W56HZV16R0001_Questions_and_Answers_31_DEC_15.pdf
PDF 118 KB Posted
- Attached to
- M870A4 Semitrailer
- Solicitation number
- W56HZV16R0001
About this file
Questions and Answers 31 DEC 15.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16R0001 Solicitation Questions W56HZV16R0001 Questions and Answers 31 DEC 15.xls
POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/31/2015
Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted
Q.001 Interested contractors List
None None Is there a list of interested vendors / contractors available for public release?
A.001
No. The Government has not collected contractors names for public distribution.
Contractors will need to make their own partnership arrangements.
12/4/2015 12/18/2015
Q.002 Max Capacity Solicitation Clause 52.242‐4557 Will contractors need to meet the 60 trailers capacity per month capacity? A.002
The clause at 52.242‐4557 requires the max capacity be 60 trailers per month, if and when, the contractor gets a delivery order. At this time, the Government does not expect the contractor to produce trailers at the rate of 60 per month during the whole contract, but instead the successful contractor would only produce 60 per month when called for in select delivery orders. Contractor will be obligated to accept a delivery that requires 60 trailer per month but not one that expects more trailers per month.
12/4/2015 12/18/2015
Q.003 Missing Attachment
Attachment 001
ATPD
2.2.2 Other applicable
Government documents, drawings, and publications.
Will the Government provide a copy of the TACOM Administrator’s Manual
(AM) for use with SAE J2014 Pneumatic Tires for Military Tactical Wheeled
Vehicles?
A.003 The document is released with Amendment 001 to the RFP as Attachment 0037.
12/11/2015 12/18/2015
Q.004 Specifications:
ABS
Attachment 001
ATPD
3.9.11.2
Normally the COTS Anti‐lock brake system (ABS) electrical has one ECU that controls the braking per axle and not per wheel end. The COTS ABS can sense the wheel end but does not control each wheel end independently.
The government specifies "The ABS shall operate on 24 volt power. ABS, with each axle end sensed and controlled independently, is required on all axles and shall meet current industry..." Does the Government need wheel end ABS braking control?
A.004
No. The Government requirement is for ABS sensing on each wheel end and ABS control on each axle. Ref ATPD paragraph 3.9.6b for clarification.
12/14/2015 12/18/2015
12/31/2015 11:32 AM POC Charley Jackson, Jr. or Tod Miller 1 of 4
POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/31/2015
Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted
Q.005 Specifications:
ABS
Attachment 001
ATPD 3.9.12.2
Current COTS ABS systems uses a function light that lights anytime there is a malfunction and does not have a black out option. The Government has specified "ABS diagnostic light shall be non‐functional" during black out periods. Does the Government need the non‐ COTS blackout option?
A.005
During blackout lighting operation the ABS diagnostic module should function; however, the diagnostic light shall not illuminate IAW the ATPD at 3.9.12.2.
12/14/2015 12/18/2015
Q.006 Specifications:
Wheels
Attachment 001
ATPD
3.9.4
Are the tire contact requirements exempt during loading and unloading the M870A4 during air transport, particularly the 15 degree ramp?
A.006
Tire contact weight and contact dimensions are applicable during air transport loading and unloading; however, it is not required that all tires remain in contact while loading and unloading. The weight and contact dimensions on the tire(s) or axle(s) in contact with the aircraft ramp must not exceed trailer component or aircraft load limits.
Additionally, there must be enough tires in contact to maintain system stability during loading and unloading maneuvers IAW the
ATPD at 3.9.4.
12/14/2015 12/23/2015
Q.007 Specifications:
Ride Quality
Attachment 003
ATPD
3.9.5
Request an extension to the offer due date so that we may perform a “Trailer Ride Quality Test” IAW Attachment 0003, Performance Requirements
Matrix, Subfactor 2. This requirement includes completely filling out Attachment 0019, Trailer Vehicle
Dynamics Data Sheets (as stated under Offerors Proposed Level of
Performance). Currently, dynamic data on the suspension has not been measured/recorded on our trailer suspension by ourselves, or our supplier. We are requesting a 30 day extension to the due date (i.e., February 4th).
A.007
The intent is not to perform a trailer ride quality test for proposal but rather provide the requested suspension component characteristic data in Attachment 0019 and allow the Government to conduct Modeling & Simulation during proposal evaluation IAW
Section L/M. The Government will verify ride quality performance during delivery order 1.
Please refer to "Notes 2 Tab in Attachment
0019."
12/16/2015 12/23/2015
12/31/2015 11:32 AM POC Charley Jackson, Jr. or Tod Miller 2 of 4
POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/31/2015
Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted
Q.008 Specifications:
ATPD
Attachment 003
ATPD
N/A
Follow up question on ATPD‐2395G, Requirements verification: When does the Government expect to receive conformance certification from the contractor? During actual Government Testing (i.e., FPVI, PVT, etc) or before testing?
If so, will the Government be providing GFE for conformance testing (e.g., 3.2
Prime Mover).
A.008
Certificate(s) of conformance shall be available for Government review at A‐FPVI and FPVI in accordance with ATPD 2395G, Table V.
The Government will provide GFE (prime mover) shortly after contract award to support system level conformance requirements.
12/16/2015 12/23/2015
Q.009 RFP Due Date N/A N/A What is the process in which I need to go about to get the response Date extended.
A.009
Email all requests for extensions to the contract specialist and PCO. Explain the need for an extension in the email and provide a suggested date. An extension has already been granted to January 11, 2016 (Amendment 0001) as a result of the Government now requiring CD submittals; See amendment 0001 and See L.1. The government is not inclined to grant extensions as a matter of course.
Contractors should use the allotted time to prepare and submit proposals.
12/18/2015 12/23/2015
Q.010 Test Plan N/A N/A Is the Test Plan and Schedule for all three Phases available to the public?
A.010
No. The test schedule and general test plan for PPT, PVT and DT/OT are outlined in
Sections E.4, E.7.1, and E.7.10, respectively.
Additionally, Attachment 0001 (ATPD 2395)
Table V identifies requirements and applicable verification method for each test event. Award of the initial delivery order is anticipated for 4QFY16 and award of LRIP delivery order is anticipated for 3QFY18.
Please refer to Amendment 002 for clarification on TSR support in paragraphs E.4.3.4.1, E.7.3.3, and E.7.12.3.
12/21/2015 12/23/2015
Q.011 Specifications:
Landing Legs
ATPD 2395G 3.9.8 and 3.15.1 (BII)
Does the Government have a definition of low pressure landing legs/pads (is there a maximum lbs./sq‐ft for each pad)? There is no part number listed.
A.011
No. Commercially available landing legs/pads are acceptable, provided, the landing legs/pads are suitable for the proposed trailer design and the trailer passes the required
Government testing.
12/28/2015 12/31/2015
12/31/2015 11:32 AM POC Charley Jackson, Jr. or Tod Miller 3 of 4
POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/31/2015
Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted
Q.012 Specifications:
ECE/TM Data
Attachments N/A Regarding LCU2000, LSV, JHSV, Army
Landing Craft, motor grader,‐ where can we find more info on this equipment?
A.012
Army Water Craft web site :
http://www.peocscss.army.mil/PdDAWS.html can provide general information. Additional web searches can provide specific vessel information.
12/28/2015 12/31/2015
Q.013 RFP Due Date RFP / SF1449 / Solicitation
Block 6.
I would kindly ask for another extension as I am still gathering all needed components for this contract. I hope you understand since this contract has come available during the holiday season it is making it difficult to gather answers to questions I have about the contract and trailer components.
A.013 No. There is no extension granted at this time. 12/28/2015 12/31/2015
Q.014 Pricing Attachment 0017 CDRL CLINS
Does the government want CDRL pricing included in the unit pricing per Ordering Year or does the government want separate pricing for the CDRLs?
A.014 No. The cells for CDRLS are greyed out because pricing is NOT submitted for CDRLS on a separate basis.
12/29/2015 12/31/2015
Q.015 Testing: FPT Attachment 0018 FPT CLINS
We notice that the Government only has requirements for four Follow on Production Tests (FPT) instead of five.
Does the Government only want FPT for four production years instead of five?
A.015 Yes. FPT CLINS are found on Attachment 0017 for Year 4 through Option Year 2. The Governemnt is not ordering FPT in years 1 to 3.
12/30/2015 12/31/2015
Acronyms ABS Anti‐lock brake system ATPD Automotive‐Tank Purchase Description ECE Engineering Construction Equipment COTS Commercial Off the Shelf TAM TACOM Administrator’s Manual (AM) POC Point of Contact PCO Procuring Contracting Officer CD Compact Disk
12/31/2015 11:32 AM POC Charley Jackson, Jr. or Tod Miller 4 of 4
File details come from the government source that posted it. Updated .