This document provides details for an unrestricted invitation for bid for the construction of an F-35 three bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope includes the complete demolition of an existing building and construction of a new three bay hangar and associated administrative and shop spaces to accommodate F-35 operations. The facility is also to include a lightning protection system, fall protection, and an Advantor security system. The base contract line items are for construction of the hangar and demolition work, with optional additions for a paint/mix area and aircraft rated pavement. The bid opening will be conducted in accordance with FAR Subpart 14.4 and DFARS Subpart 214.4. Interested contractors must register in the System for Award Management and monitor the related SAM.gov website for solicitation documents, amendments, and to submit bids ahead of the anticipated June 2022 bid opening. The contract is to be awarded to the responsive and responsible lowest bidder.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Questions and Answers 4.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
Questions and Answers 3.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
08_ITEM 01.2-8_ADD 03_Section 21 13 18.pdf PDF
10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf PDF
12_ITEM 01.3-2_ADD 03_02700C-100.pdf PDF
25_ITEM 01.3-15_ADD 03_02700A-505.pdf PDF
27_ITEM 01.3-17_ADD 03_02700A-511.pdf PDF
32_ITEM 01.3-22_ADD 03_02700A-702.pdf PDF
35_ITEM 01.3-25_ADD 03_02700FA101.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
Questions and Answers 2.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 03_2022.06.14_Narrative.pdf PDF
04_ITEM 01.2-4_ADD 03_Section 05 51 33.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
17_ITEM 01.3-7_ADD 03_02700SF102.pdf PDF
21_ITEM 01.3-11_ADD 03_02700A-306.pdf PDF
22_ITEM 01.3-12_ADD 03_02700A-307.pdf PDF
26_ITEM 01.3-16_ADD 03_02700A-510.pdf PDF
29_ITEM 01.3-19_ADD 03_02700A-601.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
40_ITEM 01.3-26_ADD 02_02700FA102.pdf PDF
41_ITEM 01.3-27_ADD 02_02700FA601.pdf PDF
47_ITEM 01.3-33_ADD 02_02700EP701.pdf PDF
31_ITEM 01.3-17_ADD 02_02700A-103.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
26_ITEM 01.3-12_ADD 02_02700SF105.pdf PDF
34_ITEM 01.3-20_ADD 02_02700A-202.pdf PDF
44_ITEM 01.3-30_ADD 02_02700EG601.pdf PDF
46_ITEM 01.3-32_ADD 02_02700EP601.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
W50S9F22B0001 Solicitation - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 4 - 20220208 Single Source Determination - Advantor - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANG/WI - F-35: 3-Bay Specialized Hangar 20202700F353BAY Addendum No. 02 8 June 2022

SECTION 08 87 35

ARCHITECTURAL WINDOW FILM

09/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials

1.2 SEQUENCING AND SCHEDULING

Specification subparagraph text.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Architectural Finish Film ; G

SD-04 Samples

Architectural Finish Film ; G

SD-05 Design Data

Material Properties ; G

1.4 QUALITY ASSURANCE

1.4.1 Manufacturer Qualifications

All primary products specified in this section will be supplied by a single manufacturer with a minimum of ten years' experience.

1.4.2 Installer Qualifications

All products listed in this section are to be installed by a single installer with a minimum of five years demonstrated experience in installing products of the same type and scope as specified.

a. Provide documentation that the installer is authorized by the Manufacturer to perform Work specified in this section.

b. Provide a commercial building reference list of 5 properties where

SECTION 08 87 35 Page 1 the installer has applied window film. This list will include the following information.

1. Name of building.

2. Type of glass.

3. Type of film and/or film attachment system.

4. Amount of film and/or film attachment system installed.

5. Date of completion.

1.5 DELIVERY, STORAGE, AND HANDLING

a. Follow Manufacturer's instructions for storage and handling.

b. Store products in manufacturer's unopened packaging until ready for installation.

c. Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction.

1.6 PROJECT CONDITIONS

1.6.1 Environmental Requirements

Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.

1.7 WARRANTY

At project closeout, provide to Contracting Officer an executed current copy of the manufacturer's standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage.

PART 2 PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

2.1.1 Flammability

Surface burning characteristics when tested in accordance ASTM E84, demonstrating film applied to glass rated Class A for Interior Use:

a. Flame Spread Index: no greater than 25.

b. Smoke Developed Index: no greater than 450.

2.2 MATERIALS

2.2.1 Architectural Finish Film

PRF

2.2.2 Material Properties

a. General: Glass and plastic finishes field-applied application to

SECTION 08 87 35 Page 2 glass or plastic material as visual opaque or decorative film.

b. Film: Polyester.

c. Decorative Pattern: Printed.

d. Adhesive: Acrylic, Pressure Sensitive, Permanent.

e. Liner: Silicone-coated Polyester.

f. Thickness (Average): 3.2 mils (80 microns).

g. Fire Performance: Surface burning characteristics when tested in accordance with ASTM E84, Class A:

1. Flame Spread: 25 maximum.

2. Smoke Developed: 450 maximum.

PART 3 EXECUTION

3.1 EXAMINATION

3.1.1 Film Examination

a. If preparation of glass surfaces is the responsibility of another installer, notify Architect in writing of deviations from manufacturer's recommended installation tolerances and conditions.

1. Glass surfaces receiving new film should first be examined to verify that they are free from defects and imperfections, which will affect the final appearance.

b. Do not proceed with installation until glass surfaces have been properly prepared and deviations from manufacturer's recommended tolerances are corrected. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result under the project conditions.

c. Commencement of installation constitutes acceptance of conditions.

3.2 PREPARATION

a. Clean surfaces thoroughly prior to installation.

b. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.3 INSTALLATION

3.3.1 Film Installation, General

a. Install in accordance with manufacturer's instructions.

b. Cut film edges neatly and square at a uniform distance of 1/8 inch to 1/16 inch of window sealant. Use new blade tips after 3 to 4 cuts.

c. Spray the slip solution, composed of one capful of baby shampoo or

SECTION 08 87 35 Page 3 dishwashing liquid to 1 gallon of water, on window glass and adhesive to facilitate proper positioning of film.

d. Apply film to glass and lightly spray film with slip solution.

e. Squeegee from top to bottom of window. Spray slip solution to film and squeegee a second time.

f. Bump film edge with lint-free towel wrapped around edge of a 5-way tool.

g. Upon completion of film application, allow 30 days for moisture from film installation to dry thoroughly, and to allow film to dry flat with no moisture dimples when viewed under normal viewing conditions.

h. If completing an exterior application, check with the manufacturer as to whether edge sealing is required.

3.4 PROTECTION AND CLEANING

a. Remove left over material and debris from Work area. Use necessary means to protect film before, during, and after installation.

b. Touch-up, repair or replace damaged products before Substantial Completion.

c. After application of film, wash film using common window cleaning solutions, including ammonia solutions, 30 days after application. Do not use abrasive type cleaning agents and bristle brushes to avoid scratching film. Use synthetic sponges or soft cloths.

-- End of Section --

SECTION 08 87 35 Page 4