34_ITEM 01.3-20_ADD 02_02700A-202.pdf
PDF 659 KB Posted
- Attached to
- F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
- Solicitation number
- W50S9F-22-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document provides details for an unrestricted invitation for bid for construction services. The 115th Fighter Wing at Dane County Regional Airport -Truax Field in Madison, Wisconsin intends to issue an IFB for award of a single firm fixed-price contract to construct a new three-bay hangar facility compatible with F-35 operations. The scope of work includes demolishing an existing building and constructing a 31,000 square foot hangar with three bays along with associated administrative and shop spaces. The facility will also require installation of specialized systems for aircraft including pre-conditioned air, aircraft power, fire suppression, and hangars bay HVAC. This solicitation will result in a base contract with two option items and has a period of performance of 550 days from notice to proceed. The bid opening will be conducted in accordance with FAR Subpart 14.4 and interested bidders must be registered in the System for Award Management by the bid submission date. The NAICS code is 236220 for commercial and institutional building construction and the project value is estimated between $25-100 million.
The document provides relevant details on the type of project, general scope of work, response dates, award terms, and federal agencies involved for an IFB to construct a specialized aircraft hangar facility in Madison, Wisconsin.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND FLOOR
100'-0"
GROUND FLOOR
100'-0"
AC
A-301 D1
A-301 C1
EGL FKM
A-302 D2
VERTICAL INSULATED
METAL PANELS-COLOR #1
CAST STONE
COPING
SPLIT-FACED
COLORED CMU
EIFS
CAST STONE COPING
SPLIT-FACED
COLORED CMU
CAST STONE
COPING
SPLIT-FACE
COLORED
CMU
HIGH ROOF HANGAR
BAY
134'-4"
HIGH ROOF HANGAR
BAY
134'-4"
TRANSLUCENT
PANELS
T.O. PARAPET
119'-4"
HOLLOW
METAL DOOR
AND FRAME
" C
LE
AR
M
IN
'-8
/2
" F R
O M
D
AT
U M
4' -0
9' -4
8"
A.3
AWNING
H
'-4
'-4
AWNING
AWNING
'-4
ROOF ACCESS LADDER ROOF ACCESS LADDER
MECHANICAL EQUIPMENT
MECHANICAL EQUIPMENT
VERTICAL LIFT
FABRIC DOOR
CONCRETE
CURB
MECHANICAL
EQUIPMENT
SIGNAGE TO MATCH
CURRENT BASE
STANDARDS
MECHANICAL LOUVER
EQEQEQ
A-307 A1
A-307 A3
4' -0
4'
-0
4' -0
4'
-0
EQEQEQCJ
CJ CJ CJ CJ
55' 4".
MECHANICAL
EQUIPMENT
DOOR CLEAR HEIGHT
121'-8 1/2"
75' - 4". 2
GROUND FLOOR
100'-0"
GROUND FLOOR
100'-0"
A C
A-301 D1
A-301 C1
B D E G LF K M
A-302 D2
CAST STONE
COPING
SPLIT-FACED
COLORED
CMU
HORIZONTAL INSULATED
METAL PANELS-COLOR #2
CURTAIN WALL
SYSTEM
VERTICAL INSULATED
METAL PANELS-COLOR #1
HIGH ROOF HANGAR
BAY
134'-4"
HIGH ROOF HANGAR
BAY
134'-4"
A-304 A5
TRANSLUCENT
PANELS
STACKED
SUNSHADE
TRANSLUCENT PANELS
T.O. PARAPET
119'-4"
FINISHED SOFFIT
109'-0"
SPLIT-FACED
COLORED
CMU
SPLIT-FACED
COLORED
CMU
EIFS
VERTICAL
INSULATED
METAL PANELS-
COLOR #1
4' -0
'-0
EIFS
CAST STONE
COPING
8" 9'
-4 "8"
2' -8
A.3
AWNING
AWNING
JB.9B.7 C.2 F.7 G.6
'-4
AWNING
'-4
ROOF
ACCESS
LADDER
MECHANICAL
LOUVER
ROOF ACCESS
LADDER
D D D D D DBAMECHANICAL
EQUIPMENT
MECHANICAL
EQUIPMENT
STACKED
SUNSHADE
SIGNAGE TO MATCH
CURRENT BASE
STANDARDS
OVERHEAD
AWNING
MECHANICAL
EQUIPMENT
SIGNAGE TO MATCH
CURRENT BASE
STANDARDS
A-307 A1
A-307 A3
4' -0
4'
-0
4' -0
4'
-0
4' -0
4'
-0
4' -0
4'
-0
3' -0
" 2' -0
1'
-0
1' -0
'-8
4'-4"
CJCJ CJCJ
MECHANICAL
EQUIPMENT
74'-8 5/8" 2
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021
C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W
7D .rvt
6/8/2022 10:27: 17 AM
BUILDING ELEVATIONS
A-202
JBC/TDB
JRT/JBC
JBC
SCALE: 1/8" = 1'-0"
NORTH ELEVATIONC1
SCALE: 1/8" = 1'-0"
SOUTH ELEVATIONA1
0 4' 8' 16'
1/8" = 1'-0"
1 ADDENDUM 1 04/22/2022
2 ADDENDUM 2 06/08/2022
W
IS C O NS IN
A R C H I T E C T
JASON T.
HOLUBY
A-13101
OKLAHOMA CITY
OK
File details come from the government source that posted it. Updated .