This federal solicitation seeks a firm fixed-price contract to construct a new three-bay specialized hangar facility at Dane County Regional Airport-Truax Field in Madison, Wisconsin for the 115th Fighter Wing of the Wisconsin Air National Guard. The scope of work includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar with associated administrative and shop spaces to support F-35 mission capabilities such as fuel cell operations, indoor wash requirements, squadron-level surface coating operations, and weapons load training. Additional requirements include a lightning protection system, fall protection, and an Advantor security system. The base contract line items are for construction of the three-bay hangar facility, while two options concern adding a paint/mix addition and aircraft-rated pavement. The North American Industry Classification code is 236220 and the estimated value is between $25-100 million. The bid opening will be conducted according to the Federal Acquisition Regulation. Interested contractors must register in the System for Award Management to access solicitation documents on SAM.gov and submit bids by the deadline.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
02_ITEM 01.2-2_ADD 04_Section 04 20 00.pdf PDF
04_ITEM 01.2-4_ADD 04_Section 07 24 00.pdf PDF
10_ITEM 01.2-10_ADD 04_Section 32 13 14.13.pdf PDF
15_ITEM 01.3-5_ADD 04_02700SF105.pdf PDF
17_ITEM 01.3-7_ADD 04_02700SF503.pdf PDF
23_ITEM 01.3-13_ADD 04_02700A-503.pdf PDF
25_ITEM 01.3-15_ADD 04_02700ES101.pdf PDF
26_ITEM 01.3-16_ADD 04_02700EP102.pdf PDF
27_ITEM 01.3-17_ADD 04_02700EP701.pdf PDF
03_ITEM 01.2-3_ADD 03_Section 05 50 13.pdf PDF
09_ITEM 01.2-9_ADD 03_Section 26 05 26.00 40.pdf PDF
11_ITEM 01.3-1_ADD 03_02700G-002.pdf PDF
13_ITEM 01.3-3_ADD 03_02700C-401.pdf PDF
15_ITEM 01.3-5_ADD 03_02700C-404.pdf PDF
16_ITEM 01.3-6_ADD 03_02700C-601.pdf PDF
18_ITEM 01.3-8_ADD 03_02700SF103.pdf PDF
33_ITEM 01.3-23_ADD 03_02700IG-500.pdf PDF
34_ITEM 01.3-24_ADD 03_02700FX102.pdf PDF
36_ITEM 01.3-26_ADD 03_02700FA102.pdf PDF
MAT MGMT PPLAN_Approval for 3-Bay Hangar.pdf PDF
W50S9F22B0001 Solicitation - Ammend 0001.pdf PDF
Questions and Answers 1.pdf PDF
01_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 02_2022.06.08_Narrative.pdf PDF
05_ITEM 01.2-4_ADD 02_Section 03 30 00.pdf PDF
06_ITEM 01.2-5_ADD 02_Section 04 20 00.pdf PDF
09_ITEM 01.2-10_ADD 02_Section 09 06 00.pdf PDF
10_ITEM 01.2-11_ADD 02_Section 11 94 10.pdf PDF
14_ITEM 01.2-15_ADD 02_Section 32 13 14.13.pdf PDF
15_ITEM 01.3-1_ADD 02_02700G-102.pdf PDF
16_ITEM 01.3-2_ADD 02_02700C-101.pdf PDF
19_ITEM 01.3-5_ADD 02_02700C-402.pdf PDF
20_ITEM 01.3-6_ADD 02_02700S-001.pdf PDF
28_ITEM 01.3-14_ADD 02_02700SF210.pdf PDF
29_ITEM 01.3-15_ADD 02_02700SF502.pdf PDF
30_ITEM 01.3-16_ADD 02_02700AD-101.pdf PDF
35_ITEM 01.3-21_ADD 02_02700A-402.pdf PDF
36_ITEM 01.3-22_ADD 02_02700A-500.pdf PDF
37_ITEM 01.3-23_ADD 02_02700A-501.pdf PDF
38_ITEM 01.3-24_ADD 02_02700A-702.pdf PDF
42_ITEM 01.3-28_ADD 02_02700ES101.pdf PDF
43_ITEM 01.3-29_ADD 02_02700EG101.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
F-35 3-Bay Hangar Site Visit Attendance.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
ATTACHMENT 2 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (1 of 2).pdf PDF
ATTACHMENT 6 - 20220208 Single Source Determination - Marshall Best - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1 A-201

A1 A-202

A1 A-201

C1 A-202

A-301 D1

A-301 D1

A-301 C1

A-301 C1

A-301 A1

A-301 A1

A-302 B2

A-302 B2

A-302 D2

A-302 D2

1/ 2"

1'

-0

1/2" / 1'-0"

1/2" / 1'-0"

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

LOW-SLOPE

MEMBRANE ROOF

PRIMARY ROOF

DRAIN

OVERFLOW

ROOF DRAIN

LOW-SLOPE

MEMBRANE

ROOF

PRIMARY

ROOF

DRAIN

OVERFLOW

ROOF

DRAIN

LOW-SLOPE

MEMBRANE ROOF

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

ROOF

ACCESS

HATCH

FALL

PROTECTION

FALL

PROTECTION

SKYLIGHT

WALKWAY

PADS

WALKWAY

PADS

WALKWAY

PADS

WALKWAY

PADS

LOW-SLOPE

MEMBRANE

ROOF

MECH

EQUIPMENT

MECH

EQUIPMENT

MECH

EQUIPMENT

MECH

EQUIPMENT

ROOF

ACCESS

LADDER

ROOF

ACCESS

LADDER

MECH

EQUIPMENT

MECH EQUIPMENT

MECH EQUIPMENT

1/ 2"

1'

-0

GAS PIPE

ON ROOF

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

1/2" / 1'-0"

CRICKET

CRICKET

CRICKET

SUNSHADES

SUNSHADES

AWNING

AWNING

AWNING

AWNING

AWNING

AWNING

EQ EQ

25'-0"

42" GUARDRAIL

1' -0

CRICKET

CRICKET

CRICKET

BID OPTION 1

MECH

EQUIPMENT

(ON GROUND)

IG-501 A1

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/8/2022 10:26: 50 AM

ROOF PLAN

A-140

JMI

JRT/JBC

JBC

SCALE: 3/32" = 1'-0"

COMPOSITE ROOF PLANA1

8' 24'16'0

3/32" = 1'-0"

GENERAL NOTES

A. ALL ROOF SLOPES SHALL BE 1/2" PER 1' - 0" UNLESS

NOTED OTHERWISE.

B. ALL DRAINAGE CRICKETS SHALL BE 1/2" PER 1' - 0".

C. BASE ROOF INSULATION SHALL BE R-30 MINIMUM.

D. ALL PARAPET CAPS ARE PRE-FINISHED METAL.

E. LIGHTENING PROTECTION SHALL HAVE STRAP OVER

PARAPET AND FASTENED TO PLYWOOD.

1 ADDENDUM 2 06/08/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .