This technical specification details the requirements for Portland Cement Concrete Pavement for Roads and Site Facilities for a Combined Vehicle Maintenance and AGE Facility. The document provides comprehensive technical specifications covering materials, mix design, construction methods, and quality control for concrete pavement installation.
Key technical requirements include using WYDOT Grading W crushed granite aggregate, a concrete mix with a minimum 550 psi flexural strength at 28 days, 6% air entrainment, and a maximum water-cementitious materials ratio of 0.45. The specification mandates specific construction techniques such as using a track-mounted slipform paver-finisher with automatic controls, precise consolidation methods using internal vibrating equipment, and detailed finishing and texturing processes. Extensive quality control measures are outlined, including mandatory testing for slump, air content, flexural strength, surface smoothness, and pavement thickness, with specific tolerances for each parameter.
View the file
Other files for this federal contract opportunity
Show all 50
Construct VM/AGE Complex has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% Revised B3 Submission Combined Vehicle Maintenance and AGE Facility
SECTION 32 13 13.06
PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Measurement
The quantity of concrete to be paid for will be the volume of concrete in cubic yards including monolithic curb, where required, placed in the completed and accepted pavement. Concrete will be measured in place in the completed and accepted pavement only within the neat line dimensions shown in the plan and cross section. No deductions will be made for rounded edges or the space occupied by embedded items or voids.
1.1.2 Payment
Payment will be made at the contract price per cubic yard for the scheduled item. Payment will constitute full compensation for furnishing all materials, equipment, plant and tools, and for all labor and other incidentals necessary to complete the concrete pavement.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI 305R (2020) Guide to Hot Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ASTM INTERNATIONAL (ASTM)
ASTM A184/A184M (2019) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement
ASTM A615/A615M (2022) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A775/A775M (2022) Standard Specification for Epoxy-Coated Steel Reinforcing Bars
ASTM A966/A966M (2015; R 2020) Standard Test Method for Magnetic Particle Examination of Steel Forgings Using Alternating Current
SECTION 32 13 13.06 Page 1
ASTM C31/C31M (2022) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C78/C78M (2022) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C88 (2018) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
ASTM C94/C94M (2022a) Standard Specification for Ready-Mixed Concrete
ASTM C143/C143M (2020) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2022) Standard Specification for Portland Cement
ASTM C171 (2020) Standard Specification for Sheet Materials for Curing Concrete
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C231/C231M (2022) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 (2019) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C494/C494M (2022) Standard Specification for Chemical Admixtures for Concrete
ASTM C595/C595M (2021) Standard Specification for Blended Hydraulic Cements
ASTM C618 (2023) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C881/C881M (2020a) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete
ASTM C989/C989M (2022) Standard Specification for Slag
SECTION 32 13 13.06 Page 2
Cement for Use in Concrete and Mortars
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1240 (2020) Standard Specification for Silica Fume Used in Cementitious Mixtures
ASTM C1260 (2021) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C1542/C1542M (2019) Standard Test Method for Measuring Length of Concrete Cores
ASTM C1549 (2016; R 2022) Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a Portable Solar Reflectometer
ASTM C1567 (2022) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2022) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM D1751 (2018) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction
ASTM D2995 (1999; R 2009) Determining Application Rate of Bituminous Distributors
ASTM E1274 (2018) Standard Test Method for Measuring Pavement Roughness Using a Profilograph
NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)
NRMCA QC 3 (2015) Quality Control Manual: Section 3, Plant Certifications Checklist:
Certification of Ready Mixed Concrete Production Facilities
SECTION 32 13 13.06 Page 3
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval and for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Curing Materials
Reinforcement
Epoxy Resin
Cementitious Materials ; G
Aggregate Materials ; G
Albedo
Dowel Bars
Expansion Joint Filler
SD-04 Samples
Test Section ; G
SD-05 Design Data
Mix Design Report ; G
SD-06 Test Reports
Concrete Slump Tests
Concrete Uniformity
Flexural Strength
Air Content
SD-07 Certificates
Batch Tickets
NRMCA Certificate Of Conformance
SD-08 Manufacturer's Instructions
Diamond Grinding Plan
SECTION 32 13 13.06 Page 4
1.4 QUALITY CONTROL
1.4.1 NRMCA Certificate of Conformance
Submit NRMCA Certificate of Conformance that conforms to the requirements of NRMCA QC 3 including provisions addressing:
1. Material Storage and Handling
2. Batching Equipment
3. Central Mixer
4. Ticketing System
5. Delivery System
1.4.2 Qualifications
1.4.2.1 Laboratory Accreditation
Perform sampling and testing using an approved commercial testing laboratory or on-site facilities that are accredited in accordance with ASTM C1077. Do not start work requiring testing until the facilities have been inspected and approved. The Government will inspect all laboratories requiring validation for equipment and test procedures prior to the start of any concreting operations for conformance to ASTM C1077.
Schedule and provide payment for laboratory inspections. Additional payment or a time extension due to failure to acquire the required laboratory validation is not allowed. Maintain this certification for the duration of the project.
1.4.2.2 Field Technicians
Provide field technicians meeting one of the following criteria:
a. Have at least one National Ready Mixed Concrete Association (NRMCA) certified concrete craftsman and at least one American Concrete Institute (ACI) Flatwork Finisher Certified craftsman on site, overseeing each placement crew during all concrete placement.
b. Have no less than three NRMCA certified concrete installers and at least two American Concrete Institute (ACI) Flatwork Finisher Certified installers on site working as members of each placement crew during all concrete placement.
1.4.3 Batch Tickets
Submit batch tickets for each load of ready-mixed concrete in accordance with ASTM C94/C94M.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver concrete paving in accordance with ASTM C94/C94M.
SECTION 32 13 13.06 Page 5
1.6 ACCEPTANCE
1.6.1 Tolerances
Acceptance of Portland cement concrete pavement is based on compliance with the tolerances presented in Table 1. Remove and replace concrete pavement represented by the failing tests or submit repair plan for approval.
Table 1
Measurement Tolerance
PLASTIC CONCRETE
Slump plus 0, minus 1.5 inches
Air Content plus/minus 1.5 percent
Flexural Strength No individual specimen less than 100 psi below specified strength.
HARDENED CONCRETE
Grade plus/minus 0.05 feet from plan
Smoothness No abrupt change exceeding 1/8 inch
Straightedge Not more than 1/8 in for roads.
Not more than 1/4 in for open storage areas.
Profilograph Not more than 9 inches/mile
Thickness minus 3/4 inch for pavement equal to/greater than 8 inches thick minus 1/2 inch for pavement less than 8 inches thick.
Edge Slump 85 percent less than 1/4 inch and 100 percent less than 3/8 inch .
1.6.2 Test Section
Construct a minimum 400 square feet test section to demonstrate typical joints, surface finish, texture, color, thickness, and standard of workmanship using the mixture proportions, materials, and equipment as proposed for the project. Test in accordance with requirements in FIELD
QUALITY CONTROL.
When a test section does not meet one or more of the tolerances in Table 1, remove and reconstruct the test section. If the test section is acceptable, it may be incorporated into the project.
SECTION 32 13 13.06 Page 6
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Cementitious Materials
Provide cementitious materials in concrete mix with 20 to 50 percent non-portland cement pozzolanic materials or slag by weight.
2.1.1.1 Portland Cement
Conforming to ASTM C150/C150M, Type I or II.
2.1.1.2 Blended Cement
Provide blended cement conforming to ASTM C595/C595M, Type IP or IS, including the optional requirement for mortar expansion and sulfate soundness. Provide pozzolan added to the Type IP blend consisting of ASTM C618 Class F or Class N and that is interground with the cement clinker. Include in written statement from the manufacturer that the amount of pozzolan in the finished cement does not vary more than plus or minus 5 mass percent of the finished cement from lot to lot or within a lot. The percentage and type of mineral admixture used in the blend are not allowed to change from that submitted for the aggregate evaluation and mixture proportioning. The requirements of paragraph Supplementary Cementitious Materials (SCM) Content do not apply to the SCM content of blended cement.
2.1.1.3 Fly Ash and Pozzolan
Conforming to ASTM C618, Type F, or N, with a loss on ignition not exceeding 6 percent. Include test results in accordance with ASTM C618.
2.1.1.4 Ultra Fine Fly Ash and Ultra Fine Pozzolan
Ultra Fine Fly Ash (UFFA) and Ultra Fine Pozzolan (UFP) conforming to ASTM C618, Class F or N, and the following additional requirements:
a. The strength activity index at 28 days of age at least 95 percent of the control specimens.
b. The average particle size not exceeding 6 microns.
c. Loss on ignition not exceeding 6 percent.
2.1.1.5 Silica Fume
Provide silica fume that conforms to ASTM C1240, including the optional limits on reactivity with cement alkalis. Provide silica fume as a dry, densified material or as a slurry. Provide the services of a manufacturer's technical representative, experienced in mixing, proportioning, placement procedures, and curing of concrete containing silica fume, at no expense to the Government. This representative is required to be present on the project prior to and during at least the first 4 days of concrete production and placement using silica fume.
2.1.1.6 Slag
Conforming to ASTM C989/C989M, Slag Cement (formerly Ground Granulated
SECTION 32 13 13.06 Page 7
Blast Furnace Slag) Grade 100 or 120. Include test results in accordance with ASTM C989/C989M.
2.1.1.7 Supplementary Cementitious Materials (SCM) Content
Include one of the SCMs listed in Table 2 within the range specified therein, whether or not the aggregates are found to be reactive in accordance with the paragraph Alkali Reactivity Test.
TABLE 2
SUPPLEMENTARY CEMENTITIOUS MATERIALS CONTENT
Supplementary Cementitious Material Minimum Content (percent)
Maximum Content (percent)
Class N Pozzolan and Class F Fly Ash
SiO2 + Al2O3 + Fe2O3 greater than 70 percent 25 35
SiO2 + A12O3 + Fe2O3 greater than 80 percent 20 35
SiO2 + A12O3 + Fe2O3 greater than 90 percent 15 35
UFFA and UFP 7 16
GGBF Slag 40 50
Silica Fume 7 10
2.1.2 Water
Water conforming to ASTM C1602/C1602M .
2.1.3 Aggregate
2.1.3.1 Satisfactory Materials
WYDOT Grading W, crushed aggregate materials . Materials shall be granite in type crushed with 95% fractured faces (Alluvial Material will NOT be permitted" and shall be free of organic matter, oil, alkali, or other deleterious materials. This material shall be uniformly graded and shall conform to the following:
Sieve Size Percent Finer
1 1/2" 100
1" 90-100
1/2" 60-65
#4 45-65
#8 33-53
SECTION 32 13 13.06 Page 8
Sieve Size Percent Finer
#200 3-12
NOTE: Liquid Limit < 25; PI < 3
2.1.3.2 Durability
Evaluate and test all fine and coarse aggregates to be used in all concrete for durability in accordance with ASTM C88. Provide fine and coarse aggregates with a maximum of 18 percent loss when subjected to 5 cycles using Magnesium Sulfate or a maximum of 12 percent loss when subjected to 5 cycles of Sodium Sulfate.
2.1.3.3 Alkali Reactivity Test
Evaluate and test fine and coarse aggregates to be used in all concrete for alkali-aggregate reactivity. Test all size groups and sources proposed for use.
a. Evaluate the fine and coarse aggregates separately, using ASTM C1260.
Reject individual aggregates with test results that indicate an expansion of greater than 0.08 percent after 28 days of immersion in 1N NaOH solution, or perform additional testing as follows: utilize the proposed low alkali portland cement, blended cement, or SCM in combination with each individual aggregate. Test in accordance with ASTM C1567. Determine the quantity that meets all the requirements of these specifications and that lowers the expansion equal to or less than 0.08 percent after 28 days of immersion in a 1N NaOH solution.
Base the mixture proportioning on the highest percentage of SCM required to mitigate ASR-reactivity.
b. If any of the above options does not lower the expansion to less than
0.08 percent after 28 days of immersion in a 1N NaOH solution, reject the aggregate(s) and submit new aggregate sources for retesting.
Submit the results of testing for evaluation and acceptance.
2.1.3.4 Fine Aggregates
Conforming to the quality and gradation of ASTM C33/C33M.
2.1.3.5 Coarse Aggregates
Coarse aggregate consisting of crushed or uncrushed gravel, crushed stone, or a combination thereof. Provide aggregates, as delivered to the mixers, consisting of clean, hard, uncoated particles. Wash coarse aggregate sufficient to remove dust and other coatings. Provide fine aggregate consisting of natural sand, manufactured sand, or a combination of the two, and composed of clean, hard, durable particles. Provide both coarse and fine aggregates meeting the requirements of ASTM C33/C33M.
a. Gradation: Provide coarse aggregate with a nominal maximum size of 1.5 inches . Grade and provide the individual aggregates in two or more size groups meeting the individual grading requirements of ASTM C33/C33M, Size No. 4 ( 1.5 to 0.75 inch ) and Size No. 67 ( 0.75 inch to No. 4 ).
b. Quality: Conforming to ASTM C33/C33M, Class 4M or 4S.
SECTION 32 13 13.06 Page 9
2.1.4 Chemical Admixtures
2.1.4.1 Water Reducing Admixtures
Provide admixture conforming to ASTM C494/C494M: Type A, water reducing;
Type B, retarding; Type C, accelerating; Type D, water-reducing and retarding; and Type E, water-reducing and accelerating admixture. Do not use calcium chloride admixtures. ASTM C494/C494M Type S specific performance admixtures and ASTM C1017/C1017M flowable admixtures are not allowed.
2.1.4.2 Air Entraining Admixture
Conforming to ASTM C260/C260M: Air-entraining.
2.1.5 Reinforcement
2.1.5.1 Dowel Bars
Dowel bars conforming to ASTM A615/A615M , Grade 60 for plain billet-steel bars of the size and length indicated. Remove all burrs and projections from the bars. Epoxy coat in accordance with ASTM A775/A775M .
2.1.5.2 Tie Bars
Billet or axle steel deformed bars conforming to ASTM A615/A615M or ASTM A966/A966M Grade 60 . Epoxy coat in accordance with ASTM A775/A775M .
2.1.5.3 Reinforcement
Deformed steel bar mats conforming to ASTM A184/A184M . Bar reinforcement conforming to ASTM A615/A615M , Grade 60 . Epoxy coat in accordance with
ASTM A775/A775M .
2.1.6 Curing Materials
Provide curing materials consisting of:
2.1.6.1 White-Burlap-Polyethylene Sheet
Conforming to ASTM C171, 0.004 inch thick white opaque polyethylene bonded to 10 oz/linear yard (40 inch) wide burlap.
2.1.6.2 Liquid Membrane-Forming Compound
Conforming to ASTM C309, white pigmented, Type 2, Class B, free of paraffin or petroleum.
2.1.6.3 Liquid Chemical Sealer-Hardener Compound
Compound consisting of magnesium fluosilicate which when mixed with water seals and hardens the surface of the concrete. Do not use on exterior slabs exposed to freezing conditions.
2.1.7 Joint Fillers and Sealants
Provide as specified in Section 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT and 32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT. Match
SECTION 32 13 13.06 Page 10 new joints with existing alignment.
2.1.8 Biodegradable Form Release Agent
Provide form release agent that is colorless and biodegradable. Provide product that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
Provide form release agent with a minimum of 87 percent biobased material and does not contain diesel fuel, petroleum-based lubricating oils, waxes, or kerosene.
2.1.9 Epoxy Resin
Provide epoxy-resin materials that consist of two-component materials conforming to the requirements of ASTM C881/C881M, Class as appropriate for each application temperature to be encountered, except that in addition, the materials meet the following requirements:
a. Type IV, Grade 3, for use for embedding dowels and anchor bolts.
b. Type III, Grade as approved, for use as patching materials for complete filling of spalls and other voids and for use in preparing epoxy resin mortar.
c. Type IV, Grade 1, for use for injecting cracks.
d. Type V, Grade as approved, for bonding freshly mixed portland cement concrete or mortar or freshly mixed epoxy resin concrete or mortar to hardened concrete.
2.1.10 Joint Materials
2.1.10.1 Expansion Joint Materials
Provide preformed expansion joint filler material conforming to ASTM D1751 or ASTM D1752 Type II. Provide expansion joint filler that is 3/4 inch thick, unless otherwise indicated, and provided in a single full depth piece.
2.1.10.2 Slip Joint Material
Provide slip joint material that is 1/4 inch thick expansion joint filler, unless otherwise indicated, conforming to paragraph EXPANSION JOINT
MATERIAL.
2.2 MIX DESIGN
Provide mix design compliant with city of Cheyenne Construction Specifications Section 03320 PORTLAND CEMENT CONCRETE PAVEMENT or as follows. Proportion concrete mix in accordance with ACI 211.1 except as modified herein.
2.2.1 Specified Concrete Properties
2.2.1.1 Flexural Strength
Provide concrete with a minimum flexural strength of 550 psi at 28 days of age.
SECTION 32 13 13.06 Page 11
2.2.1.2 Air Entrainment
Provide an entrained air content of 6.0 percent.
2.2.1.3 Slump
For fixed form and hand placement, provide a maximum slump of 4 inches per geotech report . For slipformed pavement, at the start of the project, select a maximum allowable slump which will produce in-place pavement meeting the specified tolerances for control of edge slump. The selected slump is applicable to both pilot and fill-in lanes.
2.2.1.4 Water/Cementitious Materials Ratio
Maximum allowable water-cementitious material ratio is 0.45. The water-cementitious material ratio is based on absolute volume equivalency, where the ratio is determined using the weight of cement for a cement only mix, or using the total volume of cement plus pozzolan converted to an equivalent weight of cement by the absolute volume equivalency method described in ACI 211.1 .
2.2.1.5 Albedo
Provide an Albedo with a minimum initial Solar Reflectance of at least
0.33 as tested in accordance with ASTM C1549.
2.2.2 Mix Design Report
Perform trial design batches, mixture proportioning studies, testing, and include test results demonstrating that the proposed mixture proportions produce concrete of the qualities indicated. An existing mix design may be submitted if developed within the previous 12 months. Submit test results in a mix design report to include:
a. Coarse and fine aggregate gradations and plots.
b. Coarse and fine aggregate quality test results, include deleterious materials and ASR testing.
c. Mill certificates for cement and supplemental cementitious materials.
d. Certified test results for all proposed admixtures.
e. Specified flexural strength, slump, and air content.
f. Recommended proportions and volumes for proposed mixture and each of three trial water-cementitious materials ratios.
g. Individual beam breaks.
h. Flexural strength summaries and plots.
i. Historical record of test results, documenting production standard deviation (if available).
j. Narrative discussing methodology on how the mix design was developed.
SECTION 32 13 13.06 Page 12
2.2.3 Mix Verification
Mix verification tests may be performed by the Government. Provide quantities of cementitious materials, aggregates and admixtures as requested.
2.3 EQUIPMENT
2.3.1 Batching and Mixing
Provide stationary mixers or truck mixers. Provide a batch plant conforming to ASTM C94/C94M and as specified. Do not weigh water or measure cumulatively with another ingredient. Batch all concrete materials in accordance with ASTM C94/C94M requirements. Verify batching, mixers, mixing time, permitted reduction of mixing time, and concrete uniformity in accordance with the requirements of ASTM C94/C94M, and document in the initial weekly QC Report. Do not use truck mixers for mixing slipformed concrete. Provide only truck mixers designed for mixing or transporting paving concrete with extra large blading and rear opening specifically for low-slump paving concrete and conforming to the requirements of
ASTM C94/C94M.
2.3.2 Transporting Equipment
Provide transporting equipment in conformance with ASTM C94/C94M and as specified herein. Do not permit bottom-dump trucks for delivery of concrete.
2.3.3 Delivery Equipment
When concrete transport equipment cannot operate on the paving lane, provide side-delivery transport equipment consisting of self-propelled moving conveyors to deliver concrete from the transport equipment and discharge it in front of the paver. Do not permit front-end loaders, dozers, or similar equipment to distribute the concrete.
2.3.4 Paver-Finisher
Provide a heavy-duty, self-propelled paver-finisher machine designed specifically for paving and finishing high quality pavement and capable of spreading, consolidating, and shaping the plastic concrete to the desired cross section in one pass. Equip the paver-finisher with a full width "knock-down" auger, capable of operating in both directions, which will evenly spread the fresh concrete in front of the screed or extrusion plate. Gang-mount immersion vibrators at the front of the paver on a frame equipped with suitable controls so that all vibrators can be operated at any desired depth within the slab or completely withdrawn from the concrete. Automatically control the vibrators so they will be immediately stopped as forward motion of the paver ceases. Space the immersion vibrators across the paving lane as necessary to properly consolidate the concrete, but limit the clear distance between vibrators not to exceed 30 inches , and the outside vibrators not to exceed 12 inches from the edge of the lane. Vibrators may be pneumatic, gas driven, or electric, and operated at frequencies within the concrete between 6,000 and 7,000 vibrations per minute, with an amplitude of vibration such that noticeable vibrations occur at 1.5 foot radius when the vibrator is inserted in the concrete to the depth specified. Equip the paver-finisher with a transversely oscillating screed or an extrusion plate to shape, compact, and smooth the surface.
SECTION 32 13 13.06 Page 13
2.3.4.1 Paver-Finisher with Fixed Forms
Equip the paver-finisher with wheels designed to ride the forms, keep it aligned with the forms, and to prevent deformation of the forms.
2.3.4.2 Slipform Paver-Finisher
Provide a track-mounted slipform paver-finisher with automatic controls and padded tracks. Electronically reference horizontal alignment to a taut wire guideline. Electronically reference vertical alignment on both sides of the paver to a taut wire guideline, to an approved laser control system, or to a ski operating on a completed lane. Do not control from a slope-adjustment control or from the underlying material.
2.3.4.3 Other Types of Finishing Equipment
Heavy duty vibratory truss screeds may be approved for use if successfully demonstrated on the test section to consolidate the slab full depth and without segregation. Clary screeds, rotating tube floats, or laser screeds will not be allowed on the project. Provide hand floats that are not less than 12 feet long and 6 inches wide and stiffened to prevent flexing and warping.
2.3.4.4 Work Bridge
Provide a self-propelled work bridge capable of spanning the paving lane and supporting the workmen without excessive deflection.
2.3.5 Texturing Equipment
Provide texturing equipment as specified below.
2.3.5.1 Fabric Drag
Clean, reasonably new burlap or Artificial turf fabricated of a plastic material measuring from 3 to 10 feet long, 2 feet wider than the width of the pavement, and securely attached to a separate wheel mounted frame spanning the paving lane or to one of the other similar pieces of equipment. Select dimension of burlap drag so that at least 3 feet of the material is in contact with the pavement.
2.3.5.2 Deep Texturing Equipment
Provide texturing equipment consisting of a stiff bristled broom , a comb with spring wire tines and spring strips which will produce true, even grooves. Mount this drag in a wheeled frame spanning the paving lane and constructed to mechanically pull the drag in a straight line across the paving lane perpendicular to the centerline.
2.3.6 Curing Equipment
Provide equipment for applying membrane-forming curing compound mounted on a self-propelled frame that spans the paving lane. Constantly agitate the curing compound reservoir mechanically (not air) during operation and provide a means for completely draining the reservoir. Provide a spraying system that consists of a mechanically powered pump which maintains constant pressure during operation, an operable pressure gauge, and either a series of spray nozzles evenly spaced across the lane to provide
SECTION 32 13 13.06 Page 14 uniformly overlapping coverage or a single spray nozzle which is mounted on a carriage which automatically traverses the lane width at a speed correlated with the forward movement of the overall frame. Protect all spray nozzles with wind screens. Calibrate the spraying system in accordance with ASTM D2995, Method A, for the rate of application required in subpart CURING AND PROTECTION. Provide hand-operated sprayers powered by compressed air supplied by a mechanical air compressor. Immediately replace curing equipment if it fails to apply an even coating of compound at the specified rate.
2.3.7 Sawing Equipment
Provide equipment for sawing joints and for other similar sawing of concrete consisting of standard diamond-type concrete saws mounted on a wheeled chassis which can be easily guided to follow the required alignment. Provide diamond tipped blades. If demonstrated to operate properly, abrasive blades may be used. Provide spares as required to maintain the required sawing rate. Early-entry saws may be used, subject to demonstration and approval. No change to the initial sawcut depth is permitted.
2.3.8 Straightedge
Furnish one 12 foot straightedge constructed of aluminum or magnesium alloy, having blades of box or box-girder cross section with flat bottom, adequately reinforced to insure rigidity and accuracy. Provide handles for operation on the pavement.
PART 3 EXECUTION
3.1 PREPARATION FOR PAVING
3.1.1 Weather Limitations
When windy conditions during paving appear probable, have equipment and material at the paving site to provide windbreaks, shading, fogging, or other action to prevent plastic shrinkage cracking or other damaging drying of the concrete.
3.1.1.1 Inclement Weather
Do not commence placing operations when heavy rain or other damaging weather conditions appear imminent. At all times when placing concrete, maintain on-site sufficient waterproof cover and means to rapidly place it over all unhardened concrete or concrete that might be damaged by rain.
Suspend placement of concrete whenever rain, high winds, or other damaging weather commences to damage the surface or texture of the placed unhardened concrete, washes cement out of the concrete, or changes the water content of the surface concrete. Immediately cover and protect all unhardened concrete from the rain or other damaging weather. Completely remove and replace any slab damaged by rain or other weather full depth, by full slab width, to the nearest original joint.
3.1.1.2 Hot Weather
Maintain required concrete temperature in accordance with ACI 305R to prevent evaporation rate from exceeding 0.2 pound of water per square foot of exposed concrete per hour. Cool ingredients before mixing, place concrete during cooler night time hours, or use other suitable means to
SECTION 32 13 13.06 Page 15 control concrete temperature and prevent rapid drying of newly placed concrete. Water is not allowed to be added after the initial introduction of mixing water except, when on arrival at the job site, the slump is less than specified and the water-cement ratio is less than that given as a maximum in the approved mixture. Additional water may be added to bring the slump within the specified range provided the approved water-cement ratio is not exceeded. Inject water into the head of the mixer (end opposite the discharge opening) drum under pressure, and turn the drum or blades a minimum of 30 additional revolutions at mixing speed. The addition of water to the batch at any later time is not allowed. After placement, use fog spray, apply monomolecular film, or use other suitable means to reduce the evaporation rate. Start curing when surface of fresh concrete is sufficiently hard to permit curing without damage. Cool underlying material by sprinkling lightly with water before placing concrete. Follow practices found in ACI 305R .
3.1.1.3 Prevention of Plastic Shrinkage Cracking
During weather with low humidity, and particularly with high temperature and appreciable wind, develop and institute measures to prevent plastic shrinkage cracks from developing. If plastic shrinkage cracking occurs, halt further placement of concrete until protective measures are in place to prevent further cracking. Periods of high potential for plastic shrinkage cracking can be anticipated by use of ACI 305R . In addition to the protective measures specified in the previous paragraph, the concrete placement may be further protected by erecting shades and windbreaks and by applying fog sprays of water, the addition of monomolecular films, or wet covering. Apply monomolecular films after finishing is complete, do not use in the finishing process. Immediately commence curing procedures when such water treatment is stopped.
3.1.1.4 Cold Weather
Do not place concrete when ambient temperature is below 40 degrees F or when concrete is likely to be subjected to freezing temperatures within 24 hours. When authorized, when concrete is likely to be subjected to freezing within 24 hours after placing, heat concrete materials so that temperature of concrete when deposited is between 65 and 80 degrees F .
Methods of heating materials are subject to approval. Do not heat mixing water above 165 degrees F . Remove lumps of frozen material and ice from aggregates before placing aggregates in mixer. Follow practices found in
ACI 306R .
3.1.2 Conditioning of Underlying Material
Verify the underlying material, upon which concrete is to be placed is clean, damp, and free from debris, waste concrete or cement, frost, ice, and standing or running water. Prior to setting forms or placement of concrete, verify the underlying material is well drained and has been satisfactorily graded by string-line controlled, automated, trimming machine and uniformly compacted in accordance with the applicable Section of these specifications. Test the surface of the underlying material to crown, elevation, and density in advance of setting forms or of concrete placement using slip-form techniques. Trim high areas to proper elevation. Fill and compact low areas to a condition similar to that of surrounding grade, or fill with concrete monolithically with the pavement. Low areas filled with concrete are not to be cored for thickness to avoid biasing the average thickness used for evaluation and payment adjustment. Rework and compact any underlying material disturbed
SECTION 32 13 13.06 Page 16 by construction operations to specified density immediately in front of the paver. If a slipform paver is used, continue the same underlying material under the paving lane beyond the edge of the lane a sufficient distance that is thoroughly compacted and true to grade to provide a suitable trackline for the slipform paver and firm support for the edge of the paving lane.
3.1.3 Forms
Use steel forms, except that wood forms may be used for curves having a radius of 150 feet or less, and for fillets. Forms may be built up with metal or wood, added only to the base, to provide an increase in depth of not more than 25 percent. Provide forms with the base width not less than eight-tenths of the vertical height of the form, except that for forms 8 inches or less in vertical height, provide forms with a base width not less than the vertical height of the form. Provide wood forms adequate in strength and rigidly braced for curves and fillets. Set forms on firm material cut true to grade so that each form section when placed will be firmly in contact with the underlying layer for its entire base. Do not set forms on blocks or on built-up spots of underlying material. Set and secure forms in place with stakes or by other approved methods for overlay pavements and for other locations where forms are set on existing pavements. Carefully drill holes in existing pavements for form stakes without cracking or spalling the existing pavement. Prior to setting forms for paving operations, demonstrate the proposed form setting procedures at an approved location and do not proceed further until the proposed method is approved. Before placing the concrete, coat the contact surfaces of forms except existing pavement sections where bonding is required, with a non-staining mineral oil, non-staining form coating compound, biodegradable form release agent, or two coats of nitro-cellulose lacquer. When using existing pavement as a form, clean existing concrete and then coat with asphalt emulsion bondbreaker before concrete is placed. Check and correct grade elevations and alignment of the forms immediately before placing concrete.
3.1.4 Reinforcement
3.1.4.1 Dowel Bars
Install dowels with horizontal and vertical alignment plus or minus 1 inch .
Except as otherwise specified, maintain location of dowels within a skew alignment of 1/4 inch over 1 foot length . Reject coatings which are perforated, cracked or otherwise damaged. While handling avoid scuffing or gouging of the coatings. Omit Dowels and tie bars when the center of the dowel and tie bar is located within a horizontal distance from an intersecting joint equal to or less than one-fourth of the slab thickness. Maintain dowels in position during concrete placement and curing. Before concrete placement, thoroughly grease the entire length of each dowel secured in a dowel basket or fixed form.
3.1.4.2 Tie Bars
Install bars, accurately aligned horizontally and vertically, and to the tolerances shown on the drawings, at indicated locations. For slipform construction, insert bent tie bars by hand or other approved means.
3.1.4.3 Setting Slab Reinforcement
Position reinforcement on suitable chairs prior to concrete placement. At
SECTION 32 13 13.06 Page 17 expansion, contraction and construction joints, place the reinforcement as indicated. Clean reinforcement free of mud, oil, scale or other foreign materials. Place reinforcement accurately and wire securely. Lap splices 12 inches minimum. Maintain the bar spacing from ends and sides of slabs and joints as indicated. If reinforcing for Continuously Reinforced Concrete Pavement (CRCP) is required, submit the entire operating procedure and proposed equipment for approval.
3.2 MEASURING, MIXING, CONVEYING, AND PLACING CONCRETE
3.2.1 Measuring
Conform to ASTM C94/C94M.
3.2.2 Mixing
Conform to ASTM C94/C94M, except as modified herein. Begin mixing within 30 minutes after cement has been added to aggregates. When the air temperature is greater than 85 degrees F , place concrete within 60 minutes. With approval, a hydration stabilizer admixture meeting the requirements of ASTM C494/C494M Type D, may be used to extend the placement time to 90 minutes. Additional water may be added to bring slump within required limits as specified in ASTM C94/C94M, provided that the specified water-cement ratio is not exceeded.
3.2.3 Conveying
Conform to ASTM C94/C94M.
3.2.4 Placing
Do not exceed a free vertical drop of 5 feet from the point of discharge.
Deposit concrete either directly from the transporting equipment or by conveyor on to the pre-wetted subgrade or subbase, unless otherwise specified. Deposit the concrete between the forms to an approximately uniform height. Place concrete continuously at a uniform rate, without damage to the grade and without unscheduled stops except for equipment failure or other emergencies. If an unscheduled stop occurs within 10 feet of a previously placed expansion joint, remove concrete back to joint, repair any damage to grade, install a construction joint and continue placing concrete only after cause of the stop has been corrected.
3.3 PAVING
Construct pavement with paving and finishing equipment utilizing fixed forms or slipforms.
3.3.1 Paving Plan
Submit for approval a paving plan identifying the following items:
a. A description of the placing and protection methods proposed when concrete is to be placed in or exposed to hot, cold, or rainy weather conditions.
b. A detailed paving sequence plan and proposed paving pattern showing all planned construction joints.
c. Plan and equipment proposed to control alignment of formed or sawn
SECTION 32 13 13.06 Page 18 joints within the specified tolerances.
3.3.2 Required Results
Operate the paver-finisher to produce a thoroughly consolidated slab throughout, true to line and grade within specified tolerances. Adjust the paver-finishing operation to produce a surface finish free of irregularities, tears, voids of any kind, and other discontinuities, with only a minimum of paste at the surface. Do not permit multiple passes of the paver-finisher. Produce a finished surface requiring no hand finishing, other than the use of cutting straightedges, except in very infrequent instances. Do not apply water, other than true fog sprays (mist), to the concrete surface during paving and finishing.
3.3.3 Operation
When the paver is operated between or adjacent to previously constructed pavement (fill-in lanes), make provisions to prevent damage to the previously constructed pavement, including keeping the existing pavement surface free of debris, and placing rubber mats beneath the paver tracks.
Operate transversely oscillating screeds and extrusion plates to overlap the existing pavement the minimum possible, but in no case more than 8 inches .
3.3.4 Consolidation
Immediately after spreading concrete, consolidate full depth with internal type vibrating equipment along the boundaries of all slabs regardless of slab thickness, and interior of all concrete slabs. For pavements less than 10 inches thick, operate vibrators at mid-depth parallel with or at a slight angle to the base course. For thicker pavements, angle vibrators toward the vertical, with vibrator tip preferably about 2 inches above the base course, and top of vibrator a few inches below pavement surface.
Automatically control the vibrators or tamping units in front of the paver so that they stop immediately as forward motion ceases. Limit duration of vibration to that necessary to produce consolidation of concrete. Do not permit excessive vibration. Vibrate concrete in small, odd-shaped slabs or in locations inaccessible to the paver mounted vibration equipment with a hand-operated immersion vibrator operated from a bridge spanning the area. Do not operate vibrators at one location for more than 15 seconds.
Do not use vibrators to transport or spread the concrete.
3.3.5 Fixed Form Paving
Spread and strike off concrete with with the paver. Shape the concrete to the specified and indicated cross section in one pass, and finish the surface and edges so that only a very minimum amount of hand finishing is required. Use single spud hand vibrators to consolidate the concrete adjacent to fixed forms as required to achieve a void-free formed edge.
Do not allow vibrators to contact reinforcement, forms, or the grade during vibration.
3.3.6 Slipform Paving
Shape the concrete to the specified and indicated cross section in one pass, and finish the surface and edges so that only a very minimum amount of hand finishing is required. Do not install dowels by dowel inserters attached to the paver or by any other means of inserting the dowels into the plastic concrete. If a keyway is required, install a 26 gauge thick
SECTION 32 13 13.06 Page 19 metal keyway liner as the keyway is extruded. Protect the keyway liner to remain in place and become part of the joint.
3.4 JOINTS
3.4.1 Contraction Joints
Hold dowels and tie bars in longitudinal and transverse contraction joints within the paving lane securely in place by means of rigid metal basket assemblies. Weld the dowels and tie bars to the assembly or hold firmly by mechanical locking arrangements that will prevent them from becoming distorted during paving operations. Anchor the basket assemblies securely in the proper location.
3.4.2 Construction Joints - Fixed Form Paving
Install dowels and tie bars by the bonded-in-place method, supported by means of devices fastened to the forms. Do not permit installation by removing and replacing in preformed holes.
3.4.3 Dowels Installed In Hardened Concrete
Install by bonding the dowels into holes drilled into the hardened concrete. Drill holes into the hardened concrete approximately 1/8 inch greater in diameter than the dowels. Bond the dowels in the drilled holes using epoxy resin injected at the back of the hole before installing the dowel and extruded to the collar during insertion of the dowel so as to completely fill the void around the dowel. Application by buttering the dowel is not permitted. Hold the dowels in alignment at the collar of the hole, after insertion and before the epoxy resin hardens, by means of a suitable metal or plastic collar fitted around the dowel. Check the vertical alignment of the dowels by placing the straightedge on the surface of the pavement over the top of the dowel and measuring the vertical distance between the straightedge and the beginning and ending point of the exposed part of the dowel. Where tie bars are required in longitudinal construction joints of slipform pavement, install bent tie bars at the paver, in front of the transverse screed or extrusion plate.
If tie bars are required, construct a standard keyway and install the bent tie bars into the plastic concrete through a 26 gauge thick metal keyway liner. Do not install tie bars in preformed holes. Protect the keyway liner and maintain in place and become part of the joint. Before placement of the adjoining paving lane, straighten the tie bars, without spalling the concrete around the bar.
3.5 FINISHING CONCRETE
Start finishing operations immediately after placement of concrete. Use finishing machine, except hand finishing may be used in emergencies and for concrete slabs in inaccessible locations or of such shapes or sizes that machine finishing is impracticable. Immediately halt any operations which produce more than 1/8 inch of mortar-rich surface (defined as deficient in plus U.S. No. 4 sieve size aggregate) and modify the equipment, mixture, or procedures. Finish pavement surface on both sides of a joint to the same grade. Finish formed joints from a securely supported transverse bridge. Provide hand finishing equipment for use at all times.
SECTION 32 13 13.06 Page 20
3.5.1 Machine Finishing
Strike off and screed concrete to the required slope and cross-section by a power-driven transverse finishing machine. A transverse rotating tube or pipe is not permitted. Maintain elevation of concrete such that, when consolidated and finished, pavement surface will be adequately consolidated and at the required grade. Equip finishing machine with a screed which is readily and accurately adjustable for changes in pavement slope and compensation for wear and other causes. Do not permit excessive operation over an area, which will result in an excess of mortar and water being brought to the surface.
3.5.1.1 Equipment Operation
Maintain the travel of machine on the forms without lifting, wobbling, or other variation of the machine which tend to affect the precision of concrete finish. Keep the tops of the forms clean by a device attached to the machine. Maintain a uniform ridge of concrete ahead of the front screed for its entire length.
3.5.1.2 Joint Finish
Before concrete is hardened, correct edge slump of pavement, exclusive of edge rounding, in excess of 0.25 inches . Finish concrete surface on each side of construction joints to the same plane, and correct deviations before newly placed concrete has hardened.
3.5.1.3 Hand Finishing
Strike-off and screed surface of concrete to elevations slightly above finish grade so that when concrete is consolidated and finished, the pavement surface is at the indicated elevation. Vibrate entire surface until required compaction and reduction of surface voids is secured with a strike-off template. After initial finishing, further smooth and consolidate concrete by means of hand-operated longitudinal floats.
3.5.2 Texturing
Before the surface sheen has disappeared and before the concrete hardens, provide a texture to the surface of the pavement as described herein.
After curing is complete, thoroughly broom all textured surfaces to remove all debris. Finish the concrete in areas of recesses for tie-down anchors, lighting fixtures, and other outlets in the pavement to provide a surface of the same texture as the surrounding area.
3.5.2.1 Burlap Drag Finish
Before concrete becomes non-plastic, finish the surface of the slab by dragging a strip of clean, wet burlap on the surface. Drag the surface so as to produce a finished surface with a fine granular or sandy texture without leaving disfiguring marks. Keep the burlap clean and saturated during use.
3.5.2.2 Brooming
Finish the surface of the slab by brooming the surface with a new wire broom at least 18 inches wide. Gently pull the broom over the surface of the pavement from edge to edge just before the concrete becomes non-plastic. Slightly overlap adjacent strokes of the broom. Broom
SECTION 32 13 13.06 Page 21 perpendicular to centerline of pavement so that corrugations produced will be uniform in character and width, and not more than 1/16 inch in depth.
Maintain broomed surface free from porous spots, irregularities, depressions, and small pockets or rough spots such as may be caused by accidentally disturbing particles of coarse aggregate embedded near the surface.
3.5.2.3 Wire-Comb Texturing
Apply surface texture transverse to the pavement center line using a mechanical wire comb drag capable of traversing the full width of the pavement in a single pass at a uniform speed and with a uniform pressure.
Overlap successive passes of the comb the minimum necessary to obtain a continuous and uniformly textured surface, with scores 1/16 to 3/16 inch deep, 1/16 to 1/8 inch wide, and spaced 3/8 inch apart.
3.5.2.4 Surface Grooving
Groove the areas indicated on the drawings with a spring tine drag producing individual grooves 1/4 inch deep and 1/4 inch wide at a spacing between groove centerlines of 2 inches . Cut these grooves perpendicular to the centerline. Before grooving begins, allow the concrete to stiffen sufficiently to prevent dislodging of aggregate. Do not cut grooves within 6 inches of a transverse joint or crack.
3.5.3 Edging
At the time the concrete has attained a degree of hardness suitable for edging, carefully finish slab edges, including edges at formed joints, with an edge having a maximum radius of 1/8 inch . When brooming is specified for the final surface finish, edge transverse joints before starting brooming, then operate broom to obliterate as much as possible the mark left by the edging tool without disturbing the rounded corner left by the edger. Clean by removing loose fragments and soupy mortar from corners or edges of slabs which have crumbled and areas which lack sufficient mortar for proper finishing. Refill voids solidly with a mixture of suitable proportions and consistency and refinish. Remove unnecessary tool marks and edges. Smooth remaining edges true to line.
3.6 CURING AND PROTECTION
Protect concrete adequately from injurious action by sun, rain, flowing water, frost, mechanical injury, tire marks and oil stains, and do not allow it to dry out from the time it is placed until the expiration of the minimum curing periods specified herein.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .