Attachment 02 - IEEE 15288-2 FCA-SVR-PCA Criteria Tailoring.pdf

PDF 651 KB Posted

Attached to
Mobile Protected Firepower
Solicitation number
W56HZV18R0001
Issued by

About this file

Attachment 02 - IEEE 15288-2 FCA-SVR-PCA Criteria Tailoring

View the file

Other files

File Type Posted
MPF_RFP_W56HZV-18-R-0001_-_Questions_and_Answers_BATCH_8_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_QandA_Batch_7_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_6_(Distro_A).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-_Questions_and_Answers_Batch_5_(Distro_A).pdf PDF
W56HZV-18-R-0001,_Conformed_Copy__(through_Amendment_0002).pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_4_(Distro_A).pdf PDF
W56HZV-18-R-0001-0002.pdf PDF
MPF_RFP_W56HZV-18-R-0001_-QandA_Batch_3_(Distro_A).pdf PDF
W56HZV-18-R-0001_Conformed_copy_(through_AMD1).pdf PDF
Attachment_28_-_Equipment_Publications_Defects_List.pdf PDF
Attachment_55_-_Technical_Data,_Computer_Software_and_Patent_License_Identification_and_Assertions.xlsx XLSX spreadsheet
W56HZV18R0001-0001.pdf PDF
Attachment_54_-_Force_Structure_Worksheet.xlsx XLSX spreadsheet
Attachment_35_-EMD__Pricing_Spreadsheet.xlsx XLSX spreadsheet
MPF_W56HZV-18-R-0001_-_Questions_and_Answers_-_BATCH_2_(Distro_A).pdf PDF
Attachment_40_-_EMD_VATEP_Adjustment_Spreadsheet.xlsx XLSX spreadsheet
Attachment_51_-_Identification_and_Assertion_of_Restrictions.xlsx XLSX spreadsheet
Attachment_56_-_Special_License_Requirements.pdf PDF
Attachment_36_-_LRIP_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_01_-_DD254.pdf PDF
Q&A-Batch_1-Distro_A.pdf PDF
Attachment 28 - Equipment Publications Defects List.pdf PDF
Attachment 38 - SBP Workbook Instructions.pdf PDF
Attachment 41 - Logistics Product Data - Packaging Data Requirements.pdf PDF
Attachment 33 - Performance Requirements Worksheet.pdf PDF
Attachment 12 - Vehicle Dynamics Data Sheet.xlsx XLSX spreadsheet
Attachment 47 - CARC Paint Drawing.pdf PDF
Attachment 11 - Vehicle Propulsion Data Sheet.xlsx XLSX spreadsheet
Attachment 03 - MPF Production Readiness Review Checklist.xlsx XLSX spreadsheet
Attachment 44 - Design Maturity Self Assessment.xlsx XLSX spreadsheet
Attachment 29 - LRC Design Proposal Format.pdf PDF
Attachment 01 - MPF DD Form 254.pdf PDF
W56HZV-18-R-0001.pdf PDF
Attachment 26 - Attribute Selection Sheet.pdf PDF
Attachment 39 - SBP Certification Subcontractor.pdf PDF
Attachment 37 - SBP Workbook.xlsx XLSX spreadsheet
Attachment 19 - Request for Use of Prohibited Materals.pdf PDF
Attachment 51 - Assertions for Tech Data and Computer Software.xlsx XLSX spreadsheet
Attachment 35 - Pricing Spreadsheet.xlsx XLSX spreadsheet
Attachment 27 - Critical Stockage List.pdf PDF
Attachment 10 - ATPD-2407 PDF
Attachment 04 - CSDR Plan.pdf PDF
Attachment 06 - MPF OPSEC Plan.pdf PDF
Attachment 30 - Critical Task List.pdf PDF
Attachment 20 - Production Government Format TDP Requirements.pdf PDF
Attachment 31 - Weld Standards Table 1.pdf PDF
Attachment 42 - Incoming Transaction Format.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 02

IEEE 15288.2 FCA-SVR-PCA Criteria Tailoring FCA - Section 6.8.1 - Table 25

Product FCA Acceptability Criteria Tailoring Functional, allocated, and product baseline documentation

Item a) Change "CI performance has been …" to read "System performance has been ...".

Functional, allocated, and product baseline documentation

Item b) Change "… in the CI specification" to read "… in the system specification".

Functional, allocated, and product baseline documentation

Item c) No tailoring.

Functional, allocated, and product baseline documentation

Item d) No tailoring.

Functional, allocated, and product baseline documentation

Item e) No tailoring.

Functional, allocated, and product baseline documentation

Item f) No tailoring.

Program execution and process control Item a) No tailoring.

Program execution and process control Item b) Change "Audit of PDR and CDR minutes … " to read "Audit of

DMR minutes …".

Verification results Item a) No tailoring.

Verification results Item b) Change "The CI demonstrated …" to read "The system demonstrated …".

Change "… satisfy KPP and KSA thresholds …" to read "… satisfy the system specification thresholds …".

Verification results Item c) Delete in its entirety.

Verification results Item d) Change "CI acceptance test …" to read "System acceptance test …".

Verification results Item e) No tailoring.

Verification results Item f) Change "For CIs that failed …" to read "For configuration items

(CIs) that failed …".

Page 1 of 5 6 September 2017

SVR - Section 6.9.1 - Table 29

Product SVR Acceptability Criteria Tailoring System functional and product baseline documentation

Item a) No tailoring.

System functional and product baseline documentation

Item b) Change "… documented among the CDD, the CPD, and the …" to read "… documented between the performance specification and the …".

System functional and product baseline documentation

Item c) No tailoring.

System functional and product baseline documentation

Item d) Change "… all KPP and KSA thresholds …" to read "… all system specification thresholds …".

System functional and product baseline documentation

Item e) Delete in its entirety.

System functional and product baseline documentation

Item f) Delete "… and the results incorporated into the LCSP".

System functional and product baseline documentation item g) Delete in its entirety.

System functional and product baseline documentation

Item h) Change "Assessment of the …" to read "Contractor assessment of the …".

Technical plans Item a) Delete in its entirety.

Technical plans Item b) Change "… in OT&E" to read "… in IOT&E".

Technical plans Item c) Delete in its entirety.

Technical plans Item d) Delete in its entirety.

Technical plans Item e) Change "… supports OT&E …" to read "… supports IOT&E …".

Technical plans Item f) Delete in its entirety.

Technical plans Item g) No tailoring.

Program execution and process control Item a) Delete in its entirety.

Program execution and process control Item b) No tailoring.

Program execution and process control Item c) No tailoring.

Program execution and process control Item d) No tailoring.

Risk assessment Item a) No tailoring.

Risk assessment Item b) No tailoring.

Page 2 of 5 6 September 2017

SVR - Section 6.9.1 - Table 29

Product SVR Acceptability Criteria Tailoring Program life-cycle cost estimate and schedule Item a) Delete in its entirety.

Program life-cycle cost estimate and schedule Item b) No tailoring.

Program life-cycle cost estimate and schedule Item c) No tailoring.

Program life-cycle cost estimate and schedule Item d) Delete in its entirety.

Verification results Item a) Delete in its entirety.

Verification results Item b) No tailoring.

Page 3 of 5 6 September 2017

PCA - Section 6.11.1 - Table 37

Product PCA Acceptability Criteria Tailoring Verified system product baseline documentation

Item a) Change "… through OT&E" to read "… through IOT&E".

Verified system product baseline documentation

Item b) No tailoring.

Verified system product baseline documentation

Item c) No tailoring.

Verified system product baseline documentation

Item d) No tailoring.

Verified system product baseline documentation

Item e) No tailoring.

Verified system product baseline documentation

Item f) No tailoring.

Verified system product baseline documentation item g) No tailoring.

Verified system product baseline documentation

Item h) No tailoring.

Verified system product baseline documentation

Item i) Delete in its entirety.

Verified system product baseline documentation

Item j) No tailoring.

Verified system product baseline documentation

Item k) No tailoring.

Verified system product baseline documentation

Item l) No tailoring.

Verified system product baseline documentation

Item m) No tailoring.

Verified system product baseline documentation

Item n) Change "… passed OT&E" to read "… passed IOT&E".

Verified system product baseline documentation

Item o) No tailoring.

Program execution and process control Item a) No tailoring.

Program execution and process control Item b) No tailoring.

Page 4 of 5 6 September 2017

PCA - Section 6.11.1 - Table 37

Product PCA Acceptability Criteria Tailoring Validation (IOT&E results) Item a) No tailoring.

Validation (IOT&E results) Item b) No tailoring.

Validation (IOT&E results) Item c) Change "… deficiencies are listed …" to read "… deficiences and corrective actions are listed …".

Page 5 of 5 6 September 2017

File details come from the government source that posted it.