Attachment_0017__M870A4_Trailer_Price_Worksheet_22_DEC_2015_LOCKED.xlsx

XLSX spreadsheet 54 KB Posted

Attached to
M870A4 Semitrailer
Solicitation number
W56HZV16R0001
Issued by

View the file

Other files

File Type Posted
W56HZV16R0001_Questions_and_Answers_8_JAN_16.pdf PDF
W56HZV16R0001_Questions_and_Answers_7_JAN_16.pdf PDF
W56HZV16R0001-0003.pdf PDF
W56HZV16R0001_Questions_and_Answers_31_DEC_15.pdf PDF
W56HZV16R0001_Questions_and_Answers_18_DEC_15.pdf PDF
W56HZV16R0001-0002.pdf PDF
W56HZV16R0001-0001.pdf PDF
W56HZV16R0001_Questions_and_Answers_23_DEC_15.pdf PDF
Attachment_0019__Trailer_Vehicle_Dynamic_Data_Sheet_19_DEC_15.xlsx XLSX spreadsheet
Attachment_0037__SAE_J2014_TACOM_ADM_MAN_7-11-2013.pdf PDF
W56HZV16R0001.pdf PDF
Attachment_0002__SBP-WorkbookInstructions_(17_Jul_2015).docx DOCX document
Attachment_0001__ATPD-2395G_M870A4_Semitrailer_Lowbed_Construction_Equipment_Trailer_(SLCET)_40_Ton_23_November_2015.pdf PDF
Attachment_0036__SCHEDULED_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
Attachment_0035__REQUISITIONED_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
Attachment_0034__TM_10-3930-638-10_-_4 000_lbs_Forklift.pdf PDF
Attachment_0033__Transportability_Approval_Buffalo_A2_MPCV.pdf PDF
Attachment_0032__D7_Series_TM_55-2410-237-14.pdf PDF
Attachment_0031__D7R_TM_5-2410-241-10.pdf PDF
Attachment_0030__M621B_TM-55-3805-248-14.pdf PDF
Attachment_0029__Transportability_Report_for_621_GScraper_17FEB2011.pdf PDF
Attachment_0028__120M_MG_Final_Transportability_Report_(CAT).pdf PDF
Attachment_0027__Transportability_Approval_for_the_Asphalt_Paver_(LeeBoy)_SDDC_03_JUN_11.pdf PDF
Attachment_0026__Skid_Steer_Loader_-_TAB_(G)_SDDC_Transportability_Approval.pdf PDF
Attachment_0025__Backhoe_Loader_-_TM_5-2420-231-10.pdf PDF
Attachment_0024__Dual_Steel_Wheeled_Roller_-_TM_5-3895-379-10.pdf PDF
Attachment_0023__Vibratory_Roller_-_Type_II_-_TM_5-3895-383-10.pdf PDF
Attachment_0022__966H_Wheel_Loader_-_TM_5-3805-291-10.pdf PDF
Attachment_0021__815F_High_Speed_Compactor.pdf PDF
Attachment_0020__HYEX_3_TM_10.pdf PDF
Attachment_0019__Trailer_Vehicle_Dynamic_Data_Sheet.xlsx XLSX spreadsheet
Attachment_0018__TRADOC_Regulation_350-70.pdf PDF
Attachment_0017__M870A4_Trailer_Price_Worksheet_03_DEC_2015_LOCKED.xlsx XLSX spreadsheet
Attachment_0015__Past_Performance_Matrix_-_M870A4_Trailer.xlsx XLSX spreadsheet
Attachment_0014__TOP_01-1-010_VEHICLE_TEST_COURSE_SEVERITY_(31_Oct_06).pdf PDF
Attachment_0013__ATTLA_Data_Sheet_Trailers_BLANK_(referenced_in_CDRL_A031).xls XLS spreadsheet
Attachment_0012__M870A4_Contract_Attachment_20140710_GM_Toolkit_Attachment_Tool_List.xlsx XLSX spreadsheet
Attachment_0011__SLCET_FDSC_Final_Certified_29Feb12.pdf PDF
Attachment_0010__Abbreviated_FPVI_Checklist.xlsx XLSX spreadsheet
Attachment_0009___OMS_MP_25_Feb_11.doc DOC document
Attachment_0008__Engineering_Construction_Equipment_Information.docx DOCX document
Attachment_0007__UPDATED-_PACKAGING.doc DOC document
Attachment_0006__Packaging_Data_Products.doc DOC document
Attachment_0005__Logistics_and_Maintenance_Analysis.docx DOCX document
Attachment_0004__SBP-Workbook_(17_Jul_2015).xlsx XLSX spreadsheet
Attachment_0003__M870_Performance_Requirements_Matrix_SDQ_30_JUL_15.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions to Offerors

INSTRUCTIONS TO OFFERORS

1The 'Price Evaluation Worksheet' tab reflects the Total Evaluated Price that will be used for purposes of evaluation.
2Offeror input is required in the yellow highlighted cells.
3Do not manipulate any of the other cells, except those that are highlighted yellow.
4Do NOT alter this form beyond entering data in the yellow cells. Any altered forms may be considered non-responsive.
5FRET is evaluated at 12% of the PPT Trailer total price, LRIP Trailer total price, and the Average Weighted Total Price of the production trailers.
Actual price will be calculated as 12% of the unit price of all new CONUS trailers at time of each delivery order, at the contract unit price per trailer.
6Optional Warranty - 24 Months is evaluated at unit price per trailer and multiplied by the total estimated maximum quantity trailers for Ordering Years 3-5, and Option Years 1 & 2.
Actual price will be calculated as a firm fixed unit price per trailer, multiplied by the number of trailers determined on each delivery order.
7Unit Price Affordability BY$15 tab is included for informational and evaluation purposes. Manipulation of this sheet may cause the Offeror to be considered non-responsive.
Unit Prices for Ordering Years 3-5 and Option Years 1 & 2 trailers will automatically be calculated into Base-Year FY2015 dollars to determine affordability.
If any unit price entered into the Price Evaluation Worksheet tab for Ordering Years 3-5 and Option Years 1 & 2 trailers exceeds the unit price affordability threshold,
the unit price in Column D will turn red.
8Columns J through L are there for information purposes, and demonstrate whether Inspection, Acceptance, and FOB are Source or Destination;
Column M demonstrates delivery schedule as set forth in the RFP.
Column M LEGEND:
DA-SOWMDays after start of work meeting
DACADays after contract award
DARODays after receipt of order

Price Evaluation Worksheet

M870A4 Trailer: Price Evaluation Worksheet
Solicitation: W56HZV-16-R0001
Insert Offeror Name
CLINDescriptionUnitQuantityWeightingCLIN TYPEUnit PriceAmountCiteInspectionAcceptanceFOBDelivery
Ordering Year 1
0011Production Prove-out Test (PPT) TrailersEA2N/AFFP$ - 0$ -C.3SourceSourceDestination150 DA-SOWM
0021PPT Test Service Representative (TSR) Aberbeen TC (ATC) or Yuma TC (YTC)HR1150N/AFFP$ - 0$ -E.4.3.4SourceSourceDestination150 DA-SOWM
0031FRET Ordering Year 1EA12%* PPT Trailer Total$ -C.4.9.7.9SourceSourceDestination180 DARO
0041PPT Test System Support Package (TSSP)EA1N/AFFP$ - 0$ -E.4.3.3SourceSourceDestination30 Days before PPT
0051Familiarization Training Year 1HR48N/AFFP$ - 0$ -C.3.8.2.1DestinationDestinationn/a150 DA-SOWM
0061Contractor Manpower Reporting - All Years (contractor has the opportunity to either price or not-separately price (NSP) CMR requirement)LO1N/AFFP$ - 0$ -C.6DestinationDestinationn/aOngoing
0071CDRLs Ordering Year 1LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1DestinationDestinationDestinationSee CDRL
A002Conference AgendaC.1.5.2; C.3.4.1; C.4.3.1DestinationDestinationDestinationSee CDRL
A003Conference MinutesC.1.5.3.5; C.4.3.4DestinationDestinationDestinationSee CDRL
A004Contractual Baseline Report & Baseline Description Document (Functional Baseline)C.3.4.1DestinationDestinationDestinationSee CDRL
A009CDRL A009: Safety Assessment ReportC.1.7.2; C.3.7; C.4.5.1; E.4.3.1DestinationDestinationDestinationSee CDRL
A018CDRL A018: Publication Program (Operators, Field Maintenance (with RPSTL) Tech Manual)C.3.8.1.2; C.4.9.5; E.4.3.3; E.7DestinationDestinationDestinationSee CDRL
A030CDRL A030: Transportability Report - PHASE IC.3.5; C.4.7DestinationDestinationDestinationSee CDRL
A032Tech Report - Study/Services (Equipment Tie Down Report)C.3.4.1; C.3.5; C.4.8DestinationDestinationDestinationSee CDRL
A045Work Authorization Document (PHASE I WAD)E.4.5DestinationDestinationDestinationSee CDRL
A046Failure Analysis and Corrective Action Report (PHASE I FACAR)E.4.7DestinationDestinationDestinationSee CDRL
A053PPT Training Support Package (PHASE I PPT TSP)C.3.8.2.2; E.4.3.2DestinationDestinationDestinationSee CDRL
A055PPT Test System Support Package ListE.4.3.3DestinationDestinationDestinationSee CDRL
Ordering Year 2
0012LRIP TRAILERSEA11N/AFFP$ - 0$ -C.4.1sourceSourceDestination150 DA-SOWM
0022LRIP Test Service Representative (TSR) for Production Verification Testing (PVT)HR7150N/AFFPSee belowE7.3.3.1N/AN/AN/AN/A
0022AALRIP TSR - ATCHR3250N/AFFP$ - 0$ -E.7.3.3.1.aDestinationDestinationn/a150 DA-SOWM
0022ABLRIP TSR - YTCHR3250N/AFFP$ - 0$ -E.7.3.3.1.bDestinationDestinationn/a150 DA-SOWM
0022ACLRIP TSR -White Sands TCHR650N/AFFP$ - 0$ -E.7.3.3.1.cDestinationDestinationn/a150 DA-SOWM
0032FRET Ordering Year 2EA12%* LRIP Trailer Total$ -C.4.9.7.9SourceSourceDestinationWhen applicable with trailer
0042LRIP Test System Support Package (TSSP)EA1N/AFFP$ - 0$ -E.7.3.2SourceSourceDestination30 Days before PVT
0052Familiarization Training Year 2HR48N/AFFP$ - 0$ -C.3.8.2.1DestinationDestinationn/a187 DA-SOWM
0062Technical Manuals - Test Support PackageEA11

charley.jacksonjr: charley.jacksonjr:

Confirm this is only 11 PVT trailersN/AFFP$ - 0$ -E.7.3.2.aDestinationDestinationDestination180 DA-SOWM
0072CDRLs Ordering Year 2LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A002Conference AgendaC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A003Conference MinutesC.1.5.3.5; C.4.3.4N/AN/AN/ASee CDRL
A005Contractual Baseline Report & Baseline Description Document (Allocated Baseline - End of PHASE I Testing)C.3.4.3; C.4.4; H.5.1N/AN/AN/ASee CDRL
A006Engineering Change Proposal (ECP)C.4; C.5N/AN/AN/ASee CDRL
A007Contractual Baseline Report & Baseline Description Document (Allocated Baseline: LRIP PHASE II Testing)C.1.6.3; C.3.4.3;C.4.3;C.4.4; H.5.1N/AN/AN/ASee CDRL
A008Request for VarianceC.1.8.2; C.4.4;C.5.4N/AN/AN/ASee CDRL
A009Safety Assessment ReportC.1.7.2; C.3.7; C.4.5.1; E.4.3.1N/AN/AN/ASee CDRL
A011Hazardous Materials Management Program ReportC.1.7; C.1.8; C.4.N/AN/AN/ASee CDRL
A012Corrosion Prevention & Control Plan & Finish Specification ReportC.4.6N/AN/AN/ASee CDRL
A013LMI Data Products (LORA COMPASS LITE Results)C.4.9.3.2N/AN/AN/ASee CDRL
A014LMI Data Products (Maintenance Task List)C.4.9.3.3N/AN/AN/ASee CDRL
A015LMI Data Products (Provisioning Parts List Data Product)C.9.4N/AN/AN/ASee CDRL
A016LMI Data Products (Supplementary Provisioning Tech Doc Drawings)C.4.9.4N/AN/AN/ASee CDRL
A017CDRL A017: LMI Data Products (Pre-Procurement Screening)C.4.9.4N/AN/AN/ASee CDRL
A019LMI Data Products (Tech Manual Validation)C.4.9.5.3N/AN/AN/ASee CDRL
A023New Equipment Training Spt Package (Instructior Guide, Student Guide & Multimedia SlidesC.3.8.2.2; C.4.9.6.2N/AN/AN/ASee CDRL
A025Validation Report (Packaging)C.4.9.7.1; C.4.9.7.6N/AN/AN/ASee CDRL
A026Special Packaging InstructionC.4.9.7.4N/AN/AN/ASee CDRL
A027LMI Data Products (Packaging)C.4.9.7.5N/AN/AN/ASee CDRL
A028SSPL Proposed Spare Parts ListC.4.9.7.7N/AN/AN/ASee CDRL
A035Management Plan (Quality)E.5.1.1N/AN/AN/ASee CDRL
A041Welding ProceduresE.5.13.2N/AN/AN/ASee CDRL
A042A042: Welding Procedures (Previously Qualified Welding Procedures)E.5.13.3N/AN/AN/ASee CDRL
A043Final Inspection Record (FIR)E.5.14.1.1; E.6.1N/AN/AN/ASee CDRL
A051Work Authorization Document (PHASE II WAD)E.7.5N/AN/AN/ASee CDRL
A052Failure Analysis and Corrective Action Report (PHASE II FACAR)E.7.7N/AN/AN/ASee CDRL
A054PVT & DT/OT Training Support Package (PHASE II PVT & DT/OT TSP)C.4.9.6.2; E.7.12.1N/AN/AN/ASee CDRL
A056PVT Test System Support Package ListE.7.3.2N/AN/AN/ASee CDRL
Ordering Year 3
0013Ordering Year 3 Production TrailersEA1-580%FFP$ - 0$ -SourceSourceSource30 DARO
6-205%FFP$ - 0$ -SourceSourceSource30 DARO
21-505%FFP$ - 0$ -SourceSourceSource30 DARO
51-1005%FFP$ - 0$ -C.5SourceSourceSource30 DARO
101 +5%FFP$ - 0$ -SourceSourceSource30 DARO
Average Weighted Unit Price$ -SourceSourceSourceN/A
Estimated Maximum Quantity37SourceSourceSourceN/A
Total Price Ordering Year 3$ -SourceSourceSourceN/A
0023FRET Ordering Year 3EA12%* Avg Weighted Total Price$ -C.4.9.7.9SourceSourceSourceWhen applicable with trailer
0033DT/OT Supplemental TSSPLO1N/AFFP$ - 0$ -E.7.12.2SourceSourceN/A30 Days before DT-OT
0043System Support Package - LD/TM VerificationLO1N/AFFP$ - 0$ -C.4.9.7.7SourceSourceN/A30DARO
0053PPT Trailers RefurbEA2N/AFFP$ - 0$ -H.4SourceSourceSource90 DARO
0063Application of Corrison Prevention Compound (CPC) for PPT Refurbed VehiclesLO1N/AFFP$ - 0$ -H.8SourceSourceN/AWhen applicable with trailer
0073Application of CPC for LRIP Refurbed VehiclesLO1N/AFFP$ - 0$ -H.8SourceSourceN/AWhen applicable with trailer
0083Application of CPC Ordering Year 3LO1N/AFFP$ - 0$ -H.8SourceSourceN/AWhen applicable with trailer
0093LD/TM V Operator & Maint TrainingHR360N/AFFP$ - 0$ -C.4.9.6.3.2SourceSourceN/AFirst day of LD and First Day of TM Verification
0103DT/OT TSR - ATCHR600N/AFFP$ - 0$ -E.7.12.3SourceSourceN/A500 DA-SOWM
0113Optional Warranty - 24 monthsEA1* Estimated Max Qty$ - 0$ -H.7SourceSourceSourceWhen applicable with trailer
0123Familiarization Training Year 3HR48N/AFFP$ - 0$ -C.3.8.2.1DestinationDestinationn/a492 DA-SOWM
0133Instructor & Key Personnel Training (IKPT) YEAR 3HR48N/AFFP$ - 0$ -C.4.9.6.6DestinationDestinationN/A60 Days after TM Verification complete
0143CDRLs Ordering Year 3LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001CDRL Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A002Conference AgendaC.1.5.3.4; C.4.3.4N/AN/AN/ASee CDRL
A003Conference MinutesC.1.5.3.5; C.4.3.4N/AN/AN/ASee CDRL
A006Engineering Change Proposal (ECP)C.4; C.5N/AN/AN/ASee CDRL
A008Request for VarianceC.1.8.2; C.4.4;C.5.4N/AN/AN/ASee CDRL
A009Safety Assessment ReportC.1.7.2; C.3.7; C.4.5.1; E.4.3.1N/AN/AN/ASee CDRL
A015LMI Data Products (Provisioning Parts List Data Product)C.9.4N/AN/AN/ASee CDRL
A016LMI Data Products (Supplementary Provisioning Tech Doc Drawings)C.4.9.4N/AN/AN/ASee CDRL
A017LMI Data Products (Pre-Procurement Screening)C.4.9.4N/AN/AN/ASee CDRL
A018Publication Program (Operators, Field Maintenance (with RPSTL) Tech Manual)C.3.8.1.2; C.4.9.5; E.4.3.3; E.7N/AN/AN/ASee CDRL
A022Course Completion Cert/Class Roster/Critique Sheets/Instructor CertC.3.8.2; C.4.9.6N/AN/AN/ASee CDRL
A025Validation Report (Packaging)C.4.9.7.1; C.4.9.7.6N/AN/AN/ASee CDRL
A026Special Packaging InstructionC.4.9.7.4N/AN/AN/ASee CDRL
A027LMI Data Products (Packaging)C.4.9.7.5N/AN/AN/ASee CDRL
A031Transportability Report - PHASE IIC.3.5; C.4.7N/AN/AN/ASee CDRL
A032Tech Report - Study/Services (Equipment Tie Down Report)C.3.4.1; C.3.5; C.4.8N/AN/AN/ASee CDRL
A041Welding ProceduresE.5.13.2N/AN/AN/ASee CDRL
A042Welding Procedures (Previously Qualified Welding Procedures)E.5.13.3N/AN/AN/ASee CDRL
A043Final Inspection Record (FIR)E.5.14.1.1; E.6.1N/AN/AN/ASee CDRL
A044First Production Vehicle InspectionE.6.3N/AN/AN/ASee CDRL
A051Work Authorization Document (PHASE II WAD)E.7.5N/AN/AN/ASee CDRL
A052Failure Analysis and Corrective Action Report (PHASE II FACAR)E.7.7N/AN/AN/ASee CDRL
A054PVT & DT/OT Training Support Package (PHASE II PVT & DT/OT TSP)C.4.9.6.2; E.7.12.1N/AN/AN/ASee CDRL
Ordering Year 4
0014Ordering Year 4 Production TrailersEA1-55%FFP$ - 0$ -SourceSourceSource30 DARO
6-2015%FFP$ - 0$ -SourceSourceSource30 DARO
21-5060%FFP$ - 0$ -SourceSourceSource30 DARO
51-10015%FFP$ - 0$ -C.5SourceSourceSource30 DARO
101 +5%FFP$ - 0$ -SourceSourceSource30 DARO
Average Weighted Unit Price$ -SourceSourceSourceN/A
Estimated Maximum Quantity113SourceSourceSourceN/A
Total Price Ordering Year 4$ -SourceSourceSourceN/A
0024FRET Ordering Year 4EA12%* Avg Weighted Total Price$ -C.4.9.7.9SourceSourceSourceWhen applicable with trailer
0034Follow on Production Test (FPT) TrailersEA2N/AFFP$ - 0$ -SourceSourceSource90 DARO
0044Follow on Production Test (FPT) TSR - ATC or YTCHR1250N/AFFP$ - 0$ -H.6.2.2.cDestinationDestinationN/A90 DARO
0054Follow on Production Test (FPT) TSSPLO1N/AFFP$ - 0$ -H.6.2.2.bSourceSourceN/A30 Days before FPT
0064Application of CPC Ordering Year 4LO1N/AFFP$ - 0$ -H.8SourceSourceN/AWhen applicable with trailer
0074Optional Warranty - 24 monthsEA1* Estimated Max Qty$ - 0$ -H.7SourceSourceSourceWhen applicable with trailer
0084Instructor & Key Personnel Training (IKPT) YEAR 4HR48N/AFFP$ - 0$ -C.4.9.6.6DestinationDestinationN/A60 Days after TM Verification complete
0094CDRLs Ordering Year 4LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A002Conference AgendaC.1.5.3.4; C.4.3.4N/AN/AN/ASee CDRL
A003Conference MinutesC.1.5.3.5; C.4.3.4N/AN/AN/ASee CDRL
A006Engineering Change Proposal (ECP)C.4; C.5N/AN/AN/ASee CDRL
A008Request for VarianceC.1.8.2; C.4.4;C.5.4N/AN/AN/ASee CDRL
A009Safety Assessment ReportC.1.7.2; C.3.7; C.4.5.1; E.4.3.1N/AN/AN/ASee CDRL
A010Contractual Baseline Report & Baseline Description Document (Production Baseline)C.1.6.3; C.4.3.3; C.4.4.1.2; C.4.4.2N/AN/AN/ASee CDRL
A018Publication Program (Operators, Field Maintenance (with RPSTL) Tech Manual)C.3.8.1.2; C.4.9.5;N/AN/AN/ASee CDRL
A019LMI Data Products (Tech Manual Validation)C.4.9.5.3N/AN/AN/ASee CDRL
A020LMI Data Products (Tech Manual Verification)C.4.9.5.4N/AN/AN/ASee CDRL
A021New Equipment Training Support PackageC.3.8.2.2; C.4.9.6.4N/AN/AN/ASee CDRL
A022Course Completion Cert/Class Roster/Critique Sheets/Instructor CertC.3.8.2; C.4.9.6N/AN/AN/ASee CDRL
A023New Equipment Training Spt Package (Instructior Guide, Student Guide & Multimedia SlidesC.3.8.2.2; C.4.9.6.2N/AN/AN/ASee CDRL
A025Validation Report (Packaging)C.4.9.7.1; C.4.9.7.6N/AN/AN/ASee CDRL
A026Special Packaging InstructionC.4.9.7.4N/AN/AN/ASee CDRL
A027LMI Data Products (Packaging)C.4.9.7.5N/AN/AN/ASee CDRL
A028SSPL Proposed Spare Parts ListC.4.9.7.7N/AN/AN/ASee CDRL
A029Equipment Control RecordC.4.9.7.7N/AN/AN/ASee CDRL
A034Production Status ReportC.4.9.7.8N/AN/AN/ASee CDRL
A041Welding ProceduresE.5.13.2N/AN/AN/ASee CDRL
A042Welding Procedures (Previously Qualified Welding Procedures)E.5.13.3N/AN/AN/ASee CDRL
A043Final Inspection Record (FIR)E.5.14.1.1; E.6.1N/AN/AN/ASee CDRL
A049Production Plan (Production Surge Plan)E.5.3N/AN/AN/ASee CDRL
A051FPT Work Authorization DocumentE.7.5; H.6.3.2N/AN/AN/ASee CDRL
A052FPT Failure Analysis and Corrective Action ReportE.7.7; H.6.3.2.fN/AN/AN/ASee CDRL
A056FPT Test System Support Package ListE.7.3.2; H.6.3.2.bN/AN/AN/ASee CDRL
Ordering Year 5
0015Ordering Year 5 Production TrailersEA1-55%FFP$ - 0$ -SourceSourceSource30 DARO
6-2015%FFP$ - 0$ -SourceSourceSource30 DARO
21-5060%FFP$ - 0$ -SourceSourceSource30 DARO
51-10015%FFP$ - 0$ -C.5SourceSourceSource30 DARO
101 +5%FFP$ - 0$ -SourceSourceSource30 DARO
Average Weighted Unit Price$ -SourceSourceSourceN/A
Estimated Maximum Quantity225SourceSourceSourceN/A
Total Price Ordering Year 5$ -SourceSourceSourceN/A
0025FRET Ordering Year 5EA12%* Avg Weighted Total Price$ -C.4.9.7.9SourceSourceSourceWhen applicable with trailer
0035Follow on Production Test (FPT) TrailersEA2N/AFFP$ - 0$ -H.6.2.1SourceSourceSource90 DARO
0045Follow on Production Test (FPT) TSR - ATC or YTCHR1250N/AFFP$ - 0$ -H.6.2.2.cDestinationDestinationN/A90 DARO
0055Follow on Production Test (FPT) TSSPLO1N/AFFP$ - 0$ -H.6.2.2.bsourceSourceN/A30 Days before FPT
0065Application of CPC Ordering Year 5LO1N/AFFP$ - 0$ -H.8sourceSourceN/AWhen applicable with trailer
0075Optional Warranty - 24 monthsEA1* Estimated Max Qty$ - 0$ -H.7SourceSourceSourceWhen applicable with trailer
0085Instructor & Key Personnel Training (IKPT) YEAR 5HR48N/AFFP$ - 0$ -C.4.9.6.6DestinationDestinationN/A60 Days after TM Verification complete
0095CDRLs Ordering Year 5LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001CDRL A001: Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A002CDRL A002: Conference AgendaC.1.5.3.4; C.4.3.4N/AN/AN/ASee CDRL
A003CDRL A003: Conference MinutesC.1.5.3.5; C.4.3.4N/AN/AN/ASee CDRL
A006CDRL A006: Engineering Change Proposal (ECP)C.4; C.5N/AN/AN/ASee CDRL
A008CDRL A008: Request for VarianceC.1.8.2; C.4.4;C.5.4N/AN/AN/ASee CDRL
A018CDRL A018: Publication Program (Operators, Field Maintenance (with RPSTL) Tech Manual)C.3.8.1.2; C.4.9.5; E.4.3.3; E.7N/AN/AN/ASee CDRL
A024CDRL A024: New Equipment Training Support Package (Instructor & Key Personnel Training)C.4.9.6.6; C.4.9.6.6.1N/AN/AN/ASee CDRL
A029CDRL A029: Equipment Control RecordC.4.9.7.7N/AN/AN/ASee CDRL
A032CDRL A032: Tech Report - Study/Services (Equipment Tie Down Report)C.3.4.1; C.3.5; C.4.8N/AN/AN/ASee CDRL
A034CDRL A034: Production Status ReportC.4.9.7.8N/AN/AN/ASee CDRL
A037CDRL A037: System Deficiency Report Data (Summary of NRs/MRB)E.5.5N/AN/AN/ASee CDRL
A038CDRL A038: System Deficiency Report Data (Final Non-Conformance Report)E.5.5N/AN/AN/ASee CDRL
A039CDRL A039: Inspection and Test Plan (Control Plan)E.5.7N/AN/AN/ASee CDRL
A041CDRL A041: Welding ProceduresE.5.13.2N/AN/AN/ASee CDRL
A042CDRL A042: Welding Procedures (Previously Qualified Welding Procedures)E.5.13.3N/AN/AN/ASee CDRL
A043CDRL A043: Final Inspection Record (FIR)E.5.14.1.1; E.6.1N/AN/AN/ASee CDRL
A047CDRL A047: Product Quality Deficiency Report - Corrective Action ReportE.8.3.1.3N/AN/AN/ASee CDRL
A048CDRL A048: Control Test/Inspection Report (Control Test Report)E.8.2N/AN/AN/ASee CDRL
A051CDRL A051: FPT Work Authorization DocumentE.7.5; H.6.3.2N/AN/AN/ASee CDRL
A052CDRL A052: FPT Failure Analysis and Corrective Action ReportE.7.7; H.6.3.2.fN/AN/AN/ASee CDRL
A056FPT Test System Support Package ListE.7.3.2; H.6.3.2.bN/AN/AN/ASee CDRL
Option Year 1
0016Option Year 1 Production TrailersEA1-55%FFP$ - 0$ -SourceSourceSource30 DARO
6-205%FFP$ - 0$ -SourceSourceSource30 DARO
21-5010%FFP$ - 0$ -SourceSourceSource30 DARO
51-10020%FFP$ - 0$ -C.5SourceSourceSource30 DARO
101 +60%FFP$ - 0$ -SourceSourceSource30 DARO
Average Weighted Unit Price$ -SourceSourceSourceN/A
Estimated Maximum Quantity500SourceSourceSourceN/A
Total Price Option Year 1$ -SourceSourceSourceN/A
0026FRET Option Year 1EA12%* Avg Weighted Total Price$ -C.4.9.7.9SourceSourceSourceWhen applicable with trailer
0036Follow on Production Test (FPT) TrailersEA2N/AFFP$ - 0$ -H.6.2.1SourceSourceSource90 DARO
0046Follow on Production Test (FPT) TSR - ATC or YTCHR1250N/AFFP$ - 0$ -H.6.2.2.cSourceSourceN/A90 DARO
0056Follow on Production Test (FPT) TSSPLO1N/AFFP$ - 0$ -H.6.2.2.bSourceSourceN/A30 Days before FPT
0066Application of CPC Option 1LO1N/AFFP$ - 0$ -H.8SourceSourceN/AWhen applicable with trailer
0076Optional Warranty - 24 monthsEA1* Estimated Max Qty$ - 0$ -H.7SourceSourceSourceWhen applicable with trailer
0086Instructor & Key Personnel Training (IKPT) Option Year 1HR48N/AFFP$ - 0$ -C.4.9.6.6DestinationDestinationN/A60 Days after TM Verification complete
0096CDRLs Option Year 1LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A002Conference AgendaC.1.5.3.4; C.4.3.4N/AN/AN/ASee CDRL
A003Conference MinutesC.1.5.3.5; C.4.3.4N/AN/AN/ASee CDRL
A006Engineering Change Proposal (ECP)C.4; C.5N/AN/AN/ASee CDRL
A008Request for VarianceC.1.8.2; C.4.4;C.5.4N/AN/AN/ASee CDRL
A029Equipment Control RecordC.4.9.7.7N/AN/AN/ASee CDRL
A034Production Status ReportC.4.9.7.8N/AN/AN/ASee CDRL
A037System Deficiency Report Data (Summary of NRs/MRB)E.5.5N/AN/AN/ASee CDRL
A038System Deficiency Report Data (Final Non-Conformance Report)E.5.5N/AN/AN/ASee CDRL
A041Welding ProceduresE.5.13.2N/AN/AN/ASee CDRL
A042Welding Procedures (Previously Qualified Welding Procedures)E.5.13.3N/AN/AN/ASee CDRL
A043Final Inspection Record (FIR)E.5.14.1.1; E.6.1N/AN/AN/ASee CDRL
A047Product Quality Deficiency Report - Corrective Action ReportE.8.3.1.3N/AN/AN/ASee CDRL
A048Control Test/Inspection Report (Control Test Report)E.8.2N/AN/AN/ASee CDRL
A051CDRL A051: FPT Work Authorization DocumentE.7.5; H.6.3.2N/AN/AN/ASee CDRL
A052CDRL A052: FPT Failure Analysis and Corrective Action ReportE.7.7; H.6.3.2.fN/AN/AN/ASee CDRL
A056FPT Test System Support Package ListE.7.3.2; H.6.3.2.bN/AN/AN/ASee CDRL
Option Year 2
0017Option Year 2 Production TrailersEA1-55%FFP$ - 0$ -SourceSourceSource30 DARO
6-205%FFP$ - 0$ -SourceSourceSource30 DARO
21-5010%FFP$ - 0$ -SourceSourceSource30 DARO
51-10020%FFP$ - 0$ -C.5SourceSourceSource30 DARO
101 +60%FFP$ - 0$ -SourceSourceSource30 DARO
Average Weighted Unit Price$ -SourceSourceSourceN/A
Estimated Maximum Quantity460SourceSourceSourceN/A
Total Price Option Year 2$ -SourceSourceSourceN/A
0027FRET Option Year 2EA12%* Avg Weighted Total Price$ -C.4.9.7.9SourceSourceSourceWhen applicable with trailer
0037Follow on Production Test (FPT) TrailersEA2N/AFFP$ - 0$ -H.6.2.1SourceSourceSource90 DARO
0047Follow on Production Test (FPT) TSR - ATC or YTCHR1250N/AFFP$ - 0$ -H.6.2.2.cDestinationDestinationN/A90 DARO
0057Follow on Production Test (FPT) TSSPLO1N/AFFP$ - 0$ -H.6.2.2.bSourceSourceN/a30 Days before FPT
0067Application of CPC Option 2LO1N/AFFP$ - 0$ -H.8SourceSourceN/aWhen applicable with trailer
0077Optional Warranty - 24 monthsEA1* Estimated Max Qty$ - 0$ -H.7SourceSourceN/aWhen applicable with trailer
0087Instructor & Key Personnel Training (IKPT) Option Year 2HR48N/AFFP$ - 0$ -C.4.9.6.6DestinationDestinationN/A60 Days after TM Verification complete
0097CDRLs Option Year 2LO1N/AFFPNSPN/AN/AN/ASee CDRL
A001Program ScheduleC.1.5.2; C.3.4.1; C.4.3.1N/AN/AN/ASee CDRL
A002Conference AgendaC.1.5.3.4; C.4.3.4N/AN/AN/ASee CDRL
A003Conference MinutesC.1.5.3.5; C.4.3.4N/AN/AN/ASee CDRL
A006Engineering Change Proposal (ECP)C.4; C.5N/AN/AN/ASee CDRL
A008Request for VarianceC.1.8.2; C.4.4;C.5.4N/AN/AN/ASee CDRL
A029Equipment Control RecordC.4.9.7.7N/AN/AN/ASee CDRL
A034Production Status ReportC.4.9.7.8N/AN/AN/ASee CDRL
A037System Deficiency Report Data (Summary of NRs/MRB)E.5.5N/AN/AN/ASee CDRL
A038System Deficiency Report Data (Final Non-Conformance Report)E.5.5N/AN/AN/ASee CDRL
A041Welding ProceduresE.5.13.2N/AN/AN/ASee CDRL
A042Welding Procedures (Previously Qualified Welding Procedures)E.5.13.3N/AN/AN/ASee CDRL
A043Final Inspection Record (FIR)E.5.14.1.1; E.6.1N/AN/AN/ASee CDRL
A047Product Quality Deficiency Report - Corrective Action ReportE.8.3.1.3N/AN/AN/ASee CDRL
A048Control Test/Inspection Report (Control Test Report)E.8.2N/AN/AN/ASee CDRL
A051CDRL A051: FPT Work Authorization DocumentE.7.5; H.6.3.2N/AN/AN/ASee CDRL
A052CDRL A052: FPT Failure Analysis and Corrective Action ReportE.7.7; H.6.3.2.fN/AN/AN/ASee CDRL
A056FPT Test System Support Package ListE.7.3.2; H.6.3.2.bN/AN/AN/ASee CDRL
TOTAL PROPOSED PRICE$0.00
Government Estimated Transportation
ORDERING YEAR 337
Ordering Year 3 - Ft. Hood (TX)EA13$ - 0$0.00
Ordering Year 3 - Ft. Lewis-McHord (WA)EA12$ - 0$0.00
Ordering Year 3 - Ft. Drum (NY)EA12$ - 0$0.00
TOTAL ORDERING YEAR 3$0.00
ORDERING YEAR 4113
Ordering Year 4 - Ft. Hood (TX)EA37$ - 0$0.00
Ordering Year 4 - Ft. Lewis-McHord (WA)EA38$ - 0$0.00
Ordering Year 4 - Ft. Drum (NY)EA38$ - 0$0.00
TOTAL ORDERING YEAR 4$0.00
ORDERING YEAR 5225
Ordering Year 5 - Ft. Hood (TX)EA75$ - 0$0.00
Ordering Year 5 - Ft. Lewis-McHord (WA)EA75$ - 0$0.00
Ordering Year 5 - Ft. Drum (NY)EA75$ - 0$0.00
TOTAL ORDERING YEAR 5$0.00
OPTION YEAR 1500
Option Year 1 - Ft. Hood (TX)EA166$ - 0$0.00
Option Year 1 - Ft. Lewis-McHord (WA)EA167$ - 0$0.00
Option Year 1 - Ft. Drum (NY)EA167$ - 0$0.00
TOTAL OPTION YEAR 1$0.00
OPTION YEAR 2460
Option Year 2 - Ft. Hood (TX)EA154$ - 0$0.00
Option Year 2 - Ft. Lewis-McHord (WA)EA153$ - 0$0.00
Option Year 2 - Ft. Drum (NY)EA153$ - 0$0.00
TOTAL OPTION YEAR 2$0.00
TOTAL ESTIMATED TRANSPORTATION$0.00
TOTAL EVALUATED PRICE$0.00

Unit Price Affordability BY15$

M870A4 Trailer: Unit Price Affordability Sheet (1)
Solicitation: W56HZV-16-R0001
Insert Offeror Name
Unit Cost Affordability Limit (BY15 $) (2):$ 110,000.00
DescriptionQuantityProposed Unit Price (TY$)Base Year Unit Price (BY15$)Other Procurement Army (OPA) Appropriation (3)
Ordering Year 3Base Year2015
Ordering Year 31-5$ - 0$ - 0Fiscal YearWeighted Index
6-20$ - 0$ - 020151.0337985555
21-50$ - 0$ - 020161.0479980154
51-100$ - 0$ - 020171.0682683942
101 +$ - 0$ - 020181.0895086132
Ordering Year Fiscal Year201820191.1112987855
Ordering Year Weighted Index1.089508613220201.1335247612
20211.1561952564
Ordering Year 420221.1793191615
Ordering Year 41-5$ - 0$ - 020231.2029055447
6-20$ - 0$ - 020241.2269636556
21-50$ - 0$ - 020251.2515029288
51-100$ - 0$ - 0
101 +$ - 0$ - 0Note:

(1) The prices populated by the Offeror in Attachment 0017 shall be in Then-Year dollars (TY$). Then-Year dollars reflect the actual price paid by the Government for goods or services at the time of the base award or at the time of the option award. This sheet converts the Offerors proposed prices from TY$ to Base-Year FY2015 dollars (BY15$). Base-Year dollars reflect the inflation adjusted price paid for goods or services in a defined specific base year. The base year for M870A4 is FY2015.

(2) No proposal will be considered for award if the proposed unit price per trailer (excluding PPT units for CLIN XXXX) is more than $110,000 in Base-Year 2015 Dollars (BY15$).

(3) OPA Weighted Index from the Joint Inflation Caclulator, dated January 2015.

Ordering Year Fiscal Year2019
Ordering Year Weighted Index1.1112987855
Ordering Year 5
Ordering Year 51-5$ - 0$ - 0
6-20$ - 0$ - 0
21-50$ - 0$ - 0
51-100$ - 0$ - 0
101 +$ - 0$ - 0
Ordering Year Fiscal Year2020
Ordering Year Weighted Index1.1335247612
Ordering Year 6
Option Year 61-5$ - 0$ - 0
6-20$ - 0$ - 0
21-50$ - 0$ - 0
51-100$ - 0$ - 0
101 +$ - 0$ - 0
Ordering Year Fiscal Year2021
Ordering Year Weighted Index1.1561952564
Ordering Year 7
Option Year 71-5$ - 0$ - 0
6-20$ - 0$ - 0
21-50$ - 0$ - 0
51-100$ - 0$ - 0
101 +$ - 0$ - 0
Ordering Year Fiscal Year2022
Ordering Year Weighted Index1.1793191615

File details come from the government source that posted it. Updated .