Title Page
Attachment 44 Design Maturity Self Assessment
Distribution A
10/24/2017
Maturity Level
| System Maturity Level | Artifacts Required to Achieve Level | Location within Proposal (if provided) | |
| Level 1 | |||
| Requirements Analysis | Requirements Decomposition Completed | ||
| Functional Baseline Completed | |||
| Software Requirements Documented | |||
| Derived Requirement Development Completed | |||
| Interface Identification Completed | |||
| Reliability and Maintainability (R&M) Program Plan completed | |||
| R&M Allocations Completed | |||
| Level 2 | |||
| Preliminary Design Analysis | Allocated Baseline Completed | ||
| Software Requirements Validated | |||
| Component Analysis/Selection Completed | |||
| Interface Designs Completed | |||
| Lessons Learned from previous design generation(s) implemented | |||
| Design for Manufacturability Study Completed | |||
| R&M Modeling and Prediction Completed | |||
| Cybersecurity Architectural Design Trade Study Analysis Completed | |||
| Design Failure Mode Effects and Analysis (DFMEA), Fault Tree Analysis (FTA), Critical Items List (CIL) Completed | |||
| Level 3 | |||
| Subsystem Integration, Testing and Analysis | Sub Systems Integration/Testing/Analysis on Hull/Structure/Frame Completed | ||
| Sub Systems Integration/Testing/Analysis on Running Gear Completed | |||
| Sub Systems Integration/Testing/Analysis on Base Vehicle Protection Completed | |||
| Sub Systems Integration/Testing/Analysis on Armor Kits Completed | |||
| Sub Systems Integration/Testing/Analysis on Interior Force Protection Technologies Completed | |||
| Sub Systems Integration/Testing/Analysis on Power Generation and Distribution Completed | |||
| Sub Systems Integration/Testing/Analysis on Optics and Sensors Solutions Completed | |||
| Sub Systems Integration/Testing/Analysis on Powertrain (to include cooling) Completed | |||
| Sub Systems Integration/Testing/Analysis on Vehicle Electronics Architecture/Software Completed | |||
| Sub Systems Integration/Testing/Analysis on Fire Control System/Software Completed | |||
| Power Generation Architectures Completed | |||
| Vetronics/Software Architectures Completed | |||
| Requirements Compliance Matrix Completed | |||
| Component Qualification Testing Completed | |||
| Materials Analyzed for Hull/Structure/Frame/Protection | |||
| Software Integration/Testing/Analysis completed | |||
| Failure Analysis Completed | |||
| R&M system level M&S, Analysis, and sub-system level testing completed | |||
| Cybersecurity assessment of subsystem components | |||
| R&M modeling and prediction updated with the reduced failure rates | |||
| Level 4 | |||
| System Integration, Testing and Analysis | System Demonstrator Fabricated | ||
| Integrated System Testing (to current requirements) Completed | |||
| Automotive Performance Testing (to current requirements) Completed | |||
| Turret Performance Testing (to current requirements) Completed | |||
| Optics and Sensors Performance Testing (to current requirements) Completed | |||
| Fire Control Performance Testing (to current requirements) Completed | |||
| Failure Analysis Completed | |||
| Software Integration Schedule Completed | |||
| Cybersecurity assessment of integrated system completed | |||
| The system level R&M test completed, data collected and analyzed, failure analysis completed, and R&M predictions updated with test results | |||
| Level 5 | |||
| Post-Testing Detailed Design Analysis | Design Finalized (to current requirements) | ||
| CAD Drawings Finalized (to current requirements) | |||
| Software Support Plan Finalized | |||
| Interface Design Finalized (to current requirements) | |||
| Requirements Compliance Finalized | |||
| Manufacturing plan finalized | |||
| Cybersecurity vulnerability assessment completed | |||
| Corrective actions for the failures from system level testing developed and R&M predictions updated with the reduced failure rates (to current requirements) |
&"-,Bold"&14Attachment 44
Page &P of &N 24 October 2017
Data Validation
| Yes |
| No |