E-101 - GROUNDING PLAN.pdf

PDF 285 KB Posted

Attached to
Construct VM/AGE Complex Federal contract opportunity
Solicitation number
W50S8W25RA003
Issued by
Department of the Army National Guard

About this file

This document is an electrical grounding plan (E-101) for a Wyoming Air National Guard Combined Vehicle Maintenance & Age Facility project. The technical drawing details a comprehensive grounding system design, including a ground ring that completely encircles the building, #4/0 bare copper cable installations, and multiple grounding electrodes. Key specifications include ground rods (3/4" diameter x 10' long), test wells, main grounding busbars (MGB), and specific grounding connections for building steel, foundation slab rebar, and door frames.

The drawing includes detailed general notes outlining grounding requirements, such as electrode placement (minimum 5'-0" outside building foundation, 3'-0" below finished grade), bonding of additional electrodes like Ufer grounds and metal underground water pipes, and mandating exothermic connections for underground or concrete-encased grounding connections. The plan is part of a B3 submission (100% complete) dated 11/22/2024, associated with solicitation number W9133L-16-D-0009, and prepared by AECOM Technical Services, Inc.

View the file

Other files for this federal contract opportunity

Other files attached to Construct VM/AGE Complex, newest first.
File Type Posted
E-701 - PANEL SCHEDULES.pdf PDF
E-123 - ELECTRICAL POWER AND LIGHTING PLANS - PARKING SHEDS.pdf PDF
E-121 - FIRST FLOOR POWER PLAN - AREA 1.pdf PDF
E-702 - PANEL SCHEDULES.pdf PDF
E-703 - PANEL SCHEDULES.pdf PDF
VM_AGE RFIs Answered - Version 4.xlsx XLSX spreadsheet
27 51 16 - BR.pdf PDF
10 14 00.20 - BR.pdf PDF
crouse-hinds-arktite-200a-plugs-receptacles-connectors-catalog-page.pdf PDF
MS27265A.PDF PDF
60554859_WY-ANG_VMAF_S22 - Sheet - S-002.pdf PDF
08 36 19 - BR.pdf PDF
BASE MAP 24 1TO400.pdf PDF
60554859_WY-ANG_VMAF_S22 - Sheet - S-504.pdf PDF
32 13 13.06.pdf PDF
08 33 23 - BR.pdf PDF
Solicitation Amendment W50S8W25RA0030006 SF 30.pdf PDF
20230610_060238.jpg JPG image
Jack Tester Info.PDF PDF
9000 Series.pdf PDF
1994 Asbestos Survey - B21_23_24.pdf PDF
Solicitation Amendment W50S8W25RA0030005 SF 30.pdf PDF
20230610_062744.jpg JPG image
ANG Sustainability Requirements Scoresheet.pdf PDF
20230610_060152.jpg JPG image
VM_AGE RFIs Answered - Version 2.xlsx XLSX spreadsheet
Solicitation Amendment W50S8W25RA0030004 SF 30.pdf PDF
AECOM Drawings.zip ZIP file
Existing VM_AGE as_builts.zip ZIP file
GCFI Equipment.zip ZIP file
Geotechnical Report.zip ZIP file
TEMPLATE - H.02 Progress Schedule AF3064 (23-C-XXXX).pdf PDF
Communications UFC.zip ZIP file
Fire Spec List.zip ZIP file
Pavement Evaluations.zip ZIP file
Laydown Areas.zip ZIP file
VM_AGE Questions and Answers Version 1.xlsx XLSX spreadsheet
Solicitation Amendment W50S8W25RA0030003 SF 30.pdf PDF
Solicitation Amendment W50S8W25RA0030002 SF 30.pdf PDF
B.07 Pre-proposal Conference Site Visit Slides (25-R-A003).pptx PPTX presentation
Pre-Proposal Conference Attendance Roster.pdf PDF
Solicitation Amendment W50S8W25RA0030001 SF 30.pdf PDF
B.08 Attachment 7 - Entry Authorization Form.pdf PDF
B.08 Attachment 5 - Past Performance Questionnaire.docx DOCX document
B.08 Attachment 8 - Wage Determination.pdf PDF
B.08 Attachment 6 - Schedule B (25-R-A003).pdf PDF
Attachment 1 - SOW- Construct VM_AGE Complex - Aug 22 2024.pdf PDF
B.08 Attachment 7 - Entry Authorization Form.pdf PDF
Solicitation - W50S8W25RA003.pdf PDF
B.08 Attachment 4 - Contractor Hazmat Usage Tracking Instructions.pdf PDF
Show all 50

Construct VM/AGE Complex has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 7.4 8 9 10 11

A

A.3

B

C

D

E

F

S2S1

SA

S3 S11

SD

SE

#4/0 BARE

COPPER (TYP),

UNO. BURY 3'-0"

BELOW GRADE

TEST WELL AND 3/4"

DIAMETER X 10' LONG

GROUND ROD

(TYP.)

3/4" D X 10' L

GROUND ROD (TYP)

TEST WELL AND 3/4"

DIAMETER X 10' LONG

GROUND RODTEST WELL AND 3/4"

DIAMETER X 10' LONG

GROUND ROD

TEST WELL AND 3/4"

DIAMETER X 10' LONG

GROUND ROD

TEST WELL AND 3/4"

DIAMETER X 10' LONG

GROUND ROD

S3.4

SB

SC

S4 S5 S6 S7 S8 S9 S10

#4/0 BARE

COPPER

(TYP)

PBB

MGB

SBB

GROUND BAR

(TYP.)

1 (TYP.)

7 7

AREA 1 AREA 2

PARKING SHED

HEATED

PARKING

A E

C O

M T e c h n ic a l S e rv ic e s

IN

C

T o w n

C o u n tr y R o a d

O ra n g e C

A

.5

.2 w w w .a e c o m

.c o m

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B T

W Y

O M

IN

G

A

IR

N A

T

IO

N A

L G

U A

R D

C O

M B

IN

E

D V

E H

IC

L E

M A

IN

T

E N

A N

C E

A

G E

F A

C

IL

IT

Y

P R

O J

D P

E Z

PLAN

NORTH

KEY PLAN

8' 16' 32'

1/16"=1'-0SCALE:

D A

T E

E-101

G R

O U

N D

IN

G

P L A

N

S C

P P

N S

B S

U B

M

IS

S

IO

N

/2

/2

W L -1

-D

-0

KEYNOTES

1 #1 AWG CONDUCTOR TO LIGHTNING

PROTECTION SYSTEM ON ROOF. REFER TO

SHEET E-102 FOR ADDITIONAL

INFORMATION.

2 PROVIDE A MINIMUM 1/4"X4"X24" MAIN

GROUNDING BUSBAR "MGB". INCREASE SIZE

AS REQUIRED TO MAKE NECESSARY

CONNECTIONS. COORDINATE LOCATION IN

FIELD. CONNECT TO ALL PRESENT

GROUNDING ELECTRODES AT THE BUILDING

PER DETAIL 1/E-505 (BUILDING STEEL, UFER,

METAL WATER PIPE, AND GROUND RING

AND LPS).

3 COORDINATE "PBB" SIZE AND LOCATION

WITH TELECOM DRAWINGS.

4 COORDINATE "SBB" SIZE AND LOCATION

WITH TELECOM DRAWINGS.

5 PROVIDE A 1/4"X4"X12" BUS BAR FOR USER

CONNECTIONS. COORDINATE LOCATION IN

FIELD.

6 PROVIDE A 1/4"X4"X12" BUS BAR.

COORDINATE FINAL LOCATION IN FIELD.

COORDINATE LOCATION IN FIELD. CONNECT

TO ALL PRESENT GROUNDING ELECTRODES

AT THE BUILDING PER DETAIL 1/E-505

(BUILDING STEEL, UFER, AND GROUND RING

AND LPS).

7 PROVIDE 2#6 BARE COPPER GROUND

CONNECTIONS TO EACH DOOR FRAME IN

THE REFULER MAINTENANCE BAY FOR

STATIC DISCHARGE. BOND CONDUCTORS

TO THE GROUND RING WITH EXOTHERMIC

CONNECTIONS. UTILIZE BOLTED

COMPRESSION CONECTIONS ON THE DOOR

FRAMES.

A. REFER TO TELECOM DRAWINGS FOR

ADDITIONALTELECOM GROUNDING DETAILS.

B. GROUND RING SHALL BE INSTALLED A

MINIMUM 5'-0" OUTSIDE OF THE BUILDING

FOUNDATION AND A MINIMUM OF 3'-0" BELOW

FINISHED GRADE. GROUNDING ELECTRODES

SHALL IN NO INSTANCE BE LESS THAN 1'-0"

BELOW SOIL GRADE AND 3'-8" FROM

FOUNDATION WALL.

C. GROUNDING RING SHALL COMPLETELY

ENCIRCLE THE BUILDING AND CONSIST OF #

4/0 BARE COPPER CABLE WHICH SHALL BE

CONNECTED TO EXISTING FACILITIES GROUD

RING.

D. GROUNDING RING SHALL BE CONNECTED TO

THE BUILDING GROUNDING SYSTEMS WITH #

4/0 COPPER CABLES AND LIGHTNING

PROTECTION SYSTEMS AND A MINIMUM OF 4

CONNECTION SHALL BE PROVIDED.

E. ADDITIONAL ELECTRODES SUCH AS UFER

GROUNDS OR METAL UNDERGROUND WATER

PIPES SHALL BE BONDED TO THE

GROUNDING SYSTEM. THE GROUNDING

ELECTRODE CONDUCTORS SHALL BE

PHYSICALLY PROTECTED AND SHALL BE

BONDED TO THE ELECTRODE WITH

EXOTHERMIC WELDS.

F. BUILDING STEEL AND FOUNDATION SLAB

REBAR SHALL BE BONDED TO THE GROUND

SYSTEM TO ENSURE THE ENTIRE SYSTEM IS

EQUIPOTENTIAL.

G. ALL GROUNDING CONNECTIONS BELOW

GROUND OR ENCASED IN CONCRETE SHALL

BE MADE WITH EXOTHERMIC TYPE

CONNECTIONS.

1/16" = 1'-0"1

GROUNDING PLAN

GENERAL NOTES:

B S

U B

M

IS

S

IO

N

F

IN

A

L

/2

/2 shea.culbertson Cloud shea.culbertson Cloud

File details come from the government source that posted it. Updated .