Att_0011_-_IH_OH_-_FINAL_2017-06-30.pdf

PDF 25 KB Posted

Attached to
Solicitation - Request for Proposal (RFP) Federal contract opportunity
Solicitation number
W52P1J15R0023
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This performance work statement outlines requirements for occupational health and industrial hygiene services at a federal facility. The contractor must maintain an occupational health and safety program in compliance with applicable regulations. Hazard assessments and abatement plans are required. The contractor must conduct industrial hygiene monitoring, provide chemical inventories and material safety data sheets to the government, and implement programs for respiratory protection, confined space entry, hearing conservation, and personal protective equipment. Employee medical records must also be maintained according to standards.

Relatedly, the federal contract opportunity notice announces an industry day in connection with a solicitation for the property management and operation of the Scranton Army Ammunition Plant. Project management and production of 155mm and 120mm ammunition components are included. Details are provided on the location, registration, and hotels for the industry day event.

Att 0011 - IH/OH PWS

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation - Request for Proposal (RFP), newest first.
File Type Posted
Att_0017_-_Surge_PWS_REV_A_2017-10-10.pdf PDF
W52P1J-15-R-0023_Amd_0003_2017-10-11.pdf PDF
W52P1J-15-R-0023_Amd_0002_2017-09-27_FINAL_(2).pdf PDF
Att_0030_W15QKN-17-R-0018_RFP_Amendment_0002.pdf PDF
Att_0026_-_LIF_MIF_Encl_3_GFP_Prohibited_from_Layaway.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0006_-_Property_PWS_-_FINAL_2017-07-07.pdf PDF
Att_0014_-_Facility_Plans_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
Att_0020_-_Procedures_for_Submitting_a_CDR_2017-06-16.pdf PDF
Att_0011_-_IH_OH_-_FINAL_2017-06-30.pdf PDF
Att_0016_-_MIF_PWS_-_FINAL_2017-06-29.pdf PDF
Att_0001_-_W15QKN-17-R-0018_RFP_2017-07-27.pdf PDF
Att_0005_-_Price_Matrix_REV_A_2017-08-25.xlsx XLSX spreadsheet
Att_0002_-_W15QKN-17-R-0018_Attachments_2017-07-12.pdf PDF
Att_0023_-_U.S._DOL_Wage_Determination_No._2015-2453_2016-12-30.pdf PDF
Att_0012_-_Transition_PWS_-_FINAL_2017-06-30.pdf PDF
Att_0021_-_PPQ_for_Facilities_Operation_REV_A_2017-08-28.pdf PDF
Att_0016_-_MIF_PWS_-_FINAL_2017-06-29.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
Att_0005_-_Price_Matrix_2017-07-27.xlsx XLSX spreadsheet
Att_0006_-_Property_PWS_-_FINAL_2017-07-07.pdf PDF
Att_0001_-_W15QKN-17-R-0018_RFP_2017-07-27.pdf PDF
Att_0002_-_W15QKN-17-R-0018_Attachments_2017-07-12.pdf PDF
Att_0008_-_Environmental_PWS_-_FINAL_2017-07-27.pdf PDF
Att_0020_-_Procedures_for_Submitting_a_CDR_2017-06-16.pdf PDF
Att_0026_-_LIF_MIF_Encl_3_GFP_Prohibited_from_Layaway.pdf PDF
Att_0010_-_Safety_-_FINAL_2017-06-06.pdf PDF
Att_0023_-_U.S._DOL_Wage_Determination_No._2015-2453_2016-12-30.pdf PDF
Att_0007_-_Maintenance_and_Utilities_PWS_-_FINAL_2017-07-27.pdf PDF
FINAL-Scranton_AAP_EBS-06-25-2015_v2.pdf PDF
SCAAP_Industry_Day__2_Charts_15-16_Nov_2016.pdf PDF
W52P1J-15-R-0023_Draft_11-01-2016_FINAL.pdf PDF
Att_0004_-_SCAAP_PWS_1_-_Property_-_Draft_RFP.docx DOCX document
Att_0021_-_Small_Business_Participation_Plan_Property_Management.docx DOCX document
Att_0010_-_SCAAP_PWS_7_-_Utilities-Energy_-_Draft_RFP.docx DOCX document
Att_0007_-_SCAAP_PWS_4_-_Security_-_Draft_RFP.docx DOCX document
Att_0013_-_SCAAP_PWS_10_-_Facility_Plans_-_Draft_RFP.docx DOCX document
Att_0005_-_SCAAP_PWS_2_-_Maintenance_-_Draft_RFP.docx DOCX document
Att_0014_-_SCAAP_PWS_11_-_LIF_-_Draft_RFP.docx DOCX document
Att_0017_-_Contract_Discrepancy_Report.xlsx XLSX spreadsheet
Att_0001_-_W15QKN-17-R-0018_Draft_RFP.pdf PDF
Att_0016_-_SCAAP_PWS_13_-_Surge_-_Draft_RFP.docx DOCX document
Att_0006_-_SCAAP_PWS_3_-_Environmental_-_Draft_RFP.docx DOCX document
Att_0018_-_Procedures_for_Submitting_a_CDR.doc DOC document
Att_0003_-_Price_Matrix_TEP_and_Property_Management.xlsx XLSX spreadsheet
Registration_Form_Nov_2016_FINAL.pdf PDF
Show all 50

Solicitation - Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCCUPATIONAL HEALTH / INDUSTRIAL HYGIENE (OH/IH)

PERFORMANCE WORK STATEMENT (PWS)

(INDIRECT)

1. OBJECTIVE: The contractor shall maintain and operate an occupational health and safety program IAW applicable Federal, State and local regulations.

2. REQUIREMENTS: The Occupational Health and Safety Administration (OSHA) exposure standards permissible exposure limit (PEL) shall be used except where the American Conference of Governmental Industrial Hygienists (ACGIH) threshold limit values (TLVs) are more stringent. Exposure standards and criteria shall be used to determine the need for medical monitoring, occupational health screening, and the need for protective equipment and/or reducing the exposure through engineering controls.

(DA PAM 40-11, 5-2d.)

2.1 The contractor shall evaluate workplace hazards related to the safety and health of its employees. The contractor shall keep a hazard abatement log as described in the Safety PWS paragraph 4.5. The hazard abatement log shall include, at a minimum the location of the hazard, the potential for injury or illness, the method of control or plan to mitigate the risk, and the estimated abatement date.

2.2 When the Contractor conducts industrial hygiene monitoring, such as indoor air quality, noise sampling, confined space entry permits, and other statutorily based sampling, a written copy of the results shall be forwarded to the Administrative Contracting Officer (ACO). The contractor is not required to provide individual personally identifiable information or personal health related information to the ACO (CDRL A001).

2.3 The Contractor shall provide the ACO with access to its repository for chemical inventory within 90 days of contract award. The contractor shall notify the ACO within seven calendar days of any significant change in the chemical inventory, to include the addition of a hazardous material or compound which includes at least one hazardous material listed in Table Z-1, Z-2, or Z-3 of 29 CFR 1910.1000, or any material which has been deemed hazardous by the National Institute for Occupational Safety and Health or the chemical manufacturer.

2.4 The Contractor shall provide the ACO with access to its repository to allow for viewing of the most current Material Safety Data Sheets (MSDS) for the chemicals used in work processes or stored at the facility. Proprietary information shall be handled in accordance with established OSHA standards.

2.5 The Contractor shall provide a copy of its written respiratory protection program to the ACO (CDRL A002). The contractor shall ensure that personnel who are required to wear respirators have completed a medical evaluation, fit testing, and training in accordance with 29 CFR 1910.134. A memorandum attesting to the fact that the contractor is in compliance with the respiratory protection standard shall be provided to the ACO.

2.6 The Contractor shall record and provide a copy to the ACO of all cases of occupational hearing loss and other work related medical conditions in the copy of its OSHA Form 300 as required by 29 CFR 1904, and as described in the Safety PWS paragraph 2.2.2. The Contractor shall provide personal protective equipment for its employees in accordance with 29 CFR 1910.132, 29 CFR

1910.133, 29 CFR 1910.134, 29 CFR 1910.135, 29 CFR 1910.136, 29 CFR

1910.137, and 29 CFR 1910.138. The workplace hazard assessment (required by 29 CFR 1910.132(d)(2)) shall be made available to the Government Staff as requested and copies may be made as desired. The contractor shall ensure that employees are properly fitted and trained to don, use, doff, and maintain personal protective equipment. Training documentation shall be made available to the Government Staff as requested and copies may be made as desired.

2.7 The Contractor shall prohibit the consumption of food and beverages in areas exposed to toxic materials in accordance with 29 CFR 1910.141(g)(2). A copy of the Contractor’s policy which prohibits the practice shall be provided to the ACO

(CDRL A003).

2.8 The Contractor shall provide a copy of its Permit Required Confined Space Program to the ACO (CDRL A004). The program shall be in accordance with 29 CFR 1910.146. If the Contractor’s employees enter permit required confined spaces, a written statement of certification is required to be furnished to the ACO. Additionally, the Contractor shall label permit required confined spaces in accordance with 29 CFR 1910.146(c)(2), and maintain the labeling throughout the contract period.

3. OCCUPATIONAL MEDICINE:

3.1 The contractor shall maintain and provide employee records in accordance with 29 CFR 1910.1020.

File details come from the government source that posted it. Updated .