49_ITEM 01.3-35_ADD 02_02700ET101.pdf

PDF 718 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This document provides details for an unrestricted Invitation for Bid for construction services. The bid is for a project to construct a new three-bay hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin to support operations for the F-35 aircraft. Services required include demolishing an existing building and constructing a 31,000 square foot hangar with three bays, administrative and shop spaces, a lightning protection system, and an Advantor security system. The contract value is estimated between $25-100 million. The bid includes options for adding a paint/mix addition and aircraft rated pavement. The pre-bid conference will be held on-site with the bid opening following standard FAR and DFARS procedures. The response deadline is not provided, but the contract duration is listed as 550 days. The solicitation is designated unrestricted with a HubZone preference and requires registration on SAM.gov to access the full bid package.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Questions and Answers 4.pdf PDF
08_ITEM 01.2-8_ADD 04_Section 11 94 10.pdf PDF
13_ITEM 01.3-3_ADD 04_02700C-601.pdf PDF
21_ITEM 01.3-11_ADD 04_02700A-501.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 004 COMBINED DRAWINGS.pdf PDF
22_ITEM 01.3-12_ADD 04_02700A-502.pdf PDF
Questions and Answers 3.pdf PDF
W50S9F22B0001 Solicitation - Amend 0003.pdf PDF
08_ITEM 01.2-8_ADD 03_Section 21 13 18.pdf PDF
10_ITEM 01.2-10_ADD 03_Section 26 08 00.pdf PDF
12_ITEM 01.3-2_ADD 03_02700C-100.pdf PDF
25_ITEM 01.3-15_ADD 03_02700A-505.pdf PDF
27_ITEM 01.3-17_ADD 03_02700A-511.pdf PDF
32_ITEM 01.3-22_ADD 03_02700A-702.pdf PDF
35_ITEM 01.3-25_ADD 03_02700FA101.pdf PDF
01_ITEM 01.2-1_ADD 03_Section 02 65 00.pdf PDF
07_ITEM 01.2-7_ADD 03_Section 21 13 13.pdf PDF
Bid Opening Directions.pdf PDF
02_ITEM 01.2-1_ADD 02_PROJECT TOC.pdf PDF
08_ITEM 01.2-9_ADD 02_Section 08 87 35.pdf PDF
17_ITEM 01.3-3_ADD 02_02700C-301.pdf PDF
27_ITEM 01.3-13_ADD 02_02700SF106.pdf PDF
39_ITEM 01.3-25_ADD 02_02700FA101.pdf PDF
40_ITEM 01.3-26_ADD 02_02700FA102.pdf PDF
41_ITEM 01.3-27_ADD 02_02700FA601.pdf PDF
47_ITEM 01.3-33_ADD 02_02700EP701.pdf PDF
31_ITEM 01.3-17_ADD 02_02700A-103.pdf PDF
W50S9F22B0001 Solicitation - Ammend 0001.pdf PDF
Questions and Answers 1.pdf PDF
01_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 02_2022.06.08_Narrative.pdf PDF
05_ITEM 01.2-4_ADD 02_Section 03 30 00.pdf PDF
06_ITEM 01.2-5_ADD 02_Section 04 20 00.pdf PDF
09_ITEM 01.2-10_ADD 02_Section 09 06 00.pdf PDF
10_ITEM 01.2-11_ADD 02_Section 11 94 10.pdf PDF
14_ITEM 01.2-15_ADD 02_Section 32 13 14.13.pdf PDF
15_ITEM 01.3-1_ADD 02_02700G-102.pdf PDF
16_ITEM 01.3-2_ADD 02_02700C-101.pdf PDF
19_ITEM 01.3-5_ADD 02_02700C-402.pdf PDF
20_ITEM 01.3-6_ADD 02_02700S-001.pdf PDF
28_ITEM 01.3-14_ADD 02_02700SF210.pdf PDF
29_ITEM 01.3-15_ADD 02_02700SF502.pdf PDF
30_ITEM 01.3-16_ADD 02_02700AD-101.pdf PDF
35_ITEM 01.3-21_ADD 02_02700A-402.pdf PDF
F-35 3-Bay Hangar Site Visit Attendance.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
ATTACHMENT 7 - 20220208 Single Source Determination - Monaco - Redacted.pdf PDF
W50S9F22B0001 Solicitation - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 4 - 20220208 Single Source Determination - Advantor - Redacted.pdf PDF
ATTACHMENT 2 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (1 of 2).pdf PDF
ATTACHMENT 6 - 20220208 Single Source Determination - Marshall Best - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

108110

111 109

B

B

C

C

E

E

F

F

G

G

J

J

D

D

K

K

L

L

M

M

H

H

48"

72" 72"

48"

48"

48"

WAP

WAP

WAP

WAP

WAP

WAP

WAP

MATCHLINE

SEE A1 /

ET102

MATCHLINE

SEE A1 /

ET102

TVTV

1 1

FB

FB

FB 2

TECHNOLOGY SCOPE RESPONSIBILITY MATRIX

ITEM SHOWN ON FURNISHED BY INSTALLED BY NOTES

FLOORBOX ROUGH-IN, INCLUDING FLOOR BOXES AND CONDUITS

TECHNOLOGY SYSTEMS ROUGH-IN, INCLUDING BACKBOXES, TRIM RINGS, CONDUIT AND SLEEVES

CABLE TRAY, INCLUDING ALL REQUIRED SUPPORT HARDWARE AND FITTINGS

EQUIPMENT ROOM FITTINGS (PER SPECIFICATION SECTION 271100)

EQUIPMENT ROOM POWER RECEPTACLES

GROUND BARS (TMGB, TGB) AND ELECTRICAL SERVICE BONDING

GROUNDING OF CABLE TRY AND EQUIPMENT ROOM COMPONENTS

BACKBONE CABLING, TERMINATION COMPONENTS (e.g. WALL-FIELDS), TERMINATION, TESTING AND LABELING

PATCH PANELS

TELECOMMUNICATIONS OUTLET (TO) FACEPLATES AND JACKS

HORIZONTAL CABLING, TERMINATIONS, TESTING AND LABELING

FLOOR BOX AND TELECOMMUNICATION OUTLET (TO) ASSOCIATED POWER RECEPTACLES

EQUIPMENT ROOM PLYWOOD WALL COVERINGS

PA SYSTEM COMPONENTS (SPEAKERS/HORNS, VOLUME CONTROLS) AND CABLING

PA SYSTEM ROUGH-IN, INCLUDING BACKBOXES, TRIM RINGS AND CONDUIT

TV ROUGH-IN, INCLUDING BACKBOXES, TRIM RINGS AND CONDUIT

INFORMATION DISPLAY AND TV LOCATION BLOCKING FOR DISPLAY MOUNT ATTACHMENT/ SUPPORT

TV OUTLETS, MOUNTS, DISPLAYS AND CABLING

TV SERVICE, DISTRIBUTION EQUIPMENT AND RECEIVERS

SECURITY SYSTEMS (ACS, VSS) ROUGH-IN, INCLUDING BACKBOXES, TRIM RINGS AND CONDUIT ACS FIELD DEVICES (e.g. CARD READERS, STATUS SENSORS, REX) AND CABLING ACS DOOR HARDWARE INCLUDING ELECTRIC STRIKES, MAGNETIC LOCKS AND ASSOCIATED POWER SUPPLIES

VSS HEAD-END, CAMERAS, MOUNTS AND CABLING

TV SYSTEM HEAD-END COMPONENTS AND MONITOR INTERFACES

EP AND ET SERIES EC EC 1

ET SERIES EC EC 2

T-SERIES EC OR TC EC OR TC 3

ET SERIES TC TC

EP SERIES EC EC

EG SERIES EC EC

EG SERIES TC TC

ET SERIES TC TC

ET SERIES TC TC

ET SERIES TC TC

N/A OWNER OWNER

EP AND ET SERIES EC EC

ET SERIES GC GC 5

TY SERIES TC TC

TY SERIES EC EC

ET SERIES EC EC

ET SERIES GC GC 6

ET SERIES EC EC

N/A OWNER OWNER

N/A OWNER OWNER

TY SERIES EC EC

TY SERIES ADVANTOR ADVANTOR 8

TY SERIES GC GC/EC/TC/ADVANTOR 7, 8

TY SERIES ADVANTOR ADVANTOR 8, 9

TECHNOLOGY SYSTEMS RESPONSIBILITY MATRIX NOTES:

1. FLOOR BOX LOCATIONS SHALL BE COORDINATED WITH

THE LOCATIONS OF ASSOCIATED MILLWORK AND

FURNITURE.

2. PENETRATIONS THROUGH FLOORS AND FIRE-RATED

WALLS WHERE APPLICABLE SHALL BE FIRESTOPPED IN

A MANNER THAT MAINTAINS THE RATING OF THE

FLOOR OR WALL PENETRATED. REFER TO

ARCHITECTURAL SPECIFICATIONS.

3. CABLE TRAY INDICATED ON DRAWINGS IS SHOWN FOR

INTENT, AND THE INSTALLATION OF THE CABLE TRAY

SHALL BE COORDINATED WITH OTHER TRADES

(MECHANICAL & PLUMBING).

4. LOCATIONS OF TECHNOLOGY SYSTEMS ROUGH-IN

SHALL BE COORDINATED WITH ASSOCIATED POWER

RECEPTACLES.

5. PLYWOOD WALL COVERINGS SHALL BE AS SPECIFIED

IN ARCHITECTURAL SPECIFICATIONS.

6. BLOCKING FOR ALL TV AND IDS (FPD) LOCATIONS

SHALL BE AS SPECIFIED IN ARCHITECTURAL

SPECIFICATIONS OR AS INDICATED ON

ARCHITECTURAL DRAWINGS.

7. CONTRACTOR SHALL COORDINATE THE INSTALLATION

OF ALL ACCESS CONTROL SYSTEM COMPONENTS WITH

DOOR AND DOOR HARDWARE VENDOR.

8. GENERAL CONTRACTOR SHALL SUBCONTRACT TO

ADVANTOR AND COORDINATE ALL IDS AND SECURITY

SYSTEMS.

9. PROVIDE CAMERAS, MOUNTS AND CABLING . GC IS

RESPONSIBLE FOR COORDINATING WITH ADVANTOR

FOR COST .

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\aoo\D o cum ents\M y R evit\02700_Elec_A O genche.rvt

6/7/2022 11:01: 27 AM

TELECOMMUNICATION PLAN

SECTOR ONE

ET101

WCM

GPN

GPN

SCALE: 1/8" = 1'-0"

TELECOMMUNICATION PLAN SECTOR ONEA1

0 4' 8' 16'

1/8" = 1'-0"

ROOM SCHEDULE

Name Number

WEAPONS TRAINING 101

VEST. 102

SHARED OFFICE 103

FUEL OPEN OFFICE 104

VEST. 105

CORR. 106

CLASSROOM 107

OFFICE 108

RR W 109

WING WEAPONS MGR 110

RR M 111

FUEL SUPERVISOR 112

BREAK/ TRAINING 113

VEST. 114

OFFICE 115

VINYL OPEN OFFICE 116

MOTHER'S ROOM 117A

JAN 117B

FUEL MAINT. GENERAL STORAGE 118

FUEL CELL 119

VEST 120A

CORR. 120B

ELEC. 121

FUEL 122

WASH 123

MECH 124

FIRE 125

TOOLS 126

VEST 127

WASH BAY 128

CLEAN M RR 130

CLEAN M LR 131

CLEAN SHOWER M 132

DIRTY SHOWER M 133

DIRTY LR M 134

DIRTY SHOWER M 135

CLEAN W RR 136

CLEAN W LR 137

CLEAN SHOWER W 138

DIRTY LR W 139

DIRTY SHOWER W 140

PAINT/SAND/MIX 140

DIRTY RR UNISEX 141

DIRTY VEST. 142

MASK WASHING 143

PAINT/SAND/MIX 144

ELECT 145

COMM. 146

GENERAL NOTES

A. ANY DIMENSIONS SHOWN ON THESE DRAWINGS

ARE INTENDED TO PROVIDE A GENERAL LOCATION

AS REQUESTED BY THE OWNER. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR CONFIRMING ALL

DIMENSIONS PRIOR TO ROUGH-IN AND

IMMEDIATELY REPORT ANY CONFLICTS WITH THE

OUTLET PLACEMENT TO THE GENERAL

CONTRACTOR.

B. ALL CABLE BUNDLES WILL BE SUPPORTED EVERY

48"-60" OC WITH A J-HOOK OR OTHER APPROVED

PATHWAY DEVICE. REFERENCE SPECIFICATIONS

AND DETAILS FOR ADDITIONAL CABLING PATHWAY

INSTALLATION REQUIREMENTS. CONTRACTOR WHO

VIOLATES THIS REQUIREMENTS WILL BE REQUIRED

TO REPLACE THE AFFECTED CABLE AT THEIR

EXPENSE.

C. PLASTIC TIE WRAPS ARE NOT PERMITTED AT ANY

TIME ON THE INSTALLATION. ALL CABLE ROUGH-IN

AND DRESS-OUT WILL BE WITH HOOK AND LOOP

STRAP ONLY. ALL CABLES BUNDLED WITH PLASTIC

TIE WRAPS SHALL BE IMMEDIATELY REPLACED AT

THE CONTRACTOR'S EXPENSE.

D. DO NOT INSTALL ANY CABLES IN ANY CONDUIT

SLEEVE, STUB UP, OR WALL CAP WITHOUT A

PROTECTIVE BUSHING. CABLES PULLED INTO

UNPROTECTED CONDUITS WILL BE REPLACED AT

THE CONTRACTOR'S EXPENSE. DO NOT INSTALL

ANY CABLING INTO ANY CONDUIT THAT HAS NOT

BEEN CONFIRMED TO BE BLOWN CLEAR.

COORDINATE WITH THE ELECTRICAL CONTRACTOR

PRIOR TO ROUGH IN OF ANY CABLING.

E. ANY CABLING FOUND PAINTED DURING THE

CONSTRUCTION PROCESS WILL BE REPLACED AT

CONTRACTOR'S EXPENSE. CONTRACTOR SHALL

COORDINATE WITH THE GENERAL CONTRACTOR

AND PAINTER TO AVOID CONFLICTS.

F. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO

REFERENCE BOTH THE PROJECT DRAWINGS AND

THE PROJECT SPECIFICATIONS. TOGETHER THEY

FORM THE COMPLETE CONTRACT DOCUMENTS.

REFERENCE THE PROJECT SPECIFICATIONS FOR

ALL MATERIALS, EQUIPMENT, AND COMPONENTS

NOT INDICATED ON THE DRAWING SET.

G. ALL CABLING INSTALLED IN AREAS WITH EXPOSED

CEILINGS SHALL BE INSTALLED IN A PROPERLY

SIZED CONDUIT PATHWAY. CONDUIT PATHWAYS

SHALL BE PROVIDED AND INSTALLED BY THE

CONTRACTOR. THE CONDUIT MAY BE PAINTED TO

MATCH CEILING COLOR AS DIRECTED BY THE

CONTRACT DOCUMENTS.

H. CONTRACTOR SHALL BE RESPONSIBLE FOR

STOPPING ALL TECHNOLOGY, TELECOM, SECURITY

AND AUDIO VISUAL CONDUIT PENETRATIONS FROM

WATER AND RODENT INGRESS IN ALL BUILDING

UPON COMPLETION OF THE PROJECT.

SHEET KEYNOTES

1. MOUNT CABLE TRAY 10'-10" AFF TO THE MIDDLE OF

THE CABLE TRAY.

2. FLOOR BOX SHALL HAVE 2 NIPRNET DROPS.ROUTE

1" CONDUIT FROM FLOOR BOX THROUGH THE WALL

CAVITY TO ACCESSIBLE CEILING FOR ROUTING THE

NIPRANETS.

1 ADDENDUM 2 06/08/2022

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

JOHN T

LITTLE

E-47833

EDMOND

OK

File details come from the government source that posted it. Updated .