29_ITEM 01.3-19_ADD 03_02700A-601.pdf

PDF 216 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This document provides details for an unrestricted invitation for bid for the construction of an F-35 three bay specialized hangar. The solicitation requests the construction of a new 31,000 square foot three bay hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin to support F-35 mission operations such as fuel cell work, indoor washing, and weapons load training. The scope of work includes demolishing an existing 19,875 square foot building and constructing the new hangar along with associated shop and administrative spaces. The hangar bays are to include pre-conditioned aircraft air, 270 VDC aircraft power, fire suppression, and hangar bay HVAC. The project is estimated to cost between $25-100 million and will be registered with the US Green Building Council. The solicitation includes a base bid for construction as well as two options for a paint/mix addition and aircraft rated pavement. The North American Industry Classification code is 236220 with a size standard of $39.5 million. Brand name justification is provided for several products. The bid opening will be conducted according to FAR and DFARS and award will go to the responsive and responsible lowest bidder.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Abstract of Offers.pdf PDF
39_ITEM 01.5-1_ADD 03_Bid Question Attachment_2022.06.14.pdf PDF
06_ITEM 01.2-6_ADD 04_Section 08 33 23.pdf PDF
11_ITEM 01.3-1_ADD 04_02700C-301.pdf PDF
12_ITEM 01.3-2_ADD 04_02700C-401.pdf PDF
20_ITEM 01.3-10_ADD 04_02700A-140.pdf PDF
24_ITEM 01.3-14_ADD 04_02700A-702.pdf PDF
Questions and Answers 2.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 03_2022.06.14_Narrative.pdf PDF
04_ITEM 01.2-4_ADD 03_Section 05 51 33.pdf PDF
05_ITEM 01.2-5_ADD 03_Section 08 71 00.pdf PDF
17_ITEM 01.3-7_ADD 03_02700SF102.pdf PDF
21_ITEM 01.3-11_ADD 03_02700A-306.pdf PDF
22_ITEM 01.3-12_ADD 03_02700A-307.pdf PDF
26_ITEM 01.3-16_ADD 03_02700A-510.pdf PDF
30_ITEM 01.3-20_ADD 03_02700A-602.pdf PDF
GEO TECH REPORT_F-35 Hangar_2020-08-28_FINAL9-10-2020.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
26_ITEM 01.3-12_ADD 02_02700SF105.pdf PDF
34_ITEM 01.3-20_ADD 02_02700A-202.pdf PDF
44_ITEM 01.3-30_ADD 02_02700EG601.pdf PDF
46_ITEM 01.3-32_ADD 02_02700EP601.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9' -0

3' -4

3'

-8

2' -0

TYP NOTE

HEAD

JAMB

SILL

A

D5/A-502 B1&C1/A-505 B3/A-502

7' -0

T

T

TTT

T

T

6'-0" EQEQ

11'-3"

9' -0

2' -0

3'

-8

3' -4

9'-1"

EQ EQ EQ

TYP NOTE

HEAD

JAMB

SILL

B

D5/A-502 C1&B2/A-505 B3/A-502

TTT

GROUND FLOOR

100'-0"

9' -0

EQEQEQ0"13/128" 6'-0" EQ

TYP NOTE

HEAD

JAMB

SILL

C

A4/A-501 A4/A-501 B3/A-502

TT

T T T

TT

17'-11 7/8"18'-0"

7' -0

"TT

2' -0

3'

-8

3' -4

4'-0"

SUNSHADE

PER

ELEVATIONS

4' -0

3'

-4

TYP NOTE

HEAD

JAMB

SILL

D

B4/A-500 B3/A-500 B2/A-500

1/

2"

1/ 2"

1' -4

5'-5"

4' -0

3'

-4

TYP NOTE

HEAD

JAMB

SILL

E

B4/A-500 B3/A-500 B2/A-500

9' -0

3' -4

3'

-8

2' -0

TYP NOTE

HEAD

JAMB

SILL

F

A1/A-500 A3/A-505 B3/A-502

7' -0

T

T

T

T

T

T T

EQ 3'-0" EQ

8'-0"

9' -0

8'-0"

EQ 6'-0" EQ

2' -0

3'

-8

3' -4

TYP NOTE

HEAD

JAMB

SILL

G

A1/A-500 B2/A-505 B1/A-500

T

T

T

T

T

7' -0

"T T

GROUND FLOOR

100'-0"

TYP NOTE

HEAD

JAMB

SILL

H

A1/A-500 B3/A-500 B1/A-500

T TT

T T

8'-0"

EQ 6'-0" EQ

9' -0

2' -0

3'

-8

3' -4

7' -0

"T T

7' -2

3'-8"

TYP NOTE

HEAD

JAMB

SILL

I

B2/A-501 B3/A-501 B4/A-501

T

PRIVACY FILM -

REFER TO SHEET

A-402 / C4

6 1/4" 2'-11 3/4" 2"

7' -2

6 1/4"

31'-8 3/8"

2" EQ EQ EQ EQ EQ EQ EQ EQ EQ

TYP NOTE

HEAD

JAMB

SILL

J

B2/A-501 B3/A-501 B4/A-501

T T T T T T T T T

PRIVACY FILM - REFER TO

SHEET A-402 / B1

GROUND FLOOR

100'-0"

4' -0

3'

-4

TYP NOTE

HEAD

JAMB

SILL

K

A4/A-500 A3/A-500 A2/A-500

1, 3

FIRE SHUTTER ON

HANGAR SIDE

GENERAL NOTES

A. ALL FRAME DIMENSIONS ARE NOMINAL ROUGH

OPENING AND CONTRACTOR SHALL COORDINATE

ACTUAL OPENING SIZES WITH RESPECT TO

REQUIRED SHIM SPACE AND ADJACENT MATERIAL.

B. NO EXPOSED FASTENERS SHALL BE ALLOWED IN

ALUMINUM CURTAINWALL FRAMES.

C. PROVIDE MINIMAL EXPANDING FOAM AT PERIMETER

SHIM CAVITY.

D. REFER TO SPECIFICATION SECTION 087100-GLAZING

FOR GLAZING TYPES.

E. TEMPERED GLAZING IS INDICATED WITH A "T".

F. EXTERIOR GLAZING SHALL BE INSULATED.

G. INTERIOR GLAZING SHALL BE NON-INSULATED.

SHEET KEYNOTES

1. CURTAINWALL SYSTEM: 2" X 4 - 1/2" SCREW SPLINE

OR SHEAR BLOCK UNLESS NOTED OTHERWISE.

2. BUTT GLAZED VERTICAL JOINT WITH 2" - 4 - 1/2"

EXTERIOR FRAMING SYSTEM UNLESS NOTED

OTHERWISE.

3. GLAZING IN HANGAR SHALL BE INSULATED.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021

C :\U sers\w fj\ D ocum e nts\0270 0_Arch_ W

Jim en ezKN

JQ

U

.rvt

6/14 /2022 5: 12:16 PM

WINDOW ELEVATIONS

A-601

JMI

GAZ

MP

1 ADDENDUM 3 06/14/2022

1 1 1

1 1 1 1 1

1 1 1

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

Sheets
A-002 - PARTITION TYPES
A-103 - PARTIAL FLOOR PLAN - SECTOR ONE
A-104 - PARTIAL FLOOR PLAN - SECTOR TWO
A-306 - WALL SECTIONS
A-307 - WALL SECTIONS
A-500 - DETAILS
A-501 - DETAILS
A-505 - PLAN DETAILS
A-510 - ISOMETRIC EXPANSION JOINT
A-511 - ISOMETRIC EXPANSION JOINT
A-600 - DOOR SCHEDULE
A-601 - WINDOW ELEVATIONS
A-602 - ROOM FINISH SCHEDULE & FINISH MATERIALS SCHEDULE
A-701 - COMPOSITE FLOOR PLAN, ROOF PLAN, ELEVATIONS, WALL SECTION & DETAILS - BID OPTION 1
A-702 - FLOOR FINISH PLAN, ROOM FINISH SCHEDULE- BID OPTION 1
G-002 - SHEET INDEX