This solicitation and addendum package seeks bids for a firm fixed-price construction contract to alter an F-35 aircraft hangar at Truax Field Air National Guard Base in Madison, Wisconsin. The project scope includes demolishing 19,913 square feet of hangar shop space and reconfiguring it for F-35 maintenance operations, with new lavatories, offices, break rooms, mechanical spaces and repair shops. An additional 19,803 square feet of hangar space will be modified to accommodate F-35 aircraft, including installing a high expansion foam fire suppression system, aircraft make-up power and air systems, and lightning protection. Mechanical, plumbing, electrical, technology and security systems will be provided along with asbestos abatement. The contract also includes two options for additional work. Bids are due on March 8, 2021 and award will be made to the responsive and responsible lowest bidder. Interested parties must register in the System for Award Management and attend an optional pre-bid conference on February 16, 2021 to be eligible to bid. The soliciting agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
Abstract of Offers with Hubzone Preference.pdf PDF
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
W50S9F21B00010006.pdf PDF
406 Questions and Answers_142-143.pdf PDF
23 07 00_Add04.pdf PDF
406 Questions and Answers_113-141.pdf PDF
F-102_Add03.pdf PDF
T-001 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
F-001_Add03.pdf PDF
W50S9F21B00010004.pdf PDF
C-141_Add02.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
C-101_Add02.pdf PDF
E-501_Add02.pdf PDF
SD111_Add02.pdf PDF
A-201_Add02.pdf PDF
10 28 13_Add02.pdf PDF
A-311_Add02.pdf PDF
406 Questions and Answers_26-112.pdf PDF
G-001_Add02.pdf PDF
E-101_Add02.pdf PDF
01 50 00_Add02.pdf PDF
12 21 00_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
05 40 00_Add02.pdf PDF
01 78 00_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
A-131_Add01.R1.pdf PDF
C-121_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRUAX FIELD ANGB - F-35: ALTER BLDG 406 Addendum 1

XGFG182008 24 FEB 2021

SECTION 09 67 23.13

RESINOUS FLOORING

11/19

PART 1 GENERAL

1.1 RELATED SECTIONS

a. Section 03 30 00 CAST IN PLACE CONCRETE

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C579 (2018) Standard Test Methods for Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes

ASTM C580 (2018) Standard Test Method for Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes

ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics

ASTM D2047 (2017) Standard Test Method for Static Coefficient of Friction of Polish-Coated Floor Surfaces as Measured by the James Machine

ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness

ASTM D2369 (2010; R 2015; E 2015) Volatile Content of Coatings

ASTM D2370 (1998; R 2010) Tensile Properties of Organic Coatings

ASTM D3363 (2005; E 2011; R 2011; E 2012) Film Hardness by Pencil Test

ASTM D4060 (2019) Abrasion Resistance of Organic Coatings by the Taber Abraser

ASTM D4259 (2018) Standard Practice for Preparation of Concrete by Abrasion Prior to Coating Application

ASTM D4541 (2017) Standard Test Method for Pull-Off

SECTION 09 67 23.13 Page 1

Strength of Coatings Using Portable Adhesion Testers

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

1.3 ADMINISTRATIVE REQUIREMENTS

1.3.1 Pre-Installation Meetings

Pre-installation Conference: Conduct conference at Project site.

1.3.2 Product Data

Within 30 days of contract award, submit manufacturer's catalog data for each system for each product system.

1.3.3 Design Mix Data

Within 30 days of contract award, submit design mix data for each system for the following items, including a complete list of ingredients and admixtures for each product system.

Ensure applicable test reports verify the mix has been successfully tested and meets design requirements.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Installation Drawings; G

SD-03 Product Data

Manufacturer's Catalog Data for each system

SD-04 Samples

Mockups; G

Hangar-Grade Resinous Floor

SD-05 Design Data

Design Mix Data for each system

SD-07 Certificates

SECTION 09 67 23.13 Page 2

Listing of Product Installations

Referenced Standards Certificates

SD-11 Closeout Submittals

Warranty; G

1.5 DELIVERY, STORAGE, AND HANDLING

Protect materials from weather, soil, and damage during delivery, storage, and construction. Deliver materials in original packages, containers, or bundles bearing brand name and name of material, with labels clearly identifying product name, manufacturer, batch or lot number, and date of manufacture.

Storage:

a. Store materials in accordance with manufacturer's written instructions.

b. Keep containers sealed until ready for use. Material should be stored in a dry, enclosed, protected area from the elements.

c. Do not subject material to excessive heat or freezing.

d. Shelf life: Established based on manufacturer's written recommendation for each material being used.

Protect materials during handling and application to prevent damage or contamination. Condition materials for use accordingly to manufacturer's written instructions prior to application. Record material lot number and quantity delivered to jobsite/storage.

1.6 QUALITY CONTROL

Prior to commencement of work, submit referenced standards certificates for each system component.

1.6.1 Mockups

Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. Apply full-thickness mockups on 100 foot square floor area selected by Contracting Officer. Simulate finished lighting conditions for the review of mockups.

1.6.2 Qualifications

Submit a listing of product installations for heavy duty epoxy flooring including identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years.

Identify purchaser, address of installation, service organization, and date of installation.

Manufacturer shall be certified under ISO 9001:2008 All liquid materials, including primers, resins, curing agents, finish coats, and sealants are manufactured and tested under an ISO 9001:2008 registered quality system.

SECTION 09 67 23.13 Page 3

1.6.3 Sampling

Submit hardboard mounted epoxy flooring samples not less than 12 inch square for each required system.

Provide panels showing nominal thickness of finished toppings, color, and texture of finished surfaces. Finished floor toppings and the approved samples are to match in color and texture.

1.7 Installer Qualificatiions

Engage an installer who is certified in writing by resinous flooring manufacturer as qualified to apply resinous flooring systems indicated.

Provide a written Installer Certification Letter from Manufacturer

Applicator Experience: Each bidder must have a minimum 5 years experience in the application of the type of system specified. Contractor shall submit a list of five projects of similar size, scope and complexity

1.8 WARRANTY

Submit a 2 year written warranty for all materials and installation work.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION GENERAL

Submit installation drawings for heavy duty epoxy flooring systems clearly designating the areas of application and the installation plan. Include in the installation plan, methods to control sand and dust if sand blasting is required.

2.1.1 LOW PERM MOISTURE TOLERANT PRIMER

Low-VOC, one coat moisture vapor control epoxy primer with perm rating under 0.1 Perm and resistant to substrate out gas bubbling, osmotic blistering, and moisture vapor transmission.

2.2 HANGAR-GRADE RESINOUS FLOOR (EM-1)

Solid color, high gloss, smooth, resin rich, seamless, epoxy based floor coating. Typically applied between 24 to 30 mils thick. System to consist of the following components:

2.2.1 Primer

Two-part, epoxy resin for priming and leveling mortars applied between 8 and 10 mils.

a. Pull-off Strength (ASTM D4541): greater than 400 psi with 100 percent concrete failure.

b. Shore D Hardness (ASTM D2240): 76 at 7 days.

c. Solid Content: ~ 100 percent (by volume) / ~ 100 percent (by weight).

d. VOC Content (ASTM D2369): less than 50 g/L.

SECTION 09 67 23.13 Page 4

e. Permeability (ASTM E96/E96M): 9.0 g/m² (24 hours / plus 75 degrees F).

f. Water Absorption (ASTM D570): 0.14 g/h - m2.

g. Viscosity (approximately) of Components A and B: 775 (SP2/100).

2.2.2 Intermediate Coat

Pigmented two-part, low viscosity, self-priming, epoxy coating binder applied between 12-16 mils.

a. Pull-off Strength (ASTM D4541): greater than 400 psi (2.7 MPa) with 100 percent concrete failure.

b. Shore D Hardness (ASTM D2240): 76 at 7 days.

c. Solid Content: ~ 100 percent (by volume) / ~ 100 percent (by weight).

d. VOC Content (ASTM D2369): less than 50 g/L.

e. Compressive Strength (ASTM C579): 7,250 psi (50 N/mm²) at 28 days.

f. Flexural Strength (ASTM C580): 2,900 psi (20 N/mm²) at 28 days.

2.2.3 Top Coat

High solids, low VOC abrasion resistant, aliphatic polyurethane coating applied between 3 and 3.5 mils.

a. Pull-off Strength to Primed Concrete (ASTM D4541): greater than 400 psi with 100 percent concrete failure.

b. Hardness (ASTM D3363 Pencil): 2H to 3H concrete failure.

c. VOC Content (ASTM D2369): With Wear Aggregate less than 100 g/L, With Sikafloor Urethane Color Add Only less than 50 g/L.

d. Tensile Strength (ASTM D2370): 2,882 psi.

e. Elongation: 2.29.

f. Abrasion Resistance (ASTM D4060): 0.01 - 0.02 grams (CS-17 Wheel, 1000 gm load, 1000 cycles).

g. Coefficient Of Friction (ASTM D2047): 0.6 - 0.7.

h. Slip Resistance: Equivalent to ASTM D2047 Passes.

2.2.4 Color

White

PART 3 EXECUTION

3.1 PREPARATION

Prior to applying resinous flooring material, inspect substrate and immediately report any unsatisfactory conditions that exist and repair.

SECTION 09 67 23.13 Page 5

Verify that the concrete substrates are dry and the moisture-vapor emissions are within acceptable levels according to the manufacturer's written instructions.

3.1.1 Safety Precautions

Prior to application in confined spaces of toppings and coatings containing flammable or toxic properties, institute safety precautions recommended by the manufacturer of the product.

Erect "NO SMOKING" signs, and prohibit smoking or use of spark- or flame-producing devices within 50 feet of any mixing or placing operation involving flammable materials.

Provide the personnel required to handle, mix, or apply toppings containing toxic or flammable properties with such items of personal protective equipment and apparel for eye, skin, and respiratory protection as are recommended by the manufacturer of the product. Ensure all personnel are trained in the appropriate use and wearing of personal protection equipment.

3.1.2 Protection of Adjacent Surfaces

In addition to the protection of adjacent surfaces during installation, provide areas used to store and mix materials with a protective covering under the materials. After application of the sealer coats, protect finished flooring during the remainder of the construction period. In areas of expected minimum or moderate traffic, cover floors with a 30-30-30 waterproof kraft paper, with strips taped together and edges secured to prevent roll-up. Place vegetable fiberboard, plywood, or other suitable material that does not mar the flooring over the paper to protect areas used as passages by workmen and areas subject to floor damage because of subsequent building operations. Upon completion of construction, remove the protection, clean flooring and, where necessary, repair, reseal, or both, at no additional cost to the Government.

3.1.3 General Site Conditions

Products shall be provided by a single manufacturer.

Do not install the Work of this Section outside of the following environmental ranges with Manufacturers' written acceptance:

a. Material Temperature: Precondition material for at least 24 hours between 65 degrees to 75 degrees F (18 degrees to 24 degrees C)

b. Ambient Temperature: Minimum/Maximum 50 degrees/85 degrees F (10 degrees/30 degrees C)

c. Substrate Temperature: Minimum/Maximum 50 degrees /85degrees F (10 degrees/30 degrees C). Substrate temperature must be at least 5 degrees F (3 degrees C) above measured Dew Point.

d. Mixing and Application attempted at Material, Ambient and/or Substrate Temperature conditions less than 65 degrees F (18 degrees C) will result in a decrease in product workability and slower cure rates.

e. Relative Ambient Humidity: Minimum ambient humidity 30 percent, maximum ambient humidity 75 percent (during application and curing)

SECTION 09 67 23.13 Page 6

f. Measure and confirm Substrate Moisture Content, Ambient Relative Humidity, Ambient and Surface Temperature and Dew Point.

g. Surface must be clean, sound and dry. Remove dust, laitance, grease, curing compounds bond inhibiting impregnations, waxes and any other contaminants. All projections, rough spots, etc. should be dressed off to achieve a level surface prior to the application.

h. Maintain constant ambient room temperature of plus or minus 15 degrees F (plus or minus 7 degrees C) with a minimum temperature of 50 degrees F (10 degrees C) and maximum temperature of 85 degrees F (30 degrees C). Maintain constant ambient room temperature for 48 hours before, during and after installation, or until cured. Do not apply while ambient and temperatures are rising.

i. Erect suitable barriers and post legible signs at points of entry to prevent traffic and trades from entering the work area during application and cure period of the floor.

j. Insure adequate ventilation and air flow.

3.1.4 Concrete Subfloor

3.1.4.1 General

a. Ensure concrete substrate conforms to the minimum requirements of the flooring manufacturer.

b. Concrete substrate to have a minimum compressive strength of 3,500 psi (24 MPa) at 28 days and a minimum of 215 psi (1.5 MPa) in tension at time of application.

c. Cleaned and prepare to achieve laitance-free and contaminant-free, open textured surface by shot blasting or equivalent mechanical means (CSP level as per ICRI guidelines and manufacturer's written recommendation).

d. Chemical Surface Preparation: Chemical surface preparation (acid etching) is unacceptable and will void Manufacturer's warranty.

e. Control joints and cracks: Rout and fill, utilizing manufacturer's standard materials and installation details, approximately 1800 LF of existing control joints and approximately 520 LF of exposed cracks prior to flooring installation. Honor existing control joints by marking control joints to identify locations following flooring installation.

3.1.4.2 New Concrete Floors

Do not commence installation of the floor topping until the concrete has cured a minimum of 28 calendar days. Verify that the concrete floor is straight, properly sloped, and has wooden float type finish. Ensure that the concrete is moist cured with burlap or polyethylene. Before applying the prime coat, clean the concrete surface by an approved method.

3.1.4.3 Existing Concrete Floors

Clean existing concrete floors, with hard troweled or contaminated areas in conformance with ASTM D4259. Ensure the concrete is free of all paint, SECTION 09 67 23.13 Page 7 sealers, curing agents, oil, grease, moisture, dirt or any other contaminants. Remove any loose or corroded segments of existing concrete.

Patch with a grouting compound as recommended by the resinous flooring manufacturer.

3.1.4.4 Substrate Moisture

a. Moisture content of concrete substrate must be less than or equal to 4 percent by mass as measured with a Tramex® CME/CMExpert type concrete moisture meter.

b. Additionally, relative humidity tests may be conducted per ASTM F2170 and values must be less than or equal to 85 percent.

c. Confirm and record above values at least once every 3 hours during installation, or more frequently whenever conditions change (e.g.

Ambient Temperature rise/fall, Relative Humidity increase/decrease, etc.).

d. Provide low perm moisture tolerant primer.

3.2 APPLICATION

a. Mix and apply material with strict adherence to manufacturer's written installation procedures and coverage rates.

b. Follow Manufacturer's written recommendations on terminations and connections to walls, drains, doorways, columns and floor-to-floor transitions.

c. Do not apply while ambient and substrate temperatures are rising.

d. Apply resinous flooring with care to ensure that no laps, voids, or other marks or irregularities are visible, and with an appearance of uniform color, sheen and texture, all within limitations of materials and areas concerned.

e. Match colors and textures of approved samples.

f. Sawcut previously marked existing control joints and fill with semi-rigid jointing compound compatible with the resinous flooring system used.

g Hangar Markings: Place striping, markings and grounding rod markers as shown on the drawings and in order of presidance as indicated on the drawings. When the second topcoat is within its recoat window, apply marking of the color indicated (red, yellow, black or green ) urethane topcoat at 3.0 mils- (75 microns-) DFT. Use solvent resistant tape to protect the floor coating against stripe coat bleed. A thin clear coat of either epoxy or urethane may be required to prevent strip coat bleed prior to the full application of the colored stripe coat. Completely hide the topcoat color with the color indicated, in one coat. If insufficient hiding occurs, apply one additional coat. Apply grounding rod markings using similar procedures, urethane topcoat, and colors and size coordinated with Contracting Officer.

SECTION 09 67 23.13 Page 8

3.3 FIELD QUALITY CONTROL

3.3.1 Repairing

Remove and replace damaged or unacceptable portions of completed work with new work to match adjacent surfaces at no additional cost to the Government.

3.4 ADJUSTING AND CLEANING

Clean surfaces of the new work, and adjacent surfaces soiled as a result of the work. Remove all equipment, surplus materials, and rubbish associated with the work from the site.

-- End of Section --