32_ITEM 01.3-18_ADD 02_02700A-140.pdf
PDF 919 KB Posted
- Attached to
- F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
- Solicitation number
- W50S9F-22-B-0001
- Issued by
- Department of the Army National Guard
About this file
This federal solicitation seeks a firm fixed-price contract to construct a new three-bay specialized hangar facility at Dane County Regional Airport-Truax Field in Madison, Wisconsin for the 115th Fighter Wing of the Wisconsin Air National Guard. The scope of work includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar with associated administrative and shop spaces to support F-35 mission capabilities such as fuel cell operations, indoor wash requirements, squadron-level surface coating operations, and weapons load training. Additional requirements include a lightning protection system, fall protection, and an Advantor security system. The base contract line items are for construction of the three-bay hangar facility, while two options concern adding a paint/mix addition and aircraft-rated pavement. The North American Industry Classification code is 236220 and the estimated value is between $25-100 million. The bid opening will be conducted according to the Federal Acquisition Regulation. Interested contractors must register in the System for Award Management to access solicitation documents on SAM.gov and submit bids by the deadline.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1 A-201
A1 A-202
A1 A-201
C1 A-202
A-301 D1
A-301 D1
A-301 C1
A-301 C1
A-301 A1
A-301 A1
A-302 B2
A-302 B2
A-302 D2
A-302 D2
1/ 2"
1'
-0
1/2" / 1'-0"
1/2" / 1'-0"
PRIMARY ROOF DRAIN
OVERFLOW ROOF DRAIN
LOW-SLOPE
MEMBRANE ROOF
PRIMARY ROOF
DRAIN
OVERFLOW
ROOF DRAIN
LOW-SLOPE
MEMBRANE
ROOF
PRIMARY
ROOF
DRAIN
OVERFLOW
ROOF
DRAIN
LOW-SLOPE
MEMBRANE ROOF
PRIMARY ROOF DRAIN
OVERFLOW ROOF DRAIN
ROOF
ACCESS
HATCH
FALL
PROTECTION
FALL
PROTECTION
SKYLIGHT
WALKWAY
PADS
WALKWAY
PADS
WALKWAY
PADS
WALKWAY
PADS
LOW-SLOPE
MEMBRANE
ROOF
MECH
EQUIPMENT
MECH
EQUIPMENT
MECH
EQUIPMENT
MECH
EQUIPMENT
ROOF
ACCESS
LADDER
ROOF
ACCESS
LADDER
MECH
EQUIPMENT
MECH EQUIPMENT
MECH EQUIPMENT
1/ 2"
1'
-0
GAS PIPE
ON ROOF
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
CRICKET
CRICKET
CRICKET
SUNSHADES
SUNSHADES
AWNING
AWNING
AWNING
AWNING
AWNING
AWNING
EQ EQ
25'-0"
42" GUARDRAIL
1' -0
CRICKET
CRICKET
CRICKET
BID OPTION 1
MECH
EQUIPMENT
(ON GROUND)
IG-501 A1
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021N
N
PROJECT
KEYPLAN
A
PLAN TRUE
C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W
7D .rvt
6/8/2022 10:26: 50 AM
ROOF PLAN
A-140
JMI
JRT/JBC
JBC
SCALE: 3/32" = 1'-0"
COMPOSITE ROOF PLANA1
8' 24'16'0
3/32" = 1'-0"
GENERAL NOTES
A. ALL ROOF SLOPES SHALL BE 1/2" PER 1' - 0" UNLESS
NOTED OTHERWISE.
B. ALL DRAINAGE CRICKETS SHALL BE 1/2" PER 1' - 0".
C. BASE ROOF INSULATION SHALL BE R-30 MINIMUM.
D. ALL PARAPET CAPS ARE PRE-FINISHED METAL.
E. LIGHTENING PROTECTION SHALL HAVE STRAP OVER
PARAPET AND FASTENED TO PLYWOOD.
1 ADDENDUM 2 06/08/2022
W
IS C O NS IN
A R C H I T E C T
JASON T.
HOLUBY
A-13101
OKLAHOMA CITY
OK
File details come from the government source that posted it. Updated .