21_ITEM 01.3-11_ADD 03_02700A-306.pdf
PDF 331 KB Posted
- Attached to
- F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
- Solicitation number
- W50S9F-22-B-0001
- Issued by
- Department of the Army National Guard
About this file
This solicitation is an invitation for bid to construct an F-35 three-bay specialized hangar at Dane County Regional Airport in Madison, Wisconsin. The project scope includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot hangar with three bays, administrative and shop spaces, aircraft air conditioning, power systems, fire suppression, and HVAC. Additional requirements are a lightning protection system, fall protection, and an Advantor security system. The contract is for a single fixed-price award with a base CLIN for construction and two option CLINs for a paint/mix addition and aircraft-rated pavement. The bid due date is TBD with an award date of TBD. The estimated value is between $25-100 million. The solicitation requires Advantor, Andover, Marshall Best, and Monaco brand name products. The procuring agency is the Department of the Army National Guard.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND FLOOR
100'-0"
B1 A-502
C1A A-502
C1B A-502
A1 A-502
D1 A-502
SPLIT-FACED
CMU
8" CMU
CAVITY WALL
INSULATION
(R-15)
4" VERTICAL
INSULATED
METAL PANEL
(R-32)
EDGE OF SLAB
TRANSLUCENT
PANELS
(R-12.5)
EXTEND ROOF
MEMBRANE UP &
OVER PARAPET
6" ROOF INSULATION
(R-30)
STEEL DECK
PRE-FINISHED METAL
PARAPET CAP
STEEL
STRUCTURE
ROOF PROTECTION
BOARD
STEEL
STRUCTURE
CAST STONE
COPING
4' -0
'-0
9' -4
8"
BATT INSULATION
(R-25)
4" VERTICAL
INSULATED
METAL PANEL
(R-32)
MASONRY
WALL TIES
CONCRETE
CURB
1'-10"
8" CMU BOND BEAM,
RE: STRUCTURAL
MASONRY WALL
SCHEDULE
GROUND FLOOR
100'-0"
HIGH ROOF WEAPONS
TRAINING
136'-2"
HIGH ROOF HANGAR
BAY
134'-4"
D1 A-502
SIM
B1 A-501
A1 A-501
EXTEND ROOF MEMBRANE
UP & OVER PARAPET
6" ROOF INSULATION
(R-30)
STEEL DECK
4" VERTICAL
INSULATED
METAL PANEL
(R-32)
STEEL
STRUCTURE
ROOF PROTECTION BOARD
(HEIGHT VARIES)
PRE-FINISHED METAL
PARAPET CAP
CATWALK
GUARDRAIL
CATWALK TO
ACCESS FABRIC
DOOR MOTORS
FABRIC
HANGAR
DOOR
EXTERIOR SHEATHING
BATT INSULATION (R-25)
STEEL
CHANNEL
6' -8
'-1
DOOR CLEAR HEIGHT
121'-8 1/2"
/2 " F
R O
M F
IN
IS
H F
LO
O
R
GROUND FLOOR
100'-0"
HIGH ROOF WEAPONS
TRAINING
136'-2"
G
D1 A-502
SIM
B1 A-501
SIM
A1 A-501
SIM
4" VERTICAL
INSULATED
METAL PANEL
(R-32)
SPLIT-FACED
CMU
CAST STONE
COPING
EXTEND ROOF MEMBRANE
UP & OVER PARAPET
6" ROOF INSULATION
(R-30)
PRE-FINISHED METAL
PARAPET CAP
STEEL
STRUCTURE
ROOF PROTECTION
BOARD
FABRIC
HANGAR
DOOR
5" 9'
-4
STEEL DECK
H
ELECTRICAL
EQUIPMENT
CATWALK
GUARDRAIL
CATWALK TO
ACCESS FABRIC
DOOR MOTORS
1'-10"
'-1
/2
FR
O M
F
IN
IS
H
F
LO
O R
DOOR CLEAR HEIGHT
121'-8 1/2"
GROUND FLOOR
100'-0"
C
ADMIN ROOF
116'-8"
D1 A-502
SIM
C2 A-502
C1A A-502
SIM
C1B A-502
SIM
D2 A-502
STEEL
STRUCTURE
6" BATT INSULATION
(R-25)
5/8" GYPSUM
WALLBOARD
6" CFMF
ONE HOUR RATED 12"
CMU WALL
SCHEDULED
CEILING
3 5/8" METAL
STUD
5/8" GYPSUM
WALLBOARD
EDGE OF SLAB
ROOF
MEMBRANE
6" ROOF INSULATION
(R-30)
EXTEND ROOF
MEMBRANE UP
& OVER
PARAPET
6" ROOF
INSULATION
(R-30)
STEEL DECK
ROOF
PROTECTION
BOARD
TRANSLUCENT
PANELS
(R-12.5 )
4" VERTICAL INSULATED
METAL PANEL (R-32)
PRE-FINISHED
METAL PARAPET
CAP
ROOF PROTECTION
BOARD
STEEL DECK
BEAM
AIR BARRIER24
'-0
'-0
2'-6"
3-5/8" CFMF
BATT
INSULATION
(R-25)
EXPANSION JOINT
(EJ-2)
STEEL STRUCTURE
10"
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021
C :\U sers\w fj\ D ocum e nts\0270 0_Arch_ W
Jim en ezKN
JQ
U
.rvt
6/14 /2022 5: 10:06 PM
WALL SECTIONS
A-306
JMI
JRT/JBC
JBC
SCALE: 1/2" = 1'-0"
WALL SECTIONA5SCALE: 1/2" = 1'-0"
WALL SECTIONA3SCALE: 1/2" = 1'-0"
WALL SECTIONA2SCALE: 1/2" = 1'-0"
WALL SECTIONA1
0 1' 2' 4'
1/2" = 1'-0"
1 ADDENDUM 3 06/14/2022
W
IS C O NS IN
A R C H I T E C T
JASON T.
HOLUBY
A-13101
OKLAHOMA CITY
OK
| Sheets |
| A-002 - PARTITION TYPES |
| A-103 - PARTIAL FLOOR PLAN - SECTOR ONE |
| A-104 - PARTIAL FLOOR PLAN - SECTOR TWO |
| A-306 - WALL SECTIONS |
| A-307 - WALL SECTIONS |
| A-500 - DETAILS |
| A-501 - DETAILS |
| A-505 - PLAN DETAILS |
| A-510 - ISOMETRIC EXPANSION JOINT |
| A-511 - ISOMETRIC EXPANSION JOINT |
| A-600 - DOOR SCHEDULE |
| A-601 - WINDOW ELEVATIONS |
| A-602 - ROOM FINISH SCHEDULE & FINISH MATERIALS SCHEDULE |
| A-701 - COMPOSITE FLOOR PLAN, ROOF PLAN, ELEVATIONS, WALL SECTION & DETAILS - BID OPTION 1 |
| A-702 - FLOOR FINISH PLAN, ROOM FINISH SCHEDULE- BID OPTION 1 |
| G-002 - SHEET INDEX |
File details come from the government source that posted it. Updated .