This performance work statement outlines requirements for a contractor to submit a surge facilitization plan at the Scranton Army Ammunition Plant. The plan must detail how the contractor will increase production capacity of M795 and M933A1/M934A1 projectiles from base levels to a maximum annual surge capacity of 400,000 and 540,000 respectively over an eighteen month ramp up period. The technical, management, and integrated master schedule sections of the plan must explain the production plan, equipment and facility needs, personnel management, supply stream management, and subcontractor management for meeting the surge requirements. An updated plan may be required if changes occur. The government reserves the right to implement the plan within five years as determined by emerging threats or war requirements.

Att 0017 - Surge PWS

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation - Request for Proposal (RFP), newest first.
File Type Posted
Att_0017_-_Surge_PWS_REV_A_2017-10-10.pdf PDF
Att_0030_W15QKN-17-R-0018_RFP_Amendment_0002.pdf PDF
Att_0026_-_LIF_MIF_Encl_3_GFP_Prohibited_from_Layaway.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0006_-_Property_PWS_-_FINAL_2017-07-07.pdf PDF
Att_0014_-_Facility_Plans_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0012_-_Transition_PWS_-_FINAL_2017-06-30.pdf PDF
Att_0021_-_PPQ_for_Facilities_Operation_REV_A_2017-08-28.pdf PDF
Att_0018_-_GFP_List_REV_A_2017-09-06.pdf PDF
Att_0024_-_LIF_MIF_Encl_1_GFP_Currently_in_Layaway_REV_A_2017-09-06.pdf PDF
Att_0015_-_LIF_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0017_-_Surge_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0008_-_Environmental_PWS_-_REV_A_2017-08-11.pdf PDF
Att_0027_-_LIF_MIF_Encl_4_GFP_Prohibited_from_Relocation.pdf PDF
Att_0029_-_W15QKN-17-R-0018_RFP_Amd_0001.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0004_-_Section_M_2017-07-28_FINAL.pdf PDF
Att_0025_-_LIF_MIF_Encl_2_Active_GFP.pdf PDF
Att_0016_-_MIF_PWS_-_FINAL_2017-06-29.pdf PDF
Att_0022_-_Small_Business_Participation_Plan_Property_Management_2017-06-16.pdf PDF
Att_0013_-_ARMS_(Direct)_-_FINAL_2017-06-16.pdf PDF
Att_0019_-_Contract_Discrepancy_Report_Template_2017-06-16.pdf PDF
Att_0023_-_U.S._DOL_Wage_Determination_No._2015-2453_2016-12-30.pdf PDF
Att_0007_-_Maintenance_and_Utilities_PWS_-_FINAL_2017-07-27.pdf PDF
Att_0025_-_LIF_MIF_Encl_2_Active_GFP.pdf PDF
Att_0027_-_LIF_MIF_Encl_4_GFP_Prohibited_from_Relocation.pdf PDF
Att_0014_-_Facility_Plans_PWS_-_FINAL_2017-07-17.pdf PDF
Att_0028_-_Facility_Drawings_2017-07-05.pdf PDF
Att_0012_-_Transition_PWS_-_FINAL_2017-06-30.pdf PDF
Att_0011_-_IH_OH_-_FINAL_2017-06-30.pdf PDF
Att_0003_-_Section_L_2017-07-28_FINAL.pdf PDF
Att_0021_-_PPQ_for_Facilities_Operation_2017-06-16.pdf PDF
Att_0018_-_GFP_List_2017-07-06.pdf PDF
FINAL-Scranton_AAP_EBS-06-25-2015_v2.pdf PDF
W52P1J-15-R-0023_Draft_11-01-2016_FINAL.pdf PDF
Att_0004_-_SCAAP_PWS_1_-_Property_-_Draft_RFP.docx DOCX document
Att_0021_-_Small_Business_Participation_Plan_Property_Management.docx DOCX document
Att_0010_-_SCAAP_PWS_7_-_Utilities-Energy_-_Draft_RFP.docx DOCX document
Att_0007_-_SCAAP_PWS_4_-_Security_-_Draft_RFP.docx DOCX document
Att_0013_-_SCAAP_PWS_10_-_Facility_Plans_-_Draft_RFP.docx DOCX document
Att_0005_-_SCAAP_PWS_2_-_Maintenance_-_Draft_RFP.docx DOCX document
Att_0014_-_SCAAP_PWS_11_-_LIF_-_Draft_RFP.docx DOCX document
Att_0018_-_Procedures_for_Submitting_a_CDR.doc DOC document
Att_0003_-_Price_Matrix_TEP_and_Property_Management.xlsx XLSX spreadsheet
Att_0020_-_PPQ_for_Facilities_Operation.docx DOCX document
Att_0009_-_SCAAP_PWS_6_-_OH-IH_-_Draft_RFP.docx DOCX document
Att_0002_-_W15QKN-17-R-0018_Attachments.PDF PDF
Att_0015_-_SCAAP_PWS_12_-_MIF_-_Draft_RFP.docx DOCX document
Registration_Form_Nov_2016_FINAL.pdf PDF
Show all 50

Solicitation - Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURGE FACILITIZATION

PERFORMANCE WORK STATEMENT (PWS)

(DIRECT)

1. OBJECTIVE: This PWS describes the Surge Facilitization requirements and responsibilities of the contractor at the Scranton Army Ammunition Plant (SCAAP).

The end result of this PWS is for the contractor to provide a reasonable and executable Surge Facilitization Plan. The term Surge refers to Government production capacity that is either outside the scope of the current production contract or are in quantities above and beyond normal production quantities. Implementation of the Surge Facilitization Plan is not guaranteed but could be executed based on changing global threats, war, or other emerging requirements. This PWS will detail the Governments requirements for the contractor’s Surge Facilitization Plan.

2. REQUIREMENTS:

2.1. The contractor shall submit a Surge Facilitization Plan as part of its proposal for this Property Management contract for review and approval by the Government. This plan shall describe how the contractor intends to meet the requirements and conditions described within this PWS and address any substantial risks raised as part of its Surge Facilitization Plan. (CDRL A001)

2.2. The contractor shall update the plan at the Governments request or when a significant change in available equipment, facilities, and/or subcontractor occurs. As part of this update the contractor shall provide a risk mitigation plan or alternate process for this change. Each update shall be submitted for review and approval by the Government. (CDRL A002)

2.3. The Surge Facilitization Plan shall incorporate the Integrated Cultural Resources Management Plan (ICRMP), as described in the Environmental

PWS.

2.4. The Government reserves the right to test or implement all or part of this PWS at a future date.

2.5. The contractor shall maintain all files and records created as a result of this PWS until completion of the contract and any executed extensions. The Government shall obtain Unlimited Rights to any documents created as a result of this PWS as described by DFARS 227.7103-5(a) and 252.227-7013. Copies of all documents shall be provided to the Government upon request. Electronic record keeping format is acceptable; the preferred electronic format is a searchable PDF.

2.6. It shall be noted that there is no production within the solicitation or resultant contract associated with this PWS, rather this PWS is concerned with only the facilitization. If Surge production requirements arise, the requirements, production related overheads, and production costs will not be included in this contract.

3. APPLICABLE SURGE ITEMS AND CAPACITIES: For the purpose of this PWS only the following items shall be considered for the contractors Surge Facilitization Plan. Maximum Surge capacities listed are given only for the contractor’s convenience and do not represent any current acquisition plans of the Government.

While each item has its own unique requirements all items included in the Surge Facilitization Plan must be produced concurrently.

Item Annual Surge Capacity

M795 400,000

M933A1/M934A1 540,000

Total Annual Surge Capacity

940,000

4. SURGE RAMP-UP AND TIMELINE:

4.1. The contractor is not required to meet the annual Surge Capacity detailed above immediately. There will be a ramp-up period of eighteen (18) months which allows the contractor time to implement its plan and work up to the maximum annual Surge Capacity.

4.2. The contractor shall continue to meet its required delivery schedules while ramping-up the Surge Capacity.

4.3. The contractor shall sustain the anticipated total annual Surge Capacity until the end of the Surge period as determined by the Government. For the purposes of this PWS, the Surge period, including ramp-up, is set at five (5) years, however the actual period can vary based upon actual requirements.

5. SURGE PLAN REQUIREMENTS:

5.1. The contractor’s Surge Facilitization Plan shall detail its plan to meet the annual Surge Capacity within the provided ramp-up period and timeline. The plan shall detail the contractor’s strategy for increasing production capacity from the base award quantities to the Surge quantities while paying specific attention to any changes in the manufacturing plan, facilities, equipment, and subcontractor responsibilities. The Surge Facilitization Plan shall consist of the following three areas: Technical, Management, and Surge Integrated Master Schedule (IMS) and Risk Mitigation. Each of these areas is described in greater detail in the following sections.

5.2. The Technical section of the contractor’s Surge Facilitization plan shall explain in detail how the contractor intends to meet the technical requirements of its plan. While the Government will not tell the contractor how to facilitize to meet the annual Surge Capacity the contractor shall provide sufficient data to validate its plan. Areas that need to be discussed at a minimum include:

5.2.1. Production Plan; including process maps, flow charts, facility layouts, throughput analysis and any other deviations from the contractor’s base production plan. While the Surge production plan does not need to be as detailed as the contractor’s base production plan it shall detail any technical details needed to meet Surge capacities as well as justifications for any production rates or assumptions.

5.2.2. Equipment and Facility Plan; including procurement of facilities, equipment, gages, tooling and tool making, relocation or reactivation of Government Furnished Property (GFP), and/or subcontracted manufacturing. This section shall describe in detail how the contractor intends to meet the equipment and facilities requirements based upon its Surge production plan. Consideration should be given for long lead time items including: procurement of equipment and/or facilities, reactivation of equipment, etc

5.3. The Management section of the contractor’s Surge Facilitization plan shall explain in detail how the contractor intends to meet the Management requirements of its plan. While the Government will not tell the contractor how to manage to meet the annual Surge Capacity the contractor shall provide sufficient data to validate its plan. Areas that need to be discussed at a minimum include:

5.3.1. Personnel Management; including Engineers, Laborers, Trained Equipment Operators, Quality Assurance, and any Union involvement or ramifications. This section shall describe in detail how the contractor intends to meet and manage any changes or increases in personnel required to meet Surge Capacities.

5.3.2. Supply Stream Management; including the management of GFP, Contractor Furnished Material, Raw Materials, Long Lead-Time Items and Supplies. This section shall describe in detail how the contractor intends to manage its Supply Stream to meet both the requirements of the current production contract and Surge requirements. The contractor shall provide insight into the abilities and capacities of its Supply Stream.

The contractor shall also identify an alternative to its core Supply Stream. The contractor shall describe increases to both its ingoing and outgoing supply stream to meet Surge Capacities in an efficient and cost effective manner.

5.3.3. Subcontractor Management; including the management of both existing and future subcontractors. This section shall describe in detail how the contractor intends to manage any potential subcontractor involvement as part of its Surge Facilitization plan. While utilization of subcontractors is not necessary, a plan shall be in place to manage and track subcontractor involvement and activities to maintain an appropriate level of visibility and control.

5.4. The contractor shall include as part of its Surge Facilitization Plan, a detailed IMS breaking out all significant activities by month for the eighteen (18) month ramp-up period as described in section four (4) of this PWS. This IMS shall show in detail, all significant activities and milestones as described in the contractor’s Surge Facilitization Plan and identify the critical path. As part of the IMS, the contractor shall prepare a risk analysis identifying any areas of significant risk in relation to costs, schedule, and/or performance of the Surge Facilitization Plan. The risk analysis shall include risk mitigation strategies or alternate plans. Significant activities and milestones include but are not limited to: equipment procurement, movement, installation and reactivation, facility procurement and reactivation, personnel hiring, training, First Article Testing (FAT), equipment certification, etc. The preferred format for the Surge IMS is Microsoft Project or similar.

File details come from the government source that posted it. Updated .