
Flat towing: Flat tow the MPF using the method outlined section 3-20 Flat Tow. Assume hard ground, no more than 1% grade.

Recovery of overturned MPF: Recover the overturned MPF using the method outlined in Section 3-66. Assume the MPF is on its side and use the overturn resistance calculation per Section 2-56.

Recover a mired MPF (up to hub): Recover an MPF mired up to the hub using the method outlined in Sections 3-93 through 3-96. Assume the resistance calculations per Sections 2-58, block and tackle is permissible if available per the wreckers BII.

Recover a mired MPF (over hub): Recover an MPF mired over the hub up to the fender using the method outlined in Sections 3-93 through 3-96. Assume the resistance calculations per Sections 2-29, block and tackle is permissible if available per the wreckers BII.

Lifting and removing the power pack: Lift and remove the power pack from the MPF.

Lifting and removing the turret assembly: Lift and remove the turret assembly from the MPF.

Lifting and removing armor panels: Lift and remove all armor panel sections/recipes from the MPF.

UNCLASSIFIED

Force Structure Worksheet

Existing IBCT AssetYes
Applicable TasksFRS

(LIN F64544)

Ref TM 9-4940-568-10 Substantiating Data M984A4 HEMTT Wrecker

(LIN T63161)

Ref TM 9-2320-342-10-1 Substantiating Data FMTV Wrecker

(LIN T94671)

Ref TM 9-2320-334-10-1Substantiating DataNo
Recovery Tasks
N/A
Flat towing
Recovery of overturned MPF
Recover a Mired MPF (up to hub)
Recover a Mired MPF (over hub)
Material Handling Tasks
Lifting & removing the power pack
Lifting & removing the turret assembly
Lifting & removing armor panels

File details come from the government source that posted it.