Attachment 20 24OCT2017
Production Government Format TDP Requirements
Technical Data Package (TDP) Requirements
TDP shall contain complete product definition in English suitable for procurement. The TDP shall provide the information necessary to enable the Government to competitively manufacture, procure, provision and catalog an item essentially identical to the original item, without additional engineering effort. TDP shall conform to the requirements in the TDP Option Selection Worksheet and Tailoring Checklist in this attachment, and shall contain the applicable TDP elements from the latest revision of MIL-STD-31000.
Parts and assemblies shall be parametric and associative. Any change in either the 3D or 2D will be automatically updated in the associated files. All parts shall be assigned material files in CAD system. All parts and assemblies shall include appropriate Government metadata attributes. Sample templates of parameters and IBOM are included in this attachment. The Government will provide contractor with latest Government CAD Standard Operating Procedure (SOP) document, CAD start part files, drawing formats, CAD attribute list, and IBOM Excel spreadsheet template at the Start of Work Meeting (SOWM).
The contractor shall perform the validation Checklist in this attachment and apply corrections before submitting TDP deliveries to the Government.
Source Control Technical Data
Source Control Drawings (SCDs) shall be prepared only upon written authorization from the Contracting Officer Representative. Requests for authorization to use SCDs shall be accompanied by a written justification.
Item Identification Traceability
The Contractor shall prepare the technical data so all applicable product definition documents and part identifying numbers (PIN), i.e. associated lists, test criteria, program-unique and process specifications, standard parts, etc., are referenced (top to lowest part item level) within the TDP for traceability.
TDP Standards and Best Practices
The contractor shall develop the TDP in accordance with latest versions of Department of Defense (DoD) adopted ASME industry standards Y14.1, Y14.5, Y14.24, Y14.34, Y14.35, Y14.38, Y14.41, Y14.100, MIL- STD-31000, and Government Best Practices document. Contractor’s CAD solid modeling software application is acceptable. Government’s preference is PTC’s Pro/Engineer CAD modeling software.
Version of CAD modeling software used for CAD data delivery will be agreed upon at the Start of Work Meeting (SOWM). The contractor shall verify that each file in the TDP opens without errors before each delivery.
Indentured Bill of Material (IBOM)
The contractor shall submit an IBOM to accompany and reflect each TDP delivered, sequenced down to the lowest piece part (or provisionable part). The contractor shall apply the product and enterprise identifiers in accordance with contract requirements.
TDP Deliverable File Formats
All new and modified parts and assemblies shall be in 3D and 2D parametric CAD formats. All legacy parts and assemblies shall be modeled for space claim and accompanied by all legacy models and drawings.
1. Parametric 3D and Associated 2D Native CAD.
All models for new or modified parts/assemblies shall be parametric, feature-based, dimensioned and include appropriate tolerances, notes, and metadata attributes. The 3D CAD models and 2D CAD drawings shall be associative. Any change in either the 3D or 2D will be automatically updated in the associated files. Dimensions in 2D CAD drawings shall be driving dimensions sourced from 3D CAD models sketch dimensions. Any change in either the 3D or 2D shall be automatically updated in the associated files. All Source Control and Vendor Item Control parts shall be modeled with sufficient information for procurement. The contractor shall assign Army Ordnance Part Numbers (AOPNs) to components with Government-Purpose or greater data rights.
2. Neutral CAD Format.
The contractor shall translate all parametric and non-parametric 3D CAD solid models into an ISO 10303 STEP AP203 ed2 or AP214 format. The STEP Neutral files shall include all metadata attributes sourced from 3D CAD models.
3. Envelope Cosmetic Solid Models.
All Military/Industry Standard parts shall be modeled for form, fit and function with sufficient envelope, mounting and mating features. Models shall be sufficient to provide adequate visualization, interface characteristics, accurate weight and center of gravity. Associated drawings are not required to be generated.
4. 2D PDF.
All 2D CAD drawings shall be fully dimensioned, shall meet the MIL-STD-31000 requirements for a production level TDP, shall contain all applicable MIL-STD-31000 TDP elements, shall be exported to PDF with at least 300 dpi resolution, shall contain all applicable drawing types in accordance with sections 4 through 16 of ASME Y14.24, shall serve as a stand-alone PDF version of the TDP without the need for the 3D CAD model and shall utilize true type fonts and search-able text option. All 2D PDF files shall have text recognition capability.
5. Excel Spreadsheet.
Each TDP shall be accompanied with the TDP Indentured Bill of material (IBOM) in excel format.
Legacy Technical Data
Legacy parts/assemblies that are not modified under this contract, shall be delivered at the latest release level.
Modified Legacy Technical Data
When legacy product data are to be redrawn they shall, at a minimum, be prepared to the latest standards in effect at contract award.
Material Assignment in CAD Models
All parts shall be assigned material files in the native CAD models. The material files used on the part shall match the material called out in the notes and be the same applied to 2D drawings. Alternate material files shall be included in the CAD file and noted on drawings.
File Naming Convention
Parts and assemblies shall be named using the following convention:
CAGE_Part Number.prt ( e.g., 19207_12345678.prt)
Associated STEP and PDF files shall have the same filename with extension “.stp” and “.pdf” respectively.
Security Markings
The contractor shall apply the applicable DoD Technical Distribution Statement and Export Control Warning required by DoD Instruction 5230.24 and Directive 5230.25 to all technical data produced or delivered. All statements, notices, and data rights legends shall be applied to all drawings on each sheet, directly above or adjacent to the title block. Associated lists and other related documents that are primarily of a textual nature shall have markings applied to each page. On models, all markings shall be applied to initial layer at opening. There shall be no ‘FOUO’ (For Official Use Only) markings on any technical data.
Item Unique Identification (IUID) Marking Requirement
All items requiring IUID markings in accordance with DFARS 252.211-7003 (paragraph c) shall incorporate labeling or marking information as part of the TDP in accordance with MIL-STD-130.
Applicable 2D CAD drawings and 3D CAD solid model TDP shall include IUID marking information. The IUID information in drawings, solid models and associated lists shall indicate method of marking or labeling, label or plate material composition, data matrix location and orientation and other applicable information in accordance with MIL-STD-130.
Referenced Documents
The contractor shall furnish all documents referenced in TDP deliverables as required by the latest revision of MIL-STD-31000.
Company Standards
Company standards are not allowed. Refer to the latest revision of MIL-STD-31000.
Version Control
The contractor shall assign a unique identifier to TDP contents and utilize disciplined version control in managing digital data. Each revision shall be a new master, and the contractor shall retain all approved revisions (versions) of each document and model representation to provide a traceable history in order to access the correct revision when needed. The content of a document and model revision is fixed once approved. Numerical revisions are not allowed. The contractor shall insure that all representations (i.e., hard copy, raster, Adobe PDF, CAD, STEP, etc.) of a single version or revision of data, delivered to the Government for approval and subsequently maintained by the contractor for the term of this contract, are identical. The terms version and revision as used herein are interchangeable. The revision history description for all TDP shall cite the applicable Change Request with Change Notice or Change Order number for data revised prior to product baseline.
Part Number Assignment: Army Ordnance Part Numbers (AOPNs)
Components other than standard hardware and commercial items shall be assigned Government-issued AOPNs. Refer to “File Naming Convention” in this attachment. Components identified as vendor item control or source control drawings shall be assigned AOPNs that are called out on higher up assemblies. The contractor shall request AOPNs from the designated Government CM (CDM) Representative. AOPNs will be assigned based on the following:
a) Kits (CPK and all other kits): 57Kxxxx
b) All others -Parts and Assemblies, Instructions, BII, Installations, etc.: 12xxxxxx
c) End Item/Top Assembly: 87Txxxx
Part Numbers
The contractor shall adhere to the contract requirements for Product and Enterprise Identifiers.
National Stock Numbers (NSNs) and Part or Identifying Numbers (PINs)
The PIN, in combination with the CAGE, establishes unique item identification of items in the TDP. The NSN for items may be cited in the TDP in addition to the PIN-CAGE; however, NSNs do not establish unique item identification and shall not be cited within the TDP in lieu of the PIN-CAGE.
NSNs placed within the TDP either in lieu of a PIN-CAGE or that conflict with the PIN/CAGE provisioning data found in WebFLIS will be reason for Government rejection of the TDP containing the conflicting data, and will be returned to the contractor for correction and re-submittal.
Detail Specification (MIL-STD-31000)
Appropriate detail specifications shall be used that specify design requirements, such as materials to be used, how a requirement is to be achieved, or how an item is to be fabricated or constructed. A specification that contains both performance and detailed requirements is still considered a detail specification.
Routing Diagrams - Cabling, Wiring Harnesses, and Plumbing
The Contractor shall deliver detailed wiring diagrams, schematics, and physical routing diagrams (harnesses, cables, and plumbing) as part of the TDP of all designed integration cables and lines. This information shall be available to the Government and discussed at IPT meetings and formal technical reviews.
Appendix A Attachment 20 24OCT2017
TDP OPTION SELECTION WORKSHEET
SYSTEM:) DATE PREPARED:
A. CONTRACT NO.
B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA
ITEM NO(s).
1. TDP Level (X and complete as applicable.)
A. CONCEPTUAL LEVEL
DEVELOPMENTAL LEVEL
PRODUCTION LEVEL
B. REMARKS:
2. TYPE AND FORMAT (X all that apply and complete as applicable.)
A.
TYPE 2D: 2D DRAWINGS
TYPE 3D: 3D MODELS ONLY
TYPE 3D: 3D MODELS WITH
ASSOCIATED 2D DRAWINGS
B.
CAD (SPECIFY TYPE) Contractor’s CAD 3D Modeling Software. Preferred PTC Pro/Engineer.
ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203 ed2, AP 214 etc.)
AP214 or AP203 ISO 32000 PORTABLE DOCUMENT FORMAT Adobe Acrobat at minimum 300 dpi
OTHER ELECTRONIC FORMAT (SPECIFY TYPE)
IBOM Excel Spreadsheet
HARDCOPY:
REMARKS:
3. CAGE CODE AND DOCUMENT
NUMBERS
A. CONTRACTOR CAGE AND DOCUMENT NUMBERS
GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)
D. To Be Assigned By: CM Gov’t Rep.
B. USE CAGE CODE: 19207 C. USE DOCUMENT NUMBERS: As Assigned
4. DRAWING FORMATS (X one and complete as applicable)
CONTRACTOR FORMAT.
GOVERNMENT FORMAT.
REMARKS: PTC Pro/E start part files and drawing formats are available upon request
5. TDP ELEMENTS REQUIRED (X all that apply )
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:
CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS
DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS
QUALITY ASSURANCE PROVISIONS
SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS
SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS
SPECIFICATIONS
SOFTWARE DOCUMENTATION
SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS
6. ASSOCIATED LIST (X and complete as applicable)
A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE
B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)
ASME Y14.100
ENGINEERING DRAWING PRACTICES
WITH APPENDICES:
B C D E
ASME Y14.24 TYPES AND APPLICATIONS OF
ENGINEERING DRAWINGS
ASME Y14.34 ASSOCIATED LIST
ASME Y14.35M REVISION OF ENGINEERING
DRAWINGS AND ASSOCIATED LIST
ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA
PRACTICES
ASME Y14.5 DIMENSIONING AND TOLERANCING
OTHER STANDARDS APPLY AS
DESCRIBED: ASME Y14.1
COMPANY STANDARDS PERMITTED
YES NO
Appendix A Attachment 20 24OCT2017
8. OTHER TAILORING (Attach additional sheets as necessary)
Metadata Attributes - All 3D CAD parts and assemblies shall incorporate parameters for Government configuration and data management requirements.
Solid Model Geometric Validation Proprieties (GVP) Checks. Contractor shall conduct geometric validation properties checks on all Government native (fully defined feature based parametric) part and assembly solid models. Disregard manufacturing process models.
The minimum 3-D Component Geometry, Assembly Construction, Validation Checks are:
3-D Component Geometry
1) Each model must contain only 1 solid.
2) Models are single part files consisting of modeling entities and attributes.
3) Models contain drafting entities necessary to present geometrical dimensioning and tolerancing information.
4) Models are generated for every part number that is production intent, production related, or to be prototyped.
5) No reference geometry models reside within the model.
6) Models contain no surface data (non-commercial components).
7) Parameters (attributes) are present and contain acceptable values.
8) Models contain proper density
9) Layers contain correct objects.
10) Models contain coordinate system.
11) Models that are positioned in more than one location on the vehicle end-item shall be designated at the absolute coordinated system and located in the vehicle end-item position in the assembly. All other models shall be designated in this vehicle position.
12) Models are saved in an isometric view.
13) Models and views not used are deleted.
14) All corner and fillet radii are modeled
15) All unnecessary wireframes are deleted.
16) Models passed all native CAD system (design software) solid model validation checks.
17) Models passed all interference checks (bolt/nut and gasket is ok).
18) Models contain no tiny objects or tiny edges.
19) Modeling tolerances applied in accordance with Contractor’s geometry and CAD creation standard. A default tolerance value shall be indicated in standard.
20) Model does not have any unnecessary parent/child relationships.
3-D Assembly Construction
21) Assembly contains CSYS/WCS displayed in absolute zero (x=0, y=0, z=0).
22) Assembly in body position.
23) Assembly can contain standard parts; however, standard parts must be UNMODIFIED from original.
24) Assembly is fully constrained.
3-D Component and Assembly in Explicit Non-Parametric Merged Solid Shrink-Wrap Format
25) Part and assemblies in merged solid format.
26) Complete with sufficient envelope.
27) Accurate mounting and mating dimensions (interfaces to Government baseline configuration items).
28) Body position in accordance with absolute coordinate system.
29) Includes applicable interface characteristics.
30) Current mass proprieties, weight, center of gravity and inertia information.
31) Incorporation of user-defined TDP metadata attributes.
32) Quality level at highest reasonable selection.
33) Skeletons, quilts, and small surfaces removed.
34) Real colors not gray-neutral colors presented.
BLOCK 5. Special Tooling Drawings and Associated Lists. Special tooling (e.g. jigs, dies, fixtures, molds, patterns, and other equipment or manufacturing aids) drawings developed for the Government under contract and required for production, maintenance, and logistics support shall be delivered. These models/drawings and associated lists shall permit the Government or a competent manufacturer to produce the special tooling that duplicates the performance characteristics of the original tooling and manufacturing of an acceptable item.
Appendix B Attachment 20 24OCT2017
ASME Y14.100 TAILORING CHECKLIST – SHEET 1
A. Drawing Media (Choose all that apply)
(1) Non-digital (Specify )
(2) Digital Data (3D Native, 2D neutral CAD Adobe PDF, Word, etc., IAW DI-SESS-81000C)
(3) Other (Specify )
B. Drawing Format (Choose One)
(1) Contractor
(2) Government (forms supplied by the Government)
(3) Government (forms supplied by the Contractor)
C. Drawing Sheet Size and Format (Choose One)
(1) ASME Y14.1
(2) ASME Y14.1M
D. Application Data (Choose all that apply)
(1) Contractor option
(2) Required
(a) On drawing
(b) By reference (Specify )
(c) Contractor option
(3) General use or multi-use notations
(a) allowed
(b) not allowed
E. Drawing Detail (ASME Y14.24) (Choose all that apply)
(1) Monodetail
(2) Multidetail
(3) Tabulated
F. Dimensioning and Tolerancing (Choose all that apply)
(1) Metric
(2) Decimal-inch
(3) Application of ASME Y14.5M
(a) Specific issue (revision) required (Specify issue )
(b) Issue in effect (ASME Y14.5-2009 )
G. Drawing Notes (Choose One)
(1) On drawing
(2) By reference (Specify )
(3) Contractors option
H. Types of Drawings (ASME Y14.24) (both, as needed)
(1) Contractor selects (as needed)
(2) Government selects (as needed)
ASME Y14.100 TAILORING CHECKLIST – SHEET 2
I. Maintenance of Multi-Sheet Drawings (ASME Y14.35M) (Choose all that apply)
(1) Drawing revision level (DOD preferred)
(2) All sheets same revision level
(3) Sheet revision level
J. Redrawn Drawings (redrawing without change) (ASME Y14.35M ) (Choose one)
(1) Advance revision level
(2) Revision level is not advanced
K. Maintenance of Revision History (Choose all that apply)
(2) Optional methods
(a) Remove one or more revision record as required
(b) Remove all previous revision history
(c) Remove all revision history but retain line entry for revision authorization and date of revision
(d) Remove all except revision preceding current
(e) Maintain revision history in its entirety
L. Adding Sheets (ASME Y14.35M) (Choose all that apply)
(2) Optional methods
(a) Renumber sheets using consecutive whole numbers
(b) Number added sheets in decimal-number sequence
(c) Number added sheets in alpha-numeric sequence
M. Deleting Sheets (ASME Y14.35M) (Choose all that apply)
(2) Optional methods
(a) Renumber all affected remaining sheets
(b) Affected remaining sheets not renumbered (revision status of sheets block is updated with notations such as CANC or DEL)
N. Markings on Engineering Drawings (Choose one)
(1) Special items and processes apply
(a) Applicable symbols ()
(b) Applicable special notes (Specify )
(2) Special items and processes do not apply
O. Associated Lists (ASME Y14.34M) (Choose all that apply)
(1) Non-digital (Specify )
(2) Digital Data (Native CAD Models, Drawings, and PDF)
(3) Other (Specify )
ASME Y14.100 TAILORING CHECKLIST – SHEET 3
P. Types of Associated Lists (ASME Y14.34M) (Choose all that apply)
(1) Parts Lists
(a) Integral
(b) Separate
(c) Contractors option
(2) Application List (on drawing)
(3) Data Lists
(4) Index Lists
(5) Indentured Data List
(6) Wire List (as needed)
(7) Other (Specify )
Q. Angle of Projection (ASME Y14.3M) (Choose one)
(1) 3rd Angle
(2) 1st Angle
R. Language (Choose one )
(1) English required
(2) Other (Specify )
S. Applicability of Appendices
(1) Appendix B
(a) as detailed herein
(b) as modified
(2) Appendix C
(a) as detailed herein
(b) as modified
(3) Appendix D
(a) as detailed herein
(b) as modified
(4) Appendix E
(a) as detailed herein
(b) as modified
Appendix C Attachment 20 24OCT2017
US ARMY - TACOM/TARDEC
REQUIRED MINIMUM PARAMETERS IN CAD PARTS AND ASSEMBLIES
Line #
PARAMETER NAME
TYPE
PARAMETER DESCRIPTION
FORMAT EXAMPLE
PARAMETER VALUE
PLM SEARCHABLE
(DESIGNATED)?
AGENCY String Agency or service US ARMY REQUIRED Yes 2 AUTO_PART_NUMBER Yes No Used in relation to generate Part Number attribute YES OPTIONAL No 3 CABLING_ASSY Yes No Used in relation to when working on an Electrical Cabling NO OPTIONAL No
CAGE_CODE
String
Original Design Activity CAGE code-The activity originally authorizing/creating the design. For TACOM Army Ordnance Part Numbers, use 19207; commercial designs use original design manufacturer CAGE corresponding to the original design manufacturer’s part number in parameter name PART_NUMBER
19207
REQUIRED
Yes
CHECKER_NAME
Person that checked the original drawing/model
J. Doe
REQUIRED FOR
PRODUCTION TDP
No
CIRCUIT_NUMBER
String Circuit Number used for Electrical Cables / Hydraulic Hoses (Manually generated when PIPING_ASSY set to Yes)
J159
OPTIONAL
CONTRACT_NUMBER
Contract # under which technical data is being created/delivered
**REQUIRED FOR
CRITICAL_SAFETY_ITEM
Yes No
Part Criticality to System Operation
YES REQUIRED FOR
DATA_RIGHTS_CODE
Data rights concern the ability to modify, reproduce, perform, display, release, or disclose recorded information.
U - Unlimited Rights. All uses for all purposes, Government and Commercial.
G - Government Purpose Rights. All uses, but only for Government purposes.
L - Limited. Internal Government use for Government purpose with very little else authorized.
R - Restricted Rights. Internal Government use for Government purpose with very little else authorized.
SB - Small Business Innovative Research (SBIR). A special catch-all category (SBIR Rights) and alters the normal use of some of the other legends. When dealing with a SBIR contract, the SBIR data rights clause must be applied.
SL - Special License Rights. As specified by the negotiated contract terms. Often used to alter the default rights under the clauses or agree to an apportionment of rights which does not fit neatly into the default categories.
U
DESIGN_ACTIVITY
Design activity-The individual or enterprise that commissions the engineering or design of a product; is the acquirer or purchaser of the product(s) or system.
TACOM LCMC
PL MPF
DESIGN_ACTIVITY_LOCATION
Design activity city, state and zip code
WARREN, MICHIGAN
48397-5000
DESIGN_APPROVAL_NAME
Government approver name for engineering design
*REQUIRED FOR
(DESIGNATED)?
DESIGN_CONTRACTOR
Contractor/Agency/Office physically creating drawings and models for the original design activity (optional with commercial data; mandatory with Government funded noncommercial or mixed funded product data)
ABC SERVICES,
DALLAS, TEXAS 01234
DISTRIBUTION_CODE
Technical Distribution Statement Code (DoDI 5230.24) A (Approved for public release; distribution is unlimited) B (Distribution authorized to U.S. Government Agencies only) C (Distribution authorized to U.S. Government Agencies and their contractors) D (Distribution authorized to the Department of Defense and U.S. DoD contractors only) E (Distribution authorized to DoD Components only) F (Further dissemination only as directed)
D
DRAWING_APPROVAL_NAME
Government approver name of drawing.
J. DOE *REQUIRED FOR
DRAWING_DATE
Date original drawing created
2013-04-12 REQUIRED FOR
DRAWING_NUMBER
Drawing number the part/assembly is defined on
12414568 REQUIRED FOR
DRAWN_BY
Person who created original drawing
J. DOE REQUIRED FOR
ENGINEER_NAME_1
Primary design engineer
20 ENGINEER_NAME_2 String Secondary design engineer J. DOE OPTIONAL No
ERR_ECP_APPROVAL
Government approving official of latest ECP
J. DOE **REQUIRED FOR
ERR_ECP_DATE
Date current revision was approved for release
2014-05-15 **REQUIRED FOR
ERR_ECP_NUMBER
Approved Engineering Change Proposal (ECP), Change Request or Change Order, Change Notice, or Engineering Release Record (ERR) authorizing initial release or new revision. (For production level product data the three-character contractor name prefix as assigned by the government followed by the 5 alpha-numeric characters the Contractor assigns from the Government-issued block of ECP/ERR numbers.) ERR number required for production level product data at initial Product Baseline and beyond; ECP or contractor’s change documentation number required for tech data prior to Product Baseline. (if assigned, otherwise put “NA”)
TACV1234
EXPORT_CONTROL
Yes No Controlled by International Traffic in Arms Regulation (ITAR) OR the Export Administration
Regulation (EAR)
YES
HOSE_LENGTH
Real Number Hose Length – Relation generated by PRO_MP_MASS / WEIGHT_PER_LENGTH. Automatically generated when PIPING_ASSY set to YES
12.5
MATERIAL_ENGINEER
Person who approved material for design
MODEL_DRAWING_REV
String 'X' revision is permissible for pre-release models. Alpha revisions following ASME Y 14.35M revision standard for production models.
X0 ; C
**REQUIRED
28 MODELER_NAME_1 String Primary CAD modeler J. DOE REQUIRED No
NEXT_ASSY_1
First next higher assy part no.; first or main parent part number
12419847 REQUIRED FOR
30 NEXT_ASSY_2 String Second next higher assy part no. if child part has two parents 12586793 OPTIONAL No 31 NEXT_ASSY_3 String Third next higher assy part no. if child part has three parents 12957485 OPTIONAL No 32 NEXT_ASSY_4 String Fourth next higher assy part no. if child part has four parents 12456873 OPTIONAL No 33 NEXT_ASSY_5 String Fifth next higher assy part no. if child part has five parents 12213484 OPTIONAL No
(DESIGNATED)?
34 NEXT_ASSY_6 String Sixth next higher assy part no. if child part has six parents 12436875 OPTIONAL No 35 NEXT_ASSY_7 String Seventh next higher assy part no. if child part has seven parents 12435623 OPTIONAL No 36 NEXT_ASSY_8 String Eighth next higher assy part no. if child part has eight parents 12986458 OPTIONAL No
NOMENCLATURE
String Drawing name. It can be a combination of the three nomenclature lines or represents only the first line.
BODY ASSEMBLY,
CARGO, MTV LWB
38 NOMENCLATURE_1 String First line of drawing nomenclature BODY ASSEMBLY, OPTIONAL No 39 NOMENCLATURE_2 String Second line of drawing nomenclature CARGO, OPTIONAL No 40 NOMENCLATURE_3 String Third line of drawing nomenclature MTV LWB OPTIONAL No 41 PART_NUMBER String Item part number 12423205 REQUIRED Yes 42 PIPING_ASSY Yes No Defines if the assembly is a piping assembly Yes OPTIONAL No
PMIC
Precious Metal Indicator Code.
A Item does not contain precious metal C Item contains two or more precious metals G Item contains gold P Item contains platinum family metals S Item contains silver U Precious metal type is unknown V Precious metal type varies between manufacturers
A
QA_ENGINEER_NAME
Quality assurance engineer
REMARKS
String Remarks include "CONCEPT", "DEVELOPMENTAL", "PRELIMINARY", etc. On 2D associated drawings, remark stamp is added, right adjusted, on top of title block and other stamps.
PRELIMINARY
***REQUIRED
SPEC_NUMBER
Spec or standard number from a part that is defined by a government, non-government (e.g., part B18221BH125W), or an approved international/foreign specification or standard
ASME B18.22.1
47 TOLERANCE_1_PLACE String Default tolerance if indicated on drawing 0.3 OPTIONAL No 48 TOLERANCE_2_PLACE String Default tolerance if indicated on drawing 0.03 OPTIONAL No 49 TOLERANCE_3_PLACE String Default tolerance if indicated on drawing 0.003 OPTIONAL No 50 TOLERANCE_ANG String Default tolerance if indicated on drawing 0.5 OPTIONAL No
UID_MARKABLE
Yes No In accordance with contract requirements, indicate if part requires Unique Identification (UID) marking
YES
52 UNIT_WEIGHT Real Number Mass value 1.25 REQUIRED No 53 USED_ON_1 String First used on end item M270A1 REQUIRED No 54 USED_ON_2 String Second used on end item M1078 OPTIONAL No 55 USED_ON_3 String Third used on end item M1083 OPTIONAL No 56 USED_ON_4 String Fourth used on end item M1090 OPTIONAL No 57 USED_ON_5 String Fifth used on end item M1091 OPTIONAL No 58 USED_ON_6 String Sixth used on end item M1093 OPTIONAL No 59 USED_ON_7 String Seventh used on end item M1094 OPTIONAL No 60 USED_ON_8 String Eighth used on end item M1095 OPTIONAL No
WEIGHT_PER_LENGTH
Real Number Numeric Value of the weight/length given in the line stock file (manually entered, should be the same as line stock file)
0.00417
62 WEIGHT_UNIT String Automatically filled out - toolkit application lb REQUIRED No
Appendix D Attachment 20 24OCT2017
Appendix E Attachment 20 24OCT2017
US ARMY - TACOM/TARDEC
CAD MODEL AND DRAWING VALIDATION CHECKLIST
Do the PDF drawings match CAD 2D drawings?
Are the parts/assemblies fully constrained?
Are dimensions on drawings sourced from models? Are drawings free of Cosmetic Dimensions? Are dimensions mostly driving dimensions?
Are Parameters in models correct?
Are Notes, Markings, Title blocks, and Revision blocks sourced from models?
Are the model tree (in model) and parts lists (in drawings) the same?
Did the CAD models pass geometric integrity checks?
Are NHA and Used-On properly populated on drawings?
Do Notes include…
"APPLICABLE STANDARDS/SPECIFICATIONS:
A. ASME Y14.100-2013
B. ASME Y14.5M-2009" (when applicable)" Is Distribution statement accurate and complete?
Is Export Control statement accurate?
Is ‘Destruction Statement’ accurate and complete?
Are accurate 'data rights' included with appropriate legends per DFARS?
Is Title Block consistent with standards? Is Title Block complete?
Is Revision block complete?
Do specs and stds listed exist? Are spec part numbers structured properly?
Is the IBOM consistent with Parts lists?
Are weldments' notes applied correctly?
Are GD&T markings correct?
Are assigned part numbers correct? Are sub-assemblies and sub-parts using correct Government and commercial numbers?
Are Vendor Item Control (VIC) and Source Control (SC) drawings accurate? Did contractor receive approval for SC drawings? Are the drawing formats correct?
Are the Material and SPEC callouts correct?
Is the design accurate and complete?
Can it be produced by a third party from the TDP developed?
Do drawings contain inspection and acceptance criteria?