This solicitation is an invitation for bid to construct an F-35 three-bay specialized hangar at Dane County Regional Airport in Madison, Wisconsin. The project scope includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot hangar with three bays, administrative and shop spaces, aircraft air conditioning, power systems, fire suppression, and HVAC. Additional requirements are a lightning protection system, fall protection, and an Advantor security system. The contract is for a single fixed-price award with a base CLIN for construction and two option CLINs for a paint/mix addition and aircraft-rated pavement. The bid due date is TBD with an award date of TBD. The estimated value is between $25-100 million. The solicitation requires Advantor, Andover, Marshall Best, and Monaco brand name products. The procuring agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
19_ITEM 01.3-9_ADD 03_02700SF508.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
23_ITEM 01.3-13_ADD 03_02700A-500.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
31_ITEM 01.3-21_ADD 03_02700A-701.pdf PDF
37_ITEM 01.3-27_ADD 03_02700FA601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
W50S9F22B0001 Solicitation - Ammend 0001.pdf PDF
Questions and Answers 1.pdf PDF
01_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 02_2022.06.08_Narrative.pdf PDF
F-35 3-Bay Hangar Site Visit Attendance.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
ATTACHMENT 2 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (1 of 2).pdf PDF
ATTACHMENT 6 - 20220208 Single Source Determination - Marshall Best - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

100'-0"

B1 A-502

C1A A-502

C1B A-502

A1 A-502

D1 A-502

SPLIT-FACED

CMU

8" CMU

CAVITY WALL

INSULATION

(R-15)

4" VERTICAL

INSULATED

METAL PANEL

(R-32)

EDGE OF SLAB

TRANSLUCENT

PANELS

(R-12.5)

EXTEND ROOF

MEMBRANE UP &

OVER PARAPET

6" ROOF INSULATION

(R-30)

STEEL DECK

PRE-FINISHED METAL

PARAPET CAP

STEEL

STRUCTURE

ROOF PROTECTION

BOARD

STEEL

STRUCTURE

CAST STONE

COPING

4' -0

'-0

9' -4

8"

BATT INSULATION

(R-25)

4" VERTICAL

INSULATED

METAL PANEL

(R-32)

MASONRY

WALL TIES

CONCRETE

CURB

1'-10"

8" CMU BOND BEAM,

RE: STRUCTURAL

MASONRY WALL

SCHEDULE

GROUND FLOOR

100'-0"

HIGH ROOF WEAPONS

TRAINING

136'-2"

HIGH ROOF HANGAR

BAY

134'-4"

D1 A-502

SIM

B1 A-501

A1 A-501

EXTEND ROOF MEMBRANE

UP & OVER PARAPET

6" ROOF INSULATION

(R-30)

STEEL DECK

4" VERTICAL

INSULATED

METAL PANEL

(R-32)

STEEL

STRUCTURE

ROOF PROTECTION BOARD

(HEIGHT VARIES)

PRE-FINISHED METAL

PARAPET CAP

CATWALK

GUARDRAIL

CATWALK TO

ACCESS FABRIC

DOOR MOTORS

FABRIC

HANGAR

DOOR

EXTERIOR SHEATHING

BATT INSULATION (R-25)

STEEL

CHANNEL

6' -8

'-1

DOOR CLEAR HEIGHT

121'-8 1/2"

/2 " F

R O

M F

IN

IS

H F

LO

O

R

GROUND FLOOR

100'-0"

HIGH ROOF WEAPONS

TRAINING

136'-2"

G

D1 A-502

SIM

B1 A-501

SIM

A1 A-501

SIM

4" VERTICAL

INSULATED

METAL PANEL

(R-32)

SPLIT-FACED

CMU

CAST STONE

COPING

EXTEND ROOF MEMBRANE

UP & OVER PARAPET

6" ROOF INSULATION

(R-30)

PRE-FINISHED METAL

PARAPET CAP

STEEL

STRUCTURE

ROOF PROTECTION

BOARD

FABRIC

HANGAR

DOOR

5" 9'

-4

STEEL DECK

H

ELECTRICAL

EQUIPMENT

CATWALK

GUARDRAIL

CATWALK TO

ACCESS FABRIC

DOOR MOTORS

1'-10"

'-1

/2

FR

O M

F

IN

IS

H

F

LO

O R

DOOR CLEAR HEIGHT

121'-8 1/2"

GROUND FLOOR

100'-0"

C

ADMIN ROOF

116'-8"

D1 A-502

SIM

C2 A-502

C1A A-502

SIM

C1B A-502

SIM

D2 A-502

STEEL

STRUCTURE

6" BATT INSULATION

(R-25)

5/8" GYPSUM

WALLBOARD

6" CFMF

ONE HOUR RATED 12"

CMU WALL

SCHEDULED

CEILING

3 5/8" METAL

STUD

5/8" GYPSUM

WALLBOARD

EDGE OF SLAB

ROOF

MEMBRANE

6" ROOF INSULATION

(R-30)

EXTEND ROOF

MEMBRANE UP

& OVER

PARAPET

6" ROOF

INSULATION

(R-30)

STEEL DECK

ROOF

PROTECTION

BOARD

TRANSLUCENT

PANELS

(R-12.5 )

4" VERTICAL INSULATED

METAL PANEL (R-32)

PRE-FINISHED

METAL PARAPET

CAP

ROOF PROTECTION

BOARD

STEEL DECK

BEAM

AIR BARRIER24

'-0

'-0

2'-6"

3-5/8" CFMF

BATT

INSULATION

(R-25)

EXPANSION JOINT

(EJ-2)

STEEL STRUCTURE

10"

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021

C :\U sers\w fj\ D ocum e nts\0270 0_Arch_ W

Jim en ezKN

JQ

U

.rvt

6/14 /2022 5: 10:06 PM

WALL SECTIONS

A-306

JMI

JRT/JBC

JBC

SCALE: 1/2" = 1'-0"

WALL SECTIONA5SCALE: 1/2" = 1'-0"

WALL SECTIONA3SCALE: 1/2" = 1'-0"

WALL SECTIONA2SCALE: 1/2" = 1'-0"

WALL SECTIONA1

0 1' 2' 4'

1/2" = 1'-0"

1 ADDENDUM 3 06/14/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

Sheets
A-002 - PARTITION TYPES
A-103 - PARTIAL FLOOR PLAN - SECTOR ONE
A-104 - PARTIAL FLOOR PLAN - SECTOR TWO
A-306 - WALL SECTIONS
A-307 - WALL SECTIONS
A-500 - DETAILS
A-501 - DETAILS
A-505 - PLAN DETAILS
A-510 - ISOMETRIC EXPANSION JOINT
A-511 - ISOMETRIC EXPANSION JOINT
A-600 - DOOR SCHEDULE
A-601 - WINDOW ELEVATIONS
A-602 - ROOM FINISH SCHEDULE & FINISH MATERIALS SCHEDULE
A-701 - COMPOSITE FLOOR PLAN, ROOF PLAN, ELEVATIONS, WALL SECTION & DETAILS - BID OPTION 1
A-702 - FLOOR FINISH PLAN, ROOM FINISH SCHEDULE- BID OPTION 1
G-002 - SHEET INDEX