W56HZV16R0001_Questions_and_Answers_23_DEC_15.pdf

PDF 104 KB Posted

Attached to
M870A4 Semitrailer
Solicitation number
W56HZV16R0001
Issued by

View the file

Other files

File Type Posted
W56HZV16R0001_Questions_and_Answers_8_JAN_16.pdf PDF
W56HZV16R0001_Questions_and_Answers_7_JAN_16.pdf PDF
W56HZV16R0001-0003.pdf PDF
W56HZV16R0001_Questions_and_Answers_31_DEC_15.pdf PDF
W56HZV16R0001_Questions_and_Answers_18_DEC_15.pdf PDF
W56HZV16R0001-0002.pdf PDF
W56HZV16R0001-0001.pdf PDF
Attachment_0019__Trailer_Vehicle_Dynamic_Data_Sheet_19_DEC_15.xlsx XLSX spreadsheet
Attachment_0017__M870A4_Trailer_Price_Worksheet_22_DEC_2015_LOCKED.xlsx XLSX spreadsheet
Attachment_0037__SAE_J2014_TACOM_ADM_MAN_7-11-2013.pdf PDF
W56HZV16R0001.pdf PDF
Attachment_0002__SBP-WorkbookInstructions_(17_Jul_2015).docx DOCX document
Attachment_0001__ATPD-2395G_M870A4_Semitrailer_Lowbed_Construction_Equipment_Trailer_(SLCET)_40_Ton_23_November_2015.pdf PDF
Attachment_0036__SCHEDULED_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
Attachment_0035__REQUISITIONED_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
Attachment_0034__TM_10-3930-638-10_-_4 000_lbs_Forklift.pdf PDF
Attachment_0033__Transportability_Approval_Buffalo_A2_MPCV.pdf PDF
Attachment_0032__D7_Series_TM_55-2410-237-14.pdf PDF
Attachment_0031__D7R_TM_5-2410-241-10.pdf PDF
Attachment_0030__M621B_TM-55-3805-248-14.pdf PDF
Attachment_0029__Transportability_Report_for_621_GScraper_17FEB2011.pdf PDF
Attachment_0028__120M_MG_Final_Transportability_Report_(CAT).pdf PDF
Attachment_0027__Transportability_Approval_for_the_Asphalt_Paver_(LeeBoy)_SDDC_03_JUN_11.pdf PDF
Attachment_0026__Skid_Steer_Loader_-_TAB_(G)_SDDC_Transportability_Approval.pdf PDF
Attachment_0025__Backhoe_Loader_-_TM_5-2420-231-10.pdf PDF
Attachment_0024__Dual_Steel_Wheeled_Roller_-_TM_5-3895-379-10.pdf PDF
Attachment_0023__Vibratory_Roller_-_Type_II_-_TM_5-3895-383-10.pdf PDF
Attachment_0022__966H_Wheel_Loader_-_TM_5-3805-291-10.pdf PDF
Attachment_0021__815F_High_Speed_Compactor.pdf PDF
Attachment_0020__HYEX_3_TM_10.pdf PDF
Attachment_0019__Trailer_Vehicle_Dynamic_Data_Sheet.xlsx XLSX spreadsheet
Attachment_0018__TRADOC_Regulation_350-70.pdf PDF
Attachment_0017__M870A4_Trailer_Price_Worksheet_03_DEC_2015_LOCKED.xlsx XLSX spreadsheet
Attachment_0015__Past_Performance_Matrix_-_M870A4_Trailer.xlsx XLSX spreadsheet
Attachment_0014__TOP_01-1-010_VEHICLE_TEST_COURSE_SEVERITY_(31_Oct_06).pdf PDF
Attachment_0013__ATTLA_Data_Sheet_Trailers_BLANK_(referenced_in_CDRL_A031).xls XLS spreadsheet
Attachment_0012__M870A4_Contract_Attachment_20140710_GM_Toolkit_Attachment_Tool_List.xlsx XLSX spreadsheet
Attachment_0011__SLCET_FDSC_Final_Certified_29Feb12.pdf PDF
Attachment_0010__Abbreviated_FPVI_Checklist.xlsx XLSX spreadsheet
Attachment_0009___OMS_MP_25_Feb_11.doc DOC document
Attachment_0008__Engineering_Construction_Equipment_Information.docx DOCX document
Attachment_0007__UPDATED-_PACKAGING.doc DOC document
Attachment_0006__Packaging_Data_Products.doc DOC document
Attachment_0005__Logistics_and_Maintenance_Analysis.docx DOCX document
Attachment_0004__SBP-Workbook_(17_Jul_2015).xlsx XLSX spreadsheet
Attachment_0003__M870_Performance_Requirements_Matrix_SDQ_30_JUL_15.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16R0001 Solicitation Questions W56HZV16R0001 Questions and Answers 23 DEC 15.xls

POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/23/2015

Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted

Q.001 Interested contractors List

None None Is there a list of interested vendors / contractors available for public release?

A.001

No. The Government has not collected contractors names for public distribution.

Contractors will need to make their own partnership arrangements.

12/4/2015 12/18/2015

Q.002 Max Capacity Solicitation Clause 52.242‐4557 Will contractors need to meet the 60 trailers capacity per month capacity? A.002

The clause at 52.242‐4557 requires the max capacity be 60 trailers per month, if and when, the contractor gets a delivery order. At this time, the Government does not expect the contractor to produce trailers at the rate of 60 per month during the whole contract, but instead the successful contractor would only produce 60 per month when called for in select delivery orders. Contractor will be obligated to accept a delivery that requires 60 trailer per month but not one that expects more trailers per month.

12/4/2015 12/18/2015

Q.003 Missing Attachment

Attachment 001

ATPD

2.2.2 Other applicable

Government documents, drawings, and publications.

Will the Government provide a copy of the TACOM Administrator’s Manual

(AM) for use with SAE J2014 Pneumatic Tires for Military Tactical Wheeled

Vehicles?

A.003 The document is released with Amendment 001 to the RFP as Attachment 0037.

12/11/2015 12/18/2015

Q.004 Specifications:

ABS

Attachment 001

ATPD

3.9.11.2

Normally the COTS Anti‐lock brake system (ABS) electrical has one ECU that controls the braking per axle and not per wheel end. The COTS ABS can sense the wheel end but does not control each wheel end independently.

The government specifies "The ABS shall operate on 24 volt power. ABS, with each axle end sensed and controlled independently, is required on all axles and shall meet current industry..." Does the Government need wheel end ABS braking control?

A.004

No. The Government requirement is for ABS sensing on each wheel end and ABS control on each axle. Ref ATPD paragraph 3.9.6b for clarification.

12/14/2015 12/18/2015

12/23/2015 3:30 PM POC Charley Jackson, Jr. or Tod Miller 1 of 4

POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/23/2015

Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted

Q.005 Specifications:

ABS

Attachment 001

ATPD 3.9.12.2

Current COTS ABS systems uses a function light that lights anytime there is a malfunction and does not have a black out option. The Government has specified "ABS diagnostic light shall be non‐functional" during black out periods. Does the Government need the non‐ COTS blackout option?

A.005

During blackout lighting operation the ABS diagnostic module should function; however, the diagnostic light shall not illuminate IAW the ATPD at 3.9.12.2.

12/14/2015 12/18/2015

Q.006 Specifications:

Wheels

Attachment 001

ATPD

3.9.4

Are the tire contact requirements exempt during loading and unloading the M870A4 during air transport, particularly the 15 degree ramp?

A.006

Tire contact weight and contact dimensions are applicable during air transport loading and unloading; however, it is not required that all tires remain in contact while loading and unloading. The weight and contact dimensions on the tire(s) or axle(s) in contact with the aircraft ramp must not exceed trailer component or aircraft load limits.

Additionally, there must be enough tires in contact to maintain system stability during loading and unloading maneuvers IAW the

ATPD at 3.9.4.

12/14/2015 12/23/2015

12/23/2015 3:30 PM POC Charley Jackson, Jr. or Tod Miller 2 of 4

POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/23/2015

Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted

Q.007 Specifications:

Ride Quality

Attachment 003

ATPD

3.9.5

Request an extension to the offer due date so that we may perform a “Trailer Ride Quality Test” IAW Attachment 0003, Performance Requirements

Matrix, Subfactor 2. This requirement includes completely filling out Attachment 0019, Trailer Vehicle

Dynamics Data Sheets (as stated under Offerors Proposed Level of

Performance). Currently, dynamic data on the suspension has not been measured/recorded on our trailer suspension by ourselves, or our supplier. We are requesting a 30 day extension to the due date (i.e., February 4th).

A.007

The intent is not to perform a trailer ride quality test for proposal but rather provide the requested suspension component characteristic data in Attachment 0019 and allow the Government to conduct Modeling & Simulation during proposal evaluation IAW Section L/M. The Government will verify ride quality performance during delivery order 1.

Please refer to "Notes 2 Tab in Attachment 0019."

12/16/2015 12/23/2015

Q.008 Specifications:

ATPD

Attachment 003

ATPD

N/A

Follow up question on ATPD‐2395G, Requirements verification: When does the Government expect to receive conformance certification from the contractor? During actual Government Testing (i.e., FPVI, PVT, etc) or before testing?

If so, will the Government be providing GFE for conformance testing (e.g., 3.2

Prime Mover).

A.008

Certificate(s) of conformance shall be available for Government review at A‐FPVI and FPVI in accordance with ATPD 2395G, Table V.

The Government will provide GFE (prime mover) shortly after contract award to support system level conformance requirements.

12/16/2015 12/23/2015

12/23/2015 3:30 PM POC Charley Jackson, Jr. or Tod Miller 3 of 4

POCs: Charley Jackson, Jr. charley.g.jackson2.civ@mail.mil or Tod Miller tod.v.miller.civ@mail.mil Today: 12/23/2015

Q # Subject Document Name Document Paragraph # Question/Comment A # Answer Date Asked Date Posted

Q.009 RFP Due Date N/A N/A What is the process in which I need to go about to get the response Date extended.

A.009

Email all requests for extensions to the contract specialist and PCO. Explain the need for an extension in the email and provide a suggested date. An extension has already been granted to January 11, 2016 (Amendment 0001) as a result of the Government now requiring CD submittals; See amendment 0001 and See L.1. The government is not inclined to grant extensions as a matter of course.

Contractors should use the allotted time to prepare and submit proposals.

12/18/2015 12/23/2015

Q.010 Test Plan N/A N/A Is the Test Plan and Schedule for all three Phases available to the public?

A.010

No. The test schedule and general test plan for PPT, PVT and DT/OT are outlined in Sections E.4, E.7.1, and E.7.10, respectively.

Additionally, Attachment 0001 (ATPD 2395) Table V identifies requirements and applicable verification method for each test event. Award of the initial delivery order is anticipated for 4QFY16 and award of LRIP delivery order is anticipated for 3QFY18.

Please refer to Amendment 002 for clarification on TSR support in paragraphs E.4.3.4.1, E.7.3.3, and E.7.12.3.

12/21/2015 12/23/2015

Acronyms ABS Anti‐lock brake system ATPD Automotive‐Tank Purchase Description COTS Commercial Off the Shelf TAM TACOM Administrator’s Manual (AM) POC Point of Contact PCO Procuring Contracting Officer CD Compact Disk

12/23/2015 3:30 PM POC Charley Jackson, Jr. or Tod Miller 4 of 4