26_ITEM 01.3-12_ADD 02_02700SF105.pdf

PDF 525 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This document includes an invitation for bid for construction services and the related federal contract opportunity details. The solicitation is for the construction of a new three-bay hangar at Dane County Regional Airport in Madison, Wisconsin to support F-35 operations including fuel cell work, indoor washing, surface coating, and weapons load training. Services required include demolishing an existing building and constructing a 31,000 square foot hangar with specialized aircraft systems and administrative spaces. The bid includes a base price for construction and two options for additional spaces. The contract duration is 550 days with award to the responsive and responsible lowest bidder. The estimated value is between $25-100 million. The NAICS code is 236220 and small business goals apply. The pre-bid conference will be held on-site with the bid opening following standard FAR procedures. The solicitation and amendments are available on SAM.gov and inquiries must be submitted in writing. The response due date and award timing are not specified.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Questions and Answers 4.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
Questions and Answers 3.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
08_ITEM 01.2-8_ADD 03_Section 21 13 18.pdf PDF
10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf PDF
12_ITEM 01.3-2_ADD 03_02700C-100.pdf PDF
25_ITEM 01.3-15_ADD 03_02700A-505.pdf PDF
27_ITEM 01.3-17_ADD 03_02700A-511.pdf PDF
32_ITEM 01.3-22_ADD 03_02700A-702.pdf PDF
35_ITEM 01.3-25_ADD 03_02700FA101.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
08_ITEM 01.2-9_ADD 02_Section 08 87 35.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
40_ITEM 01.3-26_ADD 02_02700FA102.pdf PDF
41_ITEM 01.3-27_ADD 02_02700FA601.pdf PDF
47_ITEM 01.3-33_ADD 02_02700EP701.pdf PDF
31_ITEM 01.3-17_ADD 02_02700A-103.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
W50S9F22B0001 Solicitation - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 4 - 20220208 Single Source Determination - Advantor - Redacted.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

J

M

M

K

K

L

L

D1

SF210

W30X116

W30X116

W30X116

W30X116

W30X116

W

X3

W

X3

W

X3

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

H

SS

X1

2X 1/

H

SS

X1 2X

1/

H

SS

X1

2X 1/

H

SS

X1 2X

1/

H

SS

X1

2X 1/

H

SS

X1 2X

1/

H

SS

X1

2X 1/

H

SS

X1 2X

1/

HSS12X12X1/4HSS12X12X1/4

W

X3

W

X3

W

X3

W16X36 W16X36

1'-10" 20'-6" 20'-8" 20'-6" 1'-10"

1' -1

0"

'-6

'-0

'-1 0"

'-4

/4

9'

-0

1' -1

0"

A1

SF401

SF502

D1

SF502

D2

B1

SF501

TYP

B1

SF501

TYP

1" DIA ROD

BRACING TYP

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W

X2

W16X36

HSS12X12X1/4

W

X3

W

X3

W

X3

H

SS

X1

2X 1/

4'-2" 4'-1" 4'-1" 4'-1" 4'-1" 4'-2" 4'-1" 4'-2" 4'-1" 4'-2" 4'-1" 4'-1" 4'-1" 4'-1" 4'-2"

A1

SF402

W14X22

0"

SF502

C3

D1

SF503

D2

SF503

D3

SF503

AT GRID 6

SF502

C1

TYP

TYP

SF503

C4

SF503

C3

D4

SF503

W14X22

W14X22

H

SS

X1

2X 1/

0'

-8

/4

61'-8"

DECK BRG

129'-8 1/2"

DECK BRG

133'-10 3/4"

'-0

" 10

10101010

1. PROVIDE BOTTOM FLANGE BRACES ON ALL ROOF GIRDERS AND

BEAMS . SPACE FLANGE BRACES AT 10'-0" OC TYP W/ ADD'L

LOCATIONS AS NOTED.

2. ALL SUSPENDED MECHANICAL, ELECTRICAL AND FIRE

PROTECTION PIPES OR EQUIPMENT SHALL BE SUPPORTED BY

BEAMS. PROVIDE KICKERS AS NEEDED. ATTACHMENT TO METAL

DECK FROM BELOW IS NOT ALLOWED.

3. LOCATION AND WEIGHTS OF MECHANICAL EQUIPMENT SHOWN ON

PLAN ARE BASIS OF DESIGN. VERIFY WITH MECHANICAL FOR

ADDITIONAL INFORMATION. GC TO COORDINATE FINAL LOCATION

AND SUPPORT REQUIREMENTS.

HIGH ROOF FRAMING PLAN NOTES

1 ROOF DECKING

1.5B 20GA GALV ROOF DECK (33 KSI MIN) ATTACHED

WITH 36/7 PATTERN OF 5/8" DIA PUDDLE WELDS AT

ALL SUPPORTS AND AT PERIMETER. PROVIDE #10

TEK LAP FASTENERS 20" OC.

2 NOT USED.

3 NOT USED.

4 RIGID RAIL FALL ARREST REFER TO .

5 NOT USED.

6 NOT USED

7 SUSPENDED FAN BELOW. 290 LBS ASSUMED WEIGHT.

8 PROVIDE ROOF FRAMING KICKERS AT 10'-0" MAX SPACING

TYPICAL.

HANGAR REFER AND

ADMIN REFER AND

C1 / SF502

C1 / SF502 C2 / SF502

C3 / SF502

MOMENT CONNX

A1 / S-002

MECHANICAL ROOF TOP UNIT OR MAKE UP AIR UNIT. REFER

TO MECHANICAL FOR UNIT SCHEDULING. GC TO COORD

FINAL LOCATION OF THE W8X18 SUPPLEMENTARY STEEL TO

SUPPORT UNIT CURBS ONCE FINAL UNITS HAVE BEEN

SELECTED. GC TO COORDINATE OPENINGS THRU ROOF OR

WALL AND PROVIDE ANGLE FRAMING FOR ROOF OPENING

AND COLD FORMED FRAMING AT WALL OPENINGS.

FALL ARREST ANCHOR PER DETAIL B3/S-002

FALL ARREST ANCHOR SIMILAR TO DETAIL B3/S-002 USING

SECONDARY BEAM INSTEAD OF ANGLE L4x4

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\ich\D o cum ents\M y R evit\02700_Stru_ih ortonXV Z5D

.rvt 6/7/2022 9:10:3 0 A

M

HIGH ROOF FRAMING PLAN -

SECTOR ONE

SF105

TJD

GMR

GMR

SCALE: 1/8" = 1'-0"

HIGH ROOF FRAMING PLAN - SECTOR ONEA1

0 4' 8' 16'

1/8" = 1'-0"

1 ADDENDUM 1 04/22/2022

2 ADDENDUM 2 06/08/2022

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

GENE O.

BROWN

E-47748

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .