33_ITEM 01.3-19_ADD 02_02700A-201.pdf

PDF 706 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This document provides details for an unrestricted Invitation for Bid for the construction of an F-35 Three Bay Specialized Hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The solicitation seeks a single firm fixed-price contract to provide all labor, materials, equipment, and supervision necessary to demolish an existing 19,875 square foot building and construct a new 31,000 square foot three bay hangar facility. Key requirements include pre-conditioned aircraft air, 270VDC aircraft power, fire suppression, hangar bay HVAC, administrative and shop spaces, a lightning protection system, and an Advantor security system. The contract duration is 550 days from notice to proceed, with a magnitude of construction between $25-100 million. The bid includes a base CLIN for construction and two option CLINs. The NAICS code is 236220 and bids are due on SAM.gov by the specified date. The agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
19_ITEM 01.3-9_ADD 03_02700SF508.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
23_ITEM 01.3-13_ADD 03_02700A-500.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
31_ITEM 01.3-21_ADD 03_02700A-701.pdf PDF
37_ITEM 01.3-27_ADD 03_02700FA601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
22_ITEM 01.3-8_ADD 02_02700SF101.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

100'-0"

A-301 A1

A-301 A1

A-302 B2

3 4 6 10 115 7 8 9 12 13 15 1714 16 18

SPLIT-FACED

COLORED CMU

CAST STONE

COPING

VERTICAL

INSULATED

METAL PANELS-

COLOR #1

VERTICAL LIFT

FABRIC DOOR

CAST STONE COPING

SPLIT-FACED

COLORED

CMU

HORIZONTAL

INSULATED

METAL PANELS-

COLOR #2

SPLIT-FACED COLORED

CMU

HIGH ROOF HANGAR

BAY

134'-4"

HORIZONTAL

INSULATED

METAL PANELS -

COLOR #2

A-304 A2

A-307

A2TRANSLUCENT

PANELS

VERTICAL

INSULATED

METAL PANELS-

COLOR #1

VERTICAL

INSULATED

METAL PANELS-

COLOR #1

HOLLOW METAL FRAME

AND DOOR CURTAIN WALL VERTICAL LIFT

FABRIC DOOR

CONCRETE CURB

CONCRETE CURB

A-155 A1

AWNING

AWNING

'-4

'-4

'-4

ROOF

ACCESS

LADDER

BEYOND

E F

HOLLOW METAL FRAME

AND DOOR

SIGNAGE TO

MATCH CURRENT

BASE STANDARDS

MECHANICAL

EQUIPMENT

MECHANICAL

EQUIPMENT

3' -0

'-0

'-0

4' -0

8" 8'

-8

8"

8" 8'

-8

8"

'-5

/2

'-8

/2

9' -0

A-307 A4

2' -0

3'

-4

1' -0

1'

-4

4'-5"

EXTERIOR

LIGHTS

FIXTURES

MECHANICAL

EQUIPMENT

CJ CJEQ EQ EQ

EQ EQ

CJ

55'-4" 55'-4"

DOOR CLEAR HEIGHT

121'-8 1/2"

" C

LE

AR

M

IN

'-8

/2

" F R

O M

D

AT

U M

GROUND FLOOR

100'-0"

2 1

A-301 A1

A-302 B2

A-302 B2

3410 517 14

VERTICAL INSULATED

METAL PANELS-COLOR #1

CAST STONE COPING

SPLIT-FACED

COLORED

CMU

CURTAIN WALL HORIZONTAL

INSULATED

METAL PANELS-

COLOR #2

EIFS

VERTICAL INSULATED

METAL PANELS-COLOR #1

CAST STONE

COPING

SPLIT-FACED

COLORED CMU

HIGH ROOF HANGAR

BAY

134'-4"

A-304 A1

A-307 A2

TRANSLUCENT

PANELS

STACKED

SUNSHADE

TRANSLUCENT

PANELS

T.O. PARAPET

119'-4"

FINISHED SOFFIT

109'-0"

STACKED

SUNSHADE

SPLIT-FACED

COLORED CMU

CURTAIN WALL

SYSTEM

CONCRETE

CURB

AWNING AWNING

AWNING

4.3

'-4

'-4

'-4

'-4

'-4

ROOF ACCESS

LADDER

ROOF ACCESS

LADDER

D D D D AG

MECHANICAL EQUIPMENT

HOLLOW METAL

FRAME AND DOOR

HOLLOW METAL

FRAME AND DOOR

HOLLOW METAL

FRAME AND DOOR

OVERHEAD

AWNING

9' -0

3' -0

8" 8'

-8

8"

'-0

4' -0

A-307 A4

AWNING

4' -0

4'

-0

4' -0

CJ

BUILDING SIGNAGE

CJ CJ CJ

CJCJ

61'-7 5/8" 9'-4" 60'-4 3/8"2 2 2 4'-4 5/8" 2

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/8/2022 10:26: 42 AM

BUILDING ELEVATIONS

A-201

JMI

JRT/JBC

JBC

SCALE: 1/8" = 1'-0"

EAST ELEVATIONC1

SCALE: 1/8" = 1'-0"

WEST ELEVATIONA1

0 4' 8' 16'

1/8" = 1'-0"

1 ADDENDUM 1 04/22/2022

2 ADDENDUM 2 06/08/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .