This document is a request for proposal (RFP) announcement for the property management and operation of the Scranton Army Ammunition Plant combined with the associated production of 155mm M795 steel projectile and 120mm mortar steel shell bodies under solicitation number W52P1J-15-R-0023. The U.S. Army Contracting Command - Rock Island and the U.S. Army Contracting Command - New Jersey on behalf of the U.S. Army Joint Munitions Command located at Rock Island Arsenal, Illinois and the Project Director for Joint Services and the Project Manager for Combat Ammunition Systems are holding an Industry Day in connection with this RFP. Attachments include an Industry Day announcement, registration form, and hotel listings for the Scranton, Pennsylvania area.

Att 0030 W15QKN-17-R-0018 RFP Amendment 0002

View the file

Other files

File Type Posted
Att_0017_-_Surge_PWS_REV_A_2017-10-10.pdf PDF
Att_0031_-_W15QKN-17-R-0018_Amendment_0003_2017-10-11.pdf PDF
W52P1J-15-R-0023_Amd_0003_2017-10-11.pdf PDF
W52P1J-15-R-0023_Amd_0002_2017-09-27_FINAL_(2).pdf PDF
W52P1J-15-R-0023_Amd_0001_2017-09-07.pdf PDF
W15QKN-17-R-0018_Att_0008_-_PPQ_for_Large_Caliber_Metal_Parts_REV_A_28_Aug_2017.pdf PDF
Att_0023_-_U.S._DOL_Wage_Determination_No._2015-2453_2016-12-30.pdf PDF
Att_0002_-_W15QKN-17-R-0018_Attachments_2017-07-12.pdf PDF
W52P1J-15-R-0023_FINAL_2017-07-28.pdf PDF
Att_0012_-_Transition_PWS_-_FINAL_2017-06-30.pdf PDF
Att_0026_-_LIF_MIF_Encl_3_GFP_Prohibited_from_Layaway.pdf PDF
Att_0004_-_Section_M_2017-07-28_FINAL.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0029_-_W15QKN-17-R-0018_RFP_Amd_0001.pdf PDF
Att_0025_-_LIF_MIF_Encl_2_Active_GFP.pdf PDF
Att_0021_-_PPQ_for_Facilities_Operation_REV_A_2017-08-28.pdf PDF
Att_0018_-_GFP_List_REV_A_2017-09-06.pdf PDF
Att_0015_-_LIF_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0024_-_LIF_MIF_Encl_1_GFP_Currently_in_Layaway_REV_A_2017-09-06.pdf PDF
Att_0006_-_Property_PWS_-_FINAL_2017-07-07.pdf PDF
Att_0014_-_Facility_Plans_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0007_-_Maintenance_and_Utilities_PWS_-_REV_A_2017-09-07.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0017_-_Surge_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0010_-_Safety_-_FINAL_2017-06-06.pdf PDF
Att_0027_-_LIF_MIF_Encl_4_GFP_Prohibited_from_Relocation.pdf PDF
Att_0008_-_Environmental_PWS_-_REV_A_2017-08-11.pdf PDF
Att_0009_-_Security_REV_A_2017-08-31.pdf PDF
Att_0011_-_IH_OH_-_FINAL_2017-06-30.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
Att_0005_-_Price_Matrix_REV_A_2017-08-25.xlsx XLSX spreadsheet
Att_0020_-_Procedures_for_Submitting_a_CDR_2017-06-16.pdf PDF
Att_0016_-_MIF_PWS_-_FINAL_2017-06-29.pdf PDF
Att_0001_-_W15QKN-17-R-0018_RFP_2017-07-27.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
W52P1J-15-R-0023_FINAL_2017-07-28.pdf PDF
Att_0023_-_U.S._DOL_Wage_Determination_No._2015-2453_2016-12-30.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0017_-_Surge_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0016_-_MIF_PWS_-_FINAL_2017-06-29.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0021_-_PPQ_for_Facilities_Operation_2017-06-16.pdf PDF
Att_0018_-_GFP_List_2017-07-06.pdf PDF
Att_0007_-_Maintenance_and_Utilities_PWS_-_FINAL_2017-07-27.pdf PDF
Att_0025_-_LIF_MIF_Encl_2_Active_GFP.pdf PDF
Att_0027_-_LIF_MIF_Encl_4_GFP_Prohibited_from_Relocation.pdf PDF
Att_0014_-_Facility_Plans_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0028_-_Facility_Drawings_2017-07-05.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Fixed Price with EPA - Actual Costs

0002 2017SEP28

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

MARIAH HANKO

EMAIL: MARIAH.LHANKO.CIV@MAIL.MIL

W15QKN-17-R-0018

2017JUL28

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 9

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MARIAH HANKO

Buyer Office Symbol/Telephone Number: ACC-NJ-CA/(973)724-7819

Type of Contract 1: Fixed Price with EPA - Actual Costs

Kind of Contract: Other

*** End of Narrative A0000 ***

The purpose of Amendment 0002 to Solicitation W15QKN-17-R-0018 is as follows:

1) Please note that all Solicitation Questions and Answers received since Amendment 0001 was posted 8 September 2017 are formally incorporated into Section A of Solicitation W15P1J-15-R-0023, Amendment 0002.

2) To formally amend Section E, Clause 52.246-4015, Ammunition Data Cards. See Section E for amended Clause.

3) To formally amend Section E, Clause 52.246-4018, Measurement System Evaluation (MSE). See Section E for amended Clause.

4) To formally amend Section E, Clause 52.246.4011, Critical Characteristics (Six Sigma). See Section E for amended Clause.

All other terms and conditions under this solicitation remain unchanged.

*** END OF NARRATIVE A0003 ***

2 9

W15QKN-17-R-0018 0002

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

E-1 CHANGED 52.246-4011 CRITICAL CHARACTERISTICS (SIX SIGMA) (ES6917) OCT/2010

a. The contractors processes shall be designed with the objective of preventing the creation or occurrence of non-conforming critical characteristics (see paragraphs d & e). The contractor shall establish, document and maintain a product specific, critical characteristics control (CCC) plan that shall be submitted to and approved by the Procuring Contracting Officer (PCO) IAW DD Form 1423 and DI-MGMT-80004. The CCC plan shall include or reference all procedures, work and handling instructions and process controls relating to any critical characteristics. Mistake Proofing techniques of the material handling and inspection systems shall be a part of the CCC

Plan. Guidance for developing this plan and submitting Critical Plans of Action (CPOA) (paragraph g) can be found at .

b. The contractor shall assure its critical processes are robust in design, capable and under control, with the objective of not generating any critical non-conformances. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its critical processes to prevent generating critical non-conformances as identified in the CCC Plan.

c. An inspection and verification system shall be employed that will verify the robustness of all critical processes. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its inspection and verification system to detect and prevent critical non-conformance escapes as identified in the CCC Plan. The Government expects that a contractor will allow zero critical escapes. To demonstrate its critical escape risk the contractor will utilize the non-conformance escape risk goal provided below.

(1) Unless otherwise specified immediately below, the calculated critical non-conformance escape risk is 1 in a million

(.000001) items delivered. Or:

Alternate calculated Critical Non-conformance Escape risk N/A:

Unless otherwise approved by the PCO, the non-conformance escape risk is the sum of the individual characteristic escape rates.

The probability of escape for a single characteristic shall be calculated by multiplying the non-conformance rate(s) entering the inspection system(s) by the error rate of the inspection system(s). These escape rates are then summed and shall not exceed the tolerable critical non-conformance escape risk.

(2) Within 45 days after award, the contractor can elect to submit a phased-in approach on how the non-conformance escape risk will be achieved over a period of time not to exceed 180 days from the date of first article approval, or from initiation of production when first article is not required. Submission will require approval by the Government and is subject to a technical review and analysis. Allowance for a phased-in approach will then become a part of the contract. Disapproval of the contractors submission does not relieve the contractor of its obligation to comply with the terms of this clause.

(3) Based on the maximum error rate defined for the inspection system, the contractor shall develop a test procedure to demonstrate the error rate. As part of the test plan the contractor shall include sufficient test quantities to assure 90% statistical confidence in the resultant rates unless otherwise approved by the PCO. Once established, the contractor shall have a documented schedule to routinely monitor the non-conformance and inspection system error rates to assure they do not exceed the maximum rates allotted.

d. As a result of previous practices, the governments technical data may refer to Critical I, Critical II, and Special characteristics.

The use of the term "critical characteristics" within this clause includes Critical I, Critical II and Special characteristics and the use of the term "critical nonconformances" includes those nonconformances pertaining to Critical I, Critical II and Special characteristics. Unless otherwise stated in Section C, these characteristics shall be subject to all requirements of this clause.

e. In addition to critical characteristics defined in the governments technical data (drawings, specifications, etc.), the contractor shall also identify and document in their contractor developed technical data all known material, component, subassembly and assembly characteristics whose non-conformances would likely result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The Critical Item Characteristic List (CICL) review process shall be included in the CCC Plan. The contractor's additional critical characteristics shall be classified in accordance with guidance located at and shall be submitted to and approved by the PCO prior to production (DI-SAFT-80970A).

f. In the event that a critical non-conformance is found anywhere in the production process, the contractor, as part of its CCC Plan, shall have procedures in place to ensure:

(1) The non-conformance is positively identified and segregated to ensure that nonconforming product does not inadvertently remain in or reenter the production process. This control shall be accomplished without affecting or impairing subsequent non-conformance analysis. Final disposition of non-conforming product shall be documented and audited for traceability.

3 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) The operation that produced the non-conforming component or assembly and any other operations incorporating suspect components or assemblies are immediately stopped. (See para h. for exceptions)

(3) The government (PCO) is immediately notified of the critical non-conformance (electronic mail)(DI-SAFT-80970A).

(4) Any suspect material is identified, segregated and suspended from any further processing and shipment.

(5) An investigation is conducted to determine the root cause of the non-conformance and the required corrective actions. An evaluation shall also be conducted with regard to suspect material to ensure that no additional critical non-conformances are present.

A report of this investigation shall be submitted to the government (DI-SAFT-80970A). The use of the DID report shall not delay notification to the government as required in f(3) above.

(6) A request to restart manufacturing or to use any suspect material associated with the critical non-conformance is submitted to the government (DI-SAFT-80970A). Restart of production shall not occur until authorized by the PCO, unless previously addressed in the approved CCC Plan. The Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without PCO approval.

(7) The procuring activity reserves the right to refuse acceptance of any suspect material until the root cause or reasonably likely cause of the critical non-conformance has been identified, corrective action has been fully implemented and sufficient evidence has been provided to exclude non-conforming material from the conforming population.

g. The contractor may develop alternative plans and provisions, collectively referred to as a Critical Plan of Action (CPOA), relative to government or contractor identified critical characteristics. All CPOAs are independent and shall be evaluated by the government for this contract. The CPOA and any subsequent revisions submitted IAW DD Form 1423 and DI-MGMT-80004 require PCO approval prior to implementation. Unless otherwise specified at time of approval, contractor shall review and evaluate CPOAs for currency and process improvements at least on an annual basis and submit results to the PCO. Unless otherwise approved by the PCO, each critical characteristic shall require a separate CPOA. If the CPOA includes other documents by reference they shall be submitted upon request.

Guidance for the development of a CPOA can be found in the referenced guidance located at paragraph a of this clause.

h. The contractor may continue production with an approved CPOA provided that the critical non-conformance is consistent with the failure mode(s) and rates established in the CPOA. Failure to meet all CPOA requirements will require the contractor to revert back to paragraph f requirements.

i. If a critical non-conformance is discovered beyond its designated inspection point and prior to Government acceptance the contractor shall take actions specified in paragraph f above. If a critical non-conformance is discovered after Government acceptance the

Government has the right to invoke the requirements of paragraph f with respect to the contractors remaining production under this contract.

E-2 CHANGED 52.246-4015 AMMUNITION DATA CARDS (ES6922) JUN/2014

Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-

STD-1168, DI-MISC-80043 and the Worldwide Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in

MIL-STD-1168 and the WARP users manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."

(a) The contractor shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.

(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the

ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.

End Item Component Listing:

M795:

Drawing Number Nomenclature ______________ ____________

12977200 Body Assembly

12977199 Body Machined

4 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

12961016 FRBC

13028027 Meltable Fuze Plug (if applicable)

9341742 Shock Attenuating Lifting Plug (if applicable)

9327882 Pallet Base

13023905 IMX Pallet Cover (if applicable)

9327881 TNT Pallet Cover (if applicable)

12977199 Steel

12997567 Top Coat

120mm:

Drawing Number Nomenclature ______________ ____________

13061384 BODY ASSEMBLY FOR 120MM HE

13061385 BODY ASSEMBLY FOR 120MM FRP

12953497 BODY ASSEMBLY FOR 120MM SMOKE

12967865 BODY, PROJECTILE, FRONT

12967864 BODY, PROJECTILE, REAR

(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.

Drawing Number from paragraph (c) above N/A, components as follows:

Component:

M795:

Drawing Number Nomenclature ______________ ____________

9341742 Shock Attenuating Lifting Plug (if applicable)

9327882 Pallet Base

13023905 IMX Pallet Cover (if applicable)

9327881 TNT Pallet Cover (if applicable)

120mm:

Drawing Number Nomenclature ______________ ____________

12953514 Body, HE Drawing

12577513-1 Adapter Drawing

12957020-2 Body, FRPC Drawing

12577513-2 Adapter Drawing

(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not considered an end item or major component, the component lot number may be constructed through contractor lot number convention.

(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.

(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user's manual provides information on the level of detail required.

(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.

(End of clause)

E-3 CHANGED 52.246-4018 MEASUREMENT SYSTEM EVALUATION (MSE) (ES6925) APR/2014

(a) Definitions. This paragraph defines specific terms utilized throughout the rest of the clause and in the accompanying Contract Data ___________

Requirements List (CDRL) and Data Item Description (DID) (DI-QCIC-81960). This aids in clarifying the MSE requirements to Government and contractor personnel.

5 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including _____________________________________ dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).

(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product ________________________________________________ is performed, in whole or in part, in an automatic manner.

(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests _______________________________ to assure conformance to contract requirements.

(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a _______________________________ specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:

(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items___________________________ as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.

(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes_______________________________________ such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.

(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways ______________________ that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.

(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of _________________________________ specialized methods useful for studying a measurement system and its properties.

(b) Scope. This clause establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and _____ acceptance. In addition, this clause establishes requirements for the preparation, submission, and approval of AIE documentation.

(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. ___

AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see DI-QCIC-81960).

(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see ________________________________________

(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.

(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of ______________________ the AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.

(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME ______________________

Y14.43 and may include commercial inspection equipment. [Commercial inspection equipment is defined as shown in paragraph (a)(4) above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME

Y14.43, Absolute Tolerancing (Pessimistic Tolerancing).

(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval. _________________

(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with DI-QCIC-81960 in the applicable ______________________

Contract Data Requirements List (CDRL DD Form 1423). In addition, the contractor shall adhere to the following requirements:

(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the ____________________

Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.

(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English. _________________________

(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements ____________________ of the Technical Data Package (TDP).

(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance _____________ inspections.

6 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to ______________________________ the Government for approval in accordance with (IAW) the CDRL (DI-QCIC-81960). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (DI-QCIC-81960) and as required below:

(1) [X] Listed Minor (characteristics displayed on specifications and/or drawings

(2) [] Government selected list (as attached or as provided herein)

(3) [] Not submitted

(g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per _________________________________________ the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.

(1) Reliability of __99.8___% at a __90___% Confidence Level for Critical/Special Characteristics

(2) Reliability of __99.0___% at a __90___% Confidence Level for Major Characteristics

(3) For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph (f)(2) or not required for submittal in paragraph (f)(3), then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.

(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance

Inspection Equipment Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the

VL-VII sampling plan per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.

(5) If the AAIE accepts a critical characteristic reject standard the contractor shall notify the Government and act in accordance with paragraph (f) of the Critical Characteristic Control Clause. In addition, if the AAIE accepts a major and/or minor characteristic reject standard the contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of

ANSI/NCSL Z540.3.

(6) All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable CDRL (DI-QCIC-81960). This test shall be performed at the contractors facilities whose manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (j) of this clause. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.

(7) The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval. The modified and/or relocated AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs (g)(1) - (g)(6).

(h) Measurement System Analysis (MSA). The contractor is responsible to ensure all AIE is, at a minimum, stable, repeatable, and _________________________________ reproducible for all characteristics. Refer to ASTM E2782 and/or AIAG MSA for guidance. The contractor shall provide objective evidence, including the MSA assessment plan, associated data, and analysis, which demonstrates the AIE is, at a minimum, stable, repeatable, and reproducible for the following characteristics (MSA CDRL):

M795:_____

Specification Paragraph No. Drawing Characteristic_____________ _____________ _______ ______________

MTL-DTL-63245C 3.10/4.3.2.9 12977200 C1-Hydrostatic Test

MTL-DTL-53245C 3.11/4.3.2.9 12977200 C2-Ultrasolic Test

MTL-DTL-63245C 4.3.2.8 12977199 M124-Wall Variation

MTL-DTL-63245C 4.3.2.8 12977199 M125-Wall Variation

120mm:______

Specification Paragraph No. Drawing Characteristic_____________ _____________ _______ ______________

MIL-DTL-71038 4.4.2.5 12953514 M117

DTL12957020 4.4.2.2 12957020 M115

MIL P 71055 4.4.2.7/4.4.3.4 12953467 M107

DTL12967865 4.4.2.2/4.4.2.3 12967864/865 M103/M120

7 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Approval of submitted MSA(s) must be granted before the corresponding AIE can be used or continue to be used for acceptance of product.

If at any time following approval of the AIE and MSA the AIE is disapproved, then the MSA shall be disapproved. After the resubmitted

AIE is approved, the MSA shall be conducted on the approved AIE and resubmitted for approval.

(i) Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection _________________ environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.

(j) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall ________________________________ be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.

(k) Non-Destructive Testing (NDT).\~ Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for _____________________________ qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.

(1) Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by NAS 410 (NAS Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT Standard for Qualification and

Certification of NDT Personnel), or SNT-TC-1A (Recommended Practice for Personnel Qualification and Certification in NDT), and additional procedures that may be identified by the Government.\~ Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.

(2) The NDT method(s) shall be applied in accordance with ASTM E 543 (Standard Specification for Agencies Performing

Nondestructive Testing) and the current nationally recognized standard practices appropriate to the NDT method(s) employed, such as

ASTM E-1742 (Standard Practice for Radiographic Examination) and SAE-AMS-STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process

For). Each application technique shall identify the standard(s) utilized. Non-destructive testing includes, but is not limited to, the following types of testing: Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.

(l) Contractor Alternate Inspection Method(s), Modifications and/or Relocation of AIE (Non-Automated) After Government Approval. If the ___________________________________________________________________________________________________________________________ contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after

Government approval the intended change(s) shall be submitted to and approved by the Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the Government to determine information needed to assess impact to AIE. See CDRL (DI-QCIC-81960).

(m) Responsibility for AIE Package Submittal. The contractor shall submit the AIE design documentation package within contractual ________________________________________ timeframes per CDRL (DI-QCIC-81960). The Government will provide approval or disapproval within the timeframe specified in the CDRL.

Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The

AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.

(n) Governments Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the ___________________________________ required acceptance criteria at any time during the performance of this contract. See CDRL (DI-QCIC-81960).

(o) Navy Furnished Gages. When gages are listed in paragraph (o)(9) below, the Navy Special Interface Gage (NSIG) Requirement ____________________ paragraphs (o)(1) - (o)(8) shall be satisfied.

(1) The NSIG(s) are provided for verification of selected interface dimensions and do not constitute sole acceptance criteria of production items or relieve the contractor of meeting all drawing/specification requirements under the contract.

(2) The contractor is responsible for contacting the Naval Surface Warfare Center (NSWC), Corona Division at least 45 days prior to FAT (if required) or production, for the delivery of NSIG(s).

(3) NSIG(s) will be forwarded to the contractor for joint use by the Government and the contractor. Government furnished

NSIG(s) shall not be used by the contractor(s) or subcontractor(s) as in-process or working gage(s).

(4) For production items that fail to be accepted by the applicable NSIG(s), an alternate inspection method may be submitted for approval.

(5) The contractor may substitute contractor designed and built AIE for the NSIG(s) noted in paragraph (o)(9) below. However, the designs require Government (Navy) approval and the contractor AIE hardware requires Government (Navy) certification. AIE designs shall be submitted in accordance with CDRL (DI-QCIC-81960).

(6) The Government (Navy) shall not be responsible for discrepancies or delays in production items resulting through misuse, damage or excessive wear to the NSIG(s).

(7) Calibration and repair of the NSIG(s) shall only be performed as authorized by the NSWC Corona Division. Repair is at no

8 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

cost to the contractor unless repair is required due to damage to the gages resulting from contractor fault or negligence.

Damaged, worn, or otherwise unserviceable NSIG(s) shall be brought to the immediate attention of the CAO and NSWC Corona Division.

The contractor shall not make any adjustments, alterations or add permanent markings to NSIG(s) hardware unless specified by the

NSIG operating instructions or authorized by the NSWC Corona Division.

(8) Within 45 calendar days after final acceptance of all production items, the NSIG(s) shall be shipped to NSWC Corona

Division, ATTN: Receiving Officer, Bldg 575, Gage Laboratory, 1999 Fourth St., Norco, CA 92860-1915. The following shipping and marking specifications are applicable:

(i) Shipping, MIL-STD-2073, "DOD Standard Practice for Military Packaging"

(ii) Marking, MIL-STD-129, "Marking for Shipment and Storage".

(9) The following NSIG(s) shall be provided and are mandatory for use except as noted by paragraph (o)(5) above.

Drawing Rev Characteristic NSIG No. Qty Dimensions Weight_______ ___ ______________ ________ ___ __________ ______ Value_____

N/A

9 9

SECTION A
SECTION E