22_ITEM 01.3-8_ADD 02_02700SF101.pdf
PDF 450 KB Posted
- Attached to
- F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
- Solicitation number
- W50S9F-22-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document provides details for an unrestricted invitation for bid for construction services. The 115th Fighter Wing at Dane County Regional Airport - Truax Field in Madison, Wisconsin intends to issue an invitation for bids for award of a single firm fixed-price contract to construct a new three-bay hangar facility compatible with the F-35 mission, including demolishing an existing building. Scope of work includes demolishing Building 414 and constructing a 31,000 square foot three bay hangar with administrative and shop spaces to accommodate a future paint booth and composite clean/dirty spaces. The facility will also require a lightning protection system, fall protection, and an Advantor security system. The contract duration is 550 days from issuance of the notice to proceed. The solicitation includes options for a paint/mix addition and aircraft rated pavement. Brand name requirements apply for security, HVAC and fire alarm systems. Award will be made to the responsive and responsible lowest bidder.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
A
J
GFEC
CB
MK LD
H
A.3
C.2 G.6F.7B.7
4.3
10'-10" 45'-1 1/2" 23'-10" 22'-0" 22'-6" 9'-0"
3' -1
0"
9' -9
'-7
7' -3
/8
'-0
/8
'-6
'-6
'-1
1/
8"
9' -6
/8
'-6
'-6
/4
8' -9
/4
'-6
'-0
'-1
0"
'-4
/4
9' -0
'-0
/8
'-8
/8
'-4
'-4
35'-10 3/8" 14'-2 3/8" 5'-10 3/4"
2'-8 1/4"
10'-10 5/8" 25'-8 1/8" 35'-2 3/4"
2'-11" 20'-6" 20'-8" 20'-6"
BRACING
BR
AC
IN
G
BR
AC
IN
G
BRACING
BRACING
BRACING
BR
AC
IN
G
BR
AC
IN
G
MATCHLINE
0'
-2
1. PROVIDE BOTTOM FLANGE BRACES ON ALL PERIMETER ROOF
BEAMS AS SHOWN ON DETAILS.
2. ALL SUSPENDED MECHANICAL, ELECTRICAL AND FIRE
PROTECTION PIPES OR EQUIPMENT SHALL BE SUPPORTED BY
BEAMS. PROVIDE KICKERS AS NEEDED. ATTACHMENT TO
METAL DECK FROM BELOW IS NOT ALLOWED.
3. LOCATION AND WEIGHTS OF MECHANICAL EQUIPMENT SHOWN
ON PLAN ARE BASIS OF DESIGN. VERIFY WITH MECHANICAL
FOR ADDITIONAL INFORMATION. GC TO COORDINATE FINAL
LOCATION AND WEIGHT WITH SUPPORT REQUIREMENTS.
LOW ROOF FRAMING PLAN NOTES
2 MECHANICAL ROOF TOP UNIT OR MAKE UP AIR UNIT. REFER
TO MECHANICAL FOR UNIT SCHEDULING. GC TO COORD
FINAL LOCATION OF THE W8X18 SUPPLEMENTARY STEEL TO
SUPPORT UNIT CURBS ONCE FINAL UNITS HAVE BEEN
SELECTED. GC TO COORDINATE OPENINGS THRU ROOF OR
WALL AND PROVIDE ANGLE FRAMING FOR ROOF OPENING
AND COLD FORMED FRAMING AT WALL OPENINGS.
MECHANICAL EXHAUST FAN. REFER TO MECHANICAL
DRAWINGS FOR FAN SCHEDULING. PROVIDE ANGLE FRAME
AT EXHAUST FAN TO SUPPORT DUCT PENETRATION IN THE
DECK AND THE EXHAUST FAN CURB PER DETAIL .
GC TO COORD LOCATION OF ANGLE FRAME ONCE FINAL
UNIT SIZE AND LOCATION HAVE BEEN SELECTED.
A3 / S-002
1 ROOF DECKING
1.5B 20GA GALV ROOF DECK (33 KSI MIN) ATTACHED
WITH 36/7 PATTERN OF 5/8" DIA PUDDLE WELDS AT ALL
SUPPORTS AND AT PERIMETER. PROVIDE #10 TEK LAP
FASTENERS 20" OC.
4 PCA UNITS. PROVIDE STEEL FRAMING AS SHOWN ON
DETAIL . REFER TO MECHANICAL DRAWINGS
FOR UNIT SCHEDULING.
5 SKYLIGHTS AND SKYLIGHT OPENING FRAMING
6 CMU WALL BELOW. REFER TO FOUNDATION PLAN.
A1 / SF508
7 ROOF DECKING
1.5B 20GA GALV ROOF DECK (33 KSI MIN) ATTACHED
WITH 36/7 PATTERN OF 5/8" DIA PUDDLE WELDS AT ALL
SUPPORTS AND AT PERIMETER. PROVIDE #10 TEK LAP
FASTENERS 6" OC.
8 EXPANSION JOINT ALONG WALL
9 MECHANICAL GAS PIPE ANCHOR. REFER TO DETAIL
A4/SF101.
COORDINATE FINAL LOCATION AND HEIGHT WITH THE
MECHANICAL CONTRACTOR.
C O
O R
D W
/ M
EC
H
AS
R
EQ
U
IR
ED
1/
4"
3/
4"
3/ 4"
1/
4"
4"
8"
CAP PLATE PLAN VIEW
1/4
TYP
1/4
TYP
(2) 3/8" "U" BOLTS
MECH PIPING
HSS3X0.25 POST
ROOFING BOOT JACK
REFER ARCH
6" RIGID INSULATION
REFER ARCH
ROOF DECK
REFER PLAN
ROOF BEAM
REFER PLAN
1/4" CAP PLATE
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021N
N
PROJECT
KEYPLAN
A
PLAN TRUE
C :\U sers\ich\D o cum ents\M y R evit\02700_Stru_ih ortonXV Z5D
.rvt 6/7/2022 9:10:2 3 A
M
LOW ROOF FRAMING PLAN -
COMPOSITE
SF101
TJD
CTW
CTW
SCALE: 1/16" = 1'-0"
LOW ROOF FRAMING PLAN - COMPOSITEA1
0 8' 16' 32'
1/16" = 1'-0"
0 6" 1' 2'
1" = 1'-0"
SCALE: 1" = 1'-0"
TYPICAL MECHANICAL ROOF PIPE ANCHOR DETAILA4 1 ADDENDUM 2 06/08/2022
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
GENE O.
BROWN
E-47748
OKLAHOMA CITY
OK
File details come from the government source that posted it. Updated .