TM 55-2410-237-14
TECHNICAL MANUAL
TRANSPORTABILITY GUIDANCE
TRACTOR, FULL-TRACKED, LOW-SPEED
DIESEL-ENGINE-DRIVEN, MEDIUM DRAWBAR PULL,
CATERPILLAR MODEL D7G
W/WINCH (NSN 2410-01-223-7261)
W/RIPPER (NSN 2410-01-223-0350)
CATERPILLAR MODEL D7F
W/WINCH, WO/ROPS (NSN 2410-00-177-7284)
W/WINCH AND ROPS (NSN 2410-00-185-9792)
W/RIPPER, WO/ROPS (NSN 241O-O0-177-7283)
W/RIPPER AND ROPS (NSN 2410-00-185-9794)
CATERPILLAR MODEL D7E
W/WINCH, WO/ROPS (NSN 2410-00-782-1130)
W/WINCH AND ROPS (NSN 2410-01-050-9628)
W/RIPPER, WO/ROPS (NSN 2410-00-926-3697)
W/RIPPER AND ROPS (NSN 2410-01-050-9629)
Approved for public release; distribution is unlimited.
H E A D Q U A R T E R S , D E P A R T M E N T O F T H E A R M Y
5 OCTOBER 1990
TECHNICAL M ANUAL Headquarters Department of the Army
NO. 55-2410-237-14 Washington, DC, 5 October 1990
TRANSPORTABILITY GUIDANCE
TRACTOR, FULL-TRACKED, LOW-SPEED
DIESEL-ENGINE-DRIVEN, MEDIUM DRAWBAR PULL,
CATERPILLAR MODEL D7G
w/Winch (NSN 2410-01-223-7261) w/Ripper (NSN 2410-01-223-0350)
CATERPILLAR MODEL D7F
w/Winch, wo/ROPS (NSN 2410-00-177-7284) w/Winch and ROPS (NSN 2410-00-185-9792) w/Ripper, wo/ROPS (NSN 2410-00-177-7283) w/Ripper and ROPS (NSN 2410-00-185-9794)
CATERPILLAR MODEL D7E
w/Winch, wo/ROPS (NSN 2410-00-782-1130) w/Winch and ROPS (NSN 2410-01-050-9628) w/Ripper, wo/ROPS (NSN 2410-00-926-3697) w/Ripper and ROPS (NSN 2410-01-050-9629)
Paragraph
C h a p t e r 1 .
1 - 1 1 - 2 1 - 3 1 - 4
C h a p t e r 2 .
Section I.
2-1 2-2 2-3
II.
2 - 4 2 - 5 2 - 6
C H A P T E R 3 .
C H A P T E R 4 .
3 - 1 3 - 2
4 - 1 4 - 2 4 - 3 4 - 4 4 - 5 4 - 6 4 - 7
C H A P T E R 5 .
Section I.
II.
III.
Approved for public release; distribution is unlimited.
INTRODUCTION
Purpose and Scope Safety Definitions of Warnings, Cautions and Notes Reporting of Recommendations and Comments
TRANSPORTABILITY DATA
GENERAL
Scope Description Transportability Drawings
CHARACTERISTICS AND RELATED DATA
General Transportability Characteristics Unusual Characteristics Hazardous and Dangerous Characteristics
SAFETY
General Specific Safety Requirements
AIR TRANSPORTABILITY GUIDANCE
Scope Maximum Utilization of Aircraft Applicability Safety Preparation of the Vehicle Transport by US Air Force Aircraft Internal and External Transport by US Army Helicopters
HIGHWAY TRANSPORTABILITY GUIDANCE
GENERAL
Scope Safety
SELF-PROPELLED MOVEMENT
General
TRANSPORT BY TRACTOR/SEMITRAILER
General Transport of the D7 Tractors on the M916/M870 and M123A1C/M172A1 Truck-Tractor/Semitrailer
Combinations
Page
1-1 1-1 1-1 1-1
2-1 2-1 2-1
2-1 2-1 2-1
3-1 3-1
4-1 4-1 4-1 4-1 4-1 4-1 4-2
5-1 5-1
5-1
5-1
5-1 i
5 - 1 5 - 2
5 - 3
5 - 4
5 - 5
C H A P T E R 6 .
S e c t i o n I .
6 - 1 6 - 2 6 - 3
6-1 6-1 6-1
I I .
6 - 4 6-1
C H A P T E R 7 .
S e c t i o n I .
7-1 7-2
I I .
7 - 3 7 - 4 7 - 5 7 - 6
I I I .
7 - 7 7 - 8
Appendix
2-3 2-4
2-1 2-2
2-5 2-6 2-7 2-8 2-9
2-10 2-11 4-1 5-1 5-2 5-3
5-4 6-1 6-2 7-1 7-2 7-3
2-1 4-1 5-1
5-2
5-3
5-4
6-1 6-2 7-1
7-2
7-3
LIST OF ILLUSTRATIONS
2 - 2 2 - 3 2 - 4 2 - 5 2 - 6 2 - 7
2-10 2-11 2-12 2-13 2-14 4 - 3 5 - 2 5 - 3 5 - 5 5 - 6 6 - 2 6 - 3 7 - 2 7 - 3 7 - 5
LIST OF TABLES
7-1 7-1
7-1 7-1 7-1 7-1
7-6 7-6
A-1 B-1
2-8 4-2
5-4
5-4
5-7
5-7 6-4 6-4
7-4
7-4
7-6 i i
CHAPTER 1
INTRODUCTION
1-1. Purpose and Scope This manual provides transportability guidance for logistical handling and movement of the Caterpillar D7E, D7F, and D7G crawler tractors. It contains information appropriate for safely transporting the tractor. It also includes significant physical charac-teristics as well as safety considerations required for worldwide movement by the various transportation modes. Where considered necessary, metric equiv-alents appear in parentheses following the dimen-sions or other measurements. This manual is for transportation officers and other personnel respon-sible for movement or for providing transportation services.
1-2. Safety Chapter 3 contains appropriate precautionary meas-ures required during movement of the tractor.
1-3. Definitions of Warnings, Cautions, and Notes Throughout this manual, warnings, cautions, and notes emphasize important or critical guidance. They are used for the following conditions:
a. Warning. Instructions that, if not followed, could result in injury to or death of personnel.
b. Caution. Instructions that, if not strictly observed, could result in damage to or destruction of equipment.
c. Note. An operating procedure or condition that must be emphasized.
1-4. Reporting of and Comments
Users of this manual are
Recommendations encouraged to submit com-ments and recommended changes for its improve-ment. Comments and recommendations should be prepared on DA Form 2028 (Recommended Changes to Publications and Blank Forms) and forwarded to Commander, Military Traffic Management Command Transportation Engineering Agency, ATTN: MTTE- TRS, PO Box 6276, Newport News, VA 23606-0276.
Electrically transmitted messages should be addressed to CDR MTMCTEA FT EUSTIS VA
//MTTE-TRS//.
1-1
CHAPTER 2
TRANSPORTABILITY DATA
Section I. GENERAL 2-1. Scope This chapter provides a general description and identification photographs of the D7 tractors as well as transportability data necessary in moving the tractors.
2-2. Description The D7 tractor is a commercial, track-type tractor modified for the US Army. It is diesel-engine-driven, has a rollover protection system (ROPS) canopy, and has a straight blade. It also has either a rear-mounted towing winch or a ripper. However, the rip-per and winch are not interchangeable. The ripper can be mounted only on D7 tractors equipped with ripper mounting devices; the winch can be mounted only on D7 tractors equipped for a winch. Figures 2–
1 and 2-2 show the D7G with ripper and the D7G with winch, respectively. The D7E and D7F model tractors are similar in appearance to the D7G.
2-3. Transportability Drawings Figures 2–3 through 2–6 are detailed side- and end-elevation transportability drawings of the D7G with ripper and the D7G with winch. These drawings show dimensions and lifting and tiedown provision locations with load rating capacities. The D7E and F models have similar features except the weights and dimensions vary as shown in table 2–1. Also, the D7E and F models have one extra tiedown provision on the track roller frame. The provision is located between the other two multipurpose provisions on each side.
Section II. CHARACTERISTICS AND RELATED DATA
2-4. General Transportability Characteristics The data in this manual apply to the model number or national stock number (NSN) shown. Changes in model number or NSN may affect the loadability of the item as related to the guidance in this manual.
Dimensions and weights are given for both opera-tional and reduced configurations. The reduced D7 configuration consists of removing the ROPS, exhaust stack, precleaned, blade, and winch or rip-per. Figures 2–7 through 2–11 show the removable items.
2-5. Unusual Characteristics require special attention be given to temperature, atmospheric pressure, or humidity variations during exposure to normal transportation environments.
2-6. Hazardous and Dangerous Characteristics The D7 crawler tractors will not present any special hazardous characteristics during exposure to normal transportation environments.
NOTE
Those regulations and/or transportation pro-cedures normally associated with vehicles
This tractor has no unusual characteristics that would containing diesel fuel will apply.
2-1
F igure 2-1.
T M
-2
-1
-2 igure 2-2.
-2
-2
-1 -3 igure 2-3.
-2
-2
-1
-4 igure 2-4.
-2
-2
-1 -5 igure 2-5.
-2
-2
-1
2-6
Figure 2-6. Rear view of D7G crawler tractor with winch.
2 -7 able 2-1.
-2
-2
-1
-2
-2
-1
-9
Figure 2-7. D7 crawler tractor ROPS/FOPS Protective Canopy.
2-10 igure 2-8.
-2
-2
-1
-1 igure 2-9.
-2
-2
-1 igure 2-10.
-2
-2
-1 igure 2-11.
-2
-2
-1
CHAPTER 3
SAFETY
3-1. General WARNING
General safety considerations and precautions for Fire extinguishers must be readily available during all loading and unloading operations.
movement are as follows:
a. Ensure all loose items are properly secured on WARNING each tractor.
b. When backing a tractor, ensure no personnel or
Proper ventilation must be provided during loading and unloading operations if vehicle obstacles are in danger of being hurt or damaged by the tractor.
engine is in use. Prolonged inhalation of car-bon monoxide fumes will produce adversec. Providing protection on all transporter decks to prevent the tractor grousers from damaging the floor affects that could prove fatal.
during loading/unloading operations.
d. Be careful when loading/unloading the tractor 3-2. Specific Safety Requirements onto a transporter via a metal ramp that is slippery Pertinent safety requirements by individual mode are due to dampness or mud. in the appropriate chapters of this manual.
3 -1
CHAPTER 4
AIR TRANSPORTABILITY GUIDANCE
4-1. Scope This chapter provides air transportability guidance for moving the Cater-pillar D7 crawler tractors. It covers significant safety considerations and pre-scribes the materials required to prepare, load, and tie down the tractor on, or unload the tractor from, US Air Force aircraft.
4-2. Maximum Utilization of Aircraft The loads described in this section are not maximum aircraft loads. General guidance on total cargoloads and operating ranges is in TM 38–236/AFP 71–8.
Additional cargo and/or personnel within allowable load limits and restrictions prescribed by pertinent safety regulations can be transported.
4-3. Applicability The D7 tractors are transportable in C-130, C-141, and C–5 aircraft. Procedures in this manual and those prescribed in TO 1C–130A–9, TO 1C-141A–9, and TO 1C–5A–9 apply.
4-4. Safety In addition to the safety precautions in chapter 3, note the following instructions:
a. The activity offering the equipment for air transport must notify the aircraft commander, or designated representative, when hazardous materials are to be transported. It must also state whether these materials have been prepared for shipment according to TM 38-250/AFR 71-4.
b. Ensure the tractor fuel tank is no more than one-half full.
c. Tie down the tractor according to procedures in
TO 1C-XXX-9.
d. Check each tractor carefully to ensure that all loose items are properly stowed and secured.
e. Transport the tractor aboard C–130 and C–141 aircraft in the reduced configuration (remove blade, ripper or winch, ROPS, and exhaust stack).
f. Use rolling and parking shoring aboard all air-craft.
g. Park the tractor between fuselage stations 337 and 682 on C–130 aircraft.
h. Straight-in load the tractor aboard C–141 air-craft.
i. Adequately restrain the tractor and all accom-panying loads. The tractor restraint system must withstand loadings of 3g forward, 2g vertically up, 4.5g vertically clown, and 1.5g aft and lateral.
WARNING
Fire extinguishers must be readily available during all loading and unloading operations.
WARNING
Proper ventilation must be provided during loading and unloading operations. Prolonged exposure to carbon monoxide fumes could be fatal.
WARNING
On C–130 aircraft, the width of the tractor may not allow for a proper safety aisle for passengers, in which case passengers would be limited to mission essential personnel only.
CAUTION
The tractor must not exceed 3 mph inside the aircraft or on the loading ramp.
CAUTION
The clearance between the dual rails on the C–130 is critical and will require careful maneuvering or building the shoring above the rails.
4-5. Preparation of the Vehicle
a. Inspect the D7 tractor for leaks, damage, and operation; repair as required.
b. Fabricate and place shoring.
c. Reduce crawler (required for C-130 and C–141 transport) by removing blade, ripper or winch, ROPS, and exhaust stack.
d. Palletize removed items.
NOTE
The tractor must be loaded onto a semi-trailer or similar transporter for straight-in loading aboard C–141 aircraft.
NOTE
The tractor ripper shanks should be turned upward when transporting the operational tractor aboard C–5 aircraft.
4-6. Transport by US Air Force Aircraft This tractor is tied down according to the applicable TO 1C–XXX–9, section IV. Figure 4–1 shows the suggested tiedown pattern for the D7G in the C–130 aircraft. The suggested tiedown pattern for the D7E and F tractors is similar to the D7G except that the transporter should use the additional center tiedown provisions located on the track roller frames in between the other two multipurpose provisions. This additional tiedown is required to adequately restrain the D7E and F tractors for air transport because the D7E and F tractors are heavier than the D7G. For C–141 and C–5 transport, fewer tiedown devices are
4-1 required because 25,000-pound (25K) aircraft fittings the devices. Shoring may have to be leapfrogged and tiedown devices are available. Table 4-1 lists the depending on the desired tiedown location. The roll-tiedown devices required, the locations of tiedown ing and parking shoring requirements below are to be points, the corresponding fittings to which the supplied by the shipper.
devices are secured, and the number and capacity of
Table 4-1. Tiedown Data for the D7 Crawler Tractor in US Air Force C-130 Aircraft (Fig 4-1).
a. Materials for Shoring the D7 Cruder Tractor in the C-130 Aircraft.
(1) Rolling Shoring.
(a) Lumber, 2- by 12- by 96-inch, 16 pieces.
(b) Lumber, 2- by 12- by 84-inch, four pieces.
(c) Lumber, 2- by 12- by 72-inch, four pieces.
(2) Parking Shoring. Lumber, 2- by 12- by 96-inch, eight pieces. Some of the rolling shoring can be used also for parking shoring.
b. Materials for Shoring the D7 Crawler tractor in the C-141 Aircraft.
(1) Rolling Shoring.
(a) Lumber, 2- by 12- by 96-inch, 16 pieces.
(b) Lumber, 2- by 12- by 132-inch, four pieces.
(2) Parking Shoring. Lumber, 2- by 12- by 96-inch, eight pieces. Some of the rolling shoring can be used also for parking shoring.
c. Materials for Shoring the D7 Crawler Tractor in the C-5 Aircraft.
(1) Rolling Shoring.
4 - 2
(a) Lumber, 2- by 12- by 96-inch, 20 pieces.
(b) Lumber, 2- by 12- by 84-inch, four pieces.
(c) Lumber, 2- by 12- by 30-inch, four pieces.
The 84-inch lumber is used along with eight pieces of the 96-inch lumber to provide rolling shoring on the forward ramp of the C–5. The 30-inch lumber is used with 12 pieces of the 96-inch lumber to provide rolling shoring on the aft ramp of the C–5.
(2) Parking Shoring. Lumber, 2- by 12- by 96-inch, eight pieces. Some of the rolling shoring can be used also for parking shoring.
d. Loadmaster Responsibilities. The loadmaster will ensure that the vehicle is loaded and secured according to the applicable TO 1C–XXX–9.
4-7. Internal and External Transport by US Army Helicopters The D7 crawler tractors exceed the size and weight limitations for either internal or external transport by US Army helicopters.
igure 4-1.
table 4-1
-2
-2
44-3
CHAPTER 5
HIGHWAY TRANSPORTABILITY GUIDANCE
Section I. GENERAL
5-1. Scope This chapter provides highway transportability guid- movement within CONUS is subject to all safety ance for moving the D7 crawler tractors. It covers laws, rules, and regulations that apply to commercial significant physical characteristics and safety consid-carriers. In overseas areas, movements erations. It also prescribes the materials and guid- by the theater and local regulations.
ance required to prepare, load, and tie down the D7 tractor on the M870 and M172A1 semitrailers. CAUTION
5-2. Safety Do not allow the D7 tractor to miles per hour during loading and
In addition to the safety precautions in chapter 3, operations.
Section II. SELF-PROPELLED MOVEMENT
5-3. General are governed exceed 3 unloading
The D7 tractor is self-deliverable only under appro- lic highways will not be made without approval from priate tactical situations. Movement over paved pub-state highway or local government authorities.
Section III. TRANSPORT BY TRACTOR/SEMITRAILER
5-4. General.
This section covers the D7 tractors transported by the M916/M870 and M123A1C/M172A1 truck-tractor/ semitrailer combinations. The D7 tractors must be in the reduced configuration for highway transport on these combinations. The exhaust stack and pre-cleaner can be stored and secured on the tractor. The blade, pusher arms,ROPS, and winch or carrier beam and ripper must be transported on a separate truck-tractor semitrailer combination and can be positioned as shown in figure 5-1 for the D7G. Move-ment over paved public highways will not be made without specific approval as outlined in AR 55-162.
5-5. Transport of the D7 Tractors on the M916/M870 and M123A1C/ M172A1 Truck-Tractor/Semitrailer Combinations
a. Restrictions. Restrictions for D7 tractor trans-port on the M916/M870 and M123A1C/M172A1 com-binations are major. Both legal and permit limits are exceeded for CONUS transport. Width, single-axle load, and most combination gross vehicle weights exceed legal limits, but are within permit limits for both combinations, Some additional restrictions will be encountered when transporting the D7 by the M916/M870 because of the length of this combination.
However, these restrictions are also within permit limits. Some permit limits, however will be exceeded for the high tandem-axle loadings and combination gross vehicle weights. Of the two transporters, the M123A1C/M172A1 combination will encounter the most restrictions when hauling the D7. In general, overseas highway transport is more restrictive than CONUS highway transport. Legal limits for overseas are identified in “Limits of Motor Vehicle Sizes and Weights,” International Road Federation, Geneva, Switzerland.
b. Materials for Blocking and Tiedown. Adequate tiedown chains and binders for securing the D7 crawler tractors are basic issue items (BII). Table 5- 1 gives the bill of materials for blocking and tiedown of the D7 tractor on the M870 semitrailer. Table 5-2 provides data concerning application of materials for tiedown on the M870. Blocking and tiedown diagrams compatible with standard loading practices are provided in figures 5–2 and 5–3. These procedures will offer adequate restraint against forces encoun-tered during movement at normal speeds and operat-ing conditions.
NOTE
The tiedown procedure for the D7E, F, and G is similar except that the shipper must use the middle tiedown provision on the D7E and F, as shown in figure 5–2, as an addi-tional tiedown point. The center tiedown provision is not available on the D7G;
however, additional tiedown is not required on this model. The D7E and F models require the additional tiedown because they are heavier than the D7G.
5-1 igure 5-1.
55-2410-237-14
-2 igure 5-3.
figure 5-3 table 5-3
-2
-2
45-3 fig 5-3 fig 5-3 fig 5-2 fig 2-6 fig 5-3 fig 5-3 fig 5-3
TM 55-2410-237-14
Table 5-1. Bill of Materials for Blocking and Tiedown of the D7 Crawler Tractor (Reduced) on the M870 Semitrailer (Figs 5-2 and 5-3)
Table 5-2. Application of Materials for Blocking and Tiedown of the D7 Crawler Tractors on the M870 Semitrailer (Figs 5-2 and 5-3)
5-4 igure 5-3.
table 5-2 table 5-4 figure 5-2 figure 5-4
-2
-2
-1
Figure 5-4. D7 tiedown diagram for the M172A1 semitrailer (table 5-4 and figure 5-3).
Table 5-3 gives the bill of materials for blocking and tiedown of the D7 tractor on the M172A1 semitrailer.
Table 5-4 provides the data concerning application of materials for tiedown on the M172A1. Figure 5-4, and details 2 and 3 of figure 5-3, provide tiedown dia-grams compatible with standard loading practices that will offer adequate restraint during movement at normal speeds and operating conditions.
c. Loading.
WARNING
At no time during loading operations should personnel, other than the guide and the driver of the tractor, be on the semitrailer bed.
WARNING
Loading should not be conducted with the semitrailer sideways on a slope that exceeds 10 percent or with a tractor-to-semi-trailer offset angle greater than 5°. Loading also should not be conducted on a severe down-grade, because the tractor driver may not be able to safely control movement of the tractor.
5 - 6
Table 5-3. Bill of Materials for Blocking and Tiedown of the D7 Crawler Tractor (Reduced) on the M172A1 Semitrailer (Figs 5-3 and 5-4)
Approximate
Item Description Quantity
Lumber Douglas-fir, or comparable, straight-grain, free from material defects; Fed Spec MM–L-751:
4- by 4-inch 8 linear feet Nails Common, steel, flathead; bright or cement coated; Fed Spec
FF-N-105: 30d 20
Wire rope 6 x 19, IWRC; improved plow steel; preformed, regular-lay;
Fed Spec RR-W-410:
½-inch 250 linear feet
Clamps Wire rope, U-bolt clips, saddled, single-grip, steel, Crosby heavy-duty, or equal; Fed Spec FF-450; type 1, class 1:
½-inch 80 5/8-inch 30
Chain* Type I, class 1; welded, steel alloy, ½-inch, 11,400-pound safe working load; Fed Spec RR–C–271; with two grabhooks equal to or better than the strength of the chain 20
Loadbinders* Type 1, plain, 18-½-inch operating lever, with two grabhooks designed for ¼-inch to ½-inch chain, 8-ton capacity; Fed Spec
GGG-B-325A, NSN 3990-00-274-6746 18
Thimbles Standard, open-type; ½-inch, type II, Fed Spec FF-T-276 26
*Chains and loadbinders may be substituted for ½-inch wire rope and clamps.
Table 5–4. Application of Materials for Blocking and Tiedown of the D7 Crawler Tractor on the M172A1 Semitrailer (Figs 5-3 and 5-4)
Item No. Required Application
A 4 Track blocking, 4- by 4- by 24-inch lumber. Place one piece in front of and behind tracks on D7 tractor and toenail with 5 30d nails on each block.
B 26 Thimble, open-type, ½-inch. Place four on each rear tiedown provision, and three on each front provision (see figs 2-3 and 2-4). Place one thimble on each semitrailer outside tiedown ring to be used.
*C 20 Wire rope. Each consists of ½-inch wire rope, length as required.
Form complete loops (detail 2, fig 5-3) between tractor diagonal braces (see fig 2-6) and M172A1 left and right tiedown rings on top of semitrailer goose-neck (see fig 5-4). Place thimble between wire rope and M172A1 tiedown rings.
From complete loops between right rear tie-down provision on tractor and four nearest M172A1 tiedown rings on same side along semitrailer bed. Place thim-bles between wire rope and tiedown provision on tractor. Place thimbles between wire rope and M172A1 tiedown rings.
Attach wire ropes to remaining tiedown provisions and tie down in same man-ner as above.
Form complete loops between tractor tow hook and M172A1 frame between first and second axles of tandem on both sides. Wrap wire rope around M172A1 frame for tiedown. Place cushioning material between wire rope around M172A1 frame if desired.
Form complete loops between D7 tracks behind forward drive sprocket and rear frame on each side of M172A1. Use cushioning material as necessary between wire rope and tracks or M172A1 frame. Wrap wire rope around M172A1 frame and D7 tracks for tie-down. Tension all tiedowns evenly.
CAUTION
Tension tiedowns evenly. Do not exceed 400 pounds of tension on any single tiedown. Wire rope ends should overlap at least 24 inches. Secure with four ½ 5/8-inch clamps (item D).
Clamps, ½-inch (detail 2, fig 5-3). Place four clamps on each wire rope loop at the overlap area. Space the four clamps 2-½ inches apart, with at least 6 inches from the free end of the wire rope. Tension wire rope and tighten clamps to approximately 65-foot-pound torque.
*E 30 Clamps, 5/8-inch (detail 3, fig 5-3).
Secure each ½-inch thimble with one clamp.
*D 80
*Suitable capacity of chains and loadbinders may be substituted for ½-inch wire rope and clamps.
5 - 7
(1) M870 Loading. Position curbing assembly (2) M172A1 Loading. Place the M172A1 loading (detail 1, fig 5-3) on the semitrailer bed so that it will ramps into position to load the D7 onto the semi-be close to the inside edge of both tracks when the trailer bed. Back or lift the D7 tractor onto semi-tractor is aboard the trailer. Drive or lift the D7 trac- trailer to the position where the tractor center of tor onto semitrailer to the position where the tractor gravity is about 91 inches aft of the M172A1 spare center of gravity is about 127 inches aft of the goose- tire. Place the transmission control in neutral, and neck lower hinge pin. Place the transmission control set the parking brakes.
in neutral, and set the parking brakes.
5 - 8
CHAPTER 6
MARINE AND TERMINAL TRANSPORTABILITY GUIDANCE
Section I. GENERAL
6-1. Scope This chapter provides marine and terminal transpor-tability guidance for moving the D7 crawler tractor.
It covers significant safety considerations and pre-scribes the materials and guidance required to pre-pare, load, tie down, and unload the vehicle.
6-2. Safety In addition to the safety precautions in chapter 3, the following precautions apply:
a. Inspect all slings, lifting rings, shackles, and other items used in loading and discharging opera-tions for their condition and adequate capacity.
b. Handle and stow vehicles according to provisions in Title 46/49, Code of Federal Regulations.
c. Ensure fire extinguishers are available during all loading and discharging operations.
d. Drain tractor fuel tanks and disconnect battery terminals.
e. Inspect all lifting provisions, including lifting eyes and shackles, to ensure they are not damaged.
f. Caution personnel not to walk under items being lifted.
g. Ensure all lifts have at least two tag lines attached to control the swing of the lift while sus-pended.
NOTE
When the D7 tractor is loaded on vessels that are adequately ventilated by power blowers, such as the roll-on/roll-off (RORO) ships, fuel tanks need not be drained.
6-3. Water Shipment The D7 tractor is transportable by a great variety of inland-waterway cargo carriers, lighters, and barges and by all seagoing cargo vessels.
NOTE
The methods described in this chapter for lifting and securing the D7 tractor are sug-gested procedures. Other methods of hand-ling and stowage may be used to accomplish safe delivery without damage.
Section II. LOADING AND SECURING
6-4. General Rules for Stowing
a. General. When possible, stow the D7 tractor below deck for protection. In general, good stowage means placing vehicles fore and aft as close together as practical, with minimum spacing (about 4 to 6 inches) between outer vehicles and the sweat-boards. Also, protect breakable parts and stow spare parts in or near the parent item. Set the brakes and place the transmission control in neutral.
NOTE
The ripper shanks should be turned upward for marine transport.
Secure the D7 tractors with blocks in front, in rear, and on both sides of the tracks to adequately restrain the vehicles. Brace individual tractor blocks to bulkheads, stanchions, and other vehicle blocks. Lash all vehicles with wire rope or chains to nearby padeyes, bulkheads, or stanchions.
b. Lifting. The correct lifting points on the D7 trac-tor are on the front and rear of the track roller frames. Figure 6-1 shows a typical lifting diagram.
c. Loading. Load the D7 tractor on vessels in the operational configuration when possible to avoid time-consuming and costly disassembly. Make sure the hatch girder clearance of the specified vessel is greater than 134 inches (3.40 m) for the operational tractor. With the ROPS and exhaust stack removal, the D7F and G tractors require a hatch girder clear-ance greater than 96 inches (2.44 m). The D7E trac-tor requires a hatch girder clearance of 101 inches (2.57 m). The D7 can be driven, or lifted by cranes of adequate capacity, aboard landing craft beach dis-charge lighters, heavy amphibious lighters, and land-ing ships. It also can be driven or towed aboard RORO vessels, or onto the decks of barges from a pier, when tidal conditions are suitable and ramps are available. The D7 can be loaded onto seagoing vessels by shoreside of floating cranes of adequate capacity or by heavy-lift ship’s gear. The D7 tractor cannot be transported on the LARC-V or LARC-XV lighterage vessels. Transport by the LACV-30 can be made pos-sible by reducing the D7 tractor weight to no more than 45,000 pounds. This involves removing at least two of the D7 major components such as the blade, ROPS, ripper, or winch. Figure 6–2 shows typical blocking and tiedown details. Bill of and application of materials for blocking and tiedown are given in tables 6-1 and 6-2.
6-1
Figure 6-1. D7 lifting diagram (side view).
6 - 2 igure 6-2.
table 6-2
-2
-2
-1 figure 6-2 table 6-1 figure 6-2
TM 55-2410-237-14
Table 6-1. Bill of Materials for Blocking and Tiedown of the D7 Crawler Tractor in General Cargo Vessels (Fig 6-2)
Table 6-2. Application of Materials for Blocking and Tiedown of the D7 Cralwer Tractor in General Cargo Vessels (Fig 6-2)
6 - 4
CHAPTER 7
RAIL TRANSPORTABILITY GUIDANCE
Section I. GENERAL
7-1. Scope This chapter provides rail transportability guidance for moving of the Caterpillar D7 crawler tractor. It covers physical characteristics and safety considera-tions. It also prescribes the materials and guidance required to prepare, load, and tie down the D7 tran-
7-3. General The transportability guidance in this section applies to transport of the tractor on CONUS railways. It includes both single and multiple movements for the types of flatcars normally used in moving this tractor.
7-4. Preparation Load the D7 tractor on the flatcar in the operational configuration, when possible, to avoid time-consum-ing and costly disassembly. However, the D7 may require disassembly along some rail lines where restrictions such as tunnels or bridges occur. When transporting the D7 tractor with minimum restric-tions in CONUS on a standard 50-inch-high flatcar, remove the tractor dozer blade to reduce the width.
Remove the exhaust stack to reduce the height. The exhaust stack can be transported on the tractor if it is securely stowed. Also, turn the ripper shanks upward to prevent railcar damage.
7-5. Loading the D7 Crawler Tractor on General-Purpose Flatcars
a. The tractor may be placed in the tiedown posi-tion on the flatcar by a crane, or it may be driven or towed if a suitable ramp or bridge is available. When loading the vehicle by crane, follow the procedures and precautions in paragraphs 6-2 and 6-4b.
b. Figure 7–1 shows typical loading diagrams of the tractor on a general-purpose flatcar with a minimum width of 10 feet 4 inches. The type of blocking and tiedown shown is compatible with standard loading practices and provides adequate restraint against the forces encountered during movements at normal speeds. Figure 7–2 shows the D7 blocking and tiedown details.
CAUTION
Do not allow the tractor to exceed 3 miles tor on open-top flatcars.
7-2. Maximum Utilization of Railcars Additional cargo, as approved by the activity offering the items for transport, may be transported with the tractors.
Section II. TRANSPORT ON CONUS RAILWAYS per hour during loading and unloading oper-ations.
NOTE
A staggered nailing pattern should be used when lumber or laminated lumber is nailed to the floor of a railcar. The nailing pattern for an upper piece of lumber should be adjusted so that a nail will not be driven into or against a nail in a lower piece of lumber.
NOTE
For the D7E and F models, the middle tiedown provision, located on each side of the track roller frame between the multipur-pose (lifting and tiedown) provisions, can be used if additional tiedown is desired.
c. Table 7–1 is the bill of materials for blocking and tiedown of the D7 tractor on a CONUS general-pur-pose flatcar. Table 7–2 provides information for the application of materials required to restrain the vehicle.
NOTE
Refer to figures 5–2 and 5–4 for other tiedown points that can be used for trans-porting the reduced D7 tractor.
7-6. Loading the D7 Crawler Tractor on Wooden-Deck Chain-Tiedown Flatcars
a. The tractor can be loaded on the wooden-deck chain-tiedown flatcars by the procedures in 7–5a.
b. Figure 7–3 shows a typical loading diagram of the D7 tractor on a wooden-deck chain-tiedown flat-car with a minimum width of 10 feet 4 inches.
7 - 1 igure 7-1.
T A
B
LE
7-2.
T
A B
LE
7-2.
table 7-2 figure 7-2
-2
-2
-1
7-2 igure 7-2.
table 7-2 figure 7-1
-2
-2
-1
Table 7-1. Bill of Materials for Blocking and Tiedown of the D7 Crawler Tractor on a CONUS General-Purpose Flatcar
(Figs 7-1 and 7-2)
Approximate Item Description Quantity
Lumber
Lumber
Nails
Wire rope
Clamps
Thimbles
Oak or comparable hardwood, straight-grain, free from material defects; type II, Fed Spec MM-L-736: 4- by 8-inch Douglas-fir, or comparable, straight-grain, free from material defects; Fed Spec MM–L- 751: 2- by 6-inch
6- by 8-inch Common, steel, flathead; bright or cement-coated; Fed Spec FF-N-105: 30d 6 x 19, IWRC; improved plow steel; preformed, regular-lay;
Fed Spec RR-W-410:
5/8-inch Wire rope, U-bolt clips, saddled, single-grip, steel, Crosby heavy-duty, or equal;
Fed Spec FF-C-450: 5/8-inch
¾-inch Standard, open-type: 5/8-inch
H 2
10 linear feet
4C
7 - 4
F 20
G 48
12 linear feet 8 linear feet
142 feet
Table 7-2. Application of Materials for Blocking and Tiedown of the D7 Crawler Tractor on a CONUS General-Purpose Flatcar
(Figs 7–1 and 7–2)
Item No. Required Application
B
D 12
E 20
A Brake-wheel clearance. Minimum clear-ance required is 6 inches above, in back of, and on both sides of and 4 inches underneath wheel; 12 inches from end of railcar to load, which extends from cen-ter of brake wheel to side of railcar; and 6 feet above railcar floor.
Track chocks. Each consists of 6- by 8-by 18-inch block cut as shown in detail 1, figure 7–2. Place one chock firmly against the center of each track at the forward and rear ends of the tractor.
Place chock with the 45° cut angle edge toward the track. Toenail each chock with four 30d nails.
Backup cleats. Use two pieces of 2- by 6-by 18-inch lumber for each track chock.
Place against each track chock, item B.
Nail bottom piece with three 30d nails in staggered pattern and nail top piece with three 30d nails in like manner.
Wire rope, 5/8-inch, 6 x 19, IWRC. Form wire rope in a complete loop. Apply from left and right tiedowns, forward towing hook, and around the center ripper shank on top of the tool block on the track-type tractor to stake pockets. Wire tie hook and pin to retain wire rope, if necessary. Overlap wire rope at least 24 inches (details 2 and 3, fig 7–2). See gen-eral instruction 2.
Thimbles. Place thimbles at the side tiedowns and the bottom of each stake pocket.
I 2
Clamps. Fasten thimbles to wire rope with ¾-inch cable clips to prevent dis-lodgement.
Clamps. Fasten each wire rope tiedown with four 5/8-inch wire rope clips spaced about 3-½ to 4 inches apart. Torque 5/8 -inch clips to 90-foot-pounds.
Lumber, oak, 4- by 8- by 30-inch. Raise blade and place one piece of lumber lengthwise, about 36 inches from each end of blade. Drill and toenail each piece of lumber to railcar floor with four 30d nails. Lower blade on top of blocking and lock hydraulic cylinders into position.
Lumber, oak, 4- by 8- by 30-inch. Raise rear ripper for placing the two pieces of lumber stacked one on another in the center of the ripper. Place a 30-inch piece lengthwise on railcar. Drill and toenail first piece of lumber to the railcar floor with four 30d nails. Then drill and toenail second piece on top of first with four 30d nails. Lower ripper on top of blocking.
GENERAL
1. Brakes must be tightly set and secured.
2. Tractors without ripper must have the rear left and right tiedowns attached to the rear towing pin. Maintain similar angles on tiedowns as shown on drawing.
3. General Loading Rules 1, 2, 4, 5, 7, 9, 14, 15, 19, 19A, and 19B appearing in section 1 of the Rules Governing the Loading of Com-modities on Open-Top Cars, published by the Association of Amer-ican Railroads, provide guidel ines that are mandatory in application.
c. Wooden-deck chain-tiedown flatcars, usually are equipped with four parallel channels that run the full length of the flatcar deck. Two channels are about 30 inches apart, and two other channels run along the outer edges of the car, or just inboard of the tread-way loading area of the car. These channels are recessed so that the top is flush with the deck surface. Each channel contains numerous (usually 8 to 12) chain anchors, each with an attached 10- to 12-foot chain. The chain anchors can be moved along- the channel and locked in place where needed. At the free end of the chain, pass a hook through the tiedown shackle on the vehicle being loaded and pull the chain hand-tight. Then hook it back onto itself or directly to the shackle. Apply tension to the chain by tightening a turnbuckle built into the chain assembly or by turning a ratchet or screwjack in the anchor block. Use an open-end wrench to tighten the turn-buckles. Use a ¾-inch square-drive, heavy-duty socket wrench to tighten the ratchet at the anchor blocks. Wire-tie open hooks to prevent them from becoming disconnected during over-the-road forces encountered en route. Table 7–3 gives the application of materials for tiedown of the D7 tractor on wooden-deck chain-tiedown flatcars.
CAUTION
Vehicles loaded on conventional wooden-igure 7-3.
table 7-3
-2
-2
-1 deck chain-tiedown flatcars are placed in the tiedown position with the gearshift placed in neutral and the parking brakes set.
Table 7-3. Application of Materials for Blocking and Tiedown of the D7 Crawler Tractor on a Wooden-Deck Chain-Tiedown
Flatcar (Fig 7-3)
Item No. Required Application
A Brake-wheel clearance. Minimum clear-ance required is 6 inches above, in back of, and on both sides of and 4 inches underneath wheel; 12 inches from end of railcair to load, which extends from cen-ter of brake wheel to side of railcar; and 6 feet above railcar floor.
B 20 (D7G) Tiedown chains (furnished with railcar), 24 (D7E&F) ½-inch diameter alloy steel chain, extra-strength, proof-tested to at least 27,500 pounds. Attach one to each tiedown
Item No. Required Application provision on each side of tractor to anchor positions as shown in figure 7-3.
Tighten all chains evenly until 1/8-inch space remains between metal rings of the compression unit of the chain tiedown assembly. The angle of the tiedown chain must be as close to 45° as possible.
GENERAL INSTRUCTIONS
1. Tractors without ripper must have the rear left and right tiedowns attached to the rear towing pin and tiedown provision on winch. Maintain similar angles on tiedowns as shown on drawing.
2. Loading rules 4, 5, 7, 11, 15(g), 19, 19A, 19B, and 19C in sec-tion 1 of the Rules Governing the Loading of Commodities on Open-Top Cars and Trailers, published by the Association of American Railroads, provides guidelines that are mandatory in application.
Section III. TRANSPORT ON FOREIGN RAILWAYS
7-7. General
The transportability guidance in this section applies to transport of the D7 tractor on foreign railways. It includes both single and multiple vehicle movements for the types of flatcars normally used for moving this type of equipment. When loaded on a suitable flatcar, the D7 tractor, in reduced configuration (para 7–4), can be transported for generally unrestricted rail movement throughout Europe. Some rail line clearances will require removal of the tractor ROPS, dozer blade, and exhaust stack to meet height requirements. Flatcars with a capacity of more than 20 metric tons must be used for transporting the D7 tractor with ripper. The ripper must be removed to reduce the tractor weight if flatcars with a suitable weight-carrying capacity are not available.
7 -6
7-8. Transport on Foreign-Service Flatcars
a. General. The D7 tractor is transportable on for-eign-service flatcars of adequate size and capacity.
Within Europe are many railcars that have a suitable size and capacity for transporting the D7. A list of them can be found in the European Railway Equip-ment Register.
b. Materials. The materials required for blocking and tiedown of the tractor on foreign-service flatcars are essentially the same as those used for transport-ing the vehicle within CONUS. The 4th Transporta-tion Command Pamphlet 55–2, Tiedown Guide for Rail Movements, provides detailed guidance. Fur-ther assistance can be obtained from the 1st Trans-portation Movement Control Agency, Oberussel Germany.
APPENDIX A
CONVERSION TABLES
A-1. Common Metric Abbreviations m = meter dm = decimeter cm = centimeter mm = millimeter
A-2. Linear Measure
1 mi = 1,609.35 m 1 yd = 0.9144 m 1 ft = 0.3048 m 1 in. = 0.0254 m kg = kilogram km = kilometer t = metric tons
1 m = 10 dm = 100 cm = 1000 mm
A-3. Surface Measure 1 yd2 = 0.8361 m2
1 ft2 = 0.0929 m2
1 in.2 = 0.00065 m2
A-4. Cubic Measure 1 yd3 = 0.76455 m3
1 ft3 = 0.02831 m3
1 in3 = 0.000016 m3
A-5. Weight 1 STON = 907.185 kg 1 lb = 0.45359 1 kg = 2.2046 lb
A-6. Simplified Conversion Factors
1 km x 0.6214 mi 1 m = 1.0936 yd 1 m = 3.2808 ft 1 m = 39.3700 in.
1 m2 = 1.196 yd2
1 m2 = 10.764 ft2
1 m2 = 1,550 in.2
1 m3 = 1.31 yd3
1 m3 = 35.30 ft3
1 m3 = 61,023 in.3
1 t = 1000 kg 1 t = 2,204.62 lb
The following simplified conversion factors are accurate to within 2 percent for quick computations:
a. Inches to centimeters. Multiply in. by 10 and divide by 4.
b. Yards to meters. Multiply yd by 9 and divide by 10.
c. Miles to kilometers. Multiply mi by 8 and divide by 5.
d. Pounds to kilograms. Multiply lb by 5 and divide by 11.
Paragraph 7-37, FM 55-15 contains additional detailed conversion factors.
A-7. Conversions for Lumber, Wire Rope, and Wire The following conversions are provided for guidance when procuring lumber, wire rope, or wire in areas that use the metric system. Lumber sizes are rounded off to nearest ½ cm.
a. Lumber.
(1) 2-in. by 4-in. by desired length = 5-cm by 10-cm by desired length.
(2) 1-in. by 6-in. by desired length = 2.5-cm by 15-cm by desired length.
(3) 6-in. by 8-in. by desired length = 15-cm by 20-cm by desired length.
(4) 1-in. by 12-in. by desired length = 2.5-cm by 30-cm by desired length (length normally expressed in ft or m).
b. Wire rope.
(1) 3/8-in. dia = 9.5-mm dia.
(2) ½-in. dia = 12.7-mm dia.
(3) 5/8-in. dia = 15.8-mm dia.
(4) ¾-in. dia = 19.0-mm dia.
(5) 7/8-in. dia = 22.2-mm dia.
A-1
(6) l-in. dia = 25.4-mm dia.
(7) 1-¼-in. dia = 31.7-mm dia.
(8) 1-½-in. dia = 38.l-mm dia.
Round off to next higher whole mm of available wire rope sizes.
c. Wire. No. 8 gauge annealed (11/64-in. dia) = 4.37-mm dia. Round off as in b above.
A - 2
APPENDIX B
REFERENCES
B-1. Army Regulations (AR) 5 5 - 2 9 5 5 - 8 0 55-162
55–228 55-355 70-44 70-47 385-40 746-1
Military Convoy Operations in CONUS Highways for National Defense Permits for Oversize, Overweight, or Other Special Military Movements on
Public Highways in the United States Transportation by Water of Explosives and Hazardous Cargo Defense Traffic Management Regulation DOD Engineering for Transportability Engineering for Transportability Accident Reporting and Records Packaging of Army Materiel for Shipment and Storage
B-2. Field Manuals (FM) 55-9 Unit Air Movement Planning 55–15 Transportation Reference Data 55-17 Terminal Operations Coordinator’s Handbook
B-3. Supply Bulletins (SB) 700–20 Army Adopted/Other Items Selected for Authorization/List of Reportable
Items
B-4. Technical Bulletins (TB) 55-46-1
B-5. Technical 5-2410–124–12
5-2410–233-10
Standard Characteristics (Dimensions, Weight, and Cube) for Transportability of Military Vehicles and Other Outsize/Overweight Equipment
Manuals
38-236 (AFP 71-8)
38-250 (AFR 71-4)
55–500 55-2200-001-12
B-6. Technical Orders 1–1B-40 1C–5A-9 1C–130-9 1C-141B-9
Operator and Organizational Maintenance Manual Tractor, Full Track, Low.
Speed; Diesel Engine Driven; Medium Drawbar Pull, Oscillating Track 78-inch gage Caterpillar Model D7E NSN 2410-00-782-1130 w/winch NSN 2410–00-926-3697 w/ripper
Operator’s Manual, Tractor, Full Tracked; Low Speed; DED; Medium Draw-bar Pull; Oscillating Track, 78 in. gage (Caterpillar Model D7F) with ripper;
FSN 2410-177-7284
Preparation of Freight for Air Shipment Packaging and Materials Handling; Preparation of Hazardous Materials for
Military Air Shipment Marine Equipment Characteristics and Data Application of Blocking, Bracing, and Tiedown Materials for Rail Transport
(TO)
Handbook of Weight and Balance Data Loading Instructions, USAF Series C–5A Airplane Loading Instructions, USAF Series C–130 Airplane Loading Instructions, USAF Series C–141B Airplane
B-7. Other publications and Source of Procurement
a. Code of Federal Regulations, Title 46 - Shipping, Part 146 and Title 49 - Transportation, Parts 170–179
Available from: Superintendent of Documents US Government Printing Office Washington, DC 20402
B-1
b. Section No. 1, General Rules Governing the Loading of Commodities on Open Top Cars Section No. 6, Rules Governing the Loading of Department of Defense Material on Open Top Cars
Available from: Association of American Railroads 50 F. Street NW Washington, DC 20001
c. Legal Maximum Dimensions and Weight of Motor Vehicles Compared with AASHTO Standards Available from: American Association of State Highway and Transportation Officials 341 National Press Building Washington, DC 20004
d. 4th Transportation Command Pamphlet 55-2, Available from: 1st Transportation Movement
ATTN: AEUTR-MCA-TA
APO New York 09451-4000
Tiedown Guide for Rail Movements Control Agency
B-2
THE METRIC SYSTEM AND EQUIVALENTS
PIN: 068108-000
| TOC |
| LOI |
| LOT |
| CHAPTERS |
| CHAPTER 1 |
| PARA 1-1 |
| PARA 1-2 |
| PARA 1-3 |
| PARA 1-4 |
| CHAPTER 2 |
| PARA 2-1 |
| PARA 2-2 |
| PARA 2-3 |
| PARA 2-4 |
| PARA 2-5 |
| PARA 2-6 |
| CHAPTER 3 |
| PARA 3-1 |
| PARA 3-2 |
| CHAPTER 4 |
| PARA 4-1 |
| PARA 4-2 |
| PARA 4-3 |
| PARA 4-4 |
| PARA 4-5 |
| PARA 4-6 |
| PARA 4-7 |
| CHAPTER 5 |
| PARA 5-1 |
| PARA 5-2 |
| PARA 5-3 |
| PARA 5-4 |
| PARA 5-5 |
| CHAPTER 6 |
| PARA 6-1 |
| PARA 6-2 |
| PARA 6-3 |
| PARA 6-4 |
| CHAPTER 7 |
| PARA 7-1 |
| PARA 7-2 |
| PARA 7-3 |
| PARA 7-4 |
| PARA 7-5 |
| PARA 7-6 |
| PARA 7-7 |
| PARA 7-8 |
| FIGURES |
| FIGURE 2-1 |
| FIGURE 2-2 |
| FIGURE 2-3 |
| FIGURE 2-4 |
| FIGURE 2-5 |
| FIGURE 2-6 |
| FIGURE 2-7 |
| FIGURE 2-8 |
| FIGURE 2-9 |
| FIGURE 2-10 |
| FIGURE 2-11 |
| FIGURE 4-1 |
| FIGURE 5-1 |
| FIGURE 5-2 |
| FIGURE 5-3 |
| FIGURE 5-4 |
| FIGURE 6-1 |
| FIGURE 6-2 |
| FIGURE 7-1 |
| FIGURE 7-2 |
| FIGURE 7-3 |
| TABLES |
| TABLE 2-1 |
| TABLE 4-1 |
| TABLE 5-1 |
| TABLE 5-2 |
| TABLE 5-3 |
| TABLE 5-4 |
| TABLE 6-1 |
| TABLE 6-2 |
| TABLE 7-1 |
| TABLE 7-2 |
| TABLE 7-3 |
| APPENDICES |
| APPENDIX A |
| APPENDIX B |
| PAGES |
| PAGE 1-1 |
| PAGE 2-1 |
| PAGE 2-2 |
| PAGE 2-3 |
| PAGE 2-4 |
| PAGE 2-5 |
| PAGE 2-6 |
| PAGE 2-7 |
| PAGE 2-8 |
| PAGE 2-10 |
| PAGE 2-11 |
| PAGE 2-12 |
| PAGE 2-13 |
| PAGE 2-14 |
| PAGE 3-1 |
| PAGE 4-1 |
| PAGE 4-2 |
| PAGE 4-3 |
| PAGE 5-1 |
| PAGE 5-2 |
| PAGE 5-3 |
| PAGE 5-4 |
| PAGE 5-5 |
| PAGE 5-6 |
| PAGE 5-7 |
| PAGE 6-1 |
| PAGE 6-2 |
| PAGE 6-3 |
| PAGE 6-4 |
| PAGE 7-1 |
| PAGE 7-2 |
| PAGE 7-3 |
| PAGE 7-4 |
| PAGE 7-5 |
| PAGE 7-6 |
| PAGE A-1 |
| PAGE B-1 |
File details come from the government source that posted it. Updated .