This solicitation is an invitation for bid to construct a new three-bay specialized hangar facility at Dane County Regional Airport-Truax Field in Madison, Wisconsin for the 115th Fighter Wing of the Wisconsin Air National Guard. The project scope includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar with associated shop and administrative spaces to support F-35 fuel cell operations, indoor wash requirements, squadron-level surface coating operations, and weapons load training. The facility will also include pre-conditioned aircraft air, 270VDC aircraft power, fire suppression, hangar bay HVAC, and accommodate future paint booth and composite spaces. The contract duration is 550 days with a bid opening date to be determined. The solicitation includes a base CLIN for construction and two option CLINs for a paint/mix addition and aircraft-rated pavement. Brand name justification is provided for several required systems. Interested parties should register in SAM and monitor the SAM.gov website for solicitation documents, amendments and the bid opening.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-35A
F-35A F-35A
F-35A
C
C
C
C
C C
C
C
C
C
C
CCC
C
C
C
C C
LOCF
F
F
F
F
F
C
CO
P
P
C
L
L
M
M
K
KJ
HG
G
F
F
E
E
D
D
C
C
B
B
108110112
MATCHLINE
SEE A1 /
FA102
CM
F
F
RTU-01
MM
FIRE ALARM SYSTEM
MONITOR MODULE FOR
EYE WASH SUPERVISION,
LOCATE AS REQUIRED.
MM
FIRE ALARM SYSTEM
MONITOR MODULE FOR
EYE WASH SUPERVISION,
LOCATE AS REQUIRED.
MM
WP
WP WP WP
S C
CM
CM
FOR GAS SHUTOFF TO
ROOM 101
(TYP)
WP
MM AED
(COORD. LOCATION)
WEAPONS
LOAD
TRAILER
(TYP)
CM CM
FIRE SHUTTER
EXP
EXP
CM CM
FIRE SHUTTER
TRENCH DRAIN OUTFALL:
MM
MM
MM
CONTAINMENT NOT EMPTY
MANUAL VALVE OPEN
MANUAL VALVE CLOSED
TRENCH DRAIN OUTFALL
CONTAINMENT LEVEL
AND MANUAL VALVE
PANEL
177 CANDELA
IN HANGAR
BAY
HVLS-02
HVLS-01
CM
EF-09
CM
EF-10
CM
EF-11
CM
HVU-01
(ON ROOF)MM
KNOX BOX
SKYLIGHT
(TYP)
EYE
WASH
177 CANDELA
IN HANGAR
BAY
WP
WP
WP
WP WP
WP
WP
WP WP
WP
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021N
N
PROJECT
KEYPLAN
A
PLAN TRUE
C :\U sers\aja\D o cum ents\M y R evit\02700_FP_aa ndersN Q
N 9J.rvt
6/7/2022 10:48: 34 AM
FIRE ALARM & MASS
NOTIFICATION SYSTEM PLAN -
SECTOR 1
FA101
LFO
JME
JMESCALE: 1/8" = 1'-0"
FIRE ALARM & MASS NOTIFICATION SYSTEM PLAN - SECTOR 1A1
0 4' 8' 16'
1/8" = 1'-0"
FIRE ALARM DESIGN SCHEDULE - SECTOR 1
NUIMBER NAME NOTES
101 WEAPONS TRAINING 1, 2
102 VEST. 1
103 SHARED OFFICE 1
104 FUEL OPEN OFFICE 1
105 VEST. 1
106 CORR. 1
107 CLASSROOM 1
108 OFFICE 1
109 RR W 1
110 WING WEAPONS MGR 1
111 RR M 1
112 FUEL SUPERVISOR 1
113 BREAK/ TRAINING 1
114 VEST. 1
115 OFFICE 1
116 VINYL OPEN OFFICE 1
117A MOTHER'S ROOM 1
117B JAN 1
118 FUEL MAINT./ GENERAL STORAGE 1, 3
NOTES:
1. PROVIDE FIRE ALARM & MASS NOTIFICATION
SYSTEM WITH OCCUPANT NOTIFICATION IN
ACCORDANCE WITH UFC 3-600-01, UFC 4-021-01,
ECB 2018-17, NFPA 72, AND NFPA 70.
2. ALL FIRE ALARM INSTALLATION INCLUDING,
APPLIANCES, DEVICES, DEVICE BACKBOXES,
PATHWAYS AND CONDUCTORS SHALL BE
SUITABLE FOR WET LOCATION, NEMA 4.
3. DEVICES, APPLIANCES AND THEIR INSTALLATION
SHALL BE SUITABLE FOR CLASS 1 DIVISION 1
LOCATIONS.
WP WP
WP
GENERAL NOTES
A. THE DESIGN AND INSTALLATION OF THE FIRE
PROTECTION SYSTEM SHALL BE IN STRICT
ACCORDANCE WITH UFC 4-021-01;
ECB 2018-17; UFC 3-600-01; NFPA 13; NFPA 70;
NFPA 20; NFPA 72; NFPA 90A; ADOPTED STATE
AND LOCAL CODES, AND THE CONTRACT
DOCUMENTS.
1 ADDENDUM 1 04/22/2022
2 ADDENDUM 2 06/08/2022
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
LIANE F
OZMUN
E-48073
OKLAHOMA CITY
OK
File details come from the government source that posted it. Updated .